7-Addendum 1 RCS Drawings.pdf

PDF 118 KB Posted

Attached to
Riddle Community Schoolyard
Solicitation number
Not on record
Issued by
Pittsburgh City, Pennsylvania

About this file

This is an Addendum No. 1 to the Request for Proposals for the Riddle Community Schoolyard project, issued by Trust for Public Land (TPL) in partnership with Riddle School District 70 and Riddle Elementary School. The addendum, dated May 8, 2026, updates the bidding documents for construction services at Riddle Elementary School, 463 Park Street, Riddle, OR 97469. The project requires contractors to provide all labor, materials, equipment, and facilities necessary to complete the schoolyard construction. Sealed bids are due June 4, 2026 at 3:00 pm local time via PennBid online submission. A mandatory pre-proposal meeting is scheduled for Monday, May 18, 2026 at 3:00 pm at the project location. Technical questions and requests for clarification must be submitted by May 22, 2026 at 5:00 pm local time. Construction is anticipated to begin in summer 2026.

Addendum No. 1 specifically revises the Conformed Set of Drawings to include the Structural Series (S101, S102, S103, S104) and a revised L561 (Site Details - Structures), with bidders directed to the updated drawing file "04-RCS Conformed Set Drawings.Addendum1.pdf." All other specifications, terms, and conditions remain unchanged from the original solicitation. The project is subject to state prevailing wage rates under Oregon Revised Statutes 279C.800 to 279C.870, and bidders are responsible for evaluating compliance costs with applicable prevailing wage rates and state labor laws. Bidding documents are available at no cost through the PennBid platform.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Riddle Community Schoolyard Addendum No. 1, Page 1

To: All Potential Bidders From: Kristin Kovalik, Project Manager Date: May 8, 2026 Re: Request for Proposals, Riddle Community Schoolyard

ADDENDUM NO. 1

The solicitation referenced above is amended as described below, and bidders are directed to incorporate the following updates and clarifications into the bid documents.

RCS Conformed Set of Drawings

The Conformed Set of Drawings for the Project have been revised to include the Structural Series (S101, S102, S103, S104) and a revised L561 (Site Details – Structures).

Bidders are directed to the updated Set of Drawings (filename “04-RCS Conformed Set Drawings.Addendum1.pdf”).

All other specifications, terms, and conditions remain unchanged.

File details come from the government source that posted it. Updated .