1-03- RCS Conformed Set Specifications.pdf
PDF 2 MB Posted
- Attached to
- Riddle Community Schoolyard
- Solicitation number
- Not on record
- Issued by
- Pittsburgh City, Pennsylvania
About this file
This file contains construction specification documents for the Riddle Community Schoolyard project, a joint initiative between the Trust for Public Land (TPL), Riddle School District 70, and Riddle Elementary School in Riddle, Oregon. The project encompasses comprehensive schoolyard improvements including selective site demolition, cast-in-place concrete work, concrete unit masonry, metal railings, play field equipment and structures, site furnishings, a metal building system, earth moving, asphalt paving, unit paving, crushed stone surfacing, playground protective surfacing, landscape boulders, turf installation, planting, and stormwater conveyance systems. The specifications detail work at Riddle Elementary School located at 463 Park Street, Riddle, OR 97469. Sealed bids are due June 4, 2026, at 3:00 p.m. local time via PennBid at https://pennbid.bonfirehub.com. A mandatory pre-proposal meeting is scheduled for Monday, May 18, 2026, at 3:00 p.m. at the project location. Technical questions and requests for clarification must be submitted by May 22, 2026, at 5:00 p.m. local time. Construction is anticipated to begin summer 2026.
The project is subject to state prevailing wage rates under Oregon Revised Statutes 279C.800 to 279C.870, with applicable rates available at https://www.oregon.gov/boli/employers/Pages/prevailing-wage-rates.aspx. Bidders are responsible for evaluating compliance costs with prevailing wage rates and state labor laws. The conformed set of specifications includes detailed requirements for materials, fabrication, installation procedures, and quality assurance standards across all work sections. TPL reserves the right to cancel or modify the solicitation at any time. Bidding documents are available at no cost through the PennBid platform. The specifications establish performance standards, testing requirements, and warranty provisions, including a five-year warranty for playground equipment from the date of substantial completion and a 20-year systems warranty for metal building panels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-02 - General Requirements-Riddle CSY.pdf | ||
| 5-Form Change Order.xlsx | XLSX spreadsheet | |
| 8-04-RCS Conformed Set Drawings.Addendum1.pdf | ||
| 4-01 - General and Supplementary Conditions-Riddle CSY.pdf | ||
| 2-00 - RFP Riddle Community Schoolyard.pdf | ||
| 7-Addendum 1 RCS Drawings.pdf | ||
| 6-Form Application-for-Payment.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIDDLE COMMUNITY SCHOOLYARD
RIDDLE, OREGON
SPECIFICATION TABLE OF CONTENTS
CURRENT ISSUE: CONFORMED DOCUMENTS 04/03/2024
PAST ISSUE: 100% CONSTRUCTION DOCUMENTS
PREPARED FOR: THE TRUST FOR PUBLIC LAND
Section No. Section Description Date Revised
02 41 19 Selective Site Demolition
03 30 00 Cast-in-Place Concrete
04 22 00 Concrete Unit Masonry
05 52 13 Metal Railings
11 68 00 Play Equipment and Structures
12 93 00 Site Furnishings
13 34 19 Metal Building Systems
31 20 00 Earth Moving
32 12 16 Asphalt Paving
32 14 00 Unit Paving
32 15 40 Crushed Stone Surfacing
32 18 16.13 Playground Protective Surfacing
32 50 00 Landscape Boulders
32 92 00 Turf
32 93 00 Planting
33 05 13 Manholes and Structures
33 42 00 Stormwater Conveyance
1of1
SECTION 02 41 19 – SELECTIVE DEMOLITION
100% Construction Documents 02 41 19-1 7/15/24
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. Section 31 20 00 "Earth Moving" for site clearing and removal of above- and below-grade improvements not part of selective demolition.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.5 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.6 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, and for dust control.
Indicate proposed locations and construction of barriers.
100% Construction Documents 02 41 19-2 7/15/24
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services and/or irrigation services.
4. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.
C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations. Submit before Work begins.
1.7 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.8 QUALITY ASSURANCE
A. Preinstallation Conference: Conduct conference at Project site.
1.9 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
2. selectively demolished because of building operations or processes performed there.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.10 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
100% Construction Documents 02 41 19-3 7/15/24
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.
1. Inventory and record the condition of items to be removed and salvaged.
3.2 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.
Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
7. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
8. Dispose of demolished items and materials promptly
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Store items in location identified by Owner onsite.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Protect items from damage during transport and storage.
3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
100% Construction Documents 02 41 19-4 7/15/24
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.
3.3 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
B. Engineered Wood Fiber and Pea Gravel to be removed and preserved for use in future play areas.
Material to be scraped off to 3” depth minimum and stockpiled onsite for reuse. Stockpile should be clean of debris and organic materials. Stockpiles to be protected during construction.
3.4 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction and recycle or dispose of them.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
B. Burning: Do not burn demolished materials.
3.5 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-1 11/20/23
ABLE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Sections Includes:
1. Paving Type P2: Concrete Paving.
2. Curbs.
3. Curb ramps.
4. Footings.
B. Related Sections:
1. Section 11 68 00 �Play Field Equipment and Structures.�
2. Section 12 93 00 �Site Furnishings.�
3. Section 31 20 00 �Earth Moving.�
4. Section 32 31 13 �Chain Link Fencing and Gates.�
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each concrete mixture. If weather or other circumstances warrant adjustments submit alternate design mixtures.
C. Shop Drawings:
1. For Walls: Provide shop drawings for site walls and cheek wall. Drawings to show steel reinforcement including bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement. Drawings to show construction joint and control joint layout.
D. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Form materials and form-release agents.
4. Steel reinforcement and accessories.
5. Curing compounds.
6. Joint-filler strips.
7. Repair materials.
E. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:
1. Aggregates.
F. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production
Facilities."
G. Installer Qualifications: A qualified installer who employs on Project personnel qualified as ACI-certified Flatwork Technician and Finisher and a supervisor who is an ACI-certified Concrete Flatwork Technician.
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-2 11/20/23
ABLE
1.4 PROJECT CONDITIONS
A. Environmental Requirements: Comply with manufacturer�s written requirements under which products can be installed.
PART 2 - PRODUCTS
2.1 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
1. Plywood, metal, or other approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. Structural 1, B-B or better; mill oiled and edge sealed.
b. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed.
B. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class. Provide units with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.
2.2 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.
B. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, plain, fabricated from as-drawn steel wire into flat sheets.
2.3 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:
1. Portland Cement: ASTM C 150, Type I, gray. Supplement with the following:
a. Fly Ash: ASTM C 618, Class F or C.
b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.
B. Normal-Weight Aggregates: ASTM C 33, coarse aggregate or better, uniformly graded. Provide aggregates from a single source.
1. Maximum Coarse-Aggregate Size: 3/4 inch nominal.
C. Water: ASTM C 94/C 94M and potable.
D. Air-Entraining Admixture: ASTM C 260.
E. Chemical Admixtures: Admixtures certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material.
1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.
2. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.
3. Water-Reducing and Accelerating Admixture: ASTM C 494/C 494M, Type E.
2.4 CURING AND SEALING MATERIALS
A. Curing Paper: Non-staining, waterproof paper, consisting of two layers of kraft paper cemented together and reinforced with fiber, and complying with ASTM C 171.
B. Evaporation Retarder: Waterborne, monomolecular, film forming, manufactured for application to fresh concrete.
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-3 11/20/23
ABLE
C. Clear Acrylic Sealer: Manufacturer's standard, waterborne, nonyellowing and UV-resistant, membrane-forming, medium-gloss, acrylic copolymer emulsion solution, manufactured for concrete paving, containing not less than 15 percent solids by volume.
2.5 RELATED MATERIALS
A. Joint Fillers: ASTM D 1751, asphalt-saturated cellulosic fiber in preformed strips.
B. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.
C. Epoxy Bonding Adhesive: ASTM C 881/C 881M, two-component epoxy resin capable of humid curing and bonding to damp surfaces; of class suitable for application temperature, of grade complying with requirements, and of the following types:
1. Types I and II, non-load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.
2.6 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301 (ACI 301M), for each type and strength of normal-weight concrete, and as determined by either laboratory trial mixtures or field experience.
1. Use a qualified independent testing agency for preparing and reporting proposed concrete design mixtures for the trial batch method.
B. Proportion mixtures to provide normal-weight concrete with the following properties:
1. Compressive Strength (28 Days): 4000 psi
2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.55 or less for all slabs, walls, and columns, and 0.60 or less for all foundations.
3. Slump Limit: 4 inches.
C. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
2.7 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M and ASTM C 1116/C 1116M. Furnish batch certificates for each batch discharged and used in the Work.
1. When air temperature is between 85 and 90 deg F (30 and 32 deg C), reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For concrete batches of 1 cu. yd. (0.76 cu. m) or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.
2. For concrete batches larger than 1 cu. yd. (0.76 cu. m), increase mixing time by 15 seconds for each additional 1 cu. yd. (0.76 cu. m).
3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixing time, quantity, and amount of water added.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-4 11/20/23
ABLE
elevation tolerances, Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Remove loose material from compacted subbase surface immediately before placing concrete.
B. Protect adjacent construction from discoloration and spillage during application of color hardeners, release agents, stains, curing compounds, and sealers.
C. Verify compacted subgrade, granular base or stabilized soil is acceptable and ready to support curbs and footings and imposed loads.
1. Verify subsoils have a permeability between 0.5 and 3.0 inches per hour.
2. Compact to minimum 95 percent Standard Proctor Density per ASTM D 698 for pedestrian areas.
3. Compact to 95 percent Modified Proctor Density per ASTM D 1557 for areas subject to heavy vehicular traffic.
4. Verify that geotextiles, if applicable, have been placed in accordance to specifications and drawings.
3.3 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.
B. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage.
3.4 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.
B. Clean reinforcement of loose rust and mill scale, grease, earth, ice, or other bond-reducing materials.
C. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement. Where note specifically detailed, the minimum concrete cover on reinforcing steel shall be:
1. Exposed to earth or weather, cast against earth: 3�
2. Exposed to earth or weather, cast against forms: 2�
D. Install welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.
E. Install fabricated bar mats in lengths as long as practicable. Handle units to keep them flat and free of distortions. Straighten bends, kinks, and other irregularities, or replace units as required before placement. Set mats for a minimum 2-inch (50-mm) overlap to adjacent mats.
3.5 JOINTS
A. General: Form expansion, construction, isolation, and contraction joints and tool edges true to line, with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline unless otherwise indicated.
1. When joining existing paving, place transverse joints to align with previously placed joints unless otherwise indicated.
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-5 11/20/23
ABLE
B. Construction Joints: Set construction joints at side and end terminations of curbs and at locations where paving operations are stopped for more than one-half hour unless curbs terminates at isolation joints.
1. Continue steel reinforcement across construction joints unless otherwise indicated. Do not continue reinforcement through sides of paving strips unless otherwise indicated.
2. Dowelled Joints: Install dowel bars and support assemblies at joints where indicated. Lubricate or coat with asphalt one-half of dowel length to prevent concrete bonding to one side of joint.
C. Isolation Joints: Form isolation joints of preformed joint-filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated.
1. Locate expansion joints at intervals of 30 feet (9.14 m) unless otherwise indicated.
2. Extend joint fillers full width and depth of joint.
3. Terminate joint filler not less than 1/2 inch (13 mm) or more than 1 inch (25 mm) below finished surface if joint sealant is indicated.
4. Place top of joint filler flush with finished concrete surface if joint sealant is not indicated.
5. Furnish joint fillers in one-piece lengths. Where more than one length is required, lace or clip joint-filler sections together.
6. During concrete placement, protect top edge of joint filler with metal, plastic, or other temporary preformed cap. Remove protective cap after concrete has been placed on both sides of joint.
D. Contraction Joints: Form weakened-plane contraction joints by sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness, as follows:
1. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- (3-mm-) wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before developing random contraction cracks.
a. Tolerance: Ensure that sawed joints are within 3 inches (75 mm) in both directions from center of dowels.
2. Doweled Contraction Joints: Install dowel bars and support assemblies at joints where indicated.
Lubricate or coat with asphalt one-half of dowel length to prevent concrete bonding to one side of joint.
3.6 CONCRETE PLACEMENT
A. Before placing concrete, inspect and complete formwork installation, steel reinforcement, and items to be embedded or cast-in. All reinforcing steel, anchor bolts, dowels, inserts, and any other hardware to be cast in concrete shall be well secured in position prior to foundation inspection. All hardware to be installed in accordance with respective manufacturer�s specifications. Refer to architectural and structural plans for locations of embedded items. The Architect, Engineer, and appropriate inspectors shall be notified in a timely manner for a reinforcement inspection prior to the placement of any concrete.
B. Moisten subbase to provide a uniform dampened condition at time concrete is placed.
C. Do not place concrete around manholes or other structures until they are at required finish elevation and alignment.
D. Comply with ACI 304R requirements for measuring, mixing, transporting, and placing concrete.
E. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place.
F. Consolidate concrete according to ACI 301 (ACI 301M) by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping.
1. Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator. Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only square-faced shovels for hand spreading and consolidation. Consolidate with care to prevent dislocating reinforcement, dowels and joint devices.
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-6 11/20/23
ABLE
G. Hot-Weather Placement: Comply with ACI 301 (ACI 301M) and as follows when hot-weather conditions exist:
1. Cool ingredients before mixing to maintain concrete temperature below 90 deg F (32 deg C) at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated in total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
2. Cover steel reinforcement with water-soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete.
3. Fog-spray forms, reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas.
3.7 FINISHING UNFORMED SURFACES
A. General: Comply with ACI 302.1R for screeding, re-straightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane before excess moisture or bleed water appears on the surface.
1. Do not further disturb surfaces before starting finishing operations.
C. Trowel and Fine-Broom Finish: Apply a partial trowel finish, stopping after second troweling, to surfaces indicated and to surfaces where ceramic or quarry tile is to be installed by either thickset or thin-set methods. Immediately after second troweling, and when concrete is still plastic, slightly scarify surface with a fine broom.
3.8 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
B. Comply with ACI 306.1 for cold-weather protection during curing, and follow recommendations in ACI 305R for hot-weather protection during curing.
C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions occur before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
E. Cure concrete for (3) three days without foot traffic and (28) twenty-eight days without heavy vehicular traffic.
3.9 CURB TOLERANCES
A. Comply with tolerances in ACI 117 and as follows:
1. Elevation: 3/4 inch (19 mm).
2. Surface: Gap below 10-foot- (3-m-) long, unleveled straightedge not to exceed 1/2 inch (13 mm).
3. Lateral Alignment and Spacing of Dowels: 1 inch (25 mm).
4. Vertical Alignment of Dowels: 1/4 inch (6 mm).
5. Alignment of Dowel-Bar End Relative to Line Perpendicular to Paving Edge: 1/4 inch per 12 inches (6 mm per 300 mm) of dowel.
6. Joint Spacing: 3 inches (75 mm).
7. Joint Width: Plus 1/8 inch (3 mm), no minus.
3.10 FIELD QUALITY CONTROL
A. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:
1. Testing Frequency: Obtain at least one composite sample for each 5000 sq. ft. (465 sq. m) or fraction thereof of each concrete mixture placed each day.
SECTION 03 30 00 � CAST-IN-PLACE CONCRETE
100% Construction Documents 03 30 00-7 11/20/23
ABLE
a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.
2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change.
3. Air Content: ASTM C 231, pressure method; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.
4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is 40 deg F (4.4 deg C) and below and when it is 80 deg F (27 deg C) and above, and one test for each composite sample.
5. Compression Test Specimens: ASTM C 31/C 31M; cast and laboratory cure one set of three standard cylinder specimens for each composite sample.
6. Compressive-Strength Tests: ASTM C 39/C 39M; test one specimen at seven days and two specimens at 28 days.
a. A compressive-strength test shall be the average compressive strength from two specimens obtained from same composite sample and tested at 28 days.
B. Strength of each concrete mixture will be satisfactory if average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi (3.4 MPa).
C. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.
D. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.
E. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect.
F. Decorative concrete paving will be considered defective if it does not pass tests and inspections.
G. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
H. Prepare test and inspection reports.
3.11 REPAIRS AND PROTECTION
A. Remove and replace decorative concrete work that is broken or damaged or does not comply with requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by Architect.
B. Protect decorative concrete work from damage. Exclude traffic from paving for at least 28 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur.
SECTION 04 22 00 � CONCRETE UNIT MASONRY
100% Construction Documents 04 22 00-1 7/17/24
ABLE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Sections Includes:
1. Reuse Salvaged Concrete Walls.
B. Related Sections:
1. Section 31 00 00 Earthwork.
2. Section 03 30 00 Cast-in-Place Concrete.
3.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Samples for Initial Selection: For each of the following:
1. Joint material involving color selection.
C. Sieve Analysis: For aggregate setting-bed materials, according to ASTM C 136.
D. Samples for Verification:
1. Joint materials.
E. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:
1. Cementitious Materials. Include brand, type, and name of manufacturer.
2. Mortar Mixes.
3. Grout Mixes.
1.4 QUALITY ASSURANCE
A. Source Limitations for Mortar Materials: Obtain mortar ingredients of a uniform quality, including color for exposed masonry, from single manufacturer for each cementitious component and from single source or producer for each aggregate.
B. Masonry Standard: Comply with ACI 530.1/ASCE 6/TMS 602 unless modified by requirements in the Contract Documents.
C. Mockups: Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. Provide 5�-0� length by full thickness of wall for mockup for review and approval of concrete plank pavers.
1. Approved mockups may become part of the completed Work if undisturbed at time of Substantial
Completion.
2. If mockup is not retained, remove and properly dispose of mockup.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store salvaged concrete on elevated platform in a dry location. If units are not stored in an enclose location, cover tops and sides of stacks with waterproof sheeting, securely tied.
B. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.
C. Store aggregates where grading and other required characteristics can be maintains and contamination avoided.
SECTION 04 22 00 � CONCRETE UNIT MASONRY
100% Construction Documents 04 22 00-2 7/17/24
ABLE
D. Store liquids in tightly closed containers protected from freezing.
E. Store asphalt cement and other bituminous materials in tightly closed containers.
1.6 PROJECT CONDITIONS
A. Protection of Masonry: During construction, cover tops of wall, projections, and sills with waterproof sheeting at the end of each day�s wrok. Cover partially completed masonry when construction is not in progress.
B. Environmental Requirements: Comply with manufacturer�s written requirements under which products can be installed.
C. Cold-Weather Protection: Do not use frozen materials or materials mixed or coated with ice or frost.
Do not build on frozen subgrade or setting beds. Remove and replace unit paver work damaged by frost or freezing.
D. Weather Limitations for Mortar and Grout
1. Cold-Weather Requirements: Comply with cold-weather construction requirements contained in
ACI 530.1/ASCE 6/TMS 602.
2. Hot-Weather Requirements: Comply with hot-weather construction requirements contained in
ACI 530.1/ASCE 6/TMS 602. Provide artificial shade and windbreaks and use cooled materials as required. Do not apply mortar to substrates with temperatures of 100 deg F and higher.
PART 2 - PRODUCTS
2.1 REUSE SALVAGED CONCRETE PAVERS
A. Reuse Salvaged Concrete Pavers: existing on-site concrete paving, salvaged for reuse as paver at scramble steps, sawcut.
1. Thickness: unknown, assumed to be 3-4 inches.
2. Face Size and Shape: rectangle size range as indicated on Drawings.
3. Color: As existing.
4. Finish: As existing.
2.2 MORTAR SETTING-BED MATERIALS
A. Thick Bed Mortar Mix
1. Laticrete 3701 Fortified Mortar Bed, a polymer fortified blend of polymers, Portland cement and graded aggregates, requiring only addition of water, suitable for interior and exterior applications, bonded and non-bonded thick bed mortar applications, ASTM C270, or approved equal.
a. Manufactured by Laticrete International, Inc. 800-243-4788, ext. 1235
b. Mix in accordance with manufacturer�s instructions.
c. Bond Coat: 254 Platinum.
2. Water: Potable.
2.3 GROUT MATERIALS
A. Grout, ANSI A118.3
1. Laticrete Permacolor Select Grout, non-sag, uniform color, chemical and stain resistant, with anti-microbial technology, or approved equal.
a. Manufactured by Laticrete International, Inc. 800-243-4788, ext. 1235
b. Mix in accordance with manufacturer�s instructions.
c. Grout Colors: As selected by Architect from manufacturer�s full range. Submit four applied-grout color samples for review.
SECTION 04 22 00 � CONCRETE UNIT MASONRY
100% Construction Documents 04 22 00-3 7/17/24
ABLE
PART 3 - EXECUTION
3.1 EXAMINATION
A. Prior to starting work, carefully inspect installed work of other trades and verify that such work is complete to the point where work of this Section may properly commence. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances, Notify the Architect in writing of conditions detrimental to the proper and timely completion of the work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Remove loose material from compacted subbase surface immediately before placing concrete.
B. Sweep concrete substrates to remove dirt, dust, debris, and loose particles.
C. Proof-roll prepared subgrade according to requirements in Section 31 00 00 Earthwork to identify soft pockets and areas of excess yielding. Proceed with unit paver installation only after deficient subgrades have been corrected and are ready to receive base course for unit pavers.
3.3 INSTALLATION, GENERAL
A. Use full-size units without cutting if possible. If cutting is required to provide a continuous pattern or to fit adjoining construction, cut units with motor-driven saws; provide clean, sharp, unchipped edges.
Allow units to dry before laying unless wetting of units is specified. Install cut units with cut surfaces and, where possible, cut edges concealed.
3.4 TOELRANCES
A. Dimensions and Locations of Elements:
1. For dimensions in elevation do not vary by more than plus 1/2 inch (12 mm) or minus 1/4 inch (6 mm).
B. Lines and Levels:
1. For conspicuous horizontal lines, such as lintels, sills, parapets, and reveals, do not vary from level by more than 1/4 inch in 20 feet (6 mm in 6 m) maximum.
C. Joints:
1. For bed joints, do not vary from thickness indicated by more than plus or minus 1/8 inch (3 mm), with a maximum thickness limited to 1/2 inch (12 mm).
2. For exposed bed joints, do not vary from bed-joint thickness of adjacent courses by more than
1/8 inch (3 mm).
3. For head and collar joints, do not vary from thickness indicated by more than plus 3/8 inch (9
mm) or minus 1/4 inch (6 mm).
4. For exposed head joints, do not vary from thickness indicated by more than plus or minus 1/8 inch (3 mm).
3.5 LAYING MASONRY WALLS
A. Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint thicknesses and for accurate location of openings, movement-type joints, returns, and offsets. Avoid using less-than-half-size units, particularly at corners, jambs, and, where possible, at other locations.
B. Bond Pattern for Exposed Masonry: Unless otherwise indicated, lay exposed masonry in running bond.
C. Stopping and Resuming Work: Stop work by racking back units in each course from those in course below; do not tooth. When resuming work, clean masonry surfaces that are to receive mortar before laying fresh masonry.
SECTION 04 22 00 � CONCRETE UNIT MASONRY
100% Construction Documents 04 22 00-4 7/17/24
ABLE
D. Built-in Work: As construction progresses, build in items specified in this and other Sections. Fill in solidly with masonry around built-in items.
3.6
3.7 REPAIRS, POINTING, AND CLEANING
A. Pointing: During the tooling of joints, enlarge voids and holes, except weep holes, and completely fill with mortar. Point up joints, including corners, openings, and adjacent construction, to provide a neat, uniform appearance. Prepare joints for sealant application, where indicated.
B. In-Progress Cleaning: Clean unit masonry as work progresses by dry brushing to remove mortar fins and smears before tooling joints.
C. Final Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as follows:
1. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or chisels.
2. Test cleaning methods on sample wall panel; leave one-half of panel uncleaned for comparison purposes. Obtain Architect's approval of sample cleaning before proceeding with cleaning of masonry.
SECTION 05 52 13 � METAL RAILINGS
100% Construction Documents 05 52 13-1 7/17/24
ABLE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Sections Includes:
1. Steel Handrails.
B. Related Sections:
1. Section 03 30 00 Cast-in-Place Concrete.
1.3 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design railings, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. General: In engineering railings to withstand structural loads indicated, determine allowable design working stresses of railing materials based on the following:
1. Stainless steel: 60 percent of minimum yield strength.
C. Structural performance: Railings shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:
1. Handrails:
a. Uniform load of 50 lbf/ft. applied in any direction.
b. Concentrated load of 200 lbf applied in any direction.
c. Uniform and concentrated loads need not be assumed to act concurrently.
D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes acting on exterior metal fabrications by preventing buckling, opening of joins, overstressing of components, failure of connections, and other detrimental effects.
1. Temperature Change 120 deg F, ambient; 180 deg F, material surfaces.
E. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metal and other materials from direct contact with incompatible materials.
1.4 SUBMITTALS
A. Product Data: For the following:
1. Manufacturer�s product lines of mechanically connected railings.
2. Railing brackets.
3. Grout, anchoring cement, and paint products.
B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
C. Samples for Initial Selection: For products involving selection of color, texture, or design.
D. Samples for Verification: For each type of exposed finish required.
1. Sections of each distinctly different linear railing member, minimum 6 inch length.
2. Fittings and brackets.
E. Delegated-Design Submittal: For installed products indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
F. Mill Certificates: Signed by manufacturers of stainless-steel products certifying that products furnished comply with requirements.
G. Welding Certificates.
SECTION 05 52 13 � METAL RAILINGS
100% Construction Documents 05 52 13-2 7/17/24
ABLE
H. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers certifying that shop primers are compatible with topcoats.
I. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, according to ASTM E 894 and ASTM E 935.
1.5 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of railing from single source from single manufacturer.
B. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, �Structural Welding Code, Steel�.
1.6 PROJECT CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.
1.7 COORDINATION AND SCHEDULING
A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers� written recommendations to ensure that shop primers and topcoats are compatible with one another.
B. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that area to be embedded in concrete or masonry. Deliver such items to project site in time for installation.
C. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy the structural performance requirements.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Steel Pipe and Tube Railings:
a. Pisor Industries, Inc.
b. Wagner, R & B, Inc.; a division of the Wagner Companies
c. Or approved equal.
2. Exterior Paint:
a. Sherwin-Williams Company
b. Or approved equal.
2.2 METALS, GENERAL
A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.
B. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails unless otherwise indicated.
2.3 STEEL AND IRON
A. Retain material types, qualities, and grades in remaining paragraphs that are indicated in Specifications or on Drawings.
B. Tubing: ASTM A 500 (cold formed) or ASTM A 513.
C. Pipe: ASTM A 53/A 53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads.
SECTION 05 52 13 � METAL RAILINGS
100% Construction Documents 05 52 13-3 7/17/24
ABLE
D. Plates, Shapes, and Bars: ASTM A 36/A 36M.
E. Cast Iron: Either gray iron, ASTM A 48/A 48M, or malleable iron, ASTM A 47/A 47M, unless otherwise indicated.
2.4 FASTENERS
A. General: provide the following:
1. Ungalvanized-Steel Railings: Plated steel fasteners complying with ASTM B 633 or
ASTM F 1941 (ASTM F 1941M), Class Fe/Zn 5 for zinc coating.
B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated and capable of withstanding design loads.
C. Fasteners for Interconnecting Railing Components:
1. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless otherwise indicated.
2. Provide tamper-resistant flat-head machine screws for exposed fasteners unless otherwise indicated.
2.5 MISCELLANEOUS MATERIALS
A. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior and exterior applications.
B. Anchoring Cement: Factory-packaged, nonshrink, nonstaining, hydraulic-controlled expansion cement formulation for mixing with water at Project site to create pourable anchoring, patching, and grouting compound.
C. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer complying with MPI#79 and compatible with topcoat.
1. Use primer containing pigments that make it easily distinguishable from zinc-rich primer.
2.6 WATER-BASED PAINTS
A. Urethane, Water Based:
1. Pro Industrial Acrolon 100 HS by Sherwin Williams, or approved equivalent.
a. Sheen: Semi-gloss
b. Color: To match Architect�s sample or RAL number.
2.7 FABRICATION
A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.
B. Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly.
Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces.
C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.
D. Form work true to line and level with accurate angles and surfaces.
E. Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.
F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.
SECTION 05 52 13 � METAL RAILINGS
100% Construction Documents 05 52 13-4 7/17/24
ABLE
G. Connections: Fabricate railings with either welded or nonwelded connections unless otherwise indicated.
H. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings.
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove flux immediately.
4. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces.
I.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .