This document contains construction plans for a roofing project undertaken by Salt Lake County, Utah, specifically for the Sheriff's Special Operations Building re-roof initiative (FAC133199). The project involves the complete removal and replacement of the existing roofing assembly, including the roof membrane, cover board, and insulation, as detailed in the contract documents. The plans serve as technical specifications and design documentation that establish the scope of work, material requirements, and construction standards that bidders must follow to submit compliant proposals for this construction opportunity.
The plans document provides detailed architectural and engineering specifications necessary for contractors to accurately estimate costs, source materials, and execute the re-roofing work. As a technical reference document, it establishes the baseline requirements for all roofing components and installation methods, ensuring that all bidding contractors operate from the same specifications and can provide comparable proposals for county evaluation and selection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
GSBS PROJECT NO.:
ISSUED DATE:
SLCo SPECIAL OPS ROOF REPLACEMENT
REVIEW SET
04/22/2026
2022.055.18
SALT LAKE COUNTY
SLCo SPECIAL OPS
ROOF
REPLACEMENT
3510 SOUTH 700 WEST
SOUTH SALT LAKE, UT 84119
2001 State St # S3100, Salt Lake City, UT 84190
2022.055.18 07/20/2026
CONSTRUCTION DOCUMENTS
PROJECT SITE
SO
U
TH
W
ES
T
COUNTY JAIL PRIVATE ROAD
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
ABBREVIATIONS
VICINITY MAP DRAWING INDEX
REV
GRAPHIC SYMBOLS MATERIALS/LEGEND
BLOCKING, ROUGH WOOD
METAL (LARGE SCALE)
QUARRY/CERAMIC TILE
GRAVEL
EARTH
CONCRETE MASONRY UNIT
CONCRETE (POURED IN PLACE)
GYPSUM BOARD OR SETTING BEDS
INSULATION (BATT & BLANKET)
INSULATION (RIGID/SEMI-RIGID)
CONTINUOUS ROUGH WOOD
PLYWOOD
FACE BRICK
GRID
GRID
W1
100A
ELEVATION CONTROL POINT
OR DATUM POINT
EXTERIOR ELEVATION SYMBOL
ELEVATION IDENTIFICATION
SHEET WHERE ELEVATION IS DRAWN
WALL SECTION SYMBOL
SECTION REFERENCE/
SHEET WHERE SECTION IS DRAWN
BUILDING SECTION SYMBOL
SECTION REFERENCE/
SHEET WHERE SECTION IS DRAWN
DETAIL SYMBOL
DETAIL NUMBER/
SHEET WHERE DETAIL IS DRAWN
REVISION TAG
GRID LINES
NAME
#SHEET
SHEET
SHEET
SHEET
SHEET
SCALE
VIEW NAME
VIEW TITLE
VIEW NUMBER/
SHEET WHERE VIEW IS LOCATED
VIEW NAME/ VIEW SCALE
INTERIOR ELEVATION SYMBOL
ELEVATION IDENTIFICATION
SHEET WHERE ELEVATION IS DRAWN
#SHEET
ROOM TAG
ROOM NAME
ROOM NUMBER
WINDOW TAG
WINDOW OR STOREFRONT NUMBER
DOOR TAG
DOOR NUMBER
WOOD
COMPACTED FILL
FIREPROOFING
04/22/2026
2022.055.18
G001
DRAWING INDEX,
SYMBOLS AND
ABBREVIATIONS
SALT LAKE COUNTY
SLCo SPECIAL OPS
ROOF
REPLACEMENT
3510 SOUTH 700 WEST
SOUTH SALT LAKE, UT 84119
2001 State St # S3100, Salt Lake City, UT 84190
REVIEW SET
ABV ABOVE
AFF ABOVE FINISH FLOOR
ADJ ADJUSTABLE
ALUM ALUMINUM
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
AB ANCHOR BOLT
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL OR ARCHITECT
AHJ AUTHORITY HAVING JURISDICTION (BUILDING
DEPARTMENT)
BP BASE PLATE
BSMT BASEMENT
BRG BEARING
BTWN BETWEEN
BITUM BITUMINOUS
BLKG BLOCKING
BD BOARD
BO BOTTOM OF
BLDG BUILDING
CLG CEILING
CL CENTER LINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CJ CONTROL JOINT
COORD COORDINATE
DEMO DEMOLISH / DEMOLITION
DEPT DEPARTMENT
DRAWING INDEX
SHEET NUMBER SHEET NAME
GENERAL
G000 COVER
G001 DRAWING INDEX, SYMBOLS AND ABBREVIATIONS
AD101 ROOF DEMO PLAN
AE101 ROOF PLAN
AE801 ROOF DETAILS
DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DW DISHWASHER
DBL DOUBLE
DN DOWN
DRWR DRAWER
DWGS DRAWINGS
EA EACH
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EPDM ETHYLENE PROPYLENE DIENE M-CLASS
(ROOFING)
EXIST EXISTING
EXP EXPANSION
EJ EXPANSION JOINT
EXT EXTERIOR
FT FEET / FOOT
FV FIELD VERIFY
FIN FINISH
FF FINISH FLOOR
FA FIRE ALARM
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FLR FLOOR
FD FLOOR DRAIN
FTG FOOTING
FDN FOUNDATION
GAL GALLON
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GALV GALVANIZED
GA GAUGE
GC GENERAL CONTRACTOR
GL GLASS / GLAZING
GLB GLUE LAMINATED BEAM
GND GROUND
GYP BD GYPSUM BOARD
HW HARDWARE
HVAC HEATING / VENTILATION / AIR CONDITIONING
H HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HYD HYDRANT
IN. INCHES OR INCH
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
JNT JOINT
LAV LAVATORY
LT WT LIGHT WEIGHT
MAINT MAINTENANCE
MFR MANUFACTURER
MO MASONRY OPENING
MAT MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO. NUMBER
OC ON CENTER
OPP OPPOSITE
OD OUTSIDE DIAMETER
OH OVERHEAD
OH DR OVERHEAD DOOR
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
PNT PAINTED OR PAINT
PTN PARTITION
PVMT PAVEMENT
PERP PERPENDICULAR
PLAM PLASTIC LAMINATE
PL PLATE
PLUM PLUMBING
PVC POLYVINYL CHLORIDE
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
QTY QUANTITY
RAD RADIUS
RE REFER / REFERENCE
RCP REFLECTED CEILING PLAN
REF REFRIGERATOR
REINF REINFORCED
REQ REQUIRED
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
STC SOUND TRANSMISSION CLASS
SPEC SPECIFICATION
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STRU STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM
THRU THROUGH
T.O. TOP OF
TOA TOP OF ASPHALT
TOC TOP OF CURB
TOF TOP OF FOOTING
TOS TOP OF SLAB OR SIDEWALK
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VEN VENEER
FV VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
WC WATER CLOSET
WRB WEATHER RESISTIVE BARRIER
W WIDTH
W/ WITH
W/O WITHOUT
WD WOOD
NOTE:
ABBREVIATIONS FOR FINISHED
MATERIALS ARE DESCRIBED IN
THE FINISH LEGEND.
CONSTRUCTION
DOCUMENTS
2022.055.18
D1
D2
D2
D2D2
D2
D2
D3D3
D4
D4
D4
D4
D4
D5 D5
D5 D5
D5
D5
D5 D5
D6
D6
D6
EXISTING BUILDING ELEMENTS TO REMAIN
DEMOLITION LEGEND
EXISTING BUILDING ELEMENTS TO BE REMOVED
D1. REMOVE EXISTING TERMINATION BAR AND WALL FLASHINGS.
D2. REMOVE EXISTING PARAPET CAP AND FLASHINGS.
D3. REMOVE EXISTING ROOF MEMBRANE, COVER BOARD, INSULATION,
AND VAPOR BARRIER. MAKE SUBSTRATE READY FOR INSTALLATION
OF NEW ROOF MEMBRANE AS REQUIRED. DEMOLITION ROOF
AREA = APPROX. 42,000 SF, F.V.
D4. REMOVE AND REINSTALL EXISTING MECHANICAL EQUIPMENT AS
REQUIRED FOR REMOVAL OF EXISTING ROOF ASSEMBLY, PREPARATION
FOR NEW ROOF MATERIALS, AND INSTALLATION OF NEW ROOF
ASSEMBLY AT MECHANICAL CURBS.
D5. REMOVE AND REINSTALL EXISTING ROOF DRAIN AS REQUIRED FOR
INSTALLATION OF NEW ROOF ASSEMBLY. REPLACE DRAINAGE PANS .
D6. REMOVE EXISTING WALKING PADS.
A. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF
THEM OFF-SITE UNLESS INDICATED TO BE SALVAGED OR REINSTALLED.
B. REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION,
IN A MANNER TO PREVENT DAMAGE, PREPARE FOR REUSE, AND
REINSTALL WHERE INDICATED.
C. EXISTING TO REMAIN: LEAVE EXISTING ITEMS THAT ARE NOT TO BE
REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE SALVAGED
OR REINSTALLED.
DEFINITIONS
DEMOLITION NOTES #
A. THE CONTRACTOR SHALL MAINTAIN THE EXISTING STRUCTURAL AND
FIREPROOFING INTEGRITY OF THE ENTIRE BUILDING EXCEPT WHERE
OTHERWISE NOTED.
B. REINSTALLED EQUIPMENT AND DEVICES ARE TO BE CLEANED OF ALL
FOREIGN MATERIAL. REPLACE EQUIPMENT OR DEVICES WHICH ARE
DEFECTIVE OR DAMAGED DURING RELOCATION.
C. WHEREVER MECHANICAL AND PLUMBING DEVICES ARE REMOVED, ALL
PIPING AND/OR CONDUITS THAT ARE ABANDONED SHALL BE CAPPED OFF
BELOW THE FLOOR, INSIDE THE WALLS, OR ABOVE THE CEILINGS EXCEPT
WHERE NOTED OTHERWISE. MECHANICAL/ELECTRICAL CONTRACTOR TO
REMOVE ALL UNUSED WIRING TO PANEL BOXES. PATCH AND REPAIR
FINISHES TO MATCH SURROUNDING FINISHES. BLANK COVER PLATES
OVER EXISTING BOXES ARE NOT ACCEPTABLE, UNLESS OTHERWISE
NOTED.
D. EXISTING ASSEMBLIES NOT IN SCOPE OF WORK SHALL BE PROTECTED TO
PREVENT DAMAGE AND WEAR DURING CONSTRUCTION. DAMAGE TO
EXISTING ASSEMBLIES SHALL BE REPAIRED AS REQUIRED TO MATCH OR
EXCEED CONDITION OF ASSEMBLY PRIOR TO DAMAGE.
GENERAL DEMO NOTES
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REVREV
RESERVED FOR CONSULTANT LOGO
04/22/2026
2022.055.18
ROOF DEMO PLAN
SALT LAKE COUNTY
SLCo SPECIAL OPS
ROOF
REPLACEMENT
3510 SOUTH 700 WEST
SOUTH SALT LAKE, UT 84119
2001 State St # S3100, Salt Lake City, UT 84190
REVIEW SET
AD101
3/32" = 1'-0"AD101
1 ROOF DEMO PLAN
CONSTRUCTION
DOCUMENTS
AE801
AE801
AE801
AE801
AE801
AE801
AE801
AE801
R
ID
G E
R
ID
G E
R
ID
G E
R
ID
G E
7 7
RIDGE RIDGE RIDGE
1/ 4"
2"
1/4" / 12"
1/4" / 12" 1/ 4"
2"
1/4" / 12"1/ 4"
2"
1/ 4"
2"
1/4" / 12"
1/ 4"
2"
1/4" / 12"
1/4" / 12" 1/ 4"
2"
1/ 4"
2"
1/4" / 12"
1/4" / 12" 1/ 4"
2"
1/4" / 12"1/ 4"
2"
1/ 4"
2"1/4" / 12"
1/4" / 12" 1/4" / 12"
1/4" / 12"
1/ 4"
2"
1/4" / 12"
1/ 4"
2"
1/4" / 12" 1/4" / 12"
1/4" / 12" 1/ 4"
2"
1/ 4"
2"
1/4" / 12"
GENERAL ROOF NOTES
DIRECTION OF ROOF SLOPE
A. PROVIDE A MINIMUM SLOPE OF 1/4" PER FOOT AT ALL ROOF AREAS.
EXISTING ROOF SLOPE IS PROVIDED BY THE SLOPED STRUCTURAL
FRAMING. WHILE THE STRUCTURE GENERALLY PROVIDES A SLOPE OF
APPROXIMATELY 1/4 INCH PER FOOT IN THE PRIMARY DIRECTION OF
SLOPE, IT DOES NOT ACHIEVE THE MINIMUM REQUIRED 1/4 INCH PER
FOOT SLOPE ALONG THE DIAGONAL DRAINAGE PATHS. PROVIDE
ADDITIONAL TAPERED ROOF INSULATION AS REQUIRED TO ACHIEVE
POSITIVE DRAINAGE AT A MINIMUM SLOPE OF 1/4 INCH PER FOOT TO
ROOF DRAINS IN ALL DIRECTIONS.
B. ALL SERVICEABLE ROOF EQUIPMENT, SHALL BE LOCATED 10' MINIMUM
FROM A ROOF EDGE.
C. IF SERVICEABLE ROOF EQUIPMENT MUST BE LOCATED AT A DISTANCE
LESS THAN 10' FROM A ROOF EDGE, A GUARDRAIL MEETING CODE MUST
BE PROVIDED AT THE ROOF EDGE WHERE THE EQUIPMENT OCCURS.
D. CONTRACTOR SHALL REPLACE OR REWORK ALL EXISTING PITCH PANS
AS REQUIRED WITHIN AREA OF NEW ROOF TO CREATE A WATER-TIGHT
SEAL AT ALL EXISTING PITCH PAN LOCATIONS.
E. PROVIDE A MINIMUM R-30 CONTINUOUS INSULATION ABOVE DECK.
KEYED ROOF NOTES #
1. NEW ROOF MEMBRANE, COVER BOARD, TAPERED INSULATION, AND
VAPOR BARRIER OVER EXISTING STEEL ROOF DECK
2. REPLACE ROOF PAN. EXISTING ROOF DRAIN TO REMAIN, REFER TO
DETAIL 4/AE801
3. EXISTING ROOF PLUMBING VENT, REFER TO DETAIL 5/AE801
4. NEW WALKWAY PADS
5. EXISTING VENT PIPE / DUCT
6. EXISTING MECHANICAL EQUIPMENT
7. NEW PARAPET FLASHING SYSTEM
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REVREV
RESERVED FOR CONSULTANT LOGO
04/22/2026
2022.055.18
ROOF PLAN
SALT LAKE COUNTY
SLCo SPECIAL OPS
ROOF
REPLACEMENT
3510 SOUTH 700 WEST
SOUTH SALT LAKE, UT 84119
2001 State St # S3100, Salt Lake City, UT 84190
REVIEW SET
AE101
3/32" = 1'-0"AE101
1 ROOF PLAN
CONSTRUCTION
DOCUMENTS
ADD WEATHER SILL TO
EXISTING DOOR
DOOR THRESHOLD SET IN
FULL BED OF CONTINUOUS
SEALANT
EXISTING STEEL ROOF DECK
EXISTING WALL
EXISTING CONCRETE STAIR
LANDING
1" M
A X
NEW VAPOR BARRIER
NEW RIGID ROOF
INSULATION (TAPER
BOARD)
NEW CANT STRIP, AS REQUIRED
LAP VAPOR BARRIER ON VERTICAL
SURFACE OVER VAPOR BARRIER AT
HORIZONTAL SURFACE
NEW ROOF MEMBRANE TO RUN UP
AND TERMINATE BELOW DOOR
THRESHOLD
NEW COVER BOARD
ROOF SLOPE
FLASHING MEMBRANE
EXISTING WALL
EXISTING STRUCTURE
NEW RIGID ROOF INSULATION (TAPER
BOARD)
EXISTING STEEL ROOF DECK
CONTINUOUS SEALANT
FASTENER W/ NEOPRENE WASHER
CONTINUOUS SEALANT
TERMINATION BAR W/ FASTENERS
COUNTERFLASHING
NEW VAPOR BARRIER
NEW COVER BOARD
NEW CANT STRIP, AS REQUIRED
NEW SINGLE-PLY ROOFING
MEMBRANE
EXISTING WALL
EXISTING STRUCTURE
NEW COVER BOARD
NEW RIGID ROOF
INSULATION (TAPER
BOARD)
EXISTING STEEL ROOF DECK
NEW VAPOR BARRIER
NEW SINGLE-PLY ROOFING
MEMBRANE, WRAP UP AND OVER
BLOCKINGS
NEW PRE-FINISHED METAL
COPING W/ CONTINUOUS
CONCEALED CLIPS, COLOR
BY ARCHITECT FROM
STANDARD COLORS
PRESERVATIVE TREATED
WOOD NAILER. HEIGHT
VARIES, FIELD VERIFY
FLASHING MEMBRANE
V A
R
IE
S
IN
H E
IG
H
T
2"
EXISTING STEEL ROOF DECK
NEW SINGLE-PLY ROOFING
MEMBRANE
SEALANT
TAPERED INSULATION
INSULATION
OVERFLOW ROOF DRAIN
WITH COLLAR
PRIMARY ROOF DRAIN
ROOF MEMBRANE. CUT &
INSTALL AT ROOF DRAIN
PER ROOFING MFR
INSTALLATION DETAILS.
ROOF MEMBRANE. CUT &
INSTALL AT ROOF DRAIN
PER ROOFING MFR
INSTALLATION DETAILS.
SURE-SEAL WATER CUT-OFF
MASTIC
PLYWOOD BLOCKING F.R.T.
AS REQ.
MIN. 1 1/2" WIDE HOT WELD
ALONG ENTIRE MEMBRANE
EDGE PER ROOFING MFR
INSTALLATION DETAILS.
NEW SINGLE-PLY ROOFING
MEMBRANE
EXISTING VENT PIPE
STAINLESS STEEL DRAW BAND
MASTIC
EXISTING STEEL ROOF DECK
NEW RIGID ROOF
INSULATION (TAPER
BOARD)
EXISTING EXHAUST TO REMAIN
M
IN8"
M
IN
1' -6
FIELD VERIFY
VARIES
375 WEST 200 SOUTH
SALT LAKE CITY, UT 84101
801.521.8600P www.gsbsarchitects.com
OWNER PROJECT NO.:
GSBS PROJECT NO.:
ISSUED DATE:
REVISIONS:
REVREV
RESERVED FOR CONSULTANT LOGO
04/22/2026
2022.055.18
ROOF DETAILS
SALT LAKE COUNTY
SLCo SPECIAL OPS
ROOF
REPLACEMENT
3510 SOUTH 700 WEST
SOUTH SALT LAKE, UT 84119
2001 State St # S3100, Salt Lake City, UT 84190
REVIEW SET
AE801
3" = 1'-0"AE801
1 TYP. HM DOOR THRESHOLD
3" = 1'-0"AE801
2 ROOF EDGE AT WALL
3" = 1'-0"AE801
3 TYP. ROOF EDGE
1 1/2" = 1'-0"AE801
4 TYP. ROOF DRAIN
3" = 1'-0"AE801
5 ROOF VENT EXHAUST PENETRATION
CONSTRUCTION
DOCUMENTS
| Sheets |
| AD101 - ROOF DEMO PLAN |
| AE101 - ROOF PLAN |
| AE801 - ROOF DETAILS |
| G000 - COVER |
| G001 - DRAWING INDEX, SYMBOLS AND ABBREVIATIONS |