1--3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SLCo FAC133199 Sheriff's Special Operations Building Re-Roof - CONST
Solicitation number
SLCo FAC133199 Sheriff's Special Operations Building Re-Roof - CONST
Issued by
Utah

About this file

This is a Schedule of Values document for a construction project with the State of Utah, specifically for the Sheriff's Special Operations Building Re-Roof project (FAC133199). The project involves the complete removal and replacement of the existing roofing assembly, including the roof membrane, cover board, and insulation. The Schedule of Values template is structured to capture pricing for a base bid and multiple alternates (Alternates 1, 2, and 3, with additional deduct and alternate options), organized by divisions of work including Payment and Performance Bond, Insurance and Builder's Risk, and Division 01-General Conditions, with a totals row designated for entry into the Online Solicitation System (OSS).

The document is a blank template with all line items showing $0 values, indicating that bidders are required to complete this form with their proposed pricing. Bidders must ensure that the total for the base bid matches the amount entered into the OSS, and the same requirement applies to each alternate bid. The form includes a field for the name of the company submitting the bid. No specific pricing information, set-asides, incumbent details, or funding sources are provided in this template document, as it serves solely as the pricing structure framework for contractor submissions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section 2 - Document 3.0
Schedule Of Values
Project: FAC133199 Sheriff's Special Operations Building Re-Roof
Divisions of WorkBase BidAlternate 1Alternate 2Alternate 3Deduct for Alternate 1 (enter positive numbers)
(Specify entire work scope; examples are listed below)Alternate BAlternate CTotal
Payment & Performance Bond$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance & Builder's Risk$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 01-General Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
Totals (Enter in OSS)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
The total for the base bid must be the same total that was entered into the Online Solicitation System (OSS).
The total for each alternate must be the same total that was entered into the Online Solicitation System (OSS)
Name of Company Bidding ________________________________

Sheet2

Sheet3

File details come from the government source that posted it. Updated .