7-26-267 - SEWER RELINING TECH SPEC.pdf

PDF 459 KB Posted

Attached to
IFB - 2026 SEWER RELINING PROJECT
Solicitation number
26-267
Issued by
Washington County, Utah

About this file

Summary

This is a technical specification document and invitation for bid (IFB) issued by the City of St. George, Utah, for a sewer relining project. The project involves furnishing and installing approximately 6,000 to 8,000 lineal feet of sewer main liners ranging from 8 inches to 18 inches in diameter, along with associated lateral liners, cleaning, and lateral work. The contractor must complete the full project within 77 consecutive calendar days from the Notice to Proceed. Two rehabilitation methods are specified as acceptable: PVC fold and form liner (AM-LINERII system per ASTM F1871) or cast-in-place pipe (CIPP) method per ASTM F1216 and F1743. A pre-construction conference will be held at the site prior to commencement of work. The specification requires comprehensive submittals including a progress schedule within 10 calendar days of contract award, shop drawings, samples, daily progress reports, and a schedule of values at least 20 days before the first payment request.

All bids must be accompanied by a bid bond equal to 5% of the total bid amount issued by a surety company licensed in Utah, with the bond naming the City of St. George as obligee. A 100% performance bond and labor and materials bond are required upon contract award. Liquidated damages of $250.00 per calendar day will be assessed for each day the project extends beyond the 77-day contract period. The contractor bears all costs for mobilization, temporary facilities, traffic control, public notification, utility coordination, encroachment permits, cleaning, bypass pumping, inspection, testing, and restoration of construction sites. Payment for mobilization is distributed across six milestone payments based on percentage of contract completion, with final payment upon completion of all work. The City of St. George reserves the right to reject any or all submissions and to waive any formality or technicality in the proposal process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART B

TECHNICAL SPECIFICATIONS

DIVISION 100 – GENERAL REQUIREMENTS

General Requirements 101-1

SECTION 101

GENERAL REQUIREMENTS

1.1 SUMMARY OF THE WORK. The Bid Schedule includes the furnish and installation of approximately 8,000 lineal feet of sewer relining using either PVC fold and form liner or cast in place pipe (CIP) method with associated cleaning and lateral work.

1.2 CONTRACT TIME. The Contractor will be required to complete the full project within 77 consecutive calendar days from the NOTICE TO PROCEED

In the event the Contractor(s) does not meet the above time schedule, liquidated damages of $250.00 per calendar day for each calendar day used beyond the contract time indicated will be assessed.

1.3 SAFETY AND HEALTH. The contractor shall comply with, and is responsible for enforcement of safety and health regulations for construction, promulgated by the Secretary of Labor under Section 107 of the Contract Hours and Safety Standards Act, as set forth in Title 29, C.F.R. Copies of these regulations may be obtained from the Labor Building, 14th and Constitution Avenue NW, Washington, DC 20013.

The Contractor shall also comply with the provisions of the Federal Occupational Safety and Health Act as amended.

1.4 REFERENCES. Abbreviations used in this specification for various societies, organizations, or government bodies shall stand for the following:

AASHTO American Association of State Highway and Transportation Officials

ACI American Concrete Institute ANSI American National Standards Institute ASTM American Society for Testing and Materials AISC American Institute of Steel Construction AITC American Institute of Timber Construction AISI American Iron and Steel Institute APA American Plywood Association AWWA American Water Works Association AWS American Welding Society FHA Federal Housing Authority ICBO International Conference of Building Officials NEC National Electric Code NEMA National Electrical Manufacturers' Association NWWDA National Wood Window & Door Association UL Underwriter's Laboratory UBCUniform Building Code

General Requirements 101-2

1.5 QUANTITIES AND PAYMENT. The amount of work to be done, and materials or services to be furnished under the Contract as noted in the proposal, are estimates and are not to be taken as an expressed or implied statement that the actual amount of work or materials will correspond to the estimate. In the event the total amount of the lowest acceptable bid exceeds the amount of funds available for the project, the scope of work will be modified as determined by the Owner and Engineer.

The right is reserved to increase or decrease or to entirely eliminate certain items from the work or materials if found desirable or expedient, and the Contractor is cautioned against unbalancing his bid by prorating his overhead into one or two items only when there are a number of items on the proposal. The overhead and indirect charges should be prorated on all items in the proposal.

The Contractor will be allowed no claims for anticipated profits, loss of profits, or for damages because of any difference between the estimated and the actual amount of work done, or materials furnished or used in the completed project.

Other items of work defined in the specifications, but not listed in the Bid Schedule, shall be considered incidental to one or more of the items listed in the Bid Schedule and shall be paid for under the bid item listed to which it is related, as determined by the Engineer.

Project Meetings 102-1

SECTION 102

PROJECT MEETINGS

1.1 PRECONSTRUCTION CONFERENCE. A pre-construction conference between the Water Services Engineer, Water Services Inspector, various Water Services Personnel, and Contractor shall be held at the site prior to commencement of the Work.

(a)This meeting shall be for the purpose of -

(1) Resolving current problems,

(2) Further orienting Contractor to requirements of the Contract Documents,

(3) Informing Contractor of Engineer's responsibility for inspection,

(4) Working out with Contractor a general schedule of inspection.

1.2 PROGRESS MEETINGS. Periodic job site meetings will be held by Engineer.

(a) Contractor shall attend such meetings and shall require subcontractors to attend as necessary.

(b) These meetings are for the purpose of -

(1) Insuring that all activities are being coordinated properly on project,

(2) To assist in staying on schedule.

(3) Checking Status of -

(a) Submittals,

(b) Changes,

(c) Progress payments,

(d) Other matters will be reviewed.

Submittals 103-1

SECTION 103

SUBMITTALS

1.1 SUBMITTALS. Deliver submittals to the Water Services Engineer unless indicated otherwise. Accompany each submittal with a letter of transmittal indicating:

(a) Title of Project

(b) Name of Contractor

(c) Title of Submittal

1.2 PROGRESS SCHEDULE. Immediately after being awarded the Contract, prepare and submit for review an estimated progress schedule for the Work. Progress schedule shall be in sufficient detail to include but not be limited to:

(a) Significant elements of the Work.

(b) Time frame for each element of work with a beginning and ending point.

(c) Percentage of progress of work placed or to be placed in a monthly period of time.

(d) Value of the elements of work and relationship of elements of work one to the other for the total work under the Contract.

Progress schedule shall be updated monthly and submitted with each periodic estimate for partial pay, and shall show the original progress schedule or revised progress schedule one entry for each item of work as follows:

(a) Progress of work placed prior to period of partial payment then being requested.

(b) Progress during period of partial payment being requested.

(c) Remaining work to be done by each item of work and for total work remaining under the Contract.

1.3 SUBMITTAL SCHEDULE.

Contractor shall, within ten (10) calendar days after receipt of Notice to Proceed, furnish a submittal schedule listing all items that will be furnished for review to Water Services Engineer.

(a) This schedule shall include, among other things, shop drawings, Manufacturer's literature, certificates of compliance, materials samples, materials colors, guarantees, etc.

103-2

(b) Schedule shall indicate type of item, contract requirement reference, Contractor's scheduled dates for submitting the items, and projected need dates for review answers from Engineer. Schedule shall show a minimum of seven (7) calendar days after receipt for review by Engineer. If re-submittal is required, an additional five (5) days will be allowed for after receipt. Contractor shall revise and/or up-date this schedule as appropriate and submit it with each payment estimate until all items have been submitted and reviewed.

(c) Submittal schedule shall be coordinated with progress schedule for all the Work.

Contractor shall revise and/or up-date the schedule to insure consistency with the progress schedule as it may be revised and/or updated. Such revised submittal schedules shall be promptly provided.

(d) Furnishing of the submittal schedule or revision thereto shall not be interpreted as relieving Contractor of his obligation to comply with all the Specification requirements for items on the schedule.

Progress schedule shall be updated monthly and submitted with each periodic estimate for partial pay, and shall show the original progress schedule or revised progress schedule one entry for each item of work as follows:

(a) Progress of work placed prior to period of partial payment then being requested.

(b) Progress during period of partial payment being requested.

(c) Remaining work to be done by each item of work and for total work remaining under the Contract.

1.4 PROGRESS REPORTS.

Contractor shall prepare daily reports of his operations and forward them to Engineer on at least a weekly basis. The daily report will contain at least the following information:

(a)Weather conditions, (b)Manpower on the job in each trade, (c)Major items of equipment on the job, (d)A brief summary of work accomplished that day, (e)Materials, equipment, or Owner-furnished items arriving or leaving site, (f)Significant events, 103-3

(g)Any tests made and their result if known, (h)Any oral instructions received, (i)Visitors to the job.

Contractor shall maintain a file of copies of all daily reports on the site and make it available to the Engineer upon request.

1.5 SHOP DRAWINGS, PRODUCT DATA, & SAMPLES.

Definitions.

(a) Shop drawings are drawings, diagrams, illustrations, schedules, performance charts, brochures, and other data which are prepared by Contractor or any subcontractor, manufacturer, supplier, or distributor. Shop drawings illustrate some portion of the Work and confirm dimensions and conformance to Contract Documents.

(1)Shop drawings are not a part of the Contract Documents.

(b) Samples are physical examples furnished by Contractor to illustrate materials, equipment, color, or workmanship and to assist in the establishment of standards by which the Work will be judged.

Procedure.

(a) Contractor shall review and designate (stamp) his approval and submit to Engineer, with reasonable promptness and in orderly sequence, all shop drawings and samples required by the Contract Documents.

(1) Divisions and Sections of the Project Manual requiring submission of shop drawings to Engineer are as follows. If a broadscope Section heading is given, all of the subsections in that Section are to submit shop drawings.

(2) Shop drawings and samples not required by the Contract Documents but requested by Contractor or supplied by those under contract to him need not be submitted to Engineer for approval unless specifically requested. These shop drawings shall meet all specified shop drawing requirements except those relating to submission to Engineer.

(b) Shop drawings and samples shall be properly identified as specified or as Engineer may require.

(c) Contractor shall reject shop drawings not in conformance with the Contract Documents.

(d) Shop drawings shall be complete and detailed. If reviewed by Engineer, each copy of the

103-4 shop drawings will be identified as having received such approval by being so stamped and dated. If review "with exception" or "as noted" by Engineer is so identified, stamped, and dated, Contractor shall comply with notations shown. If such qualified review is shown or if the shop drawings are not reviewed by Engineer or if resubmission is so directed, Contractor shall make any corrections required or indicated by Engineer at Contractor's expense.

(1) Any shop drawing or correction indicated on a shop drawing which does not conform to the Contract Documents shall be submitted as a change order and approved, as required under Section 14, of the General Conditions, prior to performing the changed work.

(2) Number of copies of shop drawings and other submittals required will be established at the Pre-construction Conference if more than three are required.

Contractor shall bear cost of reproducing copies of shop drawings required by all concerned. In lieu of prints, a sepia may be required.

By approving shop drawings and samples, Contractor thereby represents that he has determined and verified all field measurements, field construction criteria, materials, catalog numbers, and similar data, or will do so, and that he has checked and coordinated each shop drawing and sample with requirements of the Work and of the Contract Documents.

No work requiring a shop drawing or sample submission shall be commenced until submission has been approved by Engineer.

Samples.

(a) Where specified or required, Contractor shall submit samples to Engineer together with specification material, affidavits, and other documentation as may be required by Engineer.

(b) It is Contractor's specific responsibility to ascertain that samples submitted have been checked and approved by him.

(c) Cost of samples, together with transportation, delivery, and any other costs, shall be borne by Contractor. Samples shall be submitted in duplicate and one of each sample shall be retained in the office of Engineer until completion of the Project.

(d) Where samples are specifically required to be submitted for approval, no work involving the sampled materials shall proceed until written approval has been obtained from Engineer.

Review By Engineer.

(a) Review of shop drawings by Engineer shall not be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory.

103-5

Review of such drawings will not relieve Contractor of responsibility for any error which may exist in the submittals.

1.6 SCHEDULE OF VALUES. A schedule of dollar values shall be submitted to Engineer and Owner not less than twenty (20) days prior to first request for payment and shall be a condition precedent to processing first payment. Schedule of values shall be submitted on Owner's standard payment request form. This breakdown shall follow the trade Divisions of the Specification and each item thereunder shall include its pro rata part of overhead and profit so the sum of the items will equal the contract price. Breakdown will correspond exactly to items of work in the progress schedule including work of subcontractors.

Material and Equipment 104-1

SECTION 104

MATERIAL & EQUIPMENT

1.1 MATERIAL & EQUIPMENT.

Materials incorporated into the project shall be new, except as otherwise indicated in the Specifications, of specified quality, and furnished in sufficient quantity to facilitate proper and speedy execution of the Work.

Contractor shall, if required, furnish evidence of the quality of any materials.

Materials not meeting requirements of the Contract Documents shall be removed from Project by Contractor without expense to Owner.

1.2 DELIVERY, STORAGE, & HANDLING.

Materials shall be delivered to the site in original packaging with labels and trademarks intact, and such labels and trademarks shall remain intact until used.

Contractor shall confine his apparatus, storage of materials, and operations of his workmen to limits indicated by law, ordinances, and permits and shall arrange and maintain parking of vehicles and storage of materials in an orderly manner leaving all walks, driveways, roads, and entrances, unencumbered.

All equipment on site shall be protected from physical damage and from the elements by measures satisfactory to Engineer. All rotating equipment shall be rotated four turns once each week during construction.

1.3 PRODUCT OPTIONS & SUBSTITUTIONS.

When several materials are specified in the Contract Documents by name for one use, Contractor may select any one of those so specified. The mixing of several products specified by name for one use is prohibited.

Wherever an item or class of material is specified exclusively by trade name, name of maker, or by catalog reference, use such item only unless Engineer's approval for a substitution is secured by Addendum a minimum of 10 days before bid opening time. Items and material not specified in the Contract Documents and installed in the Work shall be removed and replaced by specified items and material at no additional cost to Owner and for no additional time added to Contract.

Wherever words "Approved by", "Satisfactory to", "submitted to", "inspected by," or similar phrases are used in this Specification, they shall be understood to mean that the material or item referred to shall be approved by, be satisfactory to, submitted to, or inspected by Engineer.

Contract Closeout 105-1

SECTION 105

CONTRACT CLOSEOUT

1.1 FINAL CLEANING.

Contractor shall, at completion of work, remove all rubbish from under and about the Construction Site.

If Contractor fails to clean up, Owner may do so and the cost thereof will be charged to the Contractor.

1.2 PRE-SUBSTANTIAL COMPLETION, SUBSTANTIAL COMPLETION, & FINAL

INSPECTIONS

Pre-substantial Completion Inspection.

(a) Upon Contractor's request, Engineer (and his consultants as appropriate) will make an inspection and furnish to Contractor a list of items to be corrected by Contractor.

(b) Upon correction of these items, Engineer will arrange a substantial completion inspection to include Owner.

Substantial Completion Inspection.

(a) At the substantial completion inspection, unless building is rejected, Owner, Engineer, and Contractor will execute a Certificate of Substantial Completion which states the dates for -

(1)Commencement of warranties, (2)Final completion inspection,

(3) Modifications to the amount assessed for liquidated damages.

(b) After inspection, Engineer will furnish final list of items to be corrected.

Final Inspection.

(a) Final Completion Inspection will ensure that all deficiencies noted at the substantial completion inspection have been corrected according to terms of the substantial completion certificate.

(b) The contractor shall obtain signed release waivers from all suppliers and subcontractors before final payment will be authorized.

Contract Closeout 105-2

(c) When all items have been corrected, Engineer will issue a certificate authorizing final payment.

(d) If all items have not been corrected as agreed, Owner may elect to complete the Work under provisions of Section 16 of the General Conditions.

1.3 PROJECT RECORD DOCUMENTS. Contractor shall deliver to Engineer prior to substantial completion inspection:

(a) Accurate "as built" drawings and letters of the work if the work is constructed in any way at variance to that shown on Contract Documents. "As built" drawings or descriptive letters for other work will be supplied if requested.

(b) Certificates of inspection and of occupancy that may be required by authorities having jurisdiction over the Work.

1.4 OPERATING & MAINTENANCE DATA. Before execution of the Certificate of Substantial Completion, Contractor shall furnish the operating instructions and maintenance manuals as called for in Contract Documents.

1.5 WARRANTIES & BONDS.

When written guarantees beyond one year after substantial completion are required of any section of the Work, Contractor shall secure such guarantees and/or warranties properly addressed and signed and in favor of Owner. These documents shall be delivered to Engineer upon substantial completion of Contractor's work and prior to execution of Certificate of Substantial Completion.

Delivery of guarantees and warranties shall not relieve Contractor from any obligation assumed under any other provisions of his contract.

Nothing herein intends or implies that guarantees and/or warranties shall apply to work abused or neglected by Owner.

Mobilization 106-1

SECTION 106

MOBILIZATION

DESCRIPTION

1.1 GENERAL. This item of work is provided to cover the Contractor's cost for general and miscellaneous responsibilities and operations not normally attributable to, or included in, any other single bid schedule item. This shall include, but not necessarily be limited to, work, described or enumerated in this section under the following subsections.

CONSTRUCTION

2.1 MOVING TO AND FROM JOB SITE. This shall include the Contractor's preliminary arrangements for starting construction operations, work schedules, and transportation of equipment and personnel to and from the project.

2.2 TEMPORARY FACILITIES.

Field Office. The Contractors of each schedule shall provide and maintain a temporary field office on the project or within 5 miles of the project limits.

Sanitary Facilities for Construction Workers. The Contractor shall provide, for all his workers on the project, adequate and reasonably convenient uncontaminated drinking water supply and temporary toilet facilities. All facilities shall comply with the Utah Safety and Health Act.

Utilities for Construction Operations. The Contractor shall make arrangements for, secure and pay for, any and all utility supplies such as electric power, water, natural gas or telephone that may be required for prosecution of the work.

Temporary Lighting. The Contractor shall provide all temporary lighting required for prosecution of his work and for employee and public safety. As a minimum, lighting levels during working hours shall meet the requirements of U.O.S.H.A. Subsection 1926.56 Illumination.

Heating and Ventilating. The Contractor shall provide any and all heating and ventilating equipment required to assure a safe environment for workers and to prevent damage to the project facilities from freezing or excessive temperature.

2.3 PUBLIC SAFETY AND TRAFFIC CONTROL. The cost of all safety and traffic control devices shall be included in the lump sum bid price for "Mobilization."

2.4 RESTORATION OF CONSTRUCTION SITE. The cost of all clean-up work as specified in the following sections shall be included in the Bid Schedule lump sum price for "Mobilization."

Mobilization 106-2

2.5 TEMPORARY UTILITIES. The Contractor shall arrange for, secure and pay directly any and all temporary utility supplies he may require for prosecution of his work. The cost of such utilities shall be included in the lump sum price of "Mobilization."

2.6 BONDS AND PERMITS. The Contractor shall secure all bonds and permits required for the prosecution of the work, the cost of which shall be included in the lump sum price of "Mobilization."

BASIS OF PAYMENT

3.1 PAYMENT. Payment for this work will be made at the contract unit price for "Mobilization" as listed in the Method of Measurement and Basis of Payment.

Nothing herein shall be construed to limit or preclude partial payments, otherwise provided for by the contract.

Method of Measurement & Basis of Payment 107-1

SECTION 107

METHOD OF MEASUREMENT & BASIS OF PAYMENT

1.1 General. All work will be measured by the units indicated in the bid schedule. Payment will be considered completed compensation for all design, labor, material, materials, and equipment necessary to complete each item in accordance with the Contract Documents, Specifications, and Drawings.

2.1 Bid Items.

Bid Item #1 – Mobilization

The city of St. George requires the Contractor to secure an encroachment permit for work in the city right-of-way. The Contractor shall submit for review and approval his proposed signage and traffic routing plan with his application for the encroachment permit. The Contractor shall follow all requirements of the encroachment permit. The cost to obtain an encroachment permit shall be included in the lump sum bid price for “Mobilization”.

All temporary construction signs and flagging shall be according to the Manual on Uniform Traffic Control Devices (MUTCD), latest edition. The cost of all safety and traffic control devices shall be included in the lump sum price bid for “Mobilization”.

The Contractor shall coordinate the relocation of existing utilities with the appropriate utility company. The cost to coordinate relocation of existing utilities shall be considered incidental to the project and shall be included as part of the lump sum price bid for “Mobilization”.

This item shall also include any items listed or shown under Section 106.

Payment for this work will be made at the contract unit price for "Mobilization". Six payments will be made in accordance with the following schedule:

(1) When 5% of the original contract amount is earned, 25% of the amount bid for mobilization, or 2 1/2% of the original contract amount, whichever is lesser, will be paid.

(2) When 10% of the original contract amount is earned, 50% of the amount bid for mobilization, or 5% of the original contract amount, whichever is lesser, will be paid.

(3) When 25% of the original contract amount is earned, 60% of the amount bid for mobilization, or 6% of the original contract amount, whichever is lesser, will be paid.

(4) When 65% of the original contract amount is earned, 90% of the amount bid for mobilization, or 9% of the original contract amount, whichever is lesser, will be

107-2 paid.

(5) When 80% of the original contract amount is earned, 100% of the amount bid for mobilization, or 10% of the original contract amount, whichever is lesser, will be paid.

(6) Upon completion of all work on the contract any unpaid amount of the original contract amount for mobilization will be paid.

Nothing herein shall be construed to limit or preclude partial payments, otherwise provided for by the contract.

Payment for Mobilization as defined in this section will be made at the contract lump sum price as specified under bid item #1.

Bid Item(s) #2-#5,- Furnish and Install Liner

This item shall consist of all materials, labor, and equipment necessary to install a functioning liner in the existing sewer line including, but not limited to, video, cleaning, pumping, lining, curing, freight, trucking, and installation of the liner and restoring any improvements to existing condition or better. This item shall also include reinstating or cutting out the existing laterals.

Measurement for payment of this item shall be based on the number of lineal feet of sewer line relined under Bid Item #2-#5 of the Bid Schedule.

Bid Item(s) #6-#8- Furnish and Install Lateral Connection Including Lateral Liner Insert

This item shall consist of all materials, labor, and equipment necessary to install an insert or liner between the main and the lateral and will extend a minimum of 12” into the lateral. The cost shall include but not limited to, video, cleaning, pumping, lining, curing, freight, trucking, and installation of the lateral liner and restoring any improvements to existing condition or better.

Due to the existing deteriorated condition of the existing pipe it is anticipated that every lateral will be lined. If it is found that the connection to the existing laterals are adequate without the lateral line the bid quantity will be adjusted accordingly.

Measurement for payment of this item shall be based on the number of lineal feet of sewer line relined under Bid Item #6-#8 of the Bid Schedule.

Bid Item #9- Point Repair including Surface Improvements

The bid price for this item shall be considered complete compensation for performing a point repair to the existing sewer main prior to relining the pipe as paid under Bid Item #2-#5. The contractor will be responsible to review the video of the existing sewer lines and fill out both the quantity and price of the repairs under this bid item.

107-3

Measurement for payment of this item shall be on a unit cost basis according to the number of repairs completed under Bid Item #9.

Non-Payment Items 108-1

SECTION 108

NON-PAYMENT ITEMS

1.1 NON-PAYMENT ITEMS. The Contractor shall not be paid for the following items. The costs associated with these items should be included in the unit prices for other items on the Bid Schedule.

A. All materials, labor and equipment required to excavate, uncover, remove, replace, or reconstruct any facility or improvement that was not properly inspected and tested at the time of installation as required by these specifications.

B. All construction watering and dust control costs.

C. All items required to be finished on the final inspection "Punch List".

D. All removal and replacement of concrete, road base or bituminous materials required due to faulty materials or workmanship.

E. Repairs to any existing utilities including power lines, water laterals, gas lines, irrigation lines, irrigation ditches, culverts, cable t.v., mail box standards, etc.

F. Damage to public or other physical facilities resulting from the contractor's negligence or construction operations, etc.

G. Restoration of existing surface improvements.

H. Saw-cutting any existing asphalt required to complete the project.

I. Coordination and scheduling delivery of the construction materials with material suppliers and inspection of the materials upon delivery.

J. All costs associated with the removal and replacement of materials that are unable to meet testing or warranty requirements. This includes, but is not limited to, excavation, disposal, replacement, shipping and installation costs.

K. All costs associated with providing quality control inspection and testing required by the City including preparation of a written report to summarize and certify results.

L. All costs associated with providing traffic control during construction.

M. All costs associated with moving and resetting signs, mail box standards, etc.

Sheet 1

SECTION 601

PIPE REHABILITATION BY THERMOFORMED (FOLD AND FORM) PIPE

METHOD

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

The work specified under this section provides for the rehabilitation of an existing sewer pipeline or conduit using PVC Fold and Form trenchless technology. The process consists of installing a thermoformed PVC pipe liner inside an existing sewer (Host Pipe) from manhole to manhole as described in the following sections. When installed the liner will be a seamless, joint-less, solid wall PVC pipe liner that tightly conformed to the interior contours of the original host pipe. The liner shall be continuous from manhole to manhole with no seams or joints. In most cases required service connections will be reconnected using closed circuit television and remotely controlled cutters.

1.1.1 The PVC liner shall be the AM-LINERII sewer rehabilitation system as supplied by American Pipe & Plastics, Inc.

1.1.2 “Approved equal”. Alternative materials must be approved not less than 5 days prior to the bid date.

1.2 REFERENCED DOCUMENTS

This specification references ASTM standards and other related standards, which are made a part hereof by reference and shall be the latest edition thereof.

ASTM D 638 ( ) Standard Test Method for Tensile Properties of Plastics

ASTM D 790 ( ) Standard Test Method for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

ASTM D 1784 ( ) Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds

ASTM F 1867 ( ) Standard Practice for Installation of Folded/Formed Poly (Vinyl Chloride) (PVC) Pipe Type A for Existing Sewer and Conduit Rehabilitation

ASTM F 1871 ( ) Standard Specification for Folded/Formed Poly (Vinyl Chloride) Pipe Type A for Existing Sewer and Conduit Rehabilitation

ASTM F 2122 ( ) Standard Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings

NASSCO SG-11.010/03 Specification For Sewer Line Cleaning

Sheet 2

PART 2 PRODUCTS

2.1 PIPELINER

2.1.1 General

The PVC pipe liner shall meet the requirements of ASTM F-1871

2.1.2 PVC Compound

The PVC compound used for the thermoformed PVC pipe shall conform to ASTM D 1784

CELL CLASSIFICATION 12111.

2.1.3 Pipe liner Physical Characteristics

The installed pipe liner shall provide the following minimum physical properties as listed below:

Table 2.1.3

Physical Characteristics

Test Procedures

Pipe Material

PVC

Tensile Strength ASTM D-638 3,600 psi Tensile Modulus ASTM D-638 155,000 psi Flexural Strength ASTM D-790 4,100 psi Flexural Modulus ASTM D-790 145,000 psi

2.1.4 Pipe liner Sizing

2.1.4.1 The liner shall be fabricated to a size which, when installed, will neatly fit the internal circumference of the conduit specified by the Engineer. Allowance for circumferential expansion during installation shall be made. The liner material shall be made only from a PVC compound especially designed for sewer rehabilitation.

2.1.4.2 The minimum length shall span the distance from the inlet to the outlet of the respective pipe to be lined. The Contractor shall verify the lengths in the field before insertion of the liner.

2.1.4.3 The minimum thickness shall be either SDR 32.5 OR SDR 26, depending upon the specific requirements of the pipeline as determined by the design calculations of a professional engineer. The minimum design thickness shall be calculated in accordance with the criteria set forth in appendix X1 of ASTM F 1867 and using a maximum reduction for long term modulus of 25%. When expanded to its full nominal diameter the minimum average wall thickness of the liner must be equal to or greater than the minimum requirement of the specified SDR as shown in the Table 2.2.4.3, when measured according to ASTM D 2122.

Sheet 3

Table 2.2.4.3

Minimum Average Wall Thickness for Formed Liners Nominal O.D.

in.

Minimum Average Wall Thickness, in.

SDR 32.5 SDR 26

6 0.185 0.231 8 0.246 0.308 10 0.308 0.385 12 0.369 0.462 15 0.437 0.588

2.2 MANUFACTURE

2.2.1 Pipe liner Marking

The pipe shall be marked at 5-foot intervals or less with the manufacturer’s name or trade mark, product name, nominal outside diameter, dimensional ratio, PVC cell classification, date of manufacture, shift, state where production facility is located, and production line number.

2.2.2 Materials

The pipe liner shall be extruded from a specially formulated polyvinyl chloride (PVC) compound that meets the physical properties indicated in section 2.1.2 and the requirements of section 6 of

ASTM F 1871.

2.2.3 Testing

Before shipment from the factory the product shall be tested in accordance with the manufacturers established quality control/quality assurance procedures. The testing requirements of the manufactures QC/QA program must equal or exceed those specified in

ASTM F 1871.

PART 3 EXECUTION

3.1 PRE-INSTALLATION

3.1.1 Host Pipe Preparation

3.1.1.1 The host pipe shall be cleaned in accordance with SPECIFICATION FOR SEWER LINE CLEANING as provided by the National Association of Sewer Service Companies (NASSCO). For bidding purposes the Contractor shall assume that the pipes require normal cleaning which is defined as two to three passes with a jet cleaner unless unique conditions are noted as special provisions, on the TV log sheets or videos made available to the Contractor before the bid opening. Special additional cleaning not identified will be paid for on a time and material basis.

3.1.1.2 Debris that would interfere with the installation of the pipe liner shall be removed.

The Contractor shall dispose of debris in a location provided by the Owner and in accordance with all Federal, State and Local regulations

Sheet 4

3.1.1.3 The pipeline shall be cleared of obstructions such as solids, dropped joints, protruding service connections or collapsed pipe that may prevent pipe liner installation. If inspection reveals an obstruction that cannot be removed by conventional sewer cleaning equipment then a point repair excavation shall be made to uncover and remove or repair the obstruction. Such point repair shall be approved in writing by the Owner’s representative prior to commencement of the work and shall be considered as a separate pay item.

3.1.1.4 High levels of groundwater infiltration into the host pipe, that will affect the successful installation of the liner shall be remediated by either chemical grouting or point repair prior to lining as approved by the Engineer. Such repairs shall be approved in writing by the Owner’s representative prior to commencement of the work and shall be considered as a separate pay item.

3.1.1.5 Pre-Lining television Inspection: Prior to lining the Contractor shall inspect the pipeline by means of closed circuit television to identify any unknown defects or obstructions and to accurately locate active services. Color video recordings in VHS, MPEG, or .avi format shall be made of the television inspections and two copies each shall be supplied to the Owner along with a computer generated or hand written inspection report. The Contractor shall make accurate television inspection logs that clearly show the location, in relation to adjacent manholes, of each source of infiltration discovered. Other data of significance including the locations of service connections, joints, defective materials, unusual conditions, roots, storm sewer connections, collapsed sections, presence of scale and corrosion and other discernible features shall be recorded and two copies of such records shall be supplied to the Owner in printed format along with the video recordings. The contractor shall submit a report to the Owner detailing any defects in the pipeline that will prevent the successful installation of the liner.

This report shall also contain a plan for proposed corrective action for repairs to the pipeline. Such repairs shall be approved in writing by the Owner’s representative prior to commencement of the work and shall be considered as a separate pay item.

3.1.2 Flow Control

When required for acceptable completion of the pipe liner installation, the Contractor shall implement the pre-approved by-pass pumping plan in section 1.4.3.1.

3.1.3 Public Notification:

A public notification program shall be implemented, and shall as a minimum, require the Contractor to be responsible for:

3.1.3.1 Written notice to be delivered to each home or business describing the work, how it affects them and a local telephone number of the Contractor they can call to discuss the project or any problems, which could arise.

3.1.3.2 The written notice shall be delivered the day, or week prior to the beginning of work being conducted on the section relative to the residents affected.

Sheet 5

3.1.3.3 Personal contact with any home or business, which cannot be reconnected within the time stated in the written notice.

3.2 LINER INSTALLATION

3.2.1Pre Heating Prior to insertion of the liner into the host pipe the Contractor shall pre-heat the liner in the manner proscribed by the manufacturers installation instructions. The heated liner must be pliable enough to be pulled into the host pipe with as little resistance as possible.

3.2.2Pipe Liner Insertion The liner pipe shall be inserted into the sewer through existing manholes, without modification of the manholes. Insertion of the liner into the host pipe will be accomplished by pulling the liner into the host pipe by means of a steel cable strung through the host pipe from a winch located at the downstream manhole. The end of the liner shall be prepared for attachment to the cable in accordance with the manufacturers instructions. The connection between the pulling cable and the prepared end of the liner shall be a swivel device to prevent twisting of the liner as it is pulled through the host pipe. The heated liner coil shall be placed in such a manner as to prevent damage to the liner as it is pulled through the manhole and into the host pipe.

A member of the installation crew at the upstream end shall monitor the speed of the pull;

he must coordinate the speed of the pull with the winch operator at the downstream manhole via two-way radio. The crewmember coordinating the insertion of the liner shall ensure that the liner has the proper amount of slack, to prevent it from being either stretched or kinked.

3.2.3Stress Relief After the liner has been inserted into the host pipe, the Contractor shall relieve any stress imparted to the liner during the insertion in a manner proscribed in the manufacturer’s installation instructions.

3.2.4Processing The Contractor shall supply suitable heat source equipment. The equipment shall be capable of delivering steam through the lining section to uniformly raise the temperature of the PVC material to effect forming of the liner pipe.

Suitable monitors shall be installed to gauge steam temperatures and temperatures at the input and exhaust ends of the liner. Steam monitoring methods and forming period shall be recommended by the liner manufacturer.

After forming the liner shall be cooled using compressed air or a mixture of compressed air and water. Cooling shall be deemed complete when the temperature of the exhaust air or air water mixture has remained constantly below 110ºF for a minimum of 20 minutes.

3.2.5Pipe Liner Trimming After installation the ends of the PVC liner shall be cut off in the maintenance hole. The cuts shall be smooth and parallel with the maintenance hole wall. The finished liner shall not protrude into the maintenance hole over 2 inches.

If the maintenance hole has been lined through, the top half of the liner pipe may be cut off even with the top of the shelf, leaving the channel lined.

Sheet 6

3.2.6Sealing Manhole Connections If a watertight seal is required at the manhole it may be accomplished by troweling a high viscosity epoxy cement or resin around the exposed ends of the liner and the surface of the manhole. The surface of the epoxy cement shall be shaped to smoothly transition the exposed liner to the manhole wall. If specified by the Owner a hydrophilic gasket may be placed between the pipe liner and the host pipe prior to expansion of the liner. In either case the exposed liner in the manhole shall be smoothly transitioned into the wall of the manhole using the epoxy cement.

3.2.7Service Connections The exact number and location of service connections shall be determined from the CCTV inspection done in section 3.1.3.5 of this specification. It shall be the Contractor’s responsibility to accurately locate all existing service connections whether in service or not. The Contractor shall reconnect all potentially active service connections to the pipe liner, including those from unoccupied, abandoned or vacant lots. Capped service connections shall not be reconnected unless otherwise directed by the Owner. The Contractor shall be responsible for restoring/correcting, without delay, all missed service lateral connections. All service connections that are reinstated after lining shall be shown on the “As Built Drawings” with the exact distance from the upstream manhole.

All existing service connections shall be reinstated either by remotely controlled robotic device or by excavation.

Only experienced operators shall make robotic service connection reinstatements.

Should a dimple not form or cannot be clearly ascertained at a given service connection its position must be carefully re-verified using the inspection video from 3.1.3.5.

Service reconnections shall be smooth and circular in nature as observed by a pan and tilt TV camera. The hole shall be a maximum of 105% and a minimum of 90% of the service pipe diameter. The opening shall be smooth and conform to the inside shape and size of the original connection. Trial cuts should be repaired per the pipe liner manufacturer’s recommendations at no cost to the Owner.

3.3 POST INSTALLATION INSPECTION

Upon completion, and before acceptance of the work, the Contractor will inspect the rehabilitated pipeline using a CCTV camera with a pan and tilt head. The inspection shall be recorded on either VHS or DVD. The Operator will stop the camera at each lateral reinstatement and using the pan and tilt feature record and catalog each of the service connection cuts. The Contractor shall submit the post-installation video in either VHS or DVD format to the Owner for acceptance of the work.

3.4 INSPECTION AND TESTING

3.4.1Visual Inspection The pipe liner shall be continuous and joint-less. The pipe liner shall be free of all visual and material defects except those resulting from pre-lined host pipe conditions identified in the pre-lining video.

3.4.2Testing If required, the Contractor shall provide liner field samples to the Owner prior to installation for testing. The Owner will pay all expenses for the testing of liner samples

Sheet 7 to verify that the field samples meet the minimum specified values listed in Table 2.1.3.

The samples shall be tested per the recommendations of the pipe liner manufacturer The Contractor shall pay for the cost of re-tests made necessary by the failure of a sample to meet the minimum specified values listed in table 2.1.3. Field samples shall be collected in accordance with Section 7.3 of ASTM F 1867.

Normally separate leakage testing of the liner is not required, since the liner is under constant pressure during the cool down period. However, if separate leakage testing of the liner is required by the Owner in the specifications it shall be conducted at the time of installation after cool down and before the laterals are cut, in accordance with Section 7 of F 1867.

3.5 DEFECT REPAIR OR REPLACEMENT

Any defects, which in the judgment of the Owner and the pipe liner manufacturer that will affect the integrity or strength of the liner, shall be repaired or the pipe liner replaced at the Contractor’s expense per the pipe liner manufacturers recommendations.. All repairs or replacement of defective work shall be completed to the full satisfaction of the Owner.

3.6 WARRANTY

The Manufacturer shall warrant the product for a period of 10 years from the date of manufacture, against failure as a result of defects in materials or manufacturing, and that when properly installed the product will perform in accordance with the Manufacturer’s specifications, literature and data sheets.

Sheet 1

SECTION 602

SPECIFICATIONS FOR CURED-IN-PLACE PIPE (CIPP)

1.INTENT

1.1 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated flexible tube, which is formed to the original conduit by use of a hydrostatic head. The resin is cured using hot water under hydrostatic pressure within the tube. The Cured-In-Place Pipe (CIPP) will be continuous and tight fitting.

2.REFERENCED DOCUMENTS

2.1 This specification references ASTM F1216 (Rehabilitation of pipelines by the inversion and curing of a resin-impregnated tube), ASTM F1743 (Rehabilitation of pipelines by pulled-in-place installation of a cured-in-place thermosetting resin pipe), and ASTM D790 (Test methods for flexural properties of non-reinforced plastics) which are made a part hereof by such reference and shall be the latest edition and revision thereof. In case of conflicting requirements between this specification and these referenced documents, this specification will govern.

3.PRODUCT, MANUFACTURER, CONTRACTOR QUALIFICATION REQUIREMENTS

3.1 Since sewer products are intended to have a 50-year design life, and in order to minimize the Owner’s risk, only proven products with substantial successful long term track records will be approved.

Products and Contractors seeking approval must meet all of the following criteria to be deemed Commercially Acceptable:

3.1.1 For a Product to be considered Commercially Proven, a minimum of 1,000,000 linear feet or 4,000 manhole-to-manhole line sections of successful wastewater collection system installations in the U.S. must be documented to the satisfaction of the Owner to assure commercial viability. In addition, at least 100,000 linear feet of the product shall have been in successful service within the State for a minimum of five years.

3.1.2 For a Contractor to be considered as Commercially Proven, the Contractor must satisfy all insurance, financial, and bonding requirements of the Owner, and must have had at least 5 (five) years active experience in the commercial installation of the product bid. In addition, the Contractor must have successfully installed at least 1,000,000 feet of the same product bid in wastewater collection systems and a minimum of 50,000 of thirty (30) inch or greater in diameter. Field Supervisor/Foreman: Minimum five (5) years as a foreman/superintendent for a cured-in-place lining crew (installing actual product included with this

Sheet 2 bid/project), and a minimum of 300,000 lineal feet of cured-in-place lining, diameters up to, and including, twenty-three (23) inch (Engineer shall select appropriate experience requirement based upon work included with project. If work includes work in both diameter ranges please include both clauses) or Minimum of five (5) years as a foreman/superintendent for a cured-in-place lining crew, a minimum of 50,000 lineal feet of cured-in-place lining of twenty-four (24) inch or greater, installed under his/her supervision. Such experience shall include the actual product, by trade name, CONTRACTOR proposes to install.

Acceptable documentation of these minimum installations must be submitted to the Owner.

3.1.3 For a product and installer to be Commercially Proven, the installer must own and operate a legally permitted permanent facility to impregnate the CIPP tubes. To ensure the Owner all installed products will meet the minimum product quality control standards set forth by the manufacture, all CIPP liners shall be impregnated by the approved product’s licensed installer that is performing the work. No pre-impregnated CIPP products will be accepted from a third-party vendor. Please provide a copy of your permits for this facility with the bid.

3.1.4 Sewer rehabilitation products submitted for approval must provide Third Party Test Results supporting the long term performance and structural strength of the product and such data shall be satisfactory to the Owner. Test samples shall be prepared so as to simulate installation methods and trauma of the product. No product will be approved without independent third party testing verification.

3.1.5 Both the rehabilitation manufacturing and installation processes shall operate under a quality management system which is third-party certified to ISO 9001.

Proof of certification shall be required for approval.

3.1.6 Proposals must be labeled clearly on the outside of the proposal envelope, listing the product name and Contractor being proposed. Only proposals using pre-approved products and Contractors will be opened and read. Proposals submitted on products and/or from Contractors that have not been pre-approved will be returned unopened.

4.MATERIALS

4.1 Tube - The sewn Tube shall consist of one or more layers of absorbent non-woven felt fabric and meet the requirements of ASTM F1216 or ASTM F1743, Section

5. The tube shall be constructed to withstand installation pressures, have sufficient strength to bridge missing pipe, and stretch to fit irregular pipe sections.

4.1.1 The wet out Tube shall have a uniform thickness that when compressed at installation pressures will meet or exceed the Design thickness.

4.1.2 The Tube shall be sewn to a size that when installed will tightly fit the internal circumference and length of the original pipe. Allowance should be made for

Sheet 3 circumferential stretching during inversion. Overlapped layers of felt in longitudinal seams that cause lumps in the final product shall not be utilized.

4.1.3 The outside layer of the Tube (before wet out) shall be coated with an impermeable, flexible membrane that will contain the resin and facilitate monitoring of resin saturation during the resin impregnation (wet out) procedure.

4.1.4…