About this file

This is an HVAC floor plan and layout document prepared by Evan Lloyd Associates, Inc. for the State of Illinois, depicting new air handling units for the LPU Print Shop at the Northend Stratton Building located at 401 S. Spring Street, Springfield, Illinois. The project, numbered 25-049, calls for the installation of two air handling units (AHU-1 and AHU-2, each with 800 CFM cooling capacity) and one heat pump unit (HP-1 with 48,000 BTUH cooling capacity). The plan shows the partial basement HVAC configuration with detailed specifications for refrigerant piping, condensate drain lines, control wiring, and equipment mounting requirements. The document is dated August 7, 2025, with a project expiration date of November 30, 2026.

The specifications require the HVAC contractor to be experienced in the trade and to install all systems in accordance with the 2018 International Mechanical Code and 2021 International Energy Conservation Code. The contractor must obtain manufacturer shop drawings, provide a minimum of three sets to the using agency, architect, and themselves, and deliver an operation and maintenance manual to the owner. Equipment specifications include Trane units (models TPKFYP024KM142B for air handlers and NTXMSM48A182BA for the heat pump) with pre-charged refrigerant line sets featuring 3/4-inch insulation and tamper-resistant caps. All condensate piping must be Schedule 40 PVC with solvent-welded connections. The HVAC subcontractor is required to provide a one-year written guarantee covering all labor and materials from the date of substantial completion, with any field condition changes to be made at no additional cost to the owner.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

HV-1

TCR

© Evan Lloyd Associates, Inc.

TC

S

E

CRADE

IO

N

AT

TIMOTHY

B. SMITH

L

SN

E

IC

S

TIH

F

TE

O ILIL

001-017445

Date:

Drawn By:

Revised:

Revised:

Project No.

SHEET

OF SHEETS.

Date Signed:

Expiration Date:

S ou th Si xth S tre et

Sp rin gfi eld

, Il lin ois

Ph on e

7.7

.70

NE

W

A

IR

H

AN

DL

IN

G

UN

IT

S

FO

R

TH

E

LP

U

PR

IN

T

SH

OP

N

OR

TH

E

ND

ST

RA

TT

ON

B

UI

LD

IN

G

1 S . S

PR

IN

G

ST

SP

RI

NG

FI

EL

D, IL

LIN

OI

S

AUG. 7, 2025

25-049

AUG. 7, 2025

NOV. 30, 2026

SCALE: 18" = 1'-0"

PARTIAL BASEMENT HVAC PLAN

NO

RT

H

EXISTINGSTORAGE

EXISTING PRINTSHOP

EXISTING STORAGE

EXISTING SECURITYOFFICE EXISTING MECHANICALROOM

EXISTINGTOILET

EXISTING LOADINGDOCK

HP

48,000 BTUH

COOLING

D

D

D

D

RISE UP ABOVE THE CEILING

AND RUN AS HIGH AS POSSIBLE.

HVAC CONTRACTOR SHALL REMOVE

PORTIONS OF THE EXISTING CEILING

TO INSTALL THE NEW CONDENSATE

DRAIN LINE ABOVE THE CEILING.

EXTEND TO NEAREST

EXISTING FLOOR DRAIN.

AHU

800 CFM

AHU

800 CFM

RUN NEW 5/8" PVC DRAIN LINE

FROM EACH UNIT HIGH ON WALL.

EXISTING STORAGE

EXISTINGCORRIDOR

EXISTING POST OFFICE

EXISTING SECURITYOFFICE

NEW 5/8" PVC DRAIN LINE

FROM EACH UNIT.D

PITCH DN.

PITCH DN.

EXISTINGCORRIDOR

RUN NEW SUCTION LINE AND LIQUID LINE

HIGH ON WALL, RUN ONE ABOVE THE OTHER.

USAGE

AREA OF

710 3/4

O/A

DUCT

HP

PHASE

AHU-1

MARK COOLING

AIR HANDLING UNIT SCHEDULE

CFM

COOLING

HIGH SPEED

.50"

( KW-BTUH)

HEATING CAPACITYE.S.P. COIL

VOLT.

CONFIG.

UNIT REMARKS

HORIZONTAL

AMPS

.63N/A

AND MODEL NUMBER

MANUFACTURER

TRANE TPKFYP024KM142B GENERAL

1, 2, 3

PROVIDE MOUNTING WALL BRACKET, MOUNT UNIT 1'-0" BELOW CEILING.

PROVIDE A CONDENSATE PUMP.

PIPE CONDENSATE DRAIN LINES PER MANUFACTURER'S REQUIREMENTS.

1.

2.

3.

REMARKS:

3/4710AHU-2 .50" GENERAL- N/A 1

HORIZONTAL

HORIZONTALHORIZONTAL 208.63

SEER

MIN.

TRANE NTXMSM48A182BA

MARK

HEAT PUMP SCHEDULE

REMARKSAND MODEL NUMBER

MANUFACTURER

28.0

COOLING CAPACITY

NOMINAL

PHASE

VOLT.

208 1HP-1 AHU-1 & 2

UNIT

INDOOR

AMPS

MOCD

50.048,000 1, 2, 3, 4

PROVIDE PRE-CHARGED REFRIGERANT LINE SETS W/

3/4" INSULATION.

PROVIDE WALL MOUNTING BRACKET.

1.

2.

REMARKS:

PROVIDE LOCKED, TAMPER RESISTANT CAPS ON THE

REFRIGERANT LINES PER THE I.M.C. M110.10

MOUNT THE TOP OF THE UNIT AT 8'-0" A.F.F.

3.

4.

AHU-1

TYPICAL HEATING AND

COOLING THERMOSTAT

NTXMSM48A182BA

TB7L1L2L3

TB3 G DIP SWITCH 3-7 OFF

(S)

J1 P1

L1L2 G

CN105 TB5 TB15

16-2 AWG (S)

L1L2 G

CN105 TB5 TB15

TPKFYP024KM142B TPKFYP024KM142B

MIFH2 MIFH2

MRCH2 MRCH2

SCALE: N.T.S.

AHU-1 & 2 REFRIGERANT & CONTROL WIRING DIAGRAM

GRD.

DIAGRAM SYMBOL LEGEND

DISPLAY DESCRIPTION

CONTROL WIRE

REF. PIPE

TRANE TPKFYP024KM142B

AHU-2

SCALE: N.T.S.

KEY PLAN

NO

RT

H

PROJECT AREA

GENERAL HVAC NOTES

HVAC CONTRACTOR SHALL NOT SCALE THE DRAWINGS FOR EQUIPMENT SIZES. HVAC CONTRACTOR SHALL OBTAIN THE LATEST SHOP DRAWINGS FROM THE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AND USE IT FOR ACTUAL DIMENSIONS.

ALL WORK SHALL BE PERFORMED BY A HVAC CONTRACTOR EXPERIENCED IN THE TRADE. HVAC CONTRACTOR SHALL INSTALL SYSTEMS, EQUIPMENT AND COMPONENTS IN ACCORDANCE WITH MINIMUM REQUIREMENTS SHOWN IN THESE PLANS. ANY DEVIATION FROM THE DESIGN PLANS SHALL ONLY BE PERFORMED IF APPROVED BY THE ARCHITECT. ALL WORK SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. HOWEVER, ANY DEVIATION FROM THE DESIGN PLANS IMPLIED BY LOCAL CODES THAT SUGGESTS INSTALLATION OF LESS THAN THE REQUIREMENTS SPECIFIED IN THESE DESIGN PLANS SHALL NOT BE ALLOWED WITHOUT APPROVAL BY THE ARCHITECT.

ALL THE HVAC WORK SHALL BE INSTALLED PER THE 2018 INTERNATIONAL MECHANICAL CODE AND THE 2021 INTERNATIONAL

ENERGY CONSERVATION CODE.

THE HVAC SUBCONTRACTOR SHALL PROVIDE A MINIMUM OF 3 SETS OF SHOP DRAWINGS: 1 SET FOR THE USING AGENCY, 1 SET FOR THE ARCHITECT AND 1 SET FOR THEMSELVES. THE HVAC CONTRACTOR SHALL ALSO PROVIDE AN OPERATION AND

MAINTENANCE MANUAL FOR THE OWNER.

THE HVAC SUBCONTRACTOR SHALL PROVIDE THE OWNER WITH A WRITTEN ONE (1) YEAR GUARANTEE COVERING ALL LABOR AND MATERIALS FURNISHED AND INSTALLED AS PART OF THIS PROJECT. THE GUARANTEE SHALL COMMENCE FROM THE DATE

OF SUBSTANTIAL COMPLETION.

THE HVAC SUBCONTRACTOR SHALL INSTALL THE NEW EQUIPMENT PER THE MANUFACTURER REQUIREMENTS.

ALL WORK SHALL BE PERFORMED AS INDICATED ON DRAWINGS UNLESS FIELD CONDITIONS REQUIRE MINOR CHANGES SHALL

BE MADE WITH NO ADDITIONAL COST.

ALL CONDENSATE PIPING SHALL BE SCHEDULE 40 PVC PIPING AND FITTINGS WITH SOLVENT WELDED CONNECTIONS.