Appendix C - Price Schedule.doc

DOC document 46 KB Posted

Attached to
Concrete and Masonry Scanning Services
Solicitation number
6-B185-Q-00205-00
Issued by

About this file

This is a price schedule template (Appendix C) for labor and other cost estimates used in federal contracting. The form provides a structured framework for contractors to submit pricing information for solicitation evaluation purposes. It is a blank template document that does not contain specific pricing data, contract details, or requirements unique to any particular solicitation.

The template includes three main sections: Section A requests estimated labor costs organized by classification, with columns for estimated hours, fully loaded hourly rates, and calculated labor costs; Section B provides space for estimating all other costs by category with units/hours and corresponding rates; and Section C displays the total estimated cost. The form is dated November 30, 1999 (Rev. 11/30/99) and includes a placeholder for contract number to be assigned. This appendix is designed to be used in conjunction with the Concrete and Masonry Scanning Services RFQ issued by Argonne National Laboratory (Solicitation Number 6-B185-Q-00205-00) under the Department of Energy Office of Science, where pricing will be evaluated as a lowest price, technically acceptable factor for award determination.

View the file

Other files

File Type Posted
Addendum 0001.pdf PDF
Appendix A Argonne Terms and Conditions for Labor Hour and Time and Materials Contracts ANL-528.pdf PDF
ANL-366M.pdf PDF
Appendix B SOW.docx DOCX document
ANL-71COM.pdf PDF
ANL-70 RFQ.doc DOC document
ANL-70A Reps and Certs Short.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AppC-lh2 (Rev. 11/30/99) Contract No. TBD Appendix "C"

LABOR AND OTHER COST ESTIMATES

1.

Estimated Labor and All Other Costs:

A.

Estimate of Total Labor Dollars

Classification
Estimated

Hours

(a) Fully Loaded

Hourly Rate

(b) Labor Cost (axb)

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Subtotal

B.

Estimate of All Other Costs

Category
Estimated Units/Hours
Rate
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

Subtotal

C.
Total Estimated Cost

PAGE

File details come from the government source that posted it. Updated .