UT NP ARCH 100(2) - Cross Sections-Option X.pdf

PDF 6 MB Posted

Attached to
UT NP ARCH 100(2) Bridges on Delicate Arch Road
Solicitation number
6982AF27B000005
Issued by

About this file

This document is a set of design cross-section sheets for the Bridges on Delicate Arch Road project (UT NP ARCH 100(2)) located in Arches National Park, Utah. The project is a federal highway construction initiative prepared by the U.S. Department of Transportation Federal Highway Administration, Central Federal Lands Highway Division, in coordination with the National Park Service.

The project encompasses bridge construction, drainage, pavement rehabilitation, roadway realignment, asphalt surfacing, and safety improvements along Delicate Arch Road. The cross-sections are presented for Option X and detail mainline sections, channel grading sections, and culvert sections spanning from station 11+00 to 29+36, with specific focus on the Salt Valley Wash area. Sheets show existing and proposed grades, subgrade elevations, slope ratios (typically 1:4.0 to 1:6.0), and drainage details including two 30-inch HDPE culverts at 93 feet length with specific slope gradients. Construction specifications reference the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The design was finalized in July 2026 and prepared by S. Davis (Lead Designer) and J. Felling under the management of Project Manager E. Jessee at the Central Federal Lands Highway Division in Denver, Colorado.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTAH KEY MAP

ARIZONA

WYOMING

IDAHO

C O

L O

R A

D O

N E

V A

D A

Logan

Ogden

CITY

LAKE

SALT

Salina

River

Green

Moab

St. George

City

Cedar

Delta

G R

E E

N

R I V

E R

C O

L O

R A

D O

R

IV

E R

SAN JUAN RIVER

Delicate Arch Road

Project UT NP ARCH 100(2)

Know what'sbelow.

before you dig.Call

R www.call811.com

R

D E P

A T

M

E

NT

OF TRANSPO

R T

A T I O

N

U N

IT

E

D STATES OF

AME

R I C

A curb.

Refer to the plans and staking data for slope ratios behind concrete2.

bridge are not shown.

Cross Sections from Sta. 16+40 - 17+40 at the proposed1.

CROSS SECTION NOTE:

CROSS SECTIONS

OPTION X

BRIDGES ON DELICATE ARCH ROAD

UT NP ARCH 100(2)

BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND

SPECIFICATIONS:

Slopes are expressed as RISE:RUN

U.S. CUSTOMARY DIMENSIONS:

improvements rehabilitation and widening, asphalt surfacing, and safety

Bridge construction, drainage, pavement, roadway realignment, TYPE OF CONSTRUCTION:

LEAD DESIGNER

S. DAVIS J. FELLING

PROJECT MANAGER

DENVER, CO

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

PLANS PREPARED BY

ARCHES NATIONAL PARK

NATIONAL PARK SERVICE

U.S. DEPARTMENT OF THE INTERIOR

HIGHWAY DESIGN MANAGER

E. JESSEE

:0

P M

J u ly

D e s ig n I n tl

F t

N

U T

\a rc h

(2

R o a d w a y

\C A

D D

S h e e ts

\X -M

L

X s e c \X

S S

-T T

L -O

P T

IO

N

X .d g n

PROJECT

NUMBER

SHEET

BRIDGES ON DELICATE ARCH ROAD

UT NP ARCH 100(2)

X0

NPS Drwg No. 138/192565 NPS PMIS No. 231001 d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

11+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

4,320 4,320

OPTION X CROSS SECTIONS DELICATE ARCH ROAD

BRIDGES ON DELICATE ARCH ROAD

FHWA, Office of Federal Lands Highway

:4

A

J u ly

B L

.0

S h e e t]

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X1

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

UT NP ARCH 100(2)

g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

11+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

4,320 4,320

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X2

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

LC

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

11+31.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 -2.0% -1.9%

1:4.0

4,304.98 Des Grade =

4,304.15 Subgrade =

4,304.98 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X3

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

11+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-2.0% -1.0%

1:4.0

4,304.64 Des Grade =

4,303.81 Subgrade =

4,304.69 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

11+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-2.0% +0.3%

1:4.0

4,304.19 Des Grade =

4,303.36 Subgrade =

4,304.21 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X4

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-2.0% +1.6%

1:4.0

4,303.74 Des Grade =

4,302.91 Subgrade =

4,303.71 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+02.33

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-2.0% +1.7%

1:4.0

4,303.70 Des Grade =

4,302.87 Subgrade =

4,303.66 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X5

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 1:4 .0

-2.9% +2.9%

1:4.0

4,303.29 Des Grade =

4,302.46 Subgrade =

4,303.15 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+35.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 1:4 .0

-3.4% +3.4%

1:4.0

4,303.12 Des Grade =

4,302.29 Subgrade =

4,302.93 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X6

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 1:4 .0

-3.4% +3.4%

1:4.0

4,302.85 Des Grade =

4,302.02 Subgrade =

4,302.58 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+70.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 1:4 .0

-3.4% +3.4%

1:4.0

4,302.49 Des Grade =

4,301.66 Subgrade =

4,302.11 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X7

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

12+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 1:4 .0

-3.1% +3.1%

1:4.0

4,302.40 Des Grade =

4,301.57 Subgrade =

4,301.98 Original Grnd =

FHWA, Office of Federal Lands Highway

:3

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X8

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

LC E

g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-1.8% +1.8%

1:4.0

4,301.95 Des Grade =

4,301.12 Subgrade =

4,301.35 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X9

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+01.89

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-1.7% +1.7%

1:4.0

4,301.92 Des Grade =

4,301.09 Subgrade =

4,298.92 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.8

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X10

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

-0.6% +0.5%

1:4.0

4,301.50 Des Grade =

4,300.67 Subgrade =

4,300.50 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X11

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+36.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

+0.0% -0.0%

1:4.0

4,301.30 Des Grade =

4,300.47 Subgrade =

4,300.12 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X12

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0

1:4 .0

+0.7% -0.8%

1:4.0

4,301.05 Des Grade =

4,300.22 Subgrade =

4,299.65 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4.0 1:4 .0

+2.0% -2.0%

1:4.0

4,300.60 Des Grade =

4,299.77 Subgrade =

4,298.89 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X13

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

13+93.65

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,300

4,310 4,310

1:4 .0

+3.0% -3.0%

1:5.0

4,300.27 Des Grade =

4,299.44 Subgrade =

4,298.15 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

14+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,290 4,290

4,300 4,3001:4 .0

+3.3% -3.3%

1:5.0

4,300.16 Des Grade =

4,299.33 Subgrade =

4,297.72 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.6

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X14

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

14+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300 1:4 .0

-4.6%

1:5.0

4,299.72 Des Grade =

4,298.89 Subgrade =

4,296.02 Original Grnd =

+4.6%

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

14+40.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+5.3% -5.3%

1:5.0

4,299.47 Des Grade =

4,298.64 Subgrade =

4,295.05 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X15

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

14+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+5.8% -5.8%

1:5.0

4,299.31 Des Grade =

4,298.48 Subgrade =

4,294.75 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

14+53.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+6.0% -6.0%

1:5.0

4,299.26 Des Grade =

4,298.43 Subgrade =

4,294.65 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X16

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

14+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0%

1:4.5

4,298.95 Des Grade =

4,298.12 Subgrade =

4,294.64 Original Grnd =

+6.0%

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+6.0% -6.0% -6.0% -6.0%

1:5.0

4,298.62 Des Grade =

4,297.79 Subgrade =

4,293.36 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X17

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+10.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+6.0% +6.0% -6.0% -6.0% -6.0%

1:5.0

4,298.50 Des Grade =

4,297.67 Subgrade =

4,292.50 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0%

1:5.0

4,298.33 Des Grade =

4,297.50 Subgrade =

4,292.27 Original Grnd =

+6.0%

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X18

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+6.0%+6.0% +6.0% -6.0% -6.0% -6.0%

1:5.0

4,298.08 Des Grade =

4,297.25 Subgrade =

4,292.34 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+60.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+6.0% +6.0% +6.0% -6.0% -6.0% -6.0%

1:5.0

4,298.00 Des Grade =

4,297.17 Subgrade =

4,292.39 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X19

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+5.3%

-5.3% -5.3%

1:6.0

4,297.87 Des Grade =

4,297.04 Subgrade =

4,292.05 Original Grnd =

+5.3%

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

15+80.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+5.1% +5.1% +5.1% -5.1% -5.1% -5.1%

1:6.0

4,297.84 Des Grade =

4,297.01 Subgrade =

4,291.93 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X20

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

16+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+4.2% +4.2% +4.2% -4.2% -4.2% -4.2%

1:6.0

4,297.70 Des Grade =

4,296.87 Subgrade =

4,291.44 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

16+19.32

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+3.4% +3.4% +3.4% -3.4% -3.4% -3.4%

1:6.0

4,297.60 Des Grade =

4,296.77 Subgrade =

4,291.17 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X21

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

16+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

+3.1% +3.1% +3.1% -3.1% -3.1% -3.1%

1:6.0

4,297.56 Des Grade =

4,296.73 Subgrade =

4,291.16 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X22

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

16+40.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

+2.4% +2.4%

+0.7% 1:5.8

1:5.4

-2.4% -2.4%

4,297.48 Des Grade =

4,296.65 Subgrade =

4,291.15 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X23

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

17+40.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

-2.0% -2.0%

1:6.1

+2.0% +2.0%

4,296.93 Des Grade =

4,296.10 Subgrade =

4,293.93 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

17+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-2.4% -2.4% -2.4% +2.4% +2.4% +2.4%

1:8.0

4,296.88 Des Grade =

4,296.05 Subgrade =

4,291.97 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X24

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

17+73.32

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-3.5% -3.5% -3.5% +3.5% +3.5% +3.5%

1:8.0

4,296.75 Des Grade =

4,295.92 Subgrade =

4,292.07 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

17+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-3.6% -3.6%

+3.6%

1:8.0

4,296.74 Des Grade =

4,295.91 Subgrade =

4,292.08 Original Grnd =

+3.6%

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.3

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X25

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

18+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-4.7% -4.7% -4.7% +4.7% +4.7% +4.7%

1:8.0

4,296.60 Des Grade =

4,295.77 Subgrade =

4,291.74 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

18+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-5.8% -5.8%

+5.8%

1:8.0

4,296.40 Des Grade =

4,295.57 Subgrade =

4,291.69 Original Grnd =

+5.8%

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X26

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

18+30.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0% -6.0% +6.0% +6.0%+6.0%

1:8.0

4,296.35 Des Grade =

4,295.52 Subgrade =

4,291.69 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

18+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0% -6.0% +6.0% +6.0%+6.0%

1:8.0

4,296.12 Des Grade =

4,295.29 Subgrade =

4,292.07 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X27

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

18+70.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0% -6.0% +6.0% +6.0%

1:8.0

4,295.83 Des Grade =

4,295.00 Subgrade =

4,292.34 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

18+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0%

1:8.0

4,295.75 Des Grade =

4,294.92 Subgrade =

4,292.24 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X28

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

19+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0% -6.0% +6.0% +6.0%

1:8.0

4,295.31 Des Grade =

4,294.48 Subgrade =

4,292.31 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

19+20.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -6.0% -6.0% +6.0% +6.0%

-5.0%

4,294.90 Des Grade =

4,294.07 Subgrade =

4,292.03 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X29

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

19+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4 .0

-6.0% -5.0%

4,294.79 Des Grade =

4,293.96 Subgrade =

4,292.16 Original Grnd =

+6.0%

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

19+40.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0 1:4 .0

-6.0% -6.0% +6.0% +6.0%

1:6.0

4,294.44 Des Grade =

4,293.61 Subgrade =

4,292.05 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X30

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

19+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0 1:4 .0

-6.0% -6.0% +6.0% +6.0%

1:4.0

4,294.19 Des Grade =

4,293.36 Subgrade =

4,291.51 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

19+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0 1:4 .0

-6.0% 1:4.0

4,293.51 Des Grade =

4,292.68 Subgrade =

4,291.32 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X31

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

20+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0

1:4 .0

-6.0% -6.0% +6.0% +6.0%

1:4.0

4,292.76 Des Grade =

4,291.93 Subgrade =

4,291.47 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

20+15.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0

1:4 .0

-6.0% -6.0% +6.0% +6.0%

1:4.0

4,292.29 Des Grade =

4,291.46 Subgrade =

4,291.41 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X32

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

20+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0

1:4 .0

-5.5% 1:4.0

4,291.99 Des Grade =

4,291.16 Subgrade =

4,291.26 Original Grnd =

+5.5%

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

20+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

4,300 4,300

1:4.0

1:4 .0

-4.2% -4.2% +4.2% +4.2%

1:4.0

4,291.25 Des Grade =

4,290.42 Subgrade =

4,290.87 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X33

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

20+73.55

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290 1:4.0

1:4 .0

-3.0% -3.0% +3.0% +3.0%

1:4.0

4,290.60 Des Grade =

4,289.77 Subgrade =

4,290.42 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

20+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290 1:4.0

1:4 .0

-2.9% -2.9% +2.9% +2.9%

1:4.0

4,290.56 Des Grade =

4,289.73 Subgrade =

4,290.39 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.5

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X34

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

21+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,2901:4.0 1:4 .0

-2.0% -2.0% +1.6% +1.6%

1:4.0

4,289.93 Des Grade =

4,289.10 Subgrade =

4,289.88 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

21+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290 1:4.0

1:4 .0

-2.0% -2.0% +0.4% +0.4%

1:4.0

4,289.34 Des Grade =

4,288.51 Subgrade =

4,289.37 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X35

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

21+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -0.9% -0.9%

1:4.0

4,288.80 Des Grade =

4,287.97 Subgrade =

4,288.82 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

21+71.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0

4,288.39 Des Grade =

4,287.56 Subgrade =

4,288.35 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X36

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

21+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0

4,288.31 Des Grade =

4,287.48 Subgrade =

4,288.28 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

22+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0

4,287.86 Des Grade =

4,287.03 Subgrade =

4,287.84 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X37

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

22+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0

4,287.49 Des Grade =

4,286.66 Subgrade =

4,287.48 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

22+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

1:4.0

+0.0% 1:4 .0

-2.0% -2.0% -2.0% -2.0%

4,287.18 Des Grade =

4,286.35 Subgrade =

4,287.26 Original Grnd =

FHWA, Office of Federal Lands Highway

:2

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X38

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

22+54.99

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

1:4.0

-0.0%

1:4 .0

-2.0% -2.0% -2.0% -2.0%

4,287.13 Des Grade =

4,286.30 Subgrade =

4,287.23 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

22+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

1:4.0

-0.0%

1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0

4,286.96 Des Grade =

4,286.13 Subgrade =

4,287.10 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.9

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X39

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

23+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

1:4.0

-0.0% 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,286.80 Des Grade =

4,285.97 Subgrade =

4,287.02 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

23+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,270 4,270

4,280 4,280

4,290 4,290

1:4.0

-0.0% 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,286.73 Des Grade =

4,285.90 Subgrade =

4,285.36 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X40

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

23+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,286.72 Des Grade =

4,285.89 Subgrade =

4,286.97 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

23+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,286.80 Des Grade =

4,285.97 Subgrade =

4,287.02 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X41

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

24+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,286.92 Des Grade =

4,286.09 Subgrade =

4,287.08 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

24+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.04 Des Grade =

4,286.21 Subgrade =

4,287.14 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X42

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

24+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.17 Des Grade =

4,286.34 Subgrade =

4,287.21 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

24+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.29 Des Grade =

4,286.46 Subgrade =

4,287.28 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X43

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

25+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.42 Des Grade =

4,286.59 Subgrade =

4,287.38 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

25+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.54 Des Grade =

4,286.71 Subgrade =

4,287.50 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X44

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

25+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.67 Des Grade =

4,286.84 Subgrade =

4,287.59 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

25+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.79 Des Grade =

4,286.96 Subgrade =

4,287.68 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X45

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

26+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,287.92 Des Grade =

4,287.09 Subgrade =

4,287.79 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

26+20.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0% -2.0% -2.0% -2.0%

1:4.0 1:4 .0

4,288.02 Des Grade =

4,287.19 Subgrade =

4,287.88 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X46

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

26+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-1.8% -1.8% -2.0% -2.0%

1:4.0 1:4 .0

4,288.04 Des Grade =

4,287.21 Subgrade =

4,287.92 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

26+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-0.8% -0.8% -2.0% -2.0%

1:4.0 1:4 .0

4,288.11 Des Grade =

4,287.28 Subgrade =

4,288.06 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X47

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E x

G r a v e l

E x

G r a v e l

26+60.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:6.0 1:4 .0

-0.4% -0.4% -2.0% -2.0%

1:4.0 1:4 .0

4,288.11 Des Grade =

4,287.28 Subgrade =

4,288.11 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

26+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:6.0 1:4 .0

+0.2% +0.2% -2.0% -2.0% 1:3 .3

4,288.11 Des Grade =

4,287.28 Subgrade =

4,288.18 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X48

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

27+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

+1.2% +1.2% -2.0% -2.0%

-2.2%

4,288.04 Des Grade =

4,287.21 Subgrade =

4,288.34 Original Grnd =

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

27+12.16

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

+1.7% +1.7% -2.0% -2.0%

-2.5%

4,287.99 Des Grade =

4,287.16 Subgrade =

4,287.93 Original Grnd =

FHWA, Office of Federal Lands Highway

:5

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X49

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

27+20.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

+2.0% +2.0% -2.0% -2.0%

-2.6%

-1.9%

4,287.95 Des Grade =

4,287.12 Subgrade =

4,287.93 Original Grnd =

LC

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

27+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:4.0 1:4 .0

-2.0%

-2.6%

-2.0% -1.8%

4,287.92 Des Grade = 4,287.13 Des Grade =

4,287.09 Subgrade = 4,286.30 Subgrade =

4,287.94 Original Grnd = 4,287.47 Original Grnd =

+2.0%

FHWA, Office of Federal Lands Highway

:2

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X50

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

27+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

1:6.0 1:4 .0

+2.0% +2.0% -2.0% -2.0% 1:4.6 -1.7% 1:4

.0 -1.8% -1.7% -1.5% -1.4%

4,287.72 Des Grade = 4,286.62 Des Grade =

4,286.89 Subgrade = 4,285.79 Subgrade =

4,287.77 Original Grnd = 4,286.68 Original Grnd =

LC

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

27+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

-2.0% 1:4.4

-0.7% 1:3 .6 -1.1% -1.1% -1.1%

4,287.46 Des Grade = 4,286.22 Des Grade =

4,286.63 Subgrade = 4,285.39 Subgrade =

4,287.49 Original Grnd = 4,285.82 Original Grnd =

FHWA, Office of Federal Lands Highway

:2

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X51

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

28+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

+2.0% +2.0% -2.0% -2.0% 1:4.4

+0.7% 1:3 .6 -1.0% -1.0% -1.0%

4,287.14 Des Grade = 4,286.20 Des Grade =

4,286.31 Subgrade = 4,285.37 Subgrade =

4,287.14 Original Grnd = 4,285.74 Original Grnd =

LC LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

28+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

-2.0% 1:4.4

+4.6% 1:3 .5 -1.0% -1.0% -1.0%

4,286.76 Des Grade = 4,286.43 Des Grade =

4,285.93 Subgrade = 4,285.60 Subgrade =

4,286.75 Original Grnd = 4,286.09 Original Grnd =

FHWA, Office of Federal Lands Highway

:2

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X52

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

LC LC

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

28+50.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

+2.0% +2.0% -2.0% -2.0% 1:4.5 +4.7%

1:3 .5

-1.1% -1.1% -1.1%

4,286.37 Des Grade = 4,286.67 Des Grade =

4,285.54 Subgrade = 4,285.84 Subgrade =

4,286.35 Original Grnd = 4,286.33 Original Grnd =

LC

LCLC E

d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

28+75.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

-2.0% 1:4.7 -3.6% 1:3 .4

-1.2% -1.2% -1.2%

4,285.98 Des Grade = 4,286.92 Des Grade = 4,287.56 Des Grade =

4,285.15 Subgrade = 4,286.09 Subgrade = 4,287.23 Subgrade =

4,285.96 Original Grnd = 4,286.53 Original Grnd = 4,287.32 Original Grnd =

FHWA, Office of Federal Lands Highway

:2

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X53

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

29+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

+2.0% +2.0% -2.0% -2.0% 1:4.9-6.3%

1:3 .4

-0.9% -0.9% -1.2%

4,285.70 Des Grade = 4,287.17 Des Grade =

4,284.87 Subgrade = 4,286.34 Subgrade =

4,285.72 Original Grnd = 4,286.77 Original Grnd =

LC

LC

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

29+00.31

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

+2.0% +2.0% -2.0% -2.0% 1:4.9-6.4%

1:3 .4

-0.9% -0.9% -1.2%

4,285.70 Des Grade = 4,287.17 Des Grade =

4,284.87 Subgrade = 4,286.34 Subgrade =

4,285.72 Original Grnd = 4,286.77 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X54

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

LC LC

d g e o f E x P a v e m e n t

29+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

+2.0% +2.0%

-2.9% +2.5% +2.6%

-2.0% -2.0%

+2.2%

4,285.60 Des Grade = 4,286.11 Des Grade =

4,284.77 Subgrade = 4,285.28 Subgrade =

4,285.59 Original Grnd = 4,286.36 Original Grnd =

LC

E d g e o f E x P a v e m e n t

29+36.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

4,280 4,280

4,290 4,290

+2.0% +2.0%-5.9% +2.1% -2.0% -2.0%

4,285.61 Des Grade =

4,284.78 Subgrade =

4,285.56 Original Grnd =

FHWA, Office of Federal Lands Highway

:4

J u ly

B L

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\X -M

L X s e c \X

S S

-O p ti o n X

-4 R

S e c ti o n s -1

.d g n

X55

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

200+60.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,280 4,280

4,290 4,290

4,300 4,300

1:3+0.0%

4,287.01 Des Grade =

200+70.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3-0.0%

4,286.91 Des Grade =

OPTION X SALT VALLEY WASH CHANNEL GRADING

FHWA, Office of Federal Lands Highway

:0

J u ly

S V

W B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y1

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

200+80.00

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3-0.0%

4,286.81 Des Grade =

200+90.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3+0.0%

4,286.63 Des Grade =

FHWA, Office of Federal Lands Highway

:0

S e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y2

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+00.00

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3-0.0%

4,286.36 Des Grade =

201+10.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3

-0.0%

4,286.01 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y3

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+20.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3

+0.0%

4,285.57 Des Grade =

LC

201+30.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3

4,285.06 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y4

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+40.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:3 1:3

+0.0%

4,284.53 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y5

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+50.00

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y6

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+60.00

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:2 1:3

4,283.49 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y7

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+70.00

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:2 1:3

4,283.00 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y8

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+80.00

4,270 4,270

4,280 4,280

4,290 4,290

4,300 4,300

1:2 1:

4,282.56 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y9

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

201+90.00

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:

+0.0%

4,282.15 Des Grade =

202+00.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:

4,281.79 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y10

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

202+10.00

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:

-0.0%

4,281.46 Des Grade =

202+20.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:

4,281.17 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y11

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

202+30.00

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:

-0.0%

4,280.92 Des Grade =

202+40.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:

4,280.71 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y12

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

202+50.00

4,270 4,270

4,280 4,280

4,290 4,290

1:2

1:

-0.0%

4,280.54 Des Grade =

202+60.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

1:2

1:3-0.0%

4,280.40 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y13

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

202+70.00

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:3-0.0%

4,280.27 Des Grade =

202+80.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:3-0.0%

4,280.13 Des Grade =

FHWA, Office of Federal Lands Highway

:0

J u ly

S V

W B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y14

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

202+90.00

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:3-0.0%

4,280.00 Des Grade =

203+00.00

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

1:2 1:3-0.0%

4,279.86 Des Grade =

FHWA, Office of Federal Lands Highway

:0 e p te m b e r

S

V W

B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y15

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

203+10.00

4,270 4,270

4,280 4,280

4,290 4,290

203+17.79

-50 -40 -30 -20 -10 0 10 20 30 40 50

4,270 4,270

4,280 4,280

4,290 4,290

FHWA, Office of Federal Lands Highway

:0

J u ly

S V

W B

.0

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Y -M in o r_

X s e c \X

S S

-C h a n n e l

G ra d in g R

-O p ti o n X

.d g n

Y16

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t

E d g e o f E x P a v e m e n t match existing cross section dimensions.

the edge of clearing limits. Grade channel to

Excavate and grade to drain outlet channel to1.

DRAINAGE NOTES

Varies

OPTION X

27+41.52

-50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90

4,280 4,280

4,290 4,290

1:5.9 1:4 .1

+1.7% +1.7% -1.7% -1.7%

-2.4%

-1.8% -1.6% -1.5%

4,287.80 Des Grade = 4,287.04 Des Grade =

4,286.97 Subgrade = 4,286.21 Subgrade =

4,287.84 Original Grnd = 4,287.35 Original Grnd =

30" HDPE x 93' @ -2.37%

CULVERT CROSS SECTIONS DELICATE ARCH ROAD

FHWA, Office of Federal Lands Highway

:1

J u ly

C u lv e r ts

O p t

X

.5

S h e

U T

\a rc h (2

R o a d w a y \C

A D

D S h e e ts

\Z -D ra in

X s e c \X

S D

U

T N

P A

R C

H (2

.d g n

Z2

NPS Drwg No. 138/192565 NPS PMIS No. 231001

NUMBER

SHEET

PROJECT

XXS-Option X-4R Sections.pdf
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Option X-4R Sections-100
XSS-Grading-Option X.pdf
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Channel Grading_95R-Option_X
XSS-Culvert_Option X.pdf
Option x z1
Option x z2

File details come from the government source that posted it. Updated .