UT NP ARCH 100(2) - Cross Sections-Option X.pdf
PDF 6 MB Posted
- Attached to
- UT NP ARCH 100(2) Bridges on Delicate Arch Road
- Solicitation number
- 6982AF27B000005
About this file
This document is a set of design cross-section sheets for the Bridges on Delicate Arch Road project (UT NP ARCH 100(2)) located in Arches National Park, Utah. The project is a federal highway construction initiative prepared by the U.S. Department of Transportation Federal Highway Administration, Central Federal Lands Highway Division, in coordination with the National Park Service.
The project encompasses bridge construction, drainage, pavement rehabilitation, roadway realignment, asphalt surfacing, and safety improvements along Delicate Arch Road. The cross-sections are presented for Option X and detail mainline sections, channel grading sections, and culvert sections spanning from station 11+00 to 29+36, with specific focus on the Salt Valley Wash area. Sheets show existing and proposed grades, subgrade elevations, slope ratios (typically 1:4.0 to 1:6.0), and drainage details including two 30-inch HDPE culverts at 93 feet length with specific slope gradients. Construction specifications reference the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The design was finalized in July 2026 and prepared by S. Davis (Lead Designer) and J. Felling under the management of Project Manager E. Jessee at the Central Federal Lands Highway Division in Denver, Colorado.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTAH KEY MAP
ARIZONA
WYOMING
IDAHO
C O
L O
R A
D O
N E
V A
D A
Logan
Ogden
CITY
LAKE
SALT
Salina
River
Green
Moab
St. George
City
Cedar
Delta
G R
E E
N
R I V
E R
C O
L O
R A
D O
R
IV
E R
SAN JUAN RIVER
Delicate Arch Road
Project UT NP ARCH 100(2)
Know what'sbelow.
before you dig.Call
R www.call811.com
R
D E P
A T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A curb.
Refer to the plans and staking data for slope ratios behind concrete2.
bridge are not shown.
Cross Sections from Sta. 16+40 - 17+40 at the proposed1.
CROSS SECTION NOTE:
CROSS SECTIONS
OPTION X
BRIDGES ON DELICATE ARCH ROAD
UT NP ARCH 100(2)
BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
SPECIFICATIONS:
Slopes are expressed as RISE:RUN
U.S. CUSTOMARY DIMENSIONS:
improvements rehabilitation and widening, asphalt surfacing, and safety
Bridge construction, drainage, pavement, roadway realignment, TYPE OF CONSTRUCTION:
LEAD DESIGNER
S. DAVIS J. FELLING
PROJECT MANAGER
DENVER, CO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED BY
ARCHES NATIONAL PARK
NATIONAL PARK SERVICE
U.S. DEPARTMENT OF THE INTERIOR
HIGHWAY DESIGN MANAGER
E. JESSEE
:0
P M
J u ly
D e s ig n I n tl
F t
N
U T
\a rc h
(2
R o a d w a y
\C A
D D
S h e e ts
\X -M
L
X s e c \X
S S
-T T
L -O
P T
IO
N
X .d g n
PROJECT
NUMBER
SHEET
BRIDGES ON DELICATE ARCH ROAD
UT NP ARCH 100(2)
X0
NPS Drwg No. 138/192565 NPS PMIS No. 231001 d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
11+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
4,320 4,320
OPTION X CROSS SECTIONS DELICATE ARCH ROAD
BRIDGES ON DELICATE ARCH ROAD
FHWA, Office of Federal Lands Highway
:4
A
J u ly
B L
.0
S h e e t]
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X1
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
UT NP ARCH 100(2)
g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
11+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
4,320 4,320
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X2
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
LC
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
11+31.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 -2.0% -1.9%
1:4.0
4,304.98 Des Grade =
4,304.15 Subgrade =
4,304.98 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X3
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
11+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-2.0% -1.0%
1:4.0
4,304.64 Des Grade =
4,303.81 Subgrade =
4,304.69 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
11+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-2.0% +0.3%
1:4.0
4,304.19 Des Grade =
4,303.36 Subgrade =
4,304.21 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X4
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-2.0% +1.6%
1:4.0
4,303.74 Des Grade =
4,302.91 Subgrade =
4,303.71 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+02.33
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-2.0% +1.7%
1:4.0
4,303.70 Des Grade =
4,302.87 Subgrade =
4,303.66 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X5
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 1:4 .0
-2.9% +2.9%
1:4.0
4,303.29 Des Grade =
4,302.46 Subgrade =
4,303.15 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+35.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 1:4 .0
-3.4% +3.4%
1:4.0
4,303.12 Des Grade =
4,302.29 Subgrade =
4,302.93 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X6
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 1:4 .0
-3.4% +3.4%
1:4.0
4,302.85 Des Grade =
4,302.02 Subgrade =
4,302.58 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+70.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 1:4 .0
-3.4% +3.4%
1:4.0
4,302.49 Des Grade =
4,301.66 Subgrade =
4,302.11 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X7
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
12+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 1:4 .0
-3.1% +3.1%
1:4.0
4,302.40 Des Grade =
4,301.57 Subgrade =
4,301.98 Original Grnd =
FHWA, Office of Federal Lands Highway
:3
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X8
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
LC E
g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-1.8% +1.8%
1:4.0
4,301.95 Des Grade =
4,301.12 Subgrade =
4,301.35 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X9
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+01.89
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-1.7% +1.7%
1:4.0
4,301.92 Des Grade =
4,301.09 Subgrade =
4,298.92 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.8
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X10
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
-0.6% +0.5%
1:4.0
4,301.50 Des Grade =
4,300.67 Subgrade =
4,300.50 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X11
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+36.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
+0.0% -0.0%
1:4.0
4,301.30 Des Grade =
4,300.47 Subgrade =
4,300.12 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X12
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0
1:4 .0
+0.7% -0.8%
1:4.0
4,301.05 Des Grade =
4,300.22 Subgrade =
4,299.65 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4.0 1:4 .0
+2.0% -2.0%
1:4.0
4,300.60 Des Grade =
4,299.77 Subgrade =
4,298.89 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X13
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
13+93.65
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,300
4,310 4,310
1:4 .0
+3.0% -3.0%
1:5.0
4,300.27 Des Grade =
4,299.44 Subgrade =
4,298.15 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
14+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,290 4,290
4,300 4,3001:4 .0
+3.3% -3.3%
1:5.0
4,300.16 Des Grade =
4,299.33 Subgrade =
4,297.72 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.6
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X14
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
14+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300 1:4 .0
-4.6%
1:5.0
4,299.72 Des Grade =
4,298.89 Subgrade =
4,296.02 Original Grnd =
+4.6%
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
14+40.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+5.3% -5.3%
1:5.0
4,299.47 Des Grade =
4,298.64 Subgrade =
4,295.05 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X15
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
14+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+5.8% -5.8%
1:5.0
4,299.31 Des Grade =
4,298.48 Subgrade =
4,294.75 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
14+53.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+6.0% -6.0%
1:5.0
4,299.26 Des Grade =
4,298.43 Subgrade =
4,294.65 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X16
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
14+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0%
1:4.5
4,298.95 Des Grade =
4,298.12 Subgrade =
4,294.64 Original Grnd =
+6.0%
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+6.0% -6.0% -6.0% -6.0%
1:5.0
4,298.62 Des Grade =
4,297.79 Subgrade =
4,293.36 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X17
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+10.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+6.0% +6.0% -6.0% -6.0% -6.0%
1:5.0
4,298.50 Des Grade =
4,297.67 Subgrade =
4,292.50 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0%
1:5.0
4,298.33 Des Grade =
4,297.50 Subgrade =
4,292.27 Original Grnd =
+6.0%
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X18
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+6.0%+6.0% +6.0% -6.0% -6.0% -6.0%
1:5.0
4,298.08 Des Grade =
4,297.25 Subgrade =
4,292.34 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+60.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+6.0% +6.0% +6.0% -6.0% -6.0% -6.0%
1:5.0
4,298.00 Des Grade =
4,297.17 Subgrade =
4,292.39 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X19
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+5.3%
-5.3% -5.3%
1:6.0
4,297.87 Des Grade =
4,297.04 Subgrade =
4,292.05 Original Grnd =
+5.3%
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
15+80.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+5.1% +5.1% +5.1% -5.1% -5.1% -5.1%
1:6.0
4,297.84 Des Grade =
4,297.01 Subgrade =
4,291.93 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X20
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
16+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+4.2% +4.2% +4.2% -4.2% -4.2% -4.2%
1:6.0
4,297.70 Des Grade =
4,296.87 Subgrade =
4,291.44 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
16+19.32
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+3.4% +3.4% +3.4% -3.4% -3.4% -3.4%
1:6.0
4,297.60 Des Grade =
4,296.77 Subgrade =
4,291.17 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X21
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
16+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
+3.1% +3.1% +3.1% -3.1% -3.1% -3.1%
1:6.0
4,297.56 Des Grade =
4,296.73 Subgrade =
4,291.16 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X22
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
16+40.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
+2.4% +2.4%
+0.7% 1:5.8
1:5.4
-2.4% -2.4%
4,297.48 Des Grade =
4,296.65 Subgrade =
4,291.15 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X23
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
17+40.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
-2.0% -2.0%
1:6.1
+2.0% +2.0%
4,296.93 Des Grade =
4,296.10 Subgrade =
4,293.93 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
17+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-2.4% -2.4% -2.4% +2.4% +2.4% +2.4%
1:8.0
4,296.88 Des Grade =
4,296.05 Subgrade =
4,291.97 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X24
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
17+73.32
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-3.5% -3.5% -3.5% +3.5% +3.5% +3.5%
1:8.0
4,296.75 Des Grade =
4,295.92 Subgrade =
4,292.07 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
17+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-3.6% -3.6%
+3.6%
1:8.0
4,296.74 Des Grade =
4,295.91 Subgrade =
4,292.08 Original Grnd =
+3.6%
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.3
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X25
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
18+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-4.7% -4.7% -4.7% +4.7% +4.7% +4.7%
1:8.0
4,296.60 Des Grade =
4,295.77 Subgrade =
4,291.74 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
18+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-5.8% -5.8%
+5.8%
1:8.0
4,296.40 Des Grade =
4,295.57 Subgrade =
4,291.69 Original Grnd =
+5.8%
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X26
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
18+30.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0% -6.0% +6.0% +6.0%+6.0%
1:8.0
4,296.35 Des Grade =
4,295.52 Subgrade =
4,291.69 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
18+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0% -6.0% +6.0% +6.0%+6.0%
1:8.0
4,296.12 Des Grade =
4,295.29 Subgrade =
4,292.07 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X27
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
18+70.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0% -6.0% +6.0% +6.0%
1:8.0
4,295.83 Des Grade =
4,295.00 Subgrade =
4,292.34 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
18+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0%
1:8.0
4,295.75 Des Grade =
4,294.92 Subgrade =
4,292.24 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X28
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
19+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0% -6.0% +6.0% +6.0%
1:8.0
4,295.31 Des Grade =
4,294.48 Subgrade =
4,292.31 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
19+20.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -6.0% -6.0% +6.0% +6.0%
-5.0%
4,294.90 Des Grade =
4,294.07 Subgrade =
4,292.03 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X29
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
19+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4 .0
-6.0% -5.0%
4,294.79 Des Grade =
4,293.96 Subgrade =
4,292.16 Original Grnd =
+6.0%
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
19+40.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0 1:4 .0
-6.0% -6.0% +6.0% +6.0%
1:6.0
4,294.44 Des Grade =
4,293.61 Subgrade =
4,292.05 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X30
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
19+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0 1:4 .0
-6.0% -6.0% +6.0% +6.0%
1:4.0
4,294.19 Des Grade =
4,293.36 Subgrade =
4,291.51 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
19+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0 1:4 .0
-6.0% 1:4.0
4,293.51 Des Grade =
4,292.68 Subgrade =
4,291.32 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X31
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
20+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0
1:4 .0
-6.0% -6.0% +6.0% +6.0%
1:4.0
4,292.76 Des Grade =
4,291.93 Subgrade =
4,291.47 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
20+15.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0
1:4 .0
-6.0% -6.0% +6.0% +6.0%
1:4.0
4,292.29 Des Grade =
4,291.46 Subgrade =
4,291.41 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X32
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
20+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0
1:4 .0
-5.5% 1:4.0
4,291.99 Des Grade =
4,291.16 Subgrade =
4,291.26 Original Grnd =
+5.5%
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
20+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
4,300 4,300
1:4.0
1:4 .0
-4.2% -4.2% +4.2% +4.2%
1:4.0
4,291.25 Des Grade =
4,290.42 Subgrade =
4,290.87 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X33
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
20+73.55
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290 1:4.0
1:4 .0
-3.0% -3.0% +3.0% +3.0%
1:4.0
4,290.60 Des Grade =
4,289.77 Subgrade =
4,290.42 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
20+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290 1:4.0
1:4 .0
-2.9% -2.9% +2.9% +2.9%
1:4.0
4,290.56 Des Grade =
4,289.73 Subgrade =
4,290.39 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.5
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X34
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
21+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,2901:4.0 1:4 .0
-2.0% -2.0% +1.6% +1.6%
1:4.0
4,289.93 Des Grade =
4,289.10 Subgrade =
4,289.88 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
21+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290 1:4.0
1:4 .0
-2.0% -2.0% +0.4% +0.4%
1:4.0
4,289.34 Des Grade =
4,288.51 Subgrade =
4,289.37 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X35
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
21+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -0.9% -0.9%
1:4.0
4,288.80 Des Grade =
4,287.97 Subgrade =
4,288.82 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
21+71.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0
4,288.39 Des Grade =
4,287.56 Subgrade =
4,288.35 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X36
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
21+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0
4,288.31 Des Grade =
4,287.48 Subgrade =
4,288.28 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
22+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0
4,287.86 Des Grade =
4,287.03 Subgrade =
4,287.84 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X37
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
22+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0
4,287.49 Des Grade =
4,286.66 Subgrade =
4,287.48 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
22+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
1:4.0
+0.0% 1:4 .0
-2.0% -2.0% -2.0% -2.0%
4,287.18 Des Grade =
4,286.35 Subgrade =
4,287.26 Original Grnd =
FHWA, Office of Federal Lands Highway
:2
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X38
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
22+54.99
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
1:4.0
-0.0%
1:4 .0
-2.0% -2.0% -2.0% -2.0%
4,287.13 Des Grade =
4,286.30 Subgrade =
4,287.23 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
22+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
1:4.0
-0.0%
1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0
4,286.96 Des Grade =
4,286.13 Subgrade =
4,287.10 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.9
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X39
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
23+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
1:4.0
-0.0% 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,286.80 Des Grade =
4,285.97 Subgrade =
4,287.02 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
23+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,270 4,270
4,280 4,280
4,290 4,290
1:4.0
-0.0% 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,286.73 Des Grade =
4,285.90 Subgrade =
4,285.36 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X40
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
23+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,286.72 Des Grade =
4,285.89 Subgrade =
4,286.97 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
23+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,286.80 Des Grade =
4,285.97 Subgrade =
4,287.02 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X41
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
24+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,286.92 Des Grade =
4,286.09 Subgrade =
4,287.08 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
24+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.04 Des Grade =
4,286.21 Subgrade =
4,287.14 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X42
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
24+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.17 Des Grade =
4,286.34 Subgrade =
4,287.21 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
24+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.29 Des Grade =
4,286.46 Subgrade =
4,287.28 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X43
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
25+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.42 Des Grade =
4,286.59 Subgrade =
4,287.38 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
25+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.54 Des Grade =
4,286.71 Subgrade =
4,287.50 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X44
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
25+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.67 Des Grade =
4,286.84 Subgrade =
4,287.59 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
25+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.79 Des Grade =
4,286.96 Subgrade =
4,287.68 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X45
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
26+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,287.92 Des Grade =
4,287.09 Subgrade =
4,287.79 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
26+20.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0% -2.0% -2.0% -2.0%
1:4.0 1:4 .0
4,288.02 Des Grade =
4,287.19 Subgrade =
4,287.88 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X46
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
26+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-1.8% -1.8% -2.0% -2.0%
1:4.0 1:4 .0
4,288.04 Des Grade =
4,287.21 Subgrade =
4,287.92 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
26+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-0.8% -0.8% -2.0% -2.0%
1:4.0 1:4 .0
4,288.11 Des Grade =
4,287.28 Subgrade =
4,288.06 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X47
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E x
G r a v e l
E x
G r a v e l
26+60.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:6.0 1:4 .0
-0.4% -0.4% -2.0% -2.0%
1:4.0 1:4 .0
4,288.11 Des Grade =
4,287.28 Subgrade =
4,288.11 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
26+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:6.0 1:4 .0
+0.2% +0.2% -2.0% -2.0% 1:3 .3
4,288.11 Des Grade =
4,287.28 Subgrade =
4,288.18 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X48
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
27+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
+1.2% +1.2% -2.0% -2.0%
-2.2%
4,288.04 Des Grade =
4,287.21 Subgrade =
4,288.34 Original Grnd =
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
27+12.16
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
+1.7% +1.7% -2.0% -2.0%
-2.5%
4,287.99 Des Grade =
4,287.16 Subgrade =
4,287.93 Original Grnd =
FHWA, Office of Federal Lands Highway
:5
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X49
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
27+20.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
+2.0% +2.0% -2.0% -2.0%
-2.6%
-1.9%
4,287.95 Des Grade =
4,287.12 Subgrade =
4,287.93 Original Grnd =
LC
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
27+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:4.0 1:4 .0
-2.0%
-2.6%
-2.0% -1.8%
4,287.92 Des Grade = 4,287.13 Des Grade =
4,287.09 Subgrade = 4,286.30 Subgrade =
4,287.94 Original Grnd = 4,287.47 Original Grnd =
+2.0%
FHWA, Office of Federal Lands Highway
:2
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X50
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
27+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
1:6.0 1:4 .0
+2.0% +2.0% -2.0% -2.0% 1:4.6 -1.7% 1:4
.0 -1.8% -1.7% -1.5% -1.4%
4,287.72 Des Grade = 4,286.62 Des Grade =
4,286.89 Subgrade = 4,285.79 Subgrade =
4,287.77 Original Grnd = 4,286.68 Original Grnd =
LC
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
27+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
-2.0% 1:4.4
-0.7% 1:3 .6 -1.1% -1.1% -1.1%
4,287.46 Des Grade = 4,286.22 Des Grade =
4,286.63 Subgrade = 4,285.39 Subgrade =
4,287.49 Original Grnd = 4,285.82 Original Grnd =
FHWA, Office of Federal Lands Highway
:2
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X51
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
28+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
+2.0% +2.0% -2.0% -2.0% 1:4.4
+0.7% 1:3 .6 -1.0% -1.0% -1.0%
4,287.14 Des Grade = 4,286.20 Des Grade =
4,286.31 Subgrade = 4,285.37 Subgrade =
4,287.14 Original Grnd = 4,285.74 Original Grnd =
LC LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
28+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
-2.0% 1:4.4
+4.6% 1:3 .5 -1.0% -1.0% -1.0%
4,286.76 Des Grade = 4,286.43 Des Grade =
4,285.93 Subgrade = 4,285.60 Subgrade =
4,286.75 Original Grnd = 4,286.09 Original Grnd =
FHWA, Office of Federal Lands Highway
:2
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X52
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
LC LC
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
28+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
+2.0% +2.0% -2.0% -2.0% 1:4.5 +4.7%
1:3 .5
-1.1% -1.1% -1.1%
4,286.37 Des Grade = 4,286.67 Des Grade =
4,285.54 Subgrade = 4,285.84 Subgrade =
4,286.35 Original Grnd = 4,286.33 Original Grnd =
LC
LCLC E
d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
28+75.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
-2.0% 1:4.7 -3.6% 1:3 .4
-1.2% -1.2% -1.2%
4,285.98 Des Grade = 4,286.92 Des Grade = 4,287.56 Des Grade =
4,285.15 Subgrade = 4,286.09 Subgrade = 4,287.23 Subgrade =
4,285.96 Original Grnd = 4,286.53 Original Grnd = 4,287.32 Original Grnd =
FHWA, Office of Federal Lands Highway
:2
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X53
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
29+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
+2.0% +2.0% -2.0% -2.0% 1:4.9-6.3%
1:3 .4
-0.9% -0.9% -1.2%
4,285.70 Des Grade = 4,287.17 Des Grade =
4,284.87 Subgrade = 4,286.34 Subgrade =
4,285.72 Original Grnd = 4,286.77 Original Grnd =
LC
LC
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
29+00.31
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
+2.0% +2.0% -2.0% -2.0% 1:4.9-6.4%
1:3 .4
-0.9% -0.9% -1.2%
4,285.70 Des Grade = 4,287.17 Des Grade =
4,284.87 Subgrade = 4,286.34 Subgrade =
4,285.72 Original Grnd = 4,286.77 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X54
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
LC LC
d g e o f E x P a v e m e n t
29+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
+2.0% +2.0%
-2.9% +2.5% +2.6%
-2.0% -2.0%
+2.2%
4,285.60 Des Grade = 4,286.11 Des Grade =
4,284.77 Subgrade = 4,285.28 Subgrade =
4,285.59 Original Grnd = 4,286.36 Original Grnd =
LC
E d g e o f E x P a v e m e n t
29+36.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
4,280 4,280
4,290 4,290
+2.0% +2.0%-5.9% +2.1% -2.0% -2.0%
4,285.61 Des Grade =
4,284.78 Subgrade =
4,285.56 Original Grnd =
FHWA, Office of Federal Lands Highway
:4
J u ly
B L
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\X -M
L X s e c \X
S S
-O p ti o n X
-4 R
S e c ti o n s -1
.d g n
X55
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
200+60.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,280 4,280
4,290 4,290
4,300 4,300
1:3+0.0%
4,287.01 Des Grade =
200+70.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3-0.0%
4,286.91 Des Grade =
OPTION X SALT VALLEY WASH CHANNEL GRADING
FHWA, Office of Federal Lands Highway
:0
J u ly
S V
W B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y1
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
200+80.00
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3-0.0%
4,286.81 Des Grade =
200+90.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3+0.0%
4,286.63 Des Grade =
FHWA, Office of Federal Lands Highway
:0
S e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y2
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+00.00
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3-0.0%
4,286.36 Des Grade =
201+10.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3
-0.0%
4,286.01 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y3
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+20.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3
+0.0%
4,285.57 Des Grade =
LC
201+30.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3
4,285.06 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y4
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+40.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:3 1:3
+0.0%
4,284.53 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y5
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+50.00
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y6
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+60.00
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:2 1:3
4,283.49 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y7
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+70.00
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:2 1:3
4,283.00 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y8
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+80.00
4,270 4,270
4,280 4,280
4,290 4,290
4,300 4,300
1:2 1:
4,282.56 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y9
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
201+90.00
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:
+0.0%
4,282.15 Des Grade =
202+00.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:
4,281.79 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y10
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
202+10.00
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:
-0.0%
4,281.46 Des Grade =
202+20.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:
4,281.17 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y11
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
202+30.00
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:
-0.0%
4,280.92 Des Grade =
202+40.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:
4,280.71 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y12
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
202+50.00
4,270 4,270
4,280 4,280
4,290 4,290
1:2
1:
-0.0%
4,280.54 Des Grade =
202+60.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
1:2
1:3-0.0%
4,280.40 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y13
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
202+70.00
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:3-0.0%
4,280.27 Des Grade =
202+80.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:3-0.0%
4,280.13 Des Grade =
FHWA, Office of Federal Lands Highway
:0
J u ly
S V
W B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y14
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
202+90.00
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:3-0.0%
4,280.00 Des Grade =
203+00.00
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
1:2 1:3-0.0%
4,279.86 Des Grade =
FHWA, Office of Federal Lands Highway
:0 e p te m b e r
S
V W
B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y15
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
203+10.00
4,270 4,270
4,280 4,280
4,290 4,290
203+17.79
-50 -40 -30 -20 -10 0 10 20 30 40 50
4,270 4,270
4,280 4,280
4,290 4,290
FHWA, Office of Federal Lands Highway
:0
J u ly
S V
W B
.0
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Y -M in o r_
X s e c \X
S S
-C h a n n e l
G ra d in g R
-O p ti o n X
.d g n
Y16
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t
E d g e o f E x P a v e m e n t match existing cross section dimensions.
the edge of clearing limits. Grade channel to
Excavate and grade to drain outlet channel to1.
DRAINAGE NOTES
Varies
OPTION X
27+41.52
-50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90
4,280 4,280
4,290 4,290
1:5.9 1:4 .1
+1.7% +1.7% -1.7% -1.7%
-2.4%
-1.8% -1.6% -1.5%
4,287.80 Des Grade = 4,287.04 Des Grade =
4,286.97 Subgrade = 4,286.21 Subgrade =
4,287.84 Original Grnd = 4,287.35 Original Grnd =
30" HDPE x 93' @ -2.37%
CULVERT CROSS SECTIONS DELICATE ARCH ROAD
FHWA, Office of Federal Lands Highway
:1
J u ly
C u lv e r ts
O p t
X
.5
S h e
U T
\a rc h (2
R o a d w a y \C
A D
D S h e e ts
\Z -D ra in
X s e c \X
S D
U
T N
P A
R C
H (2
.d g n
Z2
NPS Drwg No. 138/192565 NPS PMIS No. 231001
NUMBER
SHEET
PROJECT
| XXS-Option X-4R Sections.pdf |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Option X-4R Sections-100 |
| XSS-Grading-Option X.pdf |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Channel Grading_95R-Option_X |
| XSS-Culvert_Option X.pdf |
| Option x z1 |
| Option x z2 |
File details come from the government source that posted it. Updated .