This document is Amendment A001 to a Request for Quotation (RFQ) issued by the Federal Highway Administration's Central Federal Lands Highway Division for drilling services at Yosemite National Park. The amendment, effective May 29, 2026, replaces specific pages of the original RFQ (pages 1, 4, and the Scope of Work pages 5-7) with updated versions. The quotation due date remains June 11, 2026, with technical questions due by June 4, 2026. Contractors must acknowledge receipt of this amendment prior to the quotation deadline by completing items 8 and 15 on the form, acknowledging receipt on each copy of their offer, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers.
The RFQ solicits drilling and boring services to investigate pavement and base layer thickness, subsurface conditions, and subgrade soil samples across multiple locations within Yosemite National Park from June 22 through September 26, 2026. The work includes approximately 29 shallow borings (up to 5 feet depth) and 12 deeper borings (10 to 20 feet), with pavement restoration for 41 bore holes. The contractor must provide a truck-mounted drill rig with an 8-inch auger, a two-person drill crew, traffic control with flaggers and two-way radios compliant with MUTCD standards, and per diem for crew members. The bid schedule requires pricing for mobilization/demobilization (mileage-based), drilling hours (24 hours at hourly rate), crew travel (9 hours), pavement restoration (41 each), flag crew mobilization (lump sum), traffic signage equipment (lump sum), flag crew labor (33 hours), per diem for drill and flag crews (up to $267 per person per day for Mariposa, California), and supplies (5-gallon buckets). Payment will be made on a fixed-price basis upon satisfactory completion and government acceptance, with contractors required to submit DOT Form 4220.4 release of claims before final payment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CA NP YOSE MULTI(1) QnA 6-11-26.pdf | ||
| CA NP YOSE MULTI(1) QnA 6-10-26.pdf | ||
| Yosemite Disaster Supplement_2026-05-21.zip | ZIP file | |
| CA NP YOSE MULTI(1) Yosemite NP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copy to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A001
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: ERIC GROSSKREUZ
9A. AMENDMENT OF SOLICITATION NUMBER
6982AF26Q000010
5. PROJECT NUMBER (If applicable)
CA NP YOSE MULTI(1)
05/29/2026
9B. DATED (SEE ITEM 11)
05/26/2026
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Replace RFQ page 1 with the attached page 1
Replace page 4 with the attached page 4
Replace Scope of Work (SOW) pages 5-7 with attached SOW with the red highlights pages 5-7
Drilling CA NP YOSE MULTI(1) Yosemite NP Disaster Supplemental
6982AF26Q000010
05/29/2026 Amendment A001
REQUEST FOR QUOTATION (RFQ)
Issuing Office: United States Department of Transportation Federal Highway Administration (FHWA) Central Federal Lands Highway Division (CFLHD) 12300 W. Dakota Avenue Lakewood, CO 80228
Agency Contact: Eric Grosskreuz, Contract Specialist Telephone: 720-963-3417 Email: eric.grosskreuz@dot.gov
Chinh Le, Contract Specialist Telephone: 720-963-3549 Email: chinh.le@dot.gov
Solicitation Number: 6982AF26Q000010
Title: Drilling CA NP YOSE MULTI(1) Yosemite NP Disaster Supplemental
Solicitation Release Date: May 26, 2026
Technical Questions Due Date: June 4, 2026
Quotation Due Date: June 11, 2026
PART II
SCHEDULE OF SERVICES
Bid Schedule
Drilling CA NP YOSE MULTI(1) Yosemite NP Disaster Supplemental
Task Unit Quantity Price Cost
Mobilization/Demobilization - Truck Mounted Drill Mile 400 $ $
Borings, Shallow (up to 5-feet) and deep (up to 20 feet) Hour 24 $ $
Pavement Restoration Each 41 $ $
Drill Crew Travel between Lodging & Job Site Hour 9 $ $
Flag Personnel Mobilization/Demobilization Lump Sum 1 $ $
Traffic Signage & Equipment Lump Sum 1 $ $
Flag Crew Labor (incl. Travel to/from Lodging) Hour 33 $ $
Per Diem (Flag Crew) Person-Day 4 $ $
Per Diem (Drill Crew) Person-Day 4 $ $
Supplies - 5 Gallon Buckets with Lids Each 30 $ $
Subtotal $ Total $
NOTE: Unless otherwise negotiated and approved, the contractor will be paid the FFP of each CLIN upon successful completion and Government acceptance. The contractor may also request milestone payments in accordance with work completed and accepted by the Government.
Satisfactory completion and acceptance will be made by the Contracting Officer’s Representative (COR).
Drilling CA NP YOSE MULTI(1) Yosemite NP Disaster Supplemental
6982AF26Q000010
05/29/2026 Amendment A001
05/29/2026 Amendment A001
SCOPE OF WORK
Project Name: CA NP YOSE MULTI(1) Yosemite NP Disaster Supplemental
Project Description/Location. All the anticipated boring locations are within Yosemite National Park. The locations are dispersed throughout the Park as can be seen in the figure below. The purpose of the boring investigation will be to determine pavement and base layer thickness, evaluate subsurface conditions, and collect bulk subgrade soil samples to support project design recommendations. See Figure 1 below.
Figure 1. Yosemite National Park Repair Locations
Scope of Work:
General: The investigative and drilling work is anticipated to take place on or adjacent to roadways in Yosemite National Park. Most roads are paved with 2 to 6 inches of asphalt pavement, but areas with thicker or thinner pavement do exist, and some routes will have
05/29/2026 Amendment A001 segments with no pavement. The drilling sites are accessible for a truck mounted drill rig. The soils beneath the road are believed to primarily consist of silty and clayey sands, sandy gravels, and occasional cobbles. The scope of drilling will include shallow borings (up to 5 feet) and several locations with deeper borings (10 to 20 feet or until refusal). Refer to table below for additional information.
Drilling/Boring Needs & Equipment: Equipment needs include a truck mounted drill rig with an 8 inch outside diameter auger able to advance to 20-foot depths. A two-man drill crew is anticipated. The shallow borings (up to 5-foot depths, but no drilling beyond refusal) are intended to penetrate through the existing pavement structural section and into the underlying subgrade material for the purpose of gathering bulk subgrade samples (~70 lbs. each) and measuring layer depths. The deeper borings (10 to 20 feet) are intended to provide subgrade soil conditions in slide and saturated areas.
Drill cuttings can be dispersed at the site. For the pavement restoration, all borings shall be backfilled with excess cuttings, imported borrow/aggregate, and/or native material and well compacted in 12-to-18-inch lifts. The bore holes within the roadway need to be topped with at least 5 inches of compacted cold patch.
The estimated number of exploration borings and their locations are summarized in the Table below. It is estimated the shallow borings will be on ½ to ¼ mile increments, or as marked. At all locations one or more bulk 70-pound samples are expected to be collected.
Summary of Boring Locations
Location Type Quantity (estimate)
Remarks
May Lake Road, 1.72 miles (spur road off Tioga Pass Road)
Shallow Borings (5’ typical; no drilling beyond refusal)
Road is narrow and rough
El Capitan Picnic Area Access Rd,
0.22 miles (adjacent to Northside
Drive) “ 2
Curry Village Drive, 0.28 miles (adjacent to Curry Village)
“ 4 Busy area with lots of traffic and shuttle buses Northside Drive Extension, 0.36 miles (access road to Curry Village) “ 2 “
Happy Isles Loop Road, 1.67 miles (near Curry Village)
“ 5 “
Foresta Road, 2.71 miles (adjacent to Hwy 140 near El Portal)
“ 6 A village area with 500 residents Chilnualna Falls Road, 0.83 miles (provides access to Wawona area)
“ 4 A village area with over
100 residents
05/29/2026 Amendment A001
South Entrance Parking Lot, lower lot saturated from subsurface water flow
Deeper Boring (10’ to 20’ or refusal)
Potential installation of underdrain location Big Oak Flat Road, slide area around milepost 5.
“ 2 Slide repair location
Mariposa Grove Road, slide area around milepost 1.4
“ 2 repairSlide location
Wawona Road, 200 feet, slide area (a few miles south of Glacier Point
Road) ” 2 Slide repair location
Total Shallow Borings 29 Total Deeper Borings 12
Traffic Control: The drilling company is responsible for providing traffic control services during the drilling operations. The road’s two-way ADT will vary depending on location. Expect ADT’s from as low as 100 to 3000+ vehicles per day. Based upon this range of ADT, the traffic control shall include a minimum of two flaggers and two multiple channel 2-way radios. Traffic control equipment, including advanced warning signs, paddles, cones, and other traffic control devices, to be in accordance with the MUTCD.
Working Hours & Wages: It is anticipated that the work will take up to three days to complete, primarily due to the travel time between sites. Drilling work may occur any time from ½ hour before sunrise to ½ hour after dusk. On the days of drilling, meet members of FHWA at a time and location on the route to be designated later.
Davis Bacon wages are not applicable as this is a service contract and not a construction contract.
Other: FHWA will provide personnel on site to determine the locations and depths for each boring sample. FHWA personnel will also log the samples and transport the sample buckets to a shipping location. Utility locates will be coordinated and provided by FHWA in advance. The drilling company may be required to call in duplicate utility locates.
Quote Format: Please provide a quote formatted with the following items.
1. Mobilization/demobilization of drill rig and crew (mileage based).
2. 24 hours for drilling 29 shallow borings and 12 deep borings with 2-person drill crew (at hourly rate).
3. 9 hours of travel time between lodging and job site. 90 minutes one way with 3 round trips over 3 days (at hourly rate).
4. Asphalt pavement restoration for 41 borings (per each).
5. Flag personnel mobilization/demobilization (lump sum).
6. Flagging equipment (lump sum).
7. 33 hours for two-person traffic control crew. Includes hours for boring, coring, and travel to and from lodging. (at hourly rate).
05/29/2026 Amendment A001
8. Per Diem for 2-person drill crew and 2-person traffic control crew. Up to $267 per person per day for Mariposa, CA (based on current government per diem rates: $181 lodging and $86 for meals and incidentals). Four nights lodging anticipated. Oakhurst, CA is another potential location for lodging.
9. Supplies: 20 - 5-gallon buckets with lids for sample collection (lump sum).
10. Weeks with crew availability.
Work will need to be scheduled from June 22, 2026 to September 26, 2026; and is anticipated to take two days to complete. If you have any questions, please contact Mike Voth at (720) 963-3505 (Email: Michael.Voth@dot.gov ).
Final Payment: Final payment under the PO will be made as follows:
1. Upon satisfactory completion of the subject PO by the Contractor, submission of a proper invoice (see FAR Clause 52.232-25(a)(3)), and acceptance by the CO or designated official of the work described in the Scope of Work, the Contractor will be paid the unpaid balance of any money due for work under the PO.
2. Before final payment, or before settlement upon termination of the PO, and as a condition precedent thereto, the Contractor shall execute and deliver to the CO a release of all claims (DOT Form 4220.4) against the Government arising under or by virtue of this contract, other than any claims that are specifically exempted by the Contractor from the operation of the release, in amounts stated in the release.
File details come from the government source that posted it. Updated .