6982AF25B000025 FINAL.pdf
PDF 2 MB Posted
- Attached to
- NV FTBL 1094(1) Wilson Campground Road Federal contract opportunity
- Solicitation number
- 6982AF25B000025
About this file
This document is an Invitation for Bid (IFB) for the Wilson Campground Road Project, solicitation number 6982AF25B000025, issued by the U.S. Department of Transportation Federal Highway Administration's Central Federal Lands Highway Division. The project is located 83 miles northwest of Elko, Nevada, within the Bureau of Land Management's Wilson Reservoir Recreation Management Area, and aims to improve road safety, visitor access, and driving experience through comprehensive road improvements.
The solicitation is structured in two parts: Schedule A (base project) covering 6.21 miles of main road improvements, and Option X covering 1.01 miles of road improvements and minor bridge repairs. The project includes resurfacing, alignment shifts, cattle guard adjustments, drainage improvements, and sign replacements. It is a total small business set-aside with specific requirements for bid submission, including a printed bid package, SAM registration, and a bid guarantee. The project will use Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, and technical questions were to be submitted no later than November 13, 2025. The bid involves various construction activities such as excavation, aggregate surface course placement, culvert installation, and erosion control.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wilson Bid Opening Summary Sched and Opt.pdf | ||
| QnA Wilson 11.21.25.pdf | ||
| Wilson Interested Vendors 11.20.25.pdf | ||
| QnA Wilson 11.19.25 REV FINAL.pdf | ||
| A001 11.19.25 Wilson.pdf | ||
| QnA Wilson 11.19.25.pdf | ||
| QnA Wilson 11.12.25 Final.pdf | ||
| QnA Wilson 10.28.25.pdf | ||
| Section 152 Physical Data.zip | ZIP file | |
| 21.95 Final Geotechnical Report FLAT.pdf | ||
| 01.100 Plans FLAT.pdf | ||
| 20.100 Final Hydraulic Report FLAT.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: 6982AF25B000025
SOLICITATION TYPE: TOTAL SMALL BUSINESS SET-ASIDE
PROJECT NUMBER: NV FTBL 1094(1)
PROJECT NAME: WILSON CAMPGROUND ROAD
BID OPENING DATE:
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-14 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov
TABLE OF CONTENTS
PROJECT OVERVIEW
The Wilson Campground Road Project located 83 miles northwest of Elko, Nevada, within the Bureau of Land Management’s Wilson Reservoir Recreation Management Area, aims to improve safety, increase visitor use, and enhance the driving experience. Proposed improvements include resurfacing, alignment shifts, cattle guard adjustments, drainage and minor bridge repairs, and replacing signs. The project is divided into a schedule and one option, as follows:
Schedule A: Main road improvements for 6.21 miles, ending at the bridge approach.
Option X: Minor bridge repairs and 1.01 miles of main road improvements, ending at the campground entrance.
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
I. PRE-BID INFORMATION
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Submit the following documents with your Bid Package– o
Notice of SAM Registration
Representations and Certifications – NAICS 237310
Vets-4212 Reporting: -
Bid Guarantee 52.228-1 Bid Guarantee
Accuracy and Completeness of Bid -
Request for Technical Information –
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON NOVEMBER 13, 2025
Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions.
Modifications to Bids prior to the time specified for receipt of bids
STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total.
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
Time to definitize after receipt of an adequate change order definitization proposal under construction contracts
Number of change order proposals definitized under construction contracts
FY 2022 FY 2023 FY 2024
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.
Subcontracting 52.219-8, Utilization of Small Business Concerns
Insurance requirements
Masterworks - Inspector’s Daily Record of Construction Operations” Contractors Daily Reports)
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
(IFB)
(RFP)
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
(Include area code)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
*See Page A-3
(If "YES," indicate within how many calendar days after award in Item 12B.)
OFFEROR (Must be fully completed by offeror) (Include ZIP Code) (Include area code)
(Include only if different than Item 14)
(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
(Type or print)
AWARD (To be completed by Government)
(4 copies unless otherwise specified)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return copies to issuing office.)
(Contractor is not required to sign this document.)
(Type or print) (Type or print)
Item 8: LOCATION OF PUBLIC BID OPENING:
Item 9: FOR GENERAL INFORMATION:
FOR TECHNICAL INFORMATION (plans and specifications):
Item 11: COMPLETION DATE:
See SCR Section 108.01
Item 12A: PERFORMANCE AND PAYMENT BONDS: Clause 52.228-15 Performance and Payment Bonds-Construction
Item 13B: BID BOND AMOUNT: 52.228-1 Bid Guarantee Subsection 102.03 Bid Guarantee
Item 19: ACKNOWLEDGMENT OF AMENDMENTS:
IN ITEM 19 OF THE SF-1442,
Item 24: SUBMITTING INVOICES: Subsection 109.08 Progress Payments
ESTIMATED
PRICE:
Bid Schedule Instructions
NOTE:
Basis for Award by adding the total price for all options to the total price for Schedule A.
Partnering
Subsection 103.05 Partnering
A-8
BID SCHEDULE
Project No : NV FTBL 1094(1) Schedule : A Schedule Type : Base
Project Name : WILSON CAMPGROUND ROAD
Contract Quantity Pay Items No Contract Quantity Pay Items
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION ALL LPSM
A0040 15210-3000
CENTERLINE,
VERIFICATION
AND STAKING
5.900 MILE
A0060 15215-1000
SURVEY AND
STAKING,
APPROACH ROAD
8.000 EACH
A0080 15215-3000
SURVEY AND
STAKING,
DRAINAGE
STRUCTURE
18.000 EACH
A0100 15225-0000
SLOPE,
REFERENCE, AND
CLEARING AND
GRUBBING
CONTROL
0.306 MILE
A0120 15236-2000
SURVEY
CONTROL, GRADE
FINISHING
0.612 MILE
A0140 15301-0000
CONTRACTOR
QUALITY
CONTROL
ALL LPSM
A0160 15401-0000 CONTRACTOR
TESTING ALL LPSM
A0180 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
A0200 15701-0000 SOIL EROSION
CONTROL ALL LPSM
A0220 15720-0000
STORM WATER
POLLUTION
PREVENTION
PLAN
ALL LPSM
A0240 15802-0000 WATERING FOR
DUST CONTROL ALL LPSM
A0260 20101-0000 CLEARING AND
GRUBBING 11.400 ACRE
A0280 20301-1900 REMOVAL OF
PIPE CULVERT 18.000 EACH
A0300 20301-2400 REMOVAL OF
SIGN 13.000 EACH
A0320 20302-2100 REMOVAL OF
PIPE CULVERT 13.000 LNFT
A0340 20401-0000 ROADWAY
EXCAVATION 2,200.000 CUYD
A0360 20402-0000 SUBEXCAVATION 500.000 CUYD
A0380 20466-0000
CONSERVE AND
STOCKPILE
TOPSOIL
3,000.000 CUYD
A0400 25101-0200
PLACED RIPRAP,
METHOD A,
CLASS 2
4.000 CUYD
A0420 25101-0400
PLACED RIPRAP,
METHOD A,
CLASS 4
40.000 CUYD
A0440 30110-0000
AGGREGATE
SURFACE
COURSE
19,100.000 TON
A0480 30301-4000 ROADBED
RECONDITIONING 5.944 MILE
A0500 30302-1000 DITCH
RECONDITIONING 1,600.000 LNFT
A0520 60201-0800 24-INCH PIPE
CULVERT 140.000 LNFT
A0540 60201-1200 48-INCH PIPE
CULVERT 40.000 LNFT
A0560 60202-0400
24-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL
PIPE CULVERT
450.000 LNFT
A0580 60210-0600
END SECTION
FOR 18-INCH PIPE
CULVERT
18.000 EACH
A0600 60210-0800
END SECTION
FOR 24-INCH PIPE
CULVERT
8.000 EACH
A0620 60210-0900
END SECTION
FOR 30-INCH PIPE
CULVERT
2.000 EACH
A0640 60210-1200
END SECTION
FOR 48-INCH PIPE
CULVERT
2.000 EACH
A0660 60211-0800
END SECTION
FOR 24-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL
PIPE CULVERT
26.000 EACH
A0680 60704-0000
CLEANING
CULVERT IN
PLACE
10.000 EACH
A0700 61920-3000
REMOVE AND
RESET CATTLE
GUARD
2.000 EACH
A0720 62201-0200
DUMP TRUCK, 8
CUBIC YARD
MINIMUM
CAPACITY
40.000 HOUR
A0740 62201-0550
BACKHOE
LOADER, 6 CUBIC
FOOT MINIMUM
RATED CAPACITY
BUCKET, 24-INCH
WIDTH
40.000 HOUR
A0760 62201-0950
WHEEL LOADER,
3 CUBIC YARD
MINIMUM RATED
CAPACITY
40.000 HOUR
A0780 62201-1300
BULLDOZER,
160HP MINIMUM
FLYWHEEL
POWER
40.000 HOUR
A0800 62301-0000 GENERAL LABOR 80.000 HOUR
A0820 62302-1000
SPECIAL LABOR,
HIRED
TECHNICAL
SERVICES
40.000 HOUR
A0840 62303-1000
SPECIAL LABOR,
HIRED
TECHNICAL
SERVICES
(BIOLOGICAL
MONITOR) ALL LPSM
A0860 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
40.000 HOUR
A0880 62407-0000
PLACING
CONSERVED
TOPSOIL
3,500.000 CUYD
A0900 62510-2000
SEEDING,
HYDRAULIC
METHOD
8.700 ACRE
A0920 62515-3000
MULCHING,
HYDRAULIC
METHOD,
BONDED FIBER
MATRIX
8.700 ACRE
A0940 62901-1000
ROLLED EROSION
CONTROL
PRODUCT, TYPE
3.B
630.000 SQYD
A0960 63301-0000 SIGN SYSTEM 11.000 EACH
A0980 63501-0000
TEMPORARY
TRAFFIC
CONTROL
ALL LPSM
A1000 63701-0000 FIELD OFFICE 1.000 EACH
Submitted By: Schedule Total:
A-
BID SCHEDULE
Project No : NV FTBL 1094(1) Schedule : X Schedule Type : Option
Project Name : WILSON CAMPGROUND ROAD
Contract Quantity Pay Items No Contract Quantity Pay Items
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Unit Price Amount
X0020 15101-0000 MOBILIZATION ALL LPSM
X0040 15210-3000
CENTERLINE,
VERIFICATION
AND STAKING
1.011 MILE
X0060 15215-1000
SURVEY AND
STAKING,
APPROACH ROAD
8.000 EACH
X0080 15215-3000
SURVEY AND
STAKING,
DRAINAGE
STRUCTURE
3.000 EACH
X0100 15301-0000
CONTRACTOR
QUALITY
CONTROL
ALL LPSM
X0120 15401-0000 CONTRACTOR
TESTING ALL LPSM
X0140 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
X0160 15701-0000 SOIL EROSION
CONTROL ALL LPSM
X0180 15720-0000
STORM WATER
POLLUTION
PREVENTION
PLAN
ALL LPSM
X0200 15802-0000 WATERING FOR
DUST CONTROL ALL LPSM
X0220 20101-0000 CLEARING AND
GRUBBING 3.000 ACRE
X0240 20301-1900 REMOVAL OF
PIPE CULVERT 1.000 EACH
X0260 20301-2400 REMOVAL OF
SIGN 8.000 EACH
X0280 20402-0000 SUBEXCAVATION 100.000 CUYD
X0300 20466-0000
CONSERVE AND
STOCKPILE
TOPSOIL
1,000.000 CUYD
X0320 25101-0200
PLACED RIPRAP,
METHOD A,
CLASS 2
8.000 CUYD
X0340 30110-0000
AGGREGATE
SURFACE
COURSE
3,100.000 TON
X0380 30301-4000 ROADBED
RECONDITIONING 0.996 MILE
X0400 30302-1000 DITCH
RECONDITIONING 150.000 LNFT
X0420 57501-0000 MINOR BRIDGE
WORK ALL LPSM
X0440 60202-0200
18-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL
PIPE CULVERT
22.000 LNFT
X0460 60202-0400
24-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL
PIPE CULVERT
70.000 LNFT
X0480 60210-0600
END SECTION
FOR 18-INCH PIPE
CULVERT
6.000 EACH
X0500 60211-0600
END SECTION
FOR 18-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL
PIPE CULVERT
2.000 EACH
X0520 60211-0800
END SECTION
FOR 24-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL
PIPE CULVERT
4.000 EACH
X0540 60704-0000
CLEANING
CULVERT IN
PLACE
4.000 EACH
X0560 62201-0200
DUMP TRUCK, 8
CUBIC YARD
MINIMUM
CAPACITY
20.000 HOUR
X0580 62201-0550
BACKHOE
LOADER, 6 CUBIC
FOOT MINIMUM
RATED CAPACITY
BUCKET, 24-INCH
WIDTH
20.000 HOUR
X0600 62201-0950
WHEEL LOADER,
3 CUBIC YARD
MINIMUM RATED
CAPACITY
20.000 HOUR
X0620 62201-1300
BULLDOZER,
160HP MINIMUM
FLYWHEEL
POWER
20.000 HOUR
X0640 62301-0000 GENERAL LABOR 40.000 HOUR
X0660 62302-1000
SPECIAL LABOR,
HIRED
TECHNICAL
SERVICES
40.000 HOUR
X0680 62303-1000
SPECIAL LABOR,
HIRED
TECHNICAL
SERVICES
(BIOLOGICAL
MONITOR) ALL LPSM
X0700 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
20.000 HOUR
X0720 62407-0000
PLACING
CONSERVED
TOPSOIL
1,000.000 CUYD
X0740 62510-2000
SEEDING,
HYDRAULIC
METHOD
2.700 ACRE
X0760 62515-3000
MULCHING,
HYDRAULIC
METHOD,
BONDED FIBER
MATRIX
2.700 ACRE
X0780 63301-0000 SIGN SYSTEM 8.000 EACH
X0800 63501-0000
TEMPORARY
TRAFFIC
CONTROL
ALL LPSM
Submitted By: Schedule Total:
BID SCHEDULE SUMMARY
Corporate Certificate
Limited Liability Certificate
Authority to Bind Partnership
Authority to Bind Joint Venture
Sole Proprietorship Requirement
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
NOTE TO CONTRACTOR:
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
HAZARDOUS MATERIALS
BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Comprehensive Guidelines for Procurement of Products Containing Recovered Materials
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (REV. 10/2023)
Previous edition is NOT usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0001
Expiration Date: 1/31/2027 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of
1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F
Street, NW, Washington, DC 20405.
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT
OF BID
PRICE
AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER
6982AF25B000025 MILLION(S)
THOUSAND(S)
HUNDRED(S)
CENTS
00 FOR (Construction, Supplies or
Services) Construction
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
(Seal)
3.
(Seal) Corporate
Seal
NAME(S) &
TITLE(S)
(Typed)
1. 2. 3.
INDIVIDUALSURETY(IES)
SIGNATURE(S) 1.
(Seal)
2.
(Seal)
NAME(S)
(Typed)
1. 2.
CORPORATE SURETY(IES)
SU
R
ET
Y
A
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S) 1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
PRINCIPAL (Legal name and business address) ("X" one)
INDIVIDUAL PARTNERSHIP JOINT VENTURE
CORPORATION OTHER (Specify)
STATE OF INCORPORATION
STANDARD FORM 24 (REV. 10/2023) BACK
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
SU
R
ET
Y
B
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
C
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S) 1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
D
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
E
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S) 1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
F
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
SU
R
ET
Y
G
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate Seal
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
BIDDER’S INFORMATION
Solicitation Provisions
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2024)
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation. (JAN 2017)
52.204-7 System for Award Management. (NOV 2024)(DEVIATION NOV 2025)
52.204-90 Offeror Identification (DEVIATION NOV 2025)
52.209-5 Certification Regarding Responsibility Matters. (AUG 2020)
52.209-7 Information Regarding Responsibility Matters (OCT 2018)
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (FEB 2016)
52.209-13 Violation of Arms Control Treaties or Agreements – Certification (NOV 2021)
52.214-3 Amendments to Invitations for Bids. (DEC 2016) (DEVIATION OCT 2025)
52.214-4 False Statements in Bids. (APR 1984)
52.214-5 Submission of Bids. (DEC 2016)(DEVIATION OCT 2025)
52.214-6 Explanation to Prospective Bidders. (APR 1984)
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)
(DEVIATION OCT 2025)
52.214-18 Preparation of Bids - Construction. (APR 1984)
52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)
52.214-34 Submission of Offers in the English Language. (APR 1991)
52.214-35 Submission of Offers in U.S. Currency. (APR 1991)
52.216-1 Type of Contract. (APR 1984)
FIRM FIXED PRICE
52.217-5 Evaluation of Options (JUL 1990)
52.219-1 Small Business Program Representations (FEB 2024)
52.222-5 Construction Wage Rate Requirements Secondary Site of the Work. (MAY 2014)
52.222-38 Compliance with Veterans' Employment Reporting Requirements. (FEB 2016)
52.223-1 Bio based Product Certification (MAY 2024)(DEVIATION FEB 2025)
[at https://www.biopreferred.gov/resources/categories.html]
52.225-10 Notice of Buy American Requirement—Construction Materials (MAY 2014)
52.228-1 Bid Guarantee. (SEP 1996) e.g twenty (20%) percent
$3,000,000.00
52.233-2 Service of Protest. (SEP 2006)(DEVIATION SEP 2025)
Mr. Ryan Phillips Acquisitions Branch Chief Federal Highway Administration 12300 West Dakota Avenue, Suite 360 Lakewood, Colorado 80228
52.240-90 Security Prohibitions and Exclusions Representations and Certifications.
(DEVIATION SEP 2025)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far
52.252-3 Alterations in Solicitation. (APR 1984)
NONE
52.252-5 Authorized Deviations in Provisions. (NOV 2020)
1252.239–92 Information and Communication Technology Accessibility Notice (NOV 2022)
Contract Clauses
52.202-1 Definitions. (JUN 2020)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020)
52.203-7 Anti-Kickback Procedures. (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021)
52.203-14 Display of Hotline Poster(s) (NOV 2021)
Definition.
United States
Display of fraud hotline poster(s).
General Fraud https://www.oig.dot.gov/sites/default/files/files/OIG-generic-2.pdf
Subcontracts.
52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN
2020)(DEVIATION NOV 2025)
52.204-13 System for Award Management Maintenance. (OCT 2018)(DEVIATION NOV 2025)
52.204-14 Service Contract Reporting Requirements (OCT 2016)(DEVIATION NOV 2025)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.204-91 Contractor Identification (DEVIATION NOV 2025)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015)
52.211-12 Liquidated Damages - Construction. (SEP 2000)
52.211-13 Time Extensions. (SEP 2000)
52.214-26 Audit and Records – Sealed Bidding. (JUN 2020) (DEVIATION OCT 2025)
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data – Modifications – Sealed Bidding. (JUN 2020)
52.214-28 Subcontractor Certified Cost or Pricing Data – Modifications – Sealed Bidding.
(JUN 2020) (DEVIATION OCT 2025)
52.217-7 Option for Increased Quantity - Separately Priced Line Item. (MAR 1989)
60 days after award
52.219-6 Notice of Total Small Business Set-Aside (NOV 2020)
52.219-8 Utilization of Small Business Concerns (JAN 2025)
52.219-14 Limitations on Subcontracting (OCT 2022)
52.219-28 Post-Award Small Business Program Rerepresentation (JAN 2025)
52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)
52.222-3 Convict Labor. (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2018)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)(DEVIATION FEB 2025)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (JUL 2021)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)(DEVIATION FEB 2025)
52.222-12 Contract Termination - Debarment. (MAY 2014)(DEVIATION FEB 2025)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-35 Equal Opportunity for Veterans. (JUN 2020)
52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)
52.222-37 Employment Reports on Veterans (JUN 2020)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010)
52.222-50 Combating Trafficking in Persons (NOV 2021)
52.222-54 Employment Eligibility Verification (JAN 2025)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)
52.223-2 Reporting of Biobased Products Under Service and Construction Contract. (MAY
2024)(DEVIATION FEB 2025)
Definitions.
Biobased product
USDA-designated product category available at https://www.biopreferred.gov/resources/categories.html https://www.biopreferred.gov [ or 7 CFR part 4270] https://www.sam.gov, 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)
52.223-21 Foams (MAY 2024)
52.223-23 Sustainable Products and Services (May 2024)(DEVIATION FEB 2025)
Definitions Biobased product
[7 CFR part 4270.2)]
Recovered material
Sustainable products and services
Statutory purchasing programs [(1)] https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products
[(2)] https://www.energy.gov/eere/femp/search-energy-efficient-products https://www.energystar.gov/products?s=mega
[(3)] [7 CFR part 4270] https://www.biopreferred.gov
[(4)] https://www.epa.gov/snap
Required EPA purchasing programs https://www.epa.gov/watersense/watersense-products https://www.epa.gov/saferchoice/products https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing
Resource https://sftool.gov/greenprocurement
[statutory]
52.224-1 Privacy Act Notification. (APR 1984)
52.224-2 Privacy Act. (APR 1984)
52.225-9 Buy American-Construction Materials (OCT 2022)
Definitions
Commercially available off-the-shelf (COTS) item
Cost of components means
Critical component
Critical item
Domestic construction material
Fastener
Foreign construction material
Foreign iron and steel
Predominantly of iron or steel or a combination of both
Steel
None
For domestic construction material that is not a critical item or does not contain critical components
(1)
(2)
For domestic construction material that is a critical item or contains critical components
(1)
(2)
Data
Construction material description
Unit of measure Quantity Price (dollars) *
Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.226-7 Drug Free Workplace (May 2024)
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. (MAY 2024)
52.227-1 Authorization and Consent. (JUN 2020)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (JUN 2020)
52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-5 Insurance - Work on a Government Installation. (JAN 1997)
52.228-11 Individual Surety - Pledges of Assets. (FEB 2021)
52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022)
52.228-14 Irrevocable Letter of Credit (Nov 2014)
52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)
52.229-3 Federal, State, and Local Taxes. (FEB 2013)
52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)
52.232-17 Interest. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment For Construction Contracts. (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)
52.233-1 Disputes. (MAY 2014)(DEVIATION SEP 2025) - Alternate I (DEC
1991)(DEVIATION SEP 2025)
52.233-3 Protest after Award. (AUG 1996)(DEVIATION SEP 2025)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)(DEVIATION SEP 2025)
52.236-2 Differing Site Conditions. (APR 1984)(DEVIATION AUG 2025)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)(DEVIATION
AUG 2025)
52.236-5 Material and Workmanship. (APR 1984)(DEVIATION AUG 2025)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)(DEVIATION AUG 2025)
52.236-8 Other Contracts. (APR 1984)(DEVIATION AUG 2025)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)(DEVIATION AUG 2025)
52.236-10 Operations and Storage Areas. (APR 1984)(DEVIATION AUG 2025)
52.236-11 Use and Possession Prior to Completion. (APR 1984)(DEVIATION AUG 2025)
52.236-12 Cleaning Up. (APR 1984)(DEVIATION AUG 2025)
52.236-13 Accident Prevention. (NOV 1991)(DEVIATION AUG 2025) Alternate I (NOV 1991)
52.236-15 Schedules for Construction Contracts. (APR 1984)(DEVIATION AUG 2025)
52.236-17 Layout of Work. (APR 1984)(DEVIATION AUG 2025)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)(DEVIATION AUG 2025)
52.240-91 Security Prohibitions and Exclustions (DEVITAION SEP 2025)
52.242-13 Bankruptcy. (JUL 1995)
52.242-14 Suspension of Work. (APR 1984)
52.243-4 Changes. (JUN 2007)(DEVIATION JUL 2025)
52.243-6 Change Order Accounting. (APR 1984)(DEVIATION JUL 2025)
52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN
2025)(DEVIATION FEB 2025)
52.245-1 Government Property (SEP 2021) - Alternate I (APR 2012)
52.245-9 Use and Charges. (APR 2012)
52.246-12 Inspection of Construction. (AUG 1996)
52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021)
52.248-3 Value Engineering - Construction. (OCT 2020)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.252-2 Clauses Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far
52.252-4 Alterations in Contract. (APR 1984)
NONE
52.252-6 Authorized Deviations in Clauses. (NOV 2020)
52.253-1 Computer Generated Forms. (JAN 1991)
1252.201-70 Contracting Officer’s Representative (NOV 2022)
1252.223-70 Removal or Disposal of Hazardous Substances – Applicable Licenses and Permits (NOV 2022)
1252.223-71 Accident and Fire Reporting (NOV 2022)
1252.223-73 Seat Belt Use Policies and Programs (NOV 2022)
1252.228-74 Notification of Payment Bond Protection (NOV 2022)
1252.232–70 Electronic Submission of Payment Requests (NOV 2022)(DEVIATION AUG 2025)
Definitions.
Contract financing payment
Payment request
Electronic form
Invoice payment
Electronic payment requests.
Processing system.
iSupplier.
login.gov.
iSupplier www.login.gov.
Invoice requirements.
iSupplier
Payment system registration. iSupplier login.gov.
Electronic authentication. See www.login.gov www.login.gov www.login.gov iSupplier http://einvoice.esc.gov iSupplier
Training on DELPHI.
http://einvoice.esc.gov.
Account Management.
Waivers.
Exceptions and alternate payment procedures.
1252.239–93 Information and Communication Technology Accessibility (NOV 2022)
POST-AWARD EVALUATION OF CONTRACTOR PERFORMANCE
Contractor Performance Evaluations
D - 1
"General Decision Number: NV20250055 10/03/2025
Superseded General Decision Number: NV20240055
State: Nevada
Construction Type: Highway
Counties: Elko and Eureka Counties in Nevada.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered | Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an | The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on| Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or | The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2025. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2025 1 02/14/2025 2 10/03/2025
D - 2
ENGI0003-040 07/01/2024
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 50.47 30.38
ENGI0003-041 07/01/2024
Rates Fringes
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 47.56 30.38
ENGI0003-042 07/01/2024
Rates Fringes
OPERATOR: Bulldozer.............$ 60.39 30.38
ENGI0003-045 07/01/2024
Rates Fringes
OPERATOR: Grader/Blade..........$ 50.47 30.38
ENGI0003-051 07/01/2024
Rates Fringes
OPERATOR: Loader Loader over 4 cu.yds. up to and including 12 cu.yds..$ 50.71 30.38
ENGI0003-053 07/01/2024
Rates Fringes
OPERATOR: Mechanic..............$ 50.28 30.38
ENGI0003-055 07/01/2024
Rates Fringes
OPERATOR: Oiler.................$ 46.76 30.38
ENGI0003-057 07/01/2024
Rates Fringes
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 50.71 30.38
ENGI0003-065 07/01/2024
Rates Fringes
OPERATOR: Roller................$ 60.39 30.38
LABO0169-009 10/01/2024
Rates Fringes
D - 3
HIGHWAY STRIPING: Laborer........$ 36.70 16.30
LABO0169-010 10/01/2024
Rates Fringes
LABORER: Mason Tender - Cement/Concrete..................$ 34.20 16.30 LABORER: Jackhammer..............$ 34.20 16.30
LABO0169-011 10/01/2024
Rates Fringes
LABORER: Common or General......$ 33.95 16.30
LABO0169-012 10/01/2024
Rates Fringes
LABORER: Concrete Saw...........$ 34.20 16.30
LABO0169-013 10/01/2024
Rates Fringes
TRAFFIC CONTROL:
Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper.............$ 36.70 16.30
LABO0169-014 10/01/2024
Rates Fringes
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 34.45 16.30 LABORER: Pipelayer..............$ 34.45 16.30
LABO0169-016 10/01/2024
Rates Fringes
TRAFFIC CONTROL: Flagger.......$ 32.08 16.30
* PLAS0797-010 10/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 43.06 13.69
SUNV2021-010 03/01/2024
Rates Fringes
IRONWORKER, REINFORCING..........$ 43.93 31.32
OPERATOR: Drill.................$ 46.92 25.02
TRUCK DRIVER: Dump Truck........$ 39.90 0.00
D - 4
TRUCK DRIVER: Water Truck.......$ 39.91 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
D - 5
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
D - 6
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION"
Roadway Prism
Roadway Prism
Subcontractor
Subcontractor
Section 102. — BID, AWARD AND EXECUTION OF CONTRACT
Section 103. — SCOPE OF WORK
103.05 Partnering.
Section 104. — CONTROL OF WORK
104.02A Electronic Documentation.
Masterworks User Account Form
104.02B Signatures for Electronic Documentation.
(a) Definitions.
(1) Electronic signature.
(2) Wet signature.
(b) Electronic signature.
(3)
(c) Wet signature.
Section 105. — CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements.
105.04 Storing and Handling Material.
Section 106. — ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements.
(a) Disputing Government test results.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(b) Alternatives to removing and replacing non-conforming work.
106.02 Visual Inspection.
106.02 Visual Inspection.
106.03 Certification.
106.03(a) Production certification. (3)
(a)
(b)
(c)
Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification.
Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification
Section Description Material Material Property Or Specification
Frequency Certification Sample
Section Description Material Material Property Or Specification
Frequency Certification Sample
634 and
702.01
702.02
702.03
702.05
Section Description Material Material Property Or Specification
Frequency Certification Sample
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
107.01 Laws to be Observed.
Working In Waters Permit
National Pollutant Discharge Elimination System (NPDES)
(a) General.
(b) Notice of Intent (NOI).
(c) Payment of Permit Fees.
(d) Notice of Termination (NOT).
Table 107-1 NPDES Permits
State / Agency Permit Number and Link Effective Date Expiration
Date Regulatory
Review period
107.02 Protection and Restoration of Property and Landscape.
107.05 Responsibility for Damage Claims.
certificates of insurance
107.08 Sanitation, Health, and Safety.
107.10 Environmental Protection.
(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq.
(4)
(5)
(6)
(b) Oil and hazardous substances
(c) Dirt, plant, and foreign material.
(d) Clearances for Contractor-selected, noncommercial areas.
(5) Any required Certifications.
(e) Project-specific commitments.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
107.11 Protection of Forests, Parks, and Public Lands.
Section 108. — PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work.
(a)
(b)
Table 108-2 Federal Holidays and Surrounding Days
Federal Holiday Time Remarks
108.02 Subcontracting.
108.03 Determination and Extension of Contract Time. Delete the first sentence.
108.03(c) Time extensions. Add the following:
108.04 Failure to Complete Work on Time
Section 109. — MEASUREMENT AND PAYMENT
109.01 Measurement of Work.
109.02 Measurement Terms and Definitions.
(c) Cubic yard (Cubic meter).
(1) Cubic yard (Cubic meter) in-place.
(o) Square foot and Square yard (Square meter)
109.06 Pricing of Adjustments.
Variation in estimated quantity.
109.08 Progress Payments.
(a) General.
(b) Closing date and invoice submittal date.
(d) Government’s receiving report.
(e) Processing progress payment requests.
(1) Proper invoices.
(1) Invoices received by the 7th day following the closing date.
(a) Proper invoices.
(b) Defective invoices.
(2) Defective invoices.
(2) Invoices received between the 8th and 16th day following the closing date.
(a) Proper invoices.
(b) Defective invoices.
(f) Partial payments.
(f) Partial payments.
Section 152. — CONSTRUCTION SURVEY AND STAKING
Construction Requirements
152.04 General.
(1)
(2)
(3)
(4)
(5)
(6)
152.05 Survey and Staking Requirements.
(b) Centerline establishment.
(d) Slope and references stakes.
(2) Conventional survey methods.
(f) Grade-finishing stakes.
(g) Culverts.
(1)
(2)
(3)
(4)
(5)
(a)
(b)
(c)
(d)
(e) Readjust
(m) Centerline verification and staking.
(1)
(2)
(3)
Measurement
152.07
152.07
152.07
Section 153. — CONTRACTOR QUALITY CONTROL
Description
153.01
153.02 Qualifications.
(a) Quality control manager (QCM)
(1) Full-time, on-site QCM. (a) (b)
(a)
(b)
153.03 Quality Control Plan (QCP).
(b) Quality control procedures
(d) Subcontractors and suppliers.
153.04 Prosecution of Work.
(a) Preparatory phase.
(1)
(2)
(3)
(4)
(5)
(6)
(b) Start-up phase.
(1)
(2)
(c) Production phase.
(1)
(2)
(4)
(d) Construction progress meeting.
153.05 Sampling and Testing.
153.05 Sampling and Testing.
(a) Sample splitting.
(b) Testing.
153.06 Certifications.
153.07 Records and Control Charts.
(a) QC and construction operations reports.
(a) QC and construction operations reports.
(1) Subcontractor data.
(2) Labor/Equipment (a)
(b)
(c)
“I certify that the information contained in this record is accurate and that work documented herein complies with the contract. Exceptions to this certification are documented as a part of this record.”
153.08 Acceptance.
153.09 Measurement and Payment.
Measurement
153.09
Payment
153.10
(1)
(2)
Section 154. — CONTRACTOR SAMPLING AND TESTING
154.04 Testing
154.04B Field Laboratory (Contractor-Furnished).
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
155.04 Preliminary Construction Schedule.
(j)
155.05 Initial and Baseline Construction Schedule.
(g)
(g)
(f) Submission and approval.
155.06 Baseline Schedule Updates.
(f) Working Schedule.
155.07 Baseline Schedule Revision.
Section 156. — PUBLIC TRAFFIC
156.04 Accommodating Traffic During Work.
156.05 Maintaining Roadways During Work.
(a)
156.07 Limitations on Construction Operations.
(i)
(k)
(l)
(m)
(n)
(o)
156.09 Traffic Control Supervisor.
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
Section 157. — SOIL EROSION CONTROL, SEDIMENT CONTROL, AND STORMWATER POLLUTION PREVENTION PLAN
157.01
Material
157.02
157.03 Qualifications
Submit the following for approval as part of the SWPPP submittal:
(a) SWPPP Developer
(2)
(3)
(a)
(b)
(c)
(b) Erosion Control Supervisor.
(1)
(a)
(b)
(2)
(a)
(b)
(c) On-Site Stormwater Lead.
(1)
(b)
157.04 Roles and Responsibilities
(a) SWPPP Developer
(b) Erosion Control Supervisor.
(c) Stormwater Lead.
157.05 General.
157.06 Controls and Limitations on Work.
157.07 Stormwater Pollution Prevention Plan.
157.08 Soil Erosion Control.
157.09 Sediment Control.
157.10 Non-Stormwater Controls.
157.11 Acceptance.
Measurement
157.12
Payment
157.13
(a)
(1)
(2)
(3)
(b)
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.05 Disposing of Material.
(a) Remove from Project.
(b) Burn.
(c) Bury.
Section 204. — EXCAVATION AND EMBANKMENT
Materials
204.03.
Construction Requirements
204.05 Conserved Topsoil.
204.07 Subexcavation.
204.07 Subexcavation.
204.14 Disposal of Unsuitable or Excess Material.
204.14 Disposal of Unsuitable or Excess Material.
204.15.
204.16
(a) Roadway Excavation.
(1)
(e)
(h)
(2)
(n)
(g) Subexcavation.
(1
(2)
204.17
Section 301. — UNTREATED AGGREGATE COURSES
301.03 General.
Section 303. — ROAD RECONDITIONING
303.05 Roadbed Reconditioning.
Section 575. — MINOR BRIDGE WORK
575.01
Construction Requirements
575.02 General.
575.03 Clean Bridge Deck.
575.04 Replace Expansion Joints.
575.05 Clear Vegetation.
575.06 Tighten Transverse Post-tensioning Tie-rod Bolts
575.07 Acceptance.
575.08
575.08
Table 575-1
Penetrating Sealant Requirements
Property Test Method Requirement
Section 623. — GENERAL LABOR
623.01
Construction Requirements
623.02 Workers and Equipment.
623.03 Surveying Services.
623.04 Technical Services.
623.04A Biological Services.
623.05 Acceptance.
623.06
623.07
Section 625. — TURF ESTABLISHMENT
625.03 General.
625.11
Section 629. — ROLLED EROSION CONTROL PRODUCTS
AND CELLULAR CONFINEMENT SYSTEMS
Construction Requirements
629.05 (a) Slope Installations.
(a) Slope Installations.
(1) Anchor trench.
Section 635. — TEMPORARY TRAFFIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .