6982AF25B000025 FINAL.pdf

PDF 2 MB Posted

Attached to
NV FTBL 1094(1) Wilson Campground Road Federal contract opportunity
Solicitation number
6982AF25B000025
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is an Invitation for Bid (IFB) for the Wilson Campground Road Project, solicitation number 6982AF25B000025, issued by the U.S. Department of Transportation Federal Highway Administration's Central Federal Lands Highway Division. The project is located 83 miles northwest of Elko, Nevada, within the Bureau of Land Management's Wilson Reservoir Recreation Management Area, and aims to improve road safety, visitor access, and driving experience through comprehensive road improvements.

The solicitation is structured in two parts: Schedule A (base project) covering 6.21 miles of main road improvements, and Option X covering 1.01 miles of road improvements and minor bridge repairs. The project includes resurfacing, alignment shifts, cattle guard adjustments, drainage improvements, and sign replacements. It is a total small business set-aside with specific requirements for bid submission, including a printed bid package, SAM registration, and a bid guarantee. The project will use Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, and technical questions were to be submitted no later than November 13, 2025. The bid involves various construction activities such as excavation, aggregate surface course placement, culvert installation, and erosion control.

View the file

Other files for this federal contract opportunity

Other files attached to NV FTBL 1094(1) Wilson Campground Road, newest first.
File Type Posted
Wilson Bid Opening Summary Sched and Opt.pdf PDF
QnA Wilson 11.21.25.pdf PDF
Wilson Interested Vendors 11.20.25.pdf PDF
QnA Wilson 11.19.25 REV FINAL.pdf PDF
A001 11.19.25 Wilson.pdf PDF
QnA Wilson 11.19.25.pdf PDF
QnA Wilson 11.12.25 Final.pdf PDF
QnA Wilson 10.28.25.pdf PDF
Section 152 Physical Data.zip ZIP file
21.95 Final Geotechnical Report FLAT.pdf PDF
01.100 Plans FLAT.pdf PDF
20.100 Final Hydraulic Report FLAT.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER: 6982AF25B000025

SOLICITATION TYPE: TOTAL SMALL BUSINESS SET-ASIDE

PROJECT NUMBER: NV FTBL 1094(1)

PROJECT NAME: WILSON CAMPGROUND ROAD

BID OPENING DATE:

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-14 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov

TABLE OF CONTENTS

PROJECT OVERVIEW

The Wilson Campground Road Project located 83 miles northwest of Elko, Nevada, within the Bureau of Land Management’s Wilson Reservoir Recreation Management Area, aims to improve safety, increase visitor use, and enhance the driving experience. Proposed improvements include resurfacing, alignment shifts, cattle guard adjustments, drainage and minor bridge repairs, and replacing signs. The project is divided into a schedule and one option, as follows:

Schedule A: Main road improvements for 6.21 miles, ending at the bridge approach.

Option X: Minor bridge repairs and 1.01 miles of main road improvements, ending at the campground entrance.

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

I. PRE-BID INFORMATION

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Submit the following documents with your Bid Package– o

Notice of SAM Registration

Representations and Certifications – NAICS 237310

Vets-4212 Reporting: -

Bid Guarantee 52.228-1 Bid Guarantee

Accuracy and Completeness of Bid -

Request for Technical Information –

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON NOVEMBER 13, 2025

Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions.

Modifications to Bids prior to the time specified for receipt of bids

STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total.

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov

Time to definitize after receipt of an adequate change order definitization proposal under construction contracts

Number of change order proposals definitized under construction contracts

FY 2022 FY 2023 FY 2024

II. POST AWARD INFORMATION

CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.

Subcontracting 52.219-8, Utilization of Small Business Concerns

Insurance requirements

Masterworks - Inspector’s Daily Record of Construction Operations” Contractors Daily Reports)

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

(IFB)

(RFP)

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

(Include area code)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-14, U.S. CUSTOMARY UNITS

*See Page A-3

(If "YES," indicate within how many calendar days after award in Item 12B.)

OFFEROR (Must be fully completed by offeror) (Include ZIP Code) (Include area code)

(Include only if different than Item 14)

(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

(Type or print)

AWARD (To be completed by Government)

(4 copies unless otherwise specified)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return copies to issuing office.)

(Contractor is not required to sign this document.)

(Type or print) (Type or print)

Item 8: LOCATION OF PUBLIC BID OPENING:

Item 9: FOR GENERAL INFORMATION:

FOR TECHNICAL INFORMATION (plans and specifications):

Item 11: COMPLETION DATE:

See SCR Section 108.01

Item 12A: PERFORMANCE AND PAYMENT BONDS: Clause 52.228-15 Performance and Payment Bonds-Construction

Item 13B: BID BOND AMOUNT: 52.228-1 Bid Guarantee Subsection 102.03 Bid Guarantee

Item 19: ACKNOWLEDGMENT OF AMENDMENTS:

IN ITEM 19 OF THE SF-1442,

Item 24: SUBMITTING INVOICES: Subsection 109.08 Progress Payments

ESTIMATED

PRICE:

Bid Schedule Instructions

NOTE:

Basis for Award by adding the total price for all options to the total price for Schedule A.

Partnering

Subsection 103.05 Partnering

A-8

BID SCHEDULE

Project No : NV FTBL 1094(1) Schedule : A Schedule Type : Base

Project Name : WILSON CAMPGROUND ROAD

Contract Quantity Pay Items No Contract Quantity Pay Items

AMD# Line Item Number Pay Item Number Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15210-3000

CENTERLINE,

VERIFICATION

AND STAKING

5.900 MILE

A0060 15215-1000

SURVEY AND

STAKING,

APPROACH ROAD

8.000 EACH

A0080 15215-3000

SURVEY AND

STAKING,

DRAINAGE

STRUCTURE

18.000 EACH

A0100 15225-0000

SLOPE,

REFERENCE, AND

CLEARING AND

GRUBBING

CONTROL

0.306 MILE

A0120 15236-2000

SURVEY

CONTROL, GRADE

FINISHING

0.612 MILE

A0140 15301-0000

CONTRACTOR

QUALITY

CONTROL

ALL LPSM

A0160 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0180 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0200 15701-0000 SOIL EROSION

CONTROL ALL LPSM

A0220 15720-0000

STORM WATER

POLLUTION

PREVENTION

PLAN

ALL LPSM

A0240 15802-0000 WATERING FOR

DUST CONTROL ALL LPSM

A0260 20101-0000 CLEARING AND

GRUBBING 11.400 ACRE

A0280 20301-1900 REMOVAL OF

PIPE CULVERT 18.000 EACH

A0300 20301-2400 REMOVAL OF

SIGN 13.000 EACH

A0320 20302-2100 REMOVAL OF

PIPE CULVERT 13.000 LNFT

A0340 20401-0000 ROADWAY

EXCAVATION 2,200.000 CUYD

A0360 20402-0000 SUBEXCAVATION 500.000 CUYD

A0380 20466-0000

CONSERVE AND

STOCKPILE

TOPSOIL

3,000.000 CUYD

A0400 25101-0200

PLACED RIPRAP,

METHOD A,

CLASS 2

4.000 CUYD

A0420 25101-0400

PLACED RIPRAP,

METHOD A,

CLASS 4

40.000 CUYD

A0440 30110-0000

AGGREGATE

SURFACE

COURSE

19,100.000 TON

A0480 30301-4000 ROADBED

RECONDITIONING 5.944 MILE

A0500 30302-1000 DITCH

RECONDITIONING 1,600.000 LNFT

A0520 60201-0800 24-INCH PIPE

CULVERT 140.000 LNFT

A0540 60201-1200 48-INCH PIPE

CULVERT 40.000 LNFT

A0560 60202-0400

24-INCH

EQUIVALENT

DIAMETER ARCH

OR ELLIPTICAL

PIPE CULVERT

450.000 LNFT

A0580 60210-0600

END SECTION

FOR 18-INCH PIPE

CULVERT

18.000 EACH

A0600 60210-0800

END SECTION

FOR 24-INCH PIPE

CULVERT

8.000 EACH

A0620 60210-0900

END SECTION

FOR 30-INCH PIPE

CULVERT

2.000 EACH

A0640 60210-1200

END SECTION

FOR 48-INCH PIPE

CULVERT

2.000 EACH

A0660 60211-0800

END SECTION

FOR 24-INCH

EQUIVALENT

DIAMETER ARCH

OR ELLIPTICAL

PIPE CULVERT

26.000 EACH

A0680 60704-0000

CLEANING

CULVERT IN

PLACE

10.000 EACH

A0700 61920-3000

REMOVE AND

RESET CATTLE

GUARD

2.000 EACH

A0720 62201-0200

DUMP TRUCK, 8

CUBIC YARD

MINIMUM

CAPACITY

40.000 HOUR

A0740 62201-0550

BACKHOE

LOADER, 6 CUBIC

FOOT MINIMUM

RATED CAPACITY

BUCKET, 24-INCH

WIDTH

40.000 HOUR

A0760 62201-0950

WHEEL LOADER,

3 CUBIC YARD

MINIMUM RATED

CAPACITY

40.000 HOUR

A0780 62201-1300

BULLDOZER,

160HP MINIMUM

FLYWHEEL

POWER

40.000 HOUR

A0800 62301-0000 GENERAL LABOR 80.000 HOUR

A0820 62302-1000

SPECIAL LABOR,

HIRED

TECHNICAL

SERVICES

40.000 HOUR

A0840 62303-1000

SPECIAL LABOR,

HIRED

TECHNICAL

SERVICES

(BIOLOGICAL

MONITOR) ALL LPSM

A0860 62302-1100

SPECIAL LABOR,

HIRED SURVEY

SERVICES

40.000 HOUR

A0880 62407-0000

PLACING

CONSERVED

TOPSOIL

3,500.000 CUYD

A0900 62510-2000

SEEDING,

HYDRAULIC

METHOD

8.700 ACRE

A0920 62515-3000

MULCHING,

HYDRAULIC

METHOD,

BONDED FIBER

MATRIX

8.700 ACRE

A0940 62901-1000

ROLLED EROSION

CONTROL

PRODUCT, TYPE

3.B

630.000 SQYD

A0960 63301-0000 SIGN SYSTEM 11.000 EACH

A0980 63501-0000

TEMPORARY

TRAFFIC

CONTROL

ALL LPSM

A1000 63701-0000 FIELD OFFICE 1.000 EACH

Submitted By: Schedule Total:

A-

BID SCHEDULE

Project No : NV FTBL 1094(1) Schedule : X Schedule Type : Option

Project Name : WILSON CAMPGROUND ROAD

Contract Quantity Pay Items No Contract Quantity Pay Items

AMD# Line Item Number Pay Item Number Description Supplemental Description

Quantity Unit Unit Price Amount

X0020 15101-0000 MOBILIZATION ALL LPSM

X0040 15210-3000

CENTERLINE,

VERIFICATION

AND STAKING

1.011 MILE

X0060 15215-1000

SURVEY AND

STAKING,

APPROACH ROAD

8.000 EACH

X0080 15215-3000

SURVEY AND

STAKING,

DRAINAGE

STRUCTURE

3.000 EACH

X0100 15301-0000

CONTRACTOR

QUALITY

CONTROL

ALL LPSM

X0120 15401-0000 CONTRACTOR

TESTING ALL LPSM

X0140 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

X0160 15701-0000 SOIL EROSION

CONTROL ALL LPSM

X0180 15720-0000

STORM WATER

POLLUTION

PREVENTION

PLAN

ALL LPSM

X0200 15802-0000 WATERING FOR

DUST CONTROL ALL LPSM

X0220 20101-0000 CLEARING AND

GRUBBING 3.000 ACRE

X0240 20301-1900 REMOVAL OF

PIPE CULVERT 1.000 EACH

X0260 20301-2400 REMOVAL OF

SIGN 8.000 EACH

X0280 20402-0000 SUBEXCAVATION 100.000 CUYD

X0300 20466-0000

CONSERVE AND

STOCKPILE

TOPSOIL

1,000.000 CUYD

X0320 25101-0200

PLACED RIPRAP,

METHOD A,

CLASS 2

8.000 CUYD

X0340 30110-0000

AGGREGATE

SURFACE

COURSE

3,100.000 TON

X0380 30301-4000 ROADBED

RECONDITIONING 0.996 MILE

X0400 30302-1000 DITCH

RECONDITIONING 150.000 LNFT

X0420 57501-0000 MINOR BRIDGE

WORK ALL LPSM

X0440 60202-0200

18-INCH

EQUIVALENT

DIAMETER ARCH

OR ELLIPTICAL

PIPE CULVERT

22.000 LNFT

X0460 60202-0400

24-INCH

EQUIVALENT

DIAMETER ARCH

OR ELLIPTICAL

PIPE CULVERT

70.000 LNFT

X0480 60210-0600

END SECTION

FOR 18-INCH PIPE

CULVERT

6.000 EACH

X0500 60211-0600

END SECTION

FOR 18-INCH

EQUIVALENT

DIAMETER ARCH

OR ELLIPTICAL

PIPE CULVERT

2.000 EACH

X0520 60211-0800

END SECTION

FOR 24-INCH

EQUIVALENT

DIAMETER ARCH

OR ELLIPTICAL

PIPE CULVERT

4.000 EACH

X0540 60704-0000

CLEANING

CULVERT IN

PLACE

4.000 EACH

X0560 62201-0200

DUMP TRUCK, 8

CUBIC YARD

MINIMUM

CAPACITY

20.000 HOUR

X0580 62201-0550

BACKHOE

LOADER, 6 CUBIC

FOOT MINIMUM

RATED CAPACITY

BUCKET, 24-INCH

WIDTH

20.000 HOUR

X0600 62201-0950

WHEEL LOADER,

3 CUBIC YARD

MINIMUM RATED

CAPACITY

20.000 HOUR

X0620 62201-1300

BULLDOZER,

160HP MINIMUM

FLYWHEEL

POWER

20.000 HOUR

X0640 62301-0000 GENERAL LABOR 40.000 HOUR

X0660 62302-1000

SPECIAL LABOR,

HIRED

TECHNICAL

SERVICES

40.000 HOUR

X0680 62303-1000

SPECIAL LABOR,

HIRED

TECHNICAL

SERVICES

(BIOLOGICAL

MONITOR) ALL LPSM

X0700 62302-1100

SPECIAL LABOR,

HIRED SURVEY

SERVICES

20.000 HOUR

X0720 62407-0000

PLACING

CONSERVED

TOPSOIL

1,000.000 CUYD

X0740 62510-2000

SEEDING,

HYDRAULIC

METHOD

2.700 ACRE

X0760 62515-3000

MULCHING,

HYDRAULIC

METHOD,

BONDED FIBER

MATRIX

2.700 ACRE

X0780 63301-0000 SIGN SYSTEM 8.000 EACH

X0800 63501-0000

TEMPORARY

TRAFFIC

CONTROL

ALL LPSM

Submitted By: Schedule Total:

BID SCHEDULE SUMMARY

Corporate Certificate

Limited Liability Certificate

Authority to Bind Partnership

Authority to Bind Joint Venture

Sole Proprietorship Requirement

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

NOTE TO CONTRACTOR:

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

HAZARDOUS MATERIALS

BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Comprehensive Guidelines for Procurement of Products Containing Recovered Materials

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (REV. 10/2023)

Previous edition is NOT usable Prescribed by GSA - FAR (48 CFR) 53.228(a)

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0001

Expiration Date: 1/31/2027 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of

1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F

Street, NW, Washington, DC 20405.

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT

OF BID

PRICE

AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER

6982AF25B000025 MILLION(S)

THOUSAND(S)

HUNDRED(S)

CENTS

00 FOR (Construction, Supplies or

Services) Construction

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

(Seal)

3.

(Seal) Corporate

Seal

NAME(S) &

TITLE(S)

(Typed)

1. 2. 3.

INDIVIDUALSURETY(IES)

SIGNATURE(S) 1.

(Seal)

2.

(Seal)

NAME(S)

(Typed)

1. 2.

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

PRINCIPAL (Legal name and business address) ("X" one)

INDIVIDUAL PARTNERSHIP JOINT VENTURE

CORPORATION OTHER (Specify)

STATE OF INCORPORATION

STANDARD FORM 24 (REV. 10/2023) BACK

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

C

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

D

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

E

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

F

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

G

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

BIDDER’S INFORMATION

Solicitation Provisions

52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2024)

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation. (JAN 2017)

52.204-7 System for Award Management. (NOV 2024)(DEVIATION NOV 2025)

52.204-90 Offeror Identification (DEVIATION NOV 2025)

52.209-5 Certification Regarding Responsibility Matters. (AUG 2020)

52.209-7 Information Regarding Responsibility Matters (OCT 2018)

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (FEB 2016)

52.209-13 Violation of Arms Control Treaties or Agreements – Certification (NOV 2021)

52.214-3 Amendments to Invitations for Bids. (DEC 2016) (DEVIATION OCT 2025)

52.214-4 False Statements in Bids. (APR 1984)

52.214-5 Submission of Bids. (DEC 2016)(DEVIATION OCT 2025)

52.214-6 Explanation to Prospective Bidders. (APR 1984)

52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)

(DEVIATION OCT 2025)

52.214-18 Preparation of Bids - Construction. (APR 1984)

52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)

52.214-34 Submission of Offers in the English Language. (APR 1991)

52.214-35 Submission of Offers in U.S. Currency. (APR 1991)

52.216-1 Type of Contract. (APR 1984)

FIRM FIXED PRICE

52.217-5 Evaluation of Options (JUL 1990)

52.219-1 Small Business Program Representations (FEB 2024)

52.222-5 Construction Wage Rate Requirements Secondary Site of the Work. (MAY 2014)

52.222-38 Compliance with Veterans' Employment Reporting Requirements. (FEB 2016)

52.223-1 Bio based Product Certification (MAY 2024)(DEVIATION FEB 2025)

[at https://www.biopreferred.gov/resources/categories.html]

52.225-10 Notice of Buy American Requirement—Construction Materials (MAY 2014)

52.228-1 Bid Guarantee. (SEP 1996) e.g twenty (20%) percent

$3,000,000.00

52.233-2 Service of Protest. (SEP 2006)(DEVIATION SEP 2025)

Mr. Ryan Phillips Acquisitions Branch Chief Federal Highway Administration 12300 West Dakota Avenue, Suite 360 Lakewood, Colorado 80228

52.240-90 Security Prohibitions and Exclusions Representations and Certifications.

(DEVIATION SEP 2025)

52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far

52.252-3 Alterations in Solicitation. (APR 1984)

NONE

52.252-5 Authorized Deviations in Provisions. (NOV 2020)

1252.239–92 Information and Communication Technology Accessibility Notice (NOV 2022)

Contract Clauses

52.202-1 Definitions. (JUN 2020)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020)

52.203-7 Anti-Kickback Procedures. (JUN 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)

52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021)

52.203-14 Display of Hotline Poster(s) (NOV 2021)

Definition.

United States

Display of fraud hotline poster(s).

General Fraud https://www.oig.dot.gov/sites/default/files/files/OIG-generic-2.pdf

Subcontracts.

52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights (NOV 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN

2020)(DEVIATION NOV 2025)

52.204-13 System for Award Management Maintenance. (OCT 2018)(DEVIATION NOV 2025)

52.204-14 Service Contract Reporting Requirements (OCT 2016)(DEVIATION NOV 2025)

52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

52.204-91 Contractor Identification (DEVIATION NOV 2025)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015)

52.211-12 Liquidated Damages - Construction. (SEP 2000)

52.211-13 Time Extensions. (SEP 2000)

52.214-26 Audit and Records – Sealed Bidding. (JUN 2020) (DEVIATION OCT 2025)

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data – Modifications – Sealed Bidding. (JUN 2020)

52.214-28 Subcontractor Certified Cost or Pricing Data – Modifications – Sealed Bidding.

(JUN 2020) (DEVIATION OCT 2025)

52.217-7 Option for Increased Quantity - Separately Priced Line Item. (MAR 1989)

60 days after award

52.219-6 Notice of Total Small Business Set-Aside (NOV 2020)

52.219-8 Utilization of Small Business Concerns (JAN 2025)

52.219-14 Limitations on Subcontracting (OCT 2022)

52.219-28 Post-Award Small Business Program Rerepresentation (JAN 2025)

52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2018)

52.222-6 Construction Wage Rate Requirements. (AUG 2018)(DEVIATION FEB 2025)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (JUL 2021)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)(DEVIATION FEB 2025)

52.222-12 Contract Termination - Debarment. (MAY 2014)(DEVIATION FEB 2025)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)

52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)

52.222-37 Employment Reports on Veterans (JUN 2020)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010)

52.222-50 Combating Trafficking in Persons (NOV 2021)

52.222-54 Employment Eligibility Verification (JAN 2025)

52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)

52.223-2 Reporting of Biobased Products Under Service and Construction Contract. (MAY

2024)(DEVIATION FEB 2025)

Definitions.

Biobased product

USDA-designated product category available at https://www.biopreferred.gov/resources/categories.html https://www.biopreferred.gov [ or 7 CFR part 4270] https://www.sam.gov, 52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)

52.223-21 Foams (MAY 2024)

52.223-23 Sustainable Products and Services (May 2024)(DEVIATION FEB 2025)

Definitions Biobased product

[7 CFR part 4270.2)]

Recovered material

Sustainable products and services

Statutory purchasing programs [(1)] https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products

[(2)] https://www.energy.gov/eere/femp/search-energy-efficient-products https://www.energystar.gov/products?s=mega

[(3)] [7 CFR part 4270] https://www.biopreferred.gov

[(4)] https://www.epa.gov/snap

Required EPA purchasing programs https://www.epa.gov/watersense/watersense-products https://www.epa.gov/saferchoice/products https://www.epa.gov/greenerproducts/recommendations-specifications-standards-and-ecolabels-federal-purchasing

Resource https://sftool.gov/greenprocurement

[statutory]

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-9 Buy American-Construction Materials (OCT 2022)

Definitions

Commercially available off-the-shelf (COTS) item

Cost of components means

Critical component

Critical item

Domestic construction material

Fastener

Foreign construction material

Foreign iron and steel

Predominantly of iron or steel or a combination of both

Steel

None

For domestic construction material that is not a critical item or does not contain critical components

(1)

(2)

For domestic construction material that is a critical item or contains critical components

(1)

(2)

Data

Construction material description

Unit of measure Quantity Price (dollars) *

Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

52.226-7 Drug Free Workplace (May 2024)

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. (MAY 2024)

52.227-1 Authorization and Consent. (JUN 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (JUN 2020)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.228-11 Individual Surety - Pledges of Assets. (FEB 2021)

52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022)

52.228-14 Irrevocable Letter of Credit (Nov 2014)

52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)

52.232-17 Interest. (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment For Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)

52.233-1 Disputes. (MAY 2014)(DEVIATION SEP 2025) - Alternate I (DEC

1991)(DEVIATION SEP 2025)

52.233-3 Protest after Award. (AUG 1996)(DEVIATION SEP 2025)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)(DEVIATION SEP 2025)

52.236-2 Differing Site Conditions. (APR 1984)(DEVIATION AUG 2025)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)(DEVIATION

AUG 2025)

52.236-5 Material and Workmanship. (APR 1984)(DEVIATION AUG 2025)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)(DEVIATION AUG 2025)

52.236-8 Other Contracts. (APR 1984)(DEVIATION AUG 2025)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)(DEVIATION AUG 2025)

52.236-10 Operations and Storage Areas. (APR 1984)(DEVIATION AUG 2025)

52.236-11 Use and Possession Prior to Completion. (APR 1984)(DEVIATION AUG 2025)

52.236-12 Cleaning Up. (APR 1984)(DEVIATION AUG 2025)

52.236-13 Accident Prevention. (NOV 1991)(DEVIATION AUG 2025) Alternate I (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)(DEVIATION AUG 2025)

52.236-17 Layout of Work. (APR 1984)(DEVIATION AUG 2025)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)(DEVIATION AUG 2025)

52.240-91 Security Prohibitions and Exclustions (DEVITAION SEP 2025)

52.242-13 Bankruptcy. (JUL 1995)

52.242-14 Suspension of Work. (APR 1984)

52.243-4 Changes. (JUN 2007)(DEVIATION JUL 2025)

52.243-6 Change Order Accounting. (APR 1984)(DEVIATION JUL 2025)

52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN

2025)(DEVIATION FEB 2025)

52.245-1 Government Property (SEP 2021) - Alternate I (APR 2012)

52.245-9 Use and Charges. (APR 2012)

52.246-12 Inspection of Construction. (AUG 1996)

52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021)

52.248-3 Value Engineering - Construction. (OCT 2020)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.252-2 Clauses Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far

52.252-4 Alterations in Contract. (APR 1984)

NONE

52.252-6 Authorized Deviations in Clauses. (NOV 2020)

52.253-1 Computer Generated Forms. (JAN 1991)

1252.201-70 Contracting Officer’s Representative (NOV 2022)

1252.223-70 Removal or Disposal of Hazardous Substances – Applicable Licenses and Permits (NOV 2022)

1252.223-71 Accident and Fire Reporting (NOV 2022)

1252.223-73 Seat Belt Use Policies and Programs (NOV 2022)

1252.228-74 Notification of Payment Bond Protection (NOV 2022)

1252.232–70 Electronic Submission of Payment Requests (NOV 2022)(DEVIATION AUG 2025)

Definitions.

Contract financing payment

Payment request

Electronic form

Invoice payment

Electronic payment requests.

Processing system.

iSupplier.

login.gov.

iSupplier www.login.gov.

Invoice requirements.

iSupplier

Payment system registration. iSupplier login.gov.

Electronic authentication. See www.login.gov www.login.gov www.login.gov iSupplier http://einvoice.esc.gov iSupplier

Training on DELPHI.

http://einvoice.esc.gov.

Account Management.

Waivers.

Exceptions and alternate payment procedures.

1252.239–93 Information and Communication Technology Accessibility (NOV 2022)

POST-AWARD EVALUATION OF CONTRACTOR PERFORMANCE

Contractor Performance Evaluations

D - 1

"General Decision Number: NV20250055 10/03/2025

Superseded General Decision Number: NV20240055

State: Nevada

Construction Type: Highway

Counties: Elko and Eureka Counties in Nevada.

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered | Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an | The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on| Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or | The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 02/14/2025 2 10/03/2025

D - 2

ENGI0003-040 07/01/2024

Rates Fringes

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 50.47 30.38

ENGI0003-041 07/01/2024

Rates Fringes

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 47.56 30.38

ENGI0003-042 07/01/2024

Rates Fringes

OPERATOR: Bulldozer.............$ 60.39 30.38

ENGI0003-045 07/01/2024

Rates Fringes

OPERATOR: Grader/Blade..........$ 50.47 30.38

ENGI0003-051 07/01/2024

Rates Fringes

OPERATOR: Loader Loader over 4 cu.yds. up to and including 12 cu.yds..$ 50.71 30.38

ENGI0003-053 07/01/2024

Rates Fringes

OPERATOR: Mechanic..............$ 50.28 30.38

ENGI0003-055 07/01/2024

Rates Fringes

OPERATOR: Oiler.................$ 46.76 30.38

ENGI0003-057 07/01/2024

Rates Fringes

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 50.71 30.38

ENGI0003-065 07/01/2024

Rates Fringes

OPERATOR: Roller................$ 60.39 30.38

LABO0169-009 10/01/2024

Rates Fringes

D - 3

HIGHWAY STRIPING: Laborer........$ 36.70 16.30

LABO0169-010 10/01/2024

Rates Fringes

LABORER: Mason Tender - Cement/Concrete..................$ 34.20 16.30 LABORER: Jackhammer..............$ 34.20 16.30

LABO0169-011 10/01/2024

Rates Fringes

LABORER: Common or General......$ 33.95 16.30

LABO0169-012 10/01/2024

Rates Fringes

LABORER: Concrete Saw...........$ 34.20 16.30

LABO0169-013 10/01/2024

Rates Fringes

TRAFFIC CONTROL:

Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper.............$ 36.70 16.30

LABO0169-014 10/01/2024

Rates Fringes

LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 34.45 16.30 LABORER: Pipelayer..............$ 34.45 16.30

LABO0169-016 10/01/2024

Rates Fringes

TRAFFIC CONTROL: Flagger.......$ 32.08 16.30

* PLAS0797-010 10/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 43.06 13.69

SUNV2021-010 03/01/2024

Rates Fringes

IRONWORKER, REINFORCING..........$ 43.93 31.32

OPERATOR: Drill.................$ 46.92 25.02

TRUCK DRIVER: Dump Truck........$ 39.90 0.00

D - 4

TRUCK DRIVER: Water Truck.......$ 39.91 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

D - 5

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

D - 6

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

Roadway Prism

Roadway Prism

Subcontractor

Subcontractor

Section 102. — BID, AWARD AND EXECUTION OF CONTRACT

Section 103. — SCOPE OF WORK

103.05 Partnering.

Section 104. — CONTROL OF WORK

104.02A Electronic Documentation.

Masterworks User Account Form

104.02B Signatures for Electronic Documentation.

(a) Definitions.

(1) Electronic signature.

(2) Wet signature.

(b) Electronic signature.

(3)

(c) Wet signature.

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements.

105.04 Storing and Handling Material.

Section 106. — ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements.

(a) Disputing Government test results.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(b) Alternatives to removing and replacing non-conforming work.

106.02 Visual Inspection.

106.02 Visual Inspection.

106.03 Certification.

106.03(a) Production certification. (3)

(a)

(b)

(c)

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification

Section Description Material Material Property Or Specification

Frequency Certification Sample

Section Description Material Material Property Or Specification

Frequency Certification Sample

634 and

702.01

702.02

702.03

702.05

Section Description Material Material Property Or Specification

Frequency Certification Sample

Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE

PUBLIC

107.01 Laws to be Observed.

Working In Waters Permit

National Pollutant Discharge Elimination System (NPDES)

(a) General.

(b) Notice of Intent (NOI).

(c) Payment of Permit Fees.

(d) Notice of Termination (NOT).

Table 107-1 NPDES Permits

State / Agency Permit Number and Link Effective Date Expiration

Date Regulatory

Review period

107.02 Protection and Restoration of Property and Landscape.

107.05 Responsibility for Damage Claims.

certificates of insurance

107.08 Sanitation, Health, and Safety.

107.10 Environmental Protection.

(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq.

(4)

(5)

(6)

(b) Oil and hazardous substances

(c) Dirt, plant, and foreign material.

(d) Clearances for Contractor-selected, noncommercial areas.

(5) Any required Certifications.

(e) Project-specific commitments.

(2)

(3)

(4)

(5)

(6)

(7)

(8)

107.11 Protection of Forests, Parks, and Public Lands.

Section 108. — PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work.

(a)

(b)

Table 108-2 Federal Holidays and Surrounding Days

Federal Holiday Time Remarks

108.02 Subcontracting.

108.03 Determination and Extension of Contract Time. Delete the first sentence.

108.03(c) Time extensions. Add the following:

108.04 Failure to Complete Work on Time

Section 109. — MEASUREMENT AND PAYMENT

109.01 Measurement of Work.

109.02 Measurement Terms and Definitions.

(c) Cubic yard (Cubic meter).

(1) Cubic yard (Cubic meter) in-place.

(o) Square foot and Square yard (Square meter)

109.06 Pricing of Adjustments.

Variation in estimated quantity.

109.08 Progress Payments.

(a) General.

(b) Closing date and invoice submittal date.

(d) Government’s receiving report.

(e) Processing progress payment requests.

(1) Proper invoices.

(1) Invoices received by the 7th day following the closing date.

(a) Proper invoices.

(b) Defective invoices.

(2) Defective invoices.

(2) Invoices received between the 8th and 16th day following the closing date.

(a) Proper invoices.

(b) Defective invoices.

(f) Partial payments.

(f) Partial payments.

Section 152. — CONSTRUCTION SURVEY AND STAKING

Construction Requirements

152.04 General.

(1)

(2)

(3)

(4)

(5)

(6)

152.05 Survey and Staking Requirements.

(b) Centerline establishment.

(d) Slope and references stakes.

(2) Conventional survey methods.

(f) Grade-finishing stakes.

(g) Culverts.

(1)

(2)

(3)

(4)

(5)

(a)

(b)

(c)

(d)

(e) Readjust

(m) Centerline verification and staking.

(1)

(2)

(3)

Measurement

152.07

152.07

152.07

Section 153. — CONTRACTOR QUALITY CONTROL

Description

153.01

153.02 Qualifications.

(a) Quality control manager (QCM)

(1) Full-time, on-site QCM. (a) (b)

(a)

(b)

153.03 Quality Control Plan (QCP).

(b) Quality control procedures

(d) Subcontractors and suppliers.

153.04 Prosecution of Work.

(a) Preparatory phase.

(1)

(2)

(3)

(4)

(5)

(6)

(b) Start-up phase.

(1)

(2)

(c) Production phase.

(1)

(2)

(4)

(d) Construction progress meeting.

153.05 Sampling and Testing.

153.05 Sampling and Testing.

(a) Sample splitting.

(b) Testing.

153.06 Certifications.

153.07 Records and Control Charts.

(a) QC and construction operations reports.

(a) QC and construction operations reports.

(1) Subcontractor data.

(2) Labor/Equipment (a)

(b)

(c)

“I certify that the information contained in this record is accurate and that work documented herein complies with the contract. Exceptions to this certification are documented as a part of this record.”

153.08 Acceptance.

153.09 Measurement and Payment.

Measurement

153.09

Payment

153.10

(1)

(2)

Section 154. — CONTRACTOR SAMPLING AND TESTING

154.04 Testing

154.04B Field Laboratory (Contractor-Furnished).

Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS

155.04 Preliminary Construction Schedule.

(j)

155.05 Initial and Baseline Construction Schedule.

(g)

(g)

(f) Submission and approval.

155.06 Baseline Schedule Updates.

(f) Working Schedule.

155.07 Baseline Schedule Revision.

Section 156. — PUBLIC TRAFFIC

156.04 Accommodating Traffic During Work.

156.05 Maintaining Roadways During Work.

(a)

156.07 Limitations on Construction Operations.

(i)

(k)

(l)

(m)

(n)

(o)

156.09 Traffic Control Supervisor.

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

Section 157. — SOIL EROSION CONTROL, SEDIMENT CONTROL, AND STORMWATER POLLUTION PREVENTION PLAN

157.01

Material

157.02

157.03 Qualifications

Submit the following for approval as part of the SWPPP submittal:

(a) SWPPP Developer

(2)

(3)

(a)

(b)

(c)

(b) Erosion Control Supervisor.

(1)

(a)

(b)

(2)

(a)

(b)

(c) On-Site Stormwater Lead.

(1)

(b)

157.04 Roles and Responsibilities

(a) SWPPP Developer

(b) Erosion Control Supervisor.

(c) Stormwater Lead.

157.05 General.

157.06 Controls and Limitations on Work.

157.07 Stormwater Pollution Prevention Plan.

157.08 Soil Erosion Control.

157.09 Sediment Control.

157.10 Non-Stormwater Controls.

157.11 Acceptance.

Measurement

157.12

Payment

157.13

(a)

(1)

(2)

(3)

(b)

Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.05 Disposing of Material.

(a) Remove from Project.

(b) Burn.

(c) Bury.

Section 204. — EXCAVATION AND EMBANKMENT

Materials

204.03.

Construction Requirements

204.05 Conserved Topsoil.

204.07 Subexcavation.

204.07 Subexcavation.

204.14 Disposal of Unsuitable or Excess Material.

204.14 Disposal of Unsuitable or Excess Material.

204.15.

204.16

(a) Roadway Excavation.

(1)

(e)

(h)

(2)

(n)

(g) Subexcavation.

(1

(2)

204.17

Section 301. — UNTREATED AGGREGATE COURSES

301.03 General.

Section 303. — ROAD RECONDITIONING

303.05 Roadbed Reconditioning.

Section 575. — MINOR BRIDGE WORK

575.01

Construction Requirements

575.02 General.

575.03 Clean Bridge Deck.

575.04 Replace Expansion Joints.

575.05 Clear Vegetation.

575.06 Tighten Transverse Post-tensioning Tie-rod Bolts

575.07 Acceptance.

575.08

575.08

Table 575-1

Penetrating Sealant Requirements

Property Test Method Requirement

Section 623. — GENERAL LABOR

623.01

Construction Requirements

623.02 Workers and Equipment.

623.03 Surveying Services.

623.04 Technical Services.

623.04A Biological Services.

623.05 Acceptance.

623.06

623.07

Section 625. — TURF ESTABLISHMENT

625.03 General.

625.11

Section 629. — ROLLED EROSION CONTROL PRODUCTS

AND CELLULAR CONFINEMENT SYSTEMS

Construction Requirements

629.05 (a) Slope Installations.

(a) Slope Installations.

(1) Anchor trench.

Section 635. — TEMPORARY TRAFFIC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .