6982AF24B000015 INTERESTED BIDDERS LIST.pdf

PDF 212 KB Posted

Attached to
UT FLAP SLA 10(1) Mill Creek Canyon Road
Solicitation number
6982AF24B000015
Issued by

About this file

This document appears to be a Presolicitation Notice related to a federal contract opportunity for the UT FLAP SLA 10(1) Mill Creek Canyon Road project.

The project involves the reconstruction and widening of Mill Creek Canyon Road in northern Utah, from the Big Water Trailhead to the Winter Gate, to improve safety, access to recreational areas, and protect environmental resources. The work includes roadway excavation, rock embankment, retaining wall construction, aggregate base, asphalt paving, drainage improvements, and installation of utilities conduits and vault toilets. The contract opportunity is a full and open competition, with a HubZone preference. The solicitation number is 6982AF24B000015, and the project is being managed by the Department of Transportation Federal Highway Administration. Offers are due by September 19, 2024 at 2:00 PM MDT.

View the file

Other files

File Type Posted
BID TABS UT FLAP SLA 10(1) Mill Creek Canyon Road.pdf PDF
Bid Opening Summary Mill Creek Canyon.pdf PDF
QUESTION AND ANSWER AS OF 11 07 24.pdf PDF
QUESTION AND ANSWER AS OF 11 04 24.pdf PDF
A002 6982AF24B000015 UT FLAP SLA 10(1) MILL CREEK CANYON RD 10 31 2024.pdf PDF
Summary of Quantities.xls XLS spreadsheet
QUESTION AND ANSWER AS OF 10 31 24.pdf PDF
QUESTION AND ANSWER UT FLAP SLA 10(1) DATED10 24 24.pdf PDF
A001 6982AF24B000015 UT FLAP SLA 10(1) MILL CREEK CANYON RD 10 25 2024.pdf PDF
Mill Creek Road - Pre-Bid Site Visit Notes_FINAL.pdf PDF
Questions and Answers 10 09 2024.pdf PDF
PRE BID SITE VISIT UT FLAP SLA 10(1) Mill Creek Canyon Road.pdf PDF
Updated Electronic Design Files Physical Data.zip ZIP file
Electronic Design Files Physical Data.zip ZIP file
100 Percent Plans Sheets V1 Through Z6.pdf PDF
100 Percent Plans Sheets T1 Through T28.pdf PDF
Cross Sections.pdf PDF
100 Percent Plans Sheets E1 Through G28.pdf PDF
Upper Mill Creek Canyon Road Improvements_Pavement Addendum_20240508 - signed.pdf PDF
Upper Mill Creek Canyon Road Improvements_Geotech_Final_Rev 1_20240715 - signed v3 reduced.pdf PDF
100 Percent Plans Sheets H1 Through S20.pdf PDF
100 Percent Plans Sheets C1 Thourgh C18.pdf PDF
6982AF24B000015 IFB UT FLAP SLA 10(1) Mill Creek Canyon Rd.pdf PDF
100 Percent Plans Sheets U1 Through U12.pdf PDF
100 Percent Plans Sheets A1 Through B19.pdf PDF
FP-14_Eng.pdf PDF
Final Hydraulics Report_20240726_Signed.pdf PDF
MCRR_Pavement Report_Final_20221107_Revised_20230106 - signed.pdf PDF
UT FLAP SLA 10 MIll Creek JOFOC_signed_Redacted.pdf PDF
100 Percent Plans Sheets D1 Thourgh D33.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Opportunity Details

Notice ID Related Notice Active/Inactive

6982AF24B000015 Active

Notice Status Department/Ind. Agency Sub-Tier

Published TRANSPORTATION, DEPARTMENT

OF

FEDERAL HIGHWAY

ADMINISTRATION

Office

6982AF CENTRAL FEDERAL LANDS DIVISI

Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (PTAP).

General Information

Contract Opportunity Type Updated Published Date

Presolicitation (Updated) Sep 04, 2024 01:31 PM

Date Offers Due Inactive Policy

Sep 19, 2024 02:00 PM MDT After a specific date

Inactive Date Initiative

Sep 20, 2024 None

Allow Vendors to Add/remove from Interested Vendors List

Allow Vendors to View Interested Vendors List

Yes No

Classification

Original Set Aside Product Service Code

Y1LB-CONSTRUCTION OF HIGHWAYS, ROADS,

STREETS, BRIDGES, AND RAILWAYS

Place of Performance

Millcreek , UT USA

NAICS Code(s)

NAICS Code NAICS Definition

237310 Highway, Street, and Bridge Construction

UT FLAP SLA 10(1) Mill Creek Canyon Road

1Sep 19, 2024 06:04:37 PM GMT https://www.apexaccelerators.us https://www.aptac-us.org/ https://www.aptac-us.org/ https://www.apexaccelerators.us

Description

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE

SOLICITATION TYPE: FULL AND OPEN COMPETITION

PROJECT NUMBER: UT FLAP SLA 10(1)

PROJECT NAME: Mill Creek Canyon Road

PROJECT DESCRIPTION:

Mill Creek Canyon Road provides access to recreational sites in the Uinta-Wasatch-Cache National Forest from 3800 S. Wasatch Boulevard to the Upper Big Water Trailhead. The purpose of the project is to improve safety, improve access to high quality recreational opportunities, and protect the water and wildlife resources through natural resources best practices. Mill Creek Canyon Road is located within Salt Lake County in northern Utah. The majority of the road is located within the Unita-Wasatch-Cache National Forest but is maintained by Salt Lake County.

The project consists of reconstruction and widening of Mill Creek Canyon Road from Big Water Trailhead to Elbow Fork (3.1 miles) to a 20-foot paved width and from Elbow Fork to Winter Gate (1.4 miles) to 24-foot paved width.

Improve pertinent picnic area parking and trailhead areas, including, Big Water Trailhead, Alexander Basin, Clover Springs Picnic Area, Fir Crest Picnic Area, Elbow Fork, and Winter Gate (Maple Cove) parking/trailheads.

To complete the proposed widening and realignment, timber removal, rock and soil cuts and fills, profile adjustments, curve widening, ditch reconstruction, retaining walls, culvert replacement, asphalt surfacing, erosion control, singing, and pavement markings are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. The project also includes drainage improvements consisting of extending existing box culverts with headwalls and wingwalls, replacement of the White Bridge box culvert, installation of a new Mill Creek box culvert, ditch or curb and gutter establishment, vegetated swales, and water quality basins. The project also includes installation of parking area vault toilets and 3-inch diameter electrical conduit and 2-inch diameter communications conduit with pull boxes below the roadway to support future utilities. An estimated eight retaining walls are proposed along the road or at parking areas to stabilize steep slopes and minimize the overall disturbance footprint.

PRINCIPAL WORK ITEMS:

20101-0000 Clearing and Grubbing, 31.6 ACRE• 20401-0000 Roadway Excavation: 53,500 CUYD• 25201-0000 Special Rock Embankment 5,500 CUYD• 252201-0000 Rockery (Retaining Wall) 3,100 SQFT• 25902-0000 Soil Nail Retaining Wall 9,000 SQFT• 30101-0000 Aggregate Base: 25,000 TON• 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate,

0.3 to <3 Million ESAL: 11,500 TON

60201-Various – CMP: 1,425 LNFT• 60220-0000 Precast Reinforced Concrete Box Culvert: 140 LNFT• 63501-0000 Temporary Traffic Control: LPSM•

ANTICIPATED SCHEDULE:

Advertisement – September 2024 Award – October 2024 NTP – January 2025 Winter Shutdown – November 2025 to April 2026 Contract Completion – October 2026

ESTIMATED COST RANGE:

Schedule A estimated total cost is between $20,000,000 and $30,000,000

UT FLAP SLA 10(1) Mill Creek Canyon Road

2Sep 19, 2024 06:04:37 PM GMT

NON-MANDATORY PRE-BID SITE VISIT:

Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 8, 2024, from 9:00 a.m. to approximately 1:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period.

Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.

Interested parties will meet at the Maple Grove Picnic Area/Winter Gate of Mill Creek Canyon Road, approximately

4.7 miles east of the intersection of Wasatch Blvd and 3800S (Mill Creek Canyon Road) Mill Creek, UT, at 9:00 a.m.

If you would like to attend the pre-bid meeting, please email to cflcontracts@dot.gov by Friday, October 4, 2024.

Attachment/Links

Contact Information

Primary Point of Contact

Kelly Palmer cflacquisitions@dot.gov

Secondary Point of Contact

Leslie Karsten CflContracts@dot.gov

History

Contract Opportunity Type Updated Date

Presolicitation (Original) Sep 04, 2024 01:31 PM

Sources Sought (Updated) 2024-07-05T04:00:06.109466+00

Interested Vendors List

Unique Entity ID CAGE Code CONTACTS ADDRESSES

LFNJQ3DL6ZF8 0DXE6 jon@ceccantiinc.com Jon Vandergriend 2535372990

4116 Brookdale Road East Tacoma Washington 98446 United States

PSFFFB79NLD9 9NRD9 shawn@mpcontractingandconsulting.com

Shawn Owens 8015104511

PO Box 321 Honeyville Utah 84314 United States

MJ2FXE36EXX7 8AP89 troy@qctestinginc.com Troy Dunsmore 4357890220

PO Box 772 Vernal Utah 84078 United States

UT FLAP SLA 10(1) Mill Creek Canyon Road