Bid Tabs- CO FLAP SH5(1) Mount Blue Sky.pdf

PDF 586 KB Posted

Attached to
CO FLAP SH 5(1) Mount Blue Sky Highway
Solicitation number
6982AF24B000009
Issued by

About this file

This document is a Bid Tabulation Report for Federal Lands Access Program (FLAP) project CO FLAP SH5(1) Mount Blue Sky Highway. The project proposes to reconstruct 0.7 miles of Colorado State Highway 5 in Clear Creek County, Colorado. The scope includes roadway reconstruction with an air convection embankment, removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subbase, and asphalt paving. The Engineer's Estimate for the Base Schedule A is $8,195,000 and the lowest responsive bid was $7,411,057.50 from Siete, Inc. The document also includes a Schedule X for optional work items, with the Engineer's Estimate of $300,000 and the lowest responsive bid of $73,800 from Siete, Inc. The solicitation was issued by the Federal Highway Administration for work to be performed in the Arapaho and Roosevelt National Forests, with an anticipated construction period of July 2024 to October 2025.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 06/24/24

1 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Contractor Responsive?

Engineer's Estimate

American West Construction, LLC

Siete, Inc.

T1 Construction, LLC

Base Schedule A

$8,195,000.00

$8,376,638.00

$7,411,057.50

$9,344,673.00

Option: X

$300,000.00

$208,525.00

$73,800.00

$182,856.00

Contractor Responsive?

Engineer's Estimate

American West Construction, LLC

Siete, Inc.

T1 Construction, LLC

Total Base Schedule A and Option(s): X

$8,495,000.00

$8,585,163.00

$7,484,857.50

$9,527,529.00

2 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF24B000009

Division: Central Federal Lands

State: CO County: Clear Creek

Federal Land: Arapaho & Roosevelt National Forests Opened at: Lakewood, CO

Opened by: Jorey Deml

Date: 06/20/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Siete, Inc. $7,411,057.50 8155 Park Road Rye, CO 81069

American West Construction, LLC $8,376,638.00 275 E 64th Ave Denver, CO 80221

T1 Construction, LLC $9,344,673.00 3201 Tremont Avenue North Bend, OR 97459

Engineer's Estimate $8,195,000.00

3 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Siete, Inc. Lump Sum $1,000,000.00 American West Construction, LLC Lump Sum $540,000.00 T1 Construction, LLC Lump Sum $819,519.05 Engineer's Estimate ALL LPSM Lump Sum $1,048,795.00

A0040 15214-0000 SURVEY AND STAKING, MISCELLANEOUS (EXISTING WETLANDS)

Siete, Inc. Lump Sum $7,500.00 American West Construction, LLC Lump Sum $47,000.00 T1 Construction, LLC Lump Sum $48,374.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

A0060 15215-1000 SURVEY AND STAKING, APPROACH ROAD

Siete, Inc. $7,500.00 $7,500.00 American West Construction, LLC $2,500.00 $2,500.00 T1 Construction, LLC $66,374.00 $66,374.00 Engineer's Estimate 1 EACH $1,300.00 $1,300.00

A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Siete, Inc. $7,500.00 $30,000.00 American West Construction, LLC $3,100.00 $12,400.00 T1 Construction, LLC $9,547.00 $38,188.00 Engineer's Estimate 4 EACH $2,000.00 $8,000.00

A0100 15215-7000 SURVEY AND STAKING, PARKING AREA

Siete, Inc. $12,000.00 $12,000.00 American West Construction, LLC $6,200.00 $6,200.00 T1 Construction, LLC $32,187.00 $32,187.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

A0120 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

Siete, Inc. $35,000.00 $24,185.00 American West Construction, LLC $28,000.00 $19,348.00 T1 Construction, LLC $74,217.00 $51,283.95 Engineer's Estimate 0.691 MILE $72,358.90 $50,000.00

4 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 15236-2000 SURVEY CONTROL, GRADE FINISHING

Siete, Inc. $15,000.00 $28,500.00 American West Construction, LLC $11,000.00 $20,900.00 T1 Construction, LLC $12,920.00 $24,548.00 Engineer's Estimate 1.900 MILE $30,000.00 $57,000.00

A0160 15301-0000 CONTRACTOR QUALITY CONTROL

Siete, Inc. Lump Sum $300,000.00 American West Construction, LLC Lump Sum $52,000.00 T1 Construction, LLC Lump Sum $252,812.00 Engineer's Estimate ALL LPSM Lump Sum $185,000.00

A0180 15401-0000 CONTRACTOR TESTING

Siete, Inc. Lump Sum $300,000.00 American West Construction, LLC Lump Sum $79,000.00 T1 Construction, LLC Lump Sum $144,374.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00

A0200 15501-0000 CONSTRUCTION SCHEDULE

Siete, Inc. Lump Sum $10,000.00 American West Construction, LLC Lump Sum $26,000.00 T1 Construction, LLC Lump Sum $49,374.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

A0220 15701-0000 SOIL EROSION CONTROL

Siete, Inc. Lump Sum $50,000.00 American West Construction, LLC Lump Sum $103,000.00 T1 Construction, LLC Lump Sum $88,281.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00

A0240 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Siete, Inc. Lump Sum $27,000.00 American West Construction, LLC Lump Sum $2,200.00 T1 Construction, LLC Lump Sum $47,874.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00

5 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 15802-0000 WATERING FOR DUST CONTROL

Siete, Inc. Lump Sum $100,000.00 American West Construction, LLC Lump Sum $96,000.00 T1 Construction, LLC Lump Sum $216,561.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0280 20301-0700 REMOVAL OF DELINEATOR

Siete, Inc. $125.00 $3,750.00 American West Construction, LLC $160.00 $4,800.00 T1 Construction, LLC $765.00 $22,950.00 Engineer's Estimate 30 EACH $20.00 $600.00

A0300 20301-1100 REMOVAL OF GATE

Siete, Inc. $10,000.00 $10,000.00 American West Construction, LLC $1,800.00 $1,800.00 T1 Construction, LLC $26,767.00 $26,767.00 Engineer's Estimate 1 EACH $2,600.00 $2,600.00

A0320 20301-1200 REMOVAL OF HEADWALL (STONE MASONRY HEADWALL)

Siete, Inc. $15,000.00 $45,000.00 American West Construction, LLC $2,100.00 $6,300.00 T1 Construction, LLC $17,066.00 $51,198.00 Engineer's Estimate 3 EACH $3,800.00 $11,400.00

A0340 20301-1900 REMOVAL OF PIPE CULVERT

Siete, Inc. $6,000.00 $66,000.00 American West Construction, LLC $3,400.00 $37,400.00 T1 Construction, LLC $10,844.00 $119,284.00 Engineer's Estimate 11 EACH $1,800.00 $19,800.00

A0360 20301-2400 REMOVAL OF SIGN

Siete, Inc. $1,000.00 $10,000.00 American West Construction, LLC $430.00 $4,300.00 T1 Construction, LLC $3,186.00 $31,860.00 Engineer's Estimate 10 EACH $160.00 $1,600.00

6 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 20305-1600 REMOVAL OF PAVEMENT, ASPHALT

Siete, Inc. $25.00 $12,500.00 American West Construction, LLC $190.00 $95,000.00 T1 Construction, LLC $322.00 $161,000.00 Engineer's Estimate 500 CUYD $30.00 $15,000.00

A0400 20420-0000 EMBANKMENT CONSTRUCTION (EMBANKMENT FILL)

Siete, Inc. $75.00 $487,500.00 American West Construction, LLC $158.00 $1,027,000.00 T1 Construction, LLC $158.00 $1,027,000.00 Engineer's Estimate 6,500 CUYD $225.00 $1,462,500.00

A0420 20420-0000 EMBANKMENT CONSTRUCTION (ROCK EMBANKMENT)

Siete, Inc. $250.00 $2,200,000.00 American West Construction, LLC $319.00 $2,807,200.00 T1 Construction, LLC $268.00 $2,358,400.00 Engineer's Estimate 8,800 CUYD $250.00 $2,200,000.00

A0440 20420-0000 EMBANKMENT CONSTRUCTION (GRANULAR ROCK)

Siete, Inc. $300.00 $810,000.00 American West Construction, LLC $395.00 $1,066,500.00 T1 Construction, LLC $371.00 $1,001,700.00 Engineer's Estimate 2,700 CUYD $250.00 $675,000.00

A0460 20815-0000 COFFERDAMS

Siete, Inc. Lump Sum $60,000.00 American West Construction, LLC Lump Sum $50,000.00 T1 Construction, LLC Lump Sum $86,587.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

A0480 25101-2100 PLACED RIPRAP, METHOD B, CLASS 1

Siete, Inc. $1,100.00 $4,400.00 American West Construction, LLC $620.00 $2,480.00 T1 Construction, LLC $3,597.00 $14,388.00 Engineer's Estimate 4.0 CUYD $250.00 $1,000.00

7 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2

Siete, Inc. $111.00 $266,400.00 American West Construction, LLC $94.00 $225,600.00 T1 Construction, LLC $125.00 $300,000.00 Engineer's Estimate 2,400 TON $100.00 $240,000.00

A0520 30802-0000 RECYCLED AGGREGATE BASE

Siete, Inc. $100.00 $250,000.00 American West Construction, LLC $120.00 $300,000.00 T1 Construction, LLC $143.00 $357,500.00 Engineer's Estimate 2,500 CUYD $100.00 $250,000.00

A0540 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Siete, Inc. $350.00 $542,500.00 American West Construction, LLC $330.00 $511,500.00 T1 Construction, LLC $223.00 $345,650.00 Engineer's Estimate 1,550 TON $300.00 $465,000.00

A0560 60201-0800 24-INCH PIPE CULVERT

Siete, Inc. $365.00 $65,700.00 American West Construction, LLC $360.00 $64,800.00 T1 Construction, LLC $333.00 $59,940.00 Engineer's Estimate 180 LNFT $240.00 $43,200.00

A0580 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Siete, Inc. $510.00 $20,400.00 American West Construction, LLC $560.00 $22,400.00 T1 Construction, LLC $389.00 $15,560.00 Engineer's Estimate 40 LNFT $370.00 $14,800.00

A0600 61902-0900 GATE, METAL

Siete, Inc. $25,000.00 $25,000.00 American West Construction, LLC $19,000.00 $19,000.00 T1 Construction, LLC $32,219.00 $32,219.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

8 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 61921-1000 REMOVE AND RESET FENCE

Siete, Inc. $45.00 $13,950.00 American West Construction, LLC $83.00 $25,730.00 T1 Construction, LLC $136.00 $42,160.00 Engineer's Estimate 310 LNFT $45.00 $13,950.00

A0640 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

Siete, Inc. $10,000.00 $80,000.00 American West Construction, LLC $10,000.00 $80,000.00 T1 Construction, LLC $17,767.00 $142,136.00 Engineer's Estimate 8 EACH $20,000.00 $160,000.00

A0660 62011-0600 STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT

Siete, Inc. $12,000.00 $24,000.00 American West Construction, LLC $10,500.00 $21,000.00 T1 Construction, LLC $30,317.00 $60,634.00 Engineer's Estimate 2 EACH $22,000.00 $44,000.00

A0680 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Siete, Inc. $135.00 $5,400.00 American West Construction, LLC $145.00 $5,800.00 T1 Construction, LLC $255.00 $10,200.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

A0700 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Siete, Inc. $150.00 $6,000.00 American West Construction, LLC $160.00 $6,400.00 T1 Construction, LLC $226.00 $9,040.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00

A0720 62201-2750 MOTOR GRADER

Siete, Inc. $150.00 $6,000.00 American West Construction, LLC $275.00 $11,000.00 T1 Construction, LLC $278.00 $11,120.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00

9 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0740 62301-0000 GENERAL LABOR

Siete, Inc. $65.00 $2,600.00 American West Construction, LLC $55.00 $2,200.00 T1 Construction, LLC $79.00 $3,160.00 Engineer's Estimate 40 HOUR $70.00 $2,800.00

A0760 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Siete, Inc. $185.00 $7,400.00 American West Construction, LLC $250.00 $10,000.00 T1 Construction, LLC $200.00 $8,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00

A0780 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Siete, Inc. $165.00 $6,600.00 American West Construction, LLC $260.00 $10,400.00 T1 Construction, LLC $103.00 $4,120.00 Engineer's Estimate 40 HOUR $205.00 $8,200.00

A0800 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST)

Siete, Inc. Lump Sum $6,600.00 American West Construction, LLC Lump Sum $21,000.00 T1 Construction, LLC Lump Sum $8,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0820 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

Siete, Inc. $7.00 $75,600.00 American West Construction, LLC $4.80 $51,840.00 T1 Construction, LLC $11.00 $118,800.00 Engineer's Estimate 10,800 SQYD $7.00 $75,600.00

A0840 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4

Siete, Inc. $7.00 $75,600.00 American West Construction, LLC $9.00 $97,200.00 T1 Construction, LLC $16.00 $172,800.00 Engineer's Estimate 10,800 SQYD $7.00 $75,600.00

10 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0860 63301-0000 SIGN SYSTEM

Siete, Inc. $2,000.00 $30,000.00 American West Construction, LLC $1,100.00 $16,500.00 T1 Construction, LLC $5,480.00 $82,200.00 Engineer's Estimate 15 EACH $930.00 $13,950.00

A0880 63306-1700 POST, WOOD, 4-INCH X 4-INCH

Siete, Inc. $1,000.00 $3,000.00 American West Construction, LLC $330.00 $990.00 T1 Construction, LLC $7,511.00 $22,533.00 Engineer's Estimate 3 EACH $500.00 $1,500.00

A0900 63309-0200 DELINEATOR, TYPE 2

Siete, Inc. $150.00 $12,000.00 American West Construction, LLC $150.00 $12,000.00 T1 Construction, LLC $628.00 $50,240.00 Engineer's Estimate 80 EACH $80.00 $6,400.00

A0920 63309-0300 DELINEATOR, TYPE 3

Siete, Inc. $200.00 $2,000.00 American West Construction, LLC $150.00 $1,500.00 T1 Construction, LLC $2,594.00 $25,940.00 Engineer's Estimate 10 EACH $80.00 $800.00

A0940 63309-1000 DELINEATOR, TYPE SNOW POLE

Siete, Inc. $250.00 $3,750.00 American West Construction, LLC $370.00 $5,550.00 T1 Construction, LLC $4,730.00 $70,950.00 Engineer's Estimate 15 EACH $100.00 $1,500.00

A0960 63316-1000 REMOVE AND RESET SIGN

Siete, Inc. $2,000.00 $2,000.00 American West Construction, LLC $590.00 $590.00 T1 Construction, LLC $22,437.00 $22,437.00 Engineer's Estimate 1 EACH $700.00 $700.00

11 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0980 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

Siete, Inc. $2.25 $31,500.00 American West Construction, LLC $3.00 $42,000.00 T1 Construction, LLC $3.00 $42,000.00 Engineer's Estimate 14,000 LNFT $4.50 $63,000.00

A1000 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN

Siete, Inc. $2.25 $1,237.50 American West Construction, LLC $3.00 $1,650.00 T1 Construction, LLC $6.00 $3,300.00 Engineer's Estimate 550 LNFT $4.50 $2,475.00

A1020 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Siete, Inc. $485.00 $485.00 American West Construction, LLC $660.00 $660.00 T1 Construction, LLC $3,219.00 $3,219.00 Engineer's Estimate 1 EACH $830.00 $830.00

A1040 63501-0000 TEMPORARY TRAFFIC CONTROL

Siete, Inc. Lump Sum $155,000.00 American West Construction, LLC Lump Sum $445,000.00 T1 Construction, LLC Lump Sum $102,047.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00

A1060 63501-3500 TEMPORARY TRAFFIC CONTROL, PUBLIC INFORMATION PROGRAM

Siete, Inc. Lump Sum $20,000.00 American West Construction, LLC Lump Sum $30,000.00 T1 Construction, LLC Lump Sum $308,447.00 Engineer's Estimate ALL LPSM Lump Sum $80,000.00

A1080 63610-1600 CONDUIT, 2-INCH, PVC (SCHEDULE 80)

Siete, Inc. $20.00 $5,000.00 American West Construction, LLC $85.00 $21,250.00 T1 Construction, LLC $151.00 $37,750.00 Engineer's Estimate 250 LNFT $32.00 $8,000.00

12 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1100 63622-0000 UTILITY TRENCH (INSTRUMENTATION DEVICE)

Siete, Inc. $38.00 $9,500.00 American West Construction, LLC $95.00 $23,750.00 T1 Construction, LLC $10.00 $2,500.00 Engineer's Estimate 250 LNFT $50.00 $12,500.00

A1120 63701-0000 FIELD OFFICE

Siete, Inc. $50,000.00 $50,000.00 American West Construction, LLC $180,000.00 $180,000.00 T1 Construction, LLC $89,187.00 $89,187.00 Engineer's Estimate 1 EACH $40,000.00 $40,000.00

Total Schedule - All Items

Siete, Inc. $7,411,057.50 American West Construction, LLC $8,376,638.00 T1 Construction, LLC $9,344,673.00 Engineer's Estimate $8,195,000.00

13 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: X

Schedule Type: Options

Solcitation No: 6982AF24B000009

Division: Central Federal Lands

State: CO County: Clear Creek

Federal Land: Arapaho & Roosevelt National Forests Opened at: Lakewood, CO

Opened by: Jorey Deml

Date: 06/20/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Siete, Inc. $73,800.00 8155 Park Road Rye, CO 81069

T1 Construction, LLC $182,856.00 3201 Tremont Avenue North Bend, OR 97459

American West Construction, LLC $208,525.00 275 E 64th Ave Denver, CO 80221

Engineer's Estimate $300,000.00

14 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0020 15101-0000 MOBILIZATION

Siete, Inc. Lump Sum $1,500.00 T1 Construction, LLC Lump Sum $14,612.00 American West Construction, LLC Lump Sum $38,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING (ROADWAY OBLITERATION)

Siete, Inc. Lump Sum $1,500.00 T1 Construction, LLC Lump Sum $3,222.00 American West Construction, LLC Lump Sum $16,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

X0060 15214-0000 SURVEY AND STAKING, MISCELLANEOUS (EXISTING WETLANDS)

Siete, Inc. Lump Sum $1,500.00 T1 Construction, LLC Lump Sum $7,222.00 American West Construction, LLC Lump Sum $6,200.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

X0080 15301-0000 CONTRACTOR QUALITY CONTROL

Siete, Inc. Lump Sum $3,000.00 T1 Construction, LLC Lump Sum $5,722.00 American West Construction, LLC Lump Sum $19,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

X0100 15701-0000 SOIL EROSION CONTROL

Siete, Inc. Lump Sum $3,000.00 T1 Construction, LLC Lump Sum $15,222.00 American West Construction, LLC Lump Sum $18,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

X0120 15802-0000 WATERING FOR DUST CONTROL

Siete, Inc. Lump Sum $1,000.00 T1 Construction, LLC Lump Sum $25,482.00 American West Construction, LLC Lump Sum $11,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

15 out of 15

Project No: CO FLAP SH5(1)

Project Name: Mount Blue Sky Highway

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0140 21101-2000 ROADWAY OBLITERATION, METHOD 2

Siete, Inc. $6.00 $15,000.00 T1 Construction, LLC $16.00 $40,000.00 American West Construction, LLC $9.00 $22,500.00 Engineer's Estimate 2,500 SQYD $30.00 $75,000.00

X0160 25105-2000 KEYED RIPRAP, METHOD B (DITCH BLOCKS)

Siete, Inc. $500.00 $5,000.00 T1 Construction, LLC $1,953.00 $19,530.00 American West Construction, LLC $320.00 $3,200.00 Engineer's Estimate 10 CUYD $1,000.00 $10,000.00

X0180 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST)

Siete, Inc. Lump Sum $3,300.00 T1 Construction, LLC Lump Sum $6,622.00 American West Construction, LLC Lump Sum $7,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

X0200 62701-2000 SOD, STRIP (CONSERVING AND PLACING WETLAND SOD 4-INCH)

Siete, Inc. $15.00 $37,500.00 T1 Construction, LLC $16.00 $40,000.00 American West Construction, LLC $22.25 $55,625.00 Engineer's Estimate 2,500 SQYD $30.00 $75,000.00

X0220 63501-0000 TEMPORARY TRAFFIC CONTROL

Siete, Inc. Lump Sum $1,500.00 T1 Construction, LLC Lump Sum $5,222.00 American West Construction, LLC Lump Sum $12,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

Total Schedule - All Items

Siete, Inc. $73,800.00 T1 Construction, LLC $182,856.00 American West Construction, LLC $208,525.00 Engineer's Estimate $300,000.00

File details come from the government source that posted it. Updated .