This document appears to be an amendment to a solicitation for the CO FLAP SH 5(1) Mount Blue Sky Highway project. The project involves reconstructing 0.7 miles of Colorado State Highway 5 in Clear Creek County, Colorado, including roadway reconstruction using an air convection embankment and replacement of culverts.

The amendment provides details on two potential local material sources that the contractor may use for rock embankment or granular rock material, subject to certain requirements. It also includes revised language regarding maintaining the roadway and limitations on construction operations, such as maximum lane closures and administrative access above the project site. The amendment also removes Appendix A, the Free Use Mineral Permit, from the contract.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Notice to Bidders ............................................................................................................. A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ................................................................................ A-6

Solicitation Provisions .....................................................................................................B-7

Contract Clauses ..............................................................................................................C-1

Construction Wage Rate Requirement............................................................................ D-1

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-26 Division 200 ................................................................................................................... E-40 Division 300 ................................................................................................................... E-44 Division 400 ................................................................................................................... E-49 Division 500 ......................................................................................................... SEE FP-14 Division 600 ................................................................................................................... E-52 Division 700 ................................................................................................................... E-66

APPENDICES

Appendix A ................................................................................................... Mineral Permit

Appendix B ............................................................................................USFS Food Storage

Appendix C ................................................................................... USFS Blue Sky Fire Plan

Appendix D

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects jorey.deml Cross-Out

E‐5

CO FLAP SH5(1)

Mount Blue Sky Highway

Certify, according to Subsection 107.10 (d)(2), that sources of rock, sand, gravel, earth, subsoil, or other natural material imported into the project construction limits are noxious weed free.

Water use must be tracked and reported, by well (owner name and number), location, and water use location (route), and daily volume of water use. Provide water usage report to CO annually.

Delete the text for (a) and substitute the following:

105.02 Material Sources.

(a) Local Material Sources. Two potential material sources have been identified. The maintaining agency has acquired a Free Use Mineral Materials permit from the USFS for the material sources. The quantity and type of material provided in the Free Use Mineral Material is an estimation. The Government will not acquire additional permits or rights for material. Use and work will be in accordance with the Free Use Mineral Materials permit and in coordination with the maintaining agency. The permit is included in the appendix.

These identified sources are listed as information to aid the Contractor in locating a source. The decision to use an identified source is solely that of the Contractor.

(1) Local Material Source #1: Behind Overflow Parking Lot - The Contractor may use materials located within the temporary easement to generate rock embankment or granular rock material. Regrade and restore disturbed area to closely match surrounding ground contours.

(2) Local Material Source #2: Abandoned Roadbed - Located one mile southeast from the end of project. The Contractor may use materials located within the temporary easement to generate rock embankment or granular rock material. Finished excavation and grading will match surrounding terrain and topography.

The Government has not performed testing on the materials. The quality and quantity of material at available sources is considered useable but may contain layers or pockets of unacceptable material. It is not feasible to ascertain from visual inspection that the quality of material for an entire deposit meets material standards and therefore variations should be expected. Determine the quantity, appropriate evaluation, verification of materials, type of equipment, and work necessary to produce acceptable material prior to incorporating into the project.

Do not perform work within a source until a source development plan is approved by the CO.

Allow 7 days for approval. Include the following as applicable:

(1) Requirements of written agreements;

(2) Requirements in Sections 107, 157, 204, 205, 624, and 625;

(3) Source development details; and

(4) Restoration plan and details.

Miguel Martinez (Designer) Text Box

AMENDMENT A001

Revised 06/05/2024

Miguel Martinez (Designer) Strikethrough

(a) Local Material Sources. Two potential material sources have been identified. The maintaining agency has acquired a Free Use Mineral Materials permit from the USFS for the material sources. The quantity and type of material provided in the Free Use Mineral Material is an estimation. The Government will not acquire additional permits or rights for material. Use and work will be in accordance with the Free Use Mineral Materials permit and in coordination with the maintaining agency. The permit is included in the appendix.

Miguel Martinez (Designer) Strikethrough These identified sources are listed as information to aid the Contractor in locating a source. The decision to use an identified source is solely that of the Contractor.

Miguel Martinez (Designer) Strikethrough The Government has not performed testing on the materials. The quality and quantity of material at available sources is considered useable but may contain layers or pockets of unacceptable material. It is not feasible to ascertain from visual inspection that the quality of material for an entire deposit meets material standards and therefore variations should be expected. Determine the quantity, appropriate evaluation, verification of materials, type of equipment, and work necessary to produce acceptable material prior to incorporating into the project.

Miguel Martinez (Designer) Strikethrough Do not perform work within a source until a source development plan is approved by the CO.

Allow 7 days for approval. Include the following as applicable:

Miguel Martinez (Designer) Strikethrough

(1) Requirements of written agreements;

(2) Requirements in Sections 107, 157, 204, 205, 624, and 625;

(3) Source development details; and

(4) Restoration plan and details.

Miguel Martinez (Designer) Text Box

Miguel Martinez (Designer) Strikethrough Delete the text for (a) and substitute the following:

Miguel Martinez (Designer) Strikethrough

(1) Local Material Source #1: Behind Overflow Parking Lot - The Contractor may use materials located within the temporary easement to generate rock embankment or granular rock material. Regrade and restore disturbed area to closely match surrounding ground contours.

Miguel Martinez (Designer) Strikethrough

(2) Local Material Source #2: Abandoned Roadbed - Located one mile southeast from the end of project. The Contractor may use materials located within the temporary easement to generate rock embankment or granular rock material. Finished excavation and grading will match surrounding terrain and topography.

E‐34

CO FLAP SH5(1)

Mount Blue Sky Highway

Do not construct diversions outside of the clearing limits or use alternate route detours without the approval of the CO.

156.06 Maintaining Roadways and During Non-Work Periods. Delete second sentence of the first paragraph and add the following:

Maintaining agency will plow SH 5 by May 26, 2025 for access to the project site. Contractor will be responsible for all additional plowing and road maintenance during full road closures and after initial snow removal.

156.07 Limitations on Construction Operations.

(c) Delete the first sentence and substitute the following:

For alternate one-way traffic control, provide a minimum lane width of 10 feet (3 meters).

For two-way traffic, provide a minimum roadway width of 21.5 feet (6.7 meters).

(i) Delete the text and substitute the following:

Limit construction-caused delays to public traffic to a maximum of 15 minutes per passage through the project from July 22, 2024, to September 03, 2024. Provide a minimum of alternating one-way traffic during this period.

State Highway 5 will be closed to the public, bicyclist, pedestrians, and public vehicular traffic between September 03, 2024, through November 3, 2025.

Administrative access will be provided during construction. A list of entities requiring access will be provided at the Preconstruction Conference. For administrative access above the project site access will be provided once monthly (June through August) from Friday 8 AM through Sunday 6 PM during the 2025 season. In addition, provide a four-hour window for access above the project site between the monthly access requirements. A two-week minimum notification will be provided for access dates. Access to be traversable through the project by standard SUV.

Suspend operations and ensure the roadway is traversable to emergency services if required.

156.09 Traffic Control Supervisor. Delete the second sentence and substitute the following:

The superintendent may serve as the traffic control supervisor provided the requirements of Subsection 156.03 are met.

Miguel Martinez (Designer) Text Box

AMENDMENT A001

Revised 06/05/2024

Cloud

Amendment A001. 6/5/2024

USDA Forest Service FS-2800-9 (v 10/2014) OMB No. 0596-0081 (Expiration 10/31/2017)

USDA FOREST SERVICE For Forest Service Use Only

CONTRACT FOR THE SALE OF

MINERAL MATERIALS Forest Service Unit Name 0210

(Ref. FSM 2850) Contract Number MM-2024-021007-01

NOTE: This information is being collected to process your application and effect a binding contract agreement. This information will also be used to identify and communicate with applicants. Response to this request is required to obtain a benefit.

Public reporting burden for this collection of information is estimated to average 2 hours 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Agriculture, Clearance Officer, OIRM, AG Box 7630, Washington, D.C. 20250; and to the Office of Management and Budget, Paperwork Reduction Project (OMB No. 0596-0081), Washington, D.C.

20503.

THIS AGREEMENT, made this day of , under authority of the Acts of July 31, 1947 (61 Stat. 681), as amended (30 U.S.C. 601 et seq.), March 4, 1917 (16 U.S.C. 520), and June 11, 1960 (74 Stat. 205), and the regulations set forth in 36 CFR 228, Subpart C, between the UNITED STATES OF AMERICA (hereinafter called the "Government"), acting through the Authorized Officer of the Forest Service (hereinafter called the "Authorized Officer"), and COLORADO DEPARTMENT OF TRANSPORTATION (hereinafter called the "Purchaser.")

WITNESSETH, That the parties hereto mutually agree as follows:

Sec. 1. Contract area. The Government hereby sells to Purchaser and Purchaser hereby buys from Government, under the terms and conditions of this contract, all of the mineral materials described in Sec. 2 below, for severance, extraction, or removal, on the following described lands situated in the ARAPAHO AND ROOSEVELT NATIONAL FORESTS , County of CLEAR CREEK, State of COLORADO as shown on the operating plan marked "Exhibit B", attached hereto, 13th March, 2024

Miguel Martinez (Designer) Text Box

AMENDMENT A001

Revised 06/05/2024

Miguel Martinez (Designer) Strikethrough USDA Forest Service

Miguel Martinez (Designer) Strikethrough FS-2800-9 (v 10/2014)

Miguel Martinez (Designer) Strikethrough OMB No. 0596-0081 (Expiration 10/31/2017)

Miguel Martinez (Designer) Strikethrough USDA FOREST SERVICE For Forest Service Use Only

CONTRACT FOR THE SALE OF

MINERAL MATERIALS Forest Service Unit Name 0210 (Ref. FSM 2850) Contract Number MM-2024-021007-01

Miguel Martinez (Designer) Strikethrough NOTE: This information is being collected to process your application and effect a binding contract agreement. This information will also be used to identify and communicate with applicants. Response to this request is required to obtain a benefit.

Public reporting burden for this collection of information is estimated to average 2 hours 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Agriculture, Clearance Officer, OIRM, AG Box 7630, Washington, D.C. 20250; and to the Office of Management and Budget, Paperwork Reduction Project (OMB No. 0596-0081), Washington, D.C.

20503.

THIS AGREEMENT, made this day of , under authority of the Acts of July 31, 1947 (61 Stat. 681), as amended (30 U.S.C. 601 et seq.), March 4, 1917 (16 U.S.C. 520), and June 11, 1960 (74 Stat. 205), and the regulations set forth in 36 CFR 228, Subpart C, between the UNITED STATES OF AMERICA (hereinafter called the "Government"), acting through the Authorized Officer of the Forest Service (hereinafter called the "Authorized Officer"), and COLORADO DEPARTMENT OF TRANSPORTATION (hereinafter called the "Purchaser.") WITNESSETH, That the parties hereto mutually agree as follows:

Sec. 1. Contract area. The Government hereby sells to Purchaser and Purchaser hereby buys from Government, under the terms and conditions of this contract, all of the mineral materials described in Sec. 2 below, for severance, extraction, or removal, on the following described lands situated in the ARAPAHO AND ROOSEVELT NATIONAL FORESTS , County of CLEAR CREEK, State of COLORADO as shown on the operating plan marked "Exhibit B", attached hereto, 021007 HIGHWAY 5(CDOT HIGHWAY 5) and made a part hereof, viz: Sec. 23, T. 5 S., R. 74 W., 6TH PRINCIPAL MERIDIAN, Sec. 26, T. 5 S., R. 74 W., 6TH PRINCIPAL MERIDIAN ,containing 2 acres, more or less.

Miguel Martinez (Designer) Text Box AMENDMENT A001: Remove Appendix A: Free Use Minieral Permit from the contract.

Sec. 2. Amount and price of materials. The total purchase price will be determined by multiplying the total quantity of each kind of mineral material designated by the respective unit price as set forth below, or as changed through reappraisal hereunder.

KIND OF MATERIALS QUANTITY

(Units Specified)

PRICE PER

UNIT

TOTAL PRICE

RIPRAP RIP RAP 18000 CUBIC

YARDS

2.05 $ 36900.00

Total

$ 36900.00 Grand Total: $.00

The following associated charges and adjustments are obligations under this contract.

Associated Charges

CHARGE TYPE QUANTITY

(Units Specified)

COST PER UOM TOTAL

PRICE

Adjustments

ADJUSTMENT TYPE AUTHORITY AMOUNT

FREE-USE 36 CFR 228.62 $ -36900.00

Miguel Martinez (Designer) Strikethrough Sec. 2. Amount and price of materials. The total purchase price will be determined by multiplying the total quantity of each kind of mineral material designated by the respective unit price as set forth below, or as changed through reappraisal hereunder.

KIND OF MATERIALS QUANTITY

(Units Specified)

PRICE PER

UNIT

TOTAL PRICE

RIPRAP RIP RAP 18000 CUBIC

YARDS

2.05 $ 36900.00 Total

$ 36900.00 Grand Total: $.00 The following associated charges and adjustments are obligations under this contract.

Associated Charges

CHARGE TYPE QUANTITY

(Units Specified)

COST PER UOM TOTAL

PRICE

Adjustments

ADJUSTMENT TYPE AUTHORITY AMOUNT

FREE-USE 36 CFR 228.62 $ -36900.00

Determination by the Authorized Officer of the quantity of materials taken is binding on Purchaser subject to appeal only as provided in Sec. 14. All materials in the contract area in excess of the estimated quantity listed above are reserved by Government.

Sec. 3. Payments, passage of title, and risk of loss. Title to materials sold hereunder passes to Purchaser immediately before excavation and upon proper payment for such materials. No part of the material sold hereunder may be severed, extracted, or removed by Purchaser until payment for such materials has been made in accordance with the following:

a.Unless materials sold under this contract are paid for in full in advance, payment for materials must be made in installments of not less than $N/A each. The first installment must be paid upon approval of this contract.

b. Each additional installment is due and payable as billed by the Authorized Officer in advance of removal of the remaining material. The first installment will be retained as additional security for the full and faithful performance of this contract by Purchaser, and will be applied in whole or in part to the payment of the last installment required hereunder to make the total payment equal the total price set forth in Sec. 2, above.

The total purchase price must equal the sum of the total quantities severed, extracted, or designated therefor, multiplied by their respective unit prices. The balance due where less than a full installment remains to be paid upon the total price will be the value of material remaining to be severed or extracted. Each installment will be held in suspense until the quantity of material covered thereby has been determined. The total purchase price must be paid at least 60 days before the expiration date of the contract.

Upon termination, if the total payments made under the contract exceed the total value of the actual materials removed, the excess will be returned to Purchaser, except as noted in 36 CFR 228.66.

c. Risk of loss shall be borne by the party holding title to the mineral material at the time of loss except that nothing herein shall be construed to relieve either party from liability for breach of contract or any wrongful or negligent act.

Sec. 4. Stipulation and reserved items. The rights of Purchaser are subject to the regulations in 36 CFR 228, Subpart C, which are made a part of this contract, and to the stipulation, if any, which are attached hereto and made a part hereof as Exhibit A.

Sec. 5. Bonds.

(a) Purchaser must file with the Authorized Officer and must maintain at all times the bond required under the regulations to be furnished as a condition to the award of this contract in the amounts established by the Authorized Officer and to furnish additional bonds or security as the Authorized Officer may require.

(b) If all terms of this contract are not faithfully and fully performed by Purchaser, the bond in the sum of $N/A filed at the time of the signing of this contract will be forfeited to the amount of damages determined by the Authorized Officer. If damages exceed the amount of the bond, Purchaser hereby acknowledges liability for such excess. Upon satisfactory

Miguel Martinez (Designer) Strikethrough

b. Each additional installment is due and payable as billed by the Authorized Officer in advance of removal of the remaining material. The first installment will be retained as additional security for the full and faithful performance of this contract by Purchaser, and will be applied in whole or in part to the payment of the last installment required hereunder to make the total payment equal the total price set forth in Sec. 2, above.

The total purchase price must equal the sum of the total quantities severed, extracted, or designated therefor, multiplied by their respective unit prices. The balance due where less than a full installment remains to be paid upon the total price will be the value of material remaining to be severed or extracted. Each installment will be held in suspense until the quantity of material covered thereby has been determined. The total purchase price must be paid at least 60 days before the expiration date of the contract.

Upon termination, if the total payments made under the contract exceed the total value of the actual materials removed, the excess will be returned to Purchaser, except as noted in 36 CFR 228.66.

c. Risk of loss shall be borne by the party holding title to the mineral material at the time of loss except that nothing herein shall be construed to relieve either party from liability for breach of contract or any wrongful or negligent act.

Sec. 4. Stipulation and reserved items. The rights of Purchaser are subject to the regulations in 36 CFR 228, Subpart C, which are made a part of this contract, and to the stipulation, if any, which are attached hereto and made a part hereof as Exhibit A.

Sec. 5. Bonds.

(a) Purchaser must file with the Authorized Officer and must maintain at all times the bond required under the regulations to be furnished as a condition to the award of this contract in the amounts established by the Authorized Officer and to furnish additional bonds or security as the Authorized Officer may require.

(b) If all terms of this contract are not faithfully and fully performed by Purchaser, the bond in the sum of $N/A filed at the time of the signing of this contract will be forfeited to the amount of damages determined by the Authorized Officer. If damages exceed the amount of the bond, Purchaser hereby acknowledges liability for such excess. Upon satisfactory performance of this contract, the bonds will be canceled, or if cash or United States securities were furnished in lieu of a security bond, such cash or securities will be returned to Purchaser.

(c) Whenever any bond furnished under this contract is found unsatisfactory by the Authorized Officer, the Authorized Officer may require a new bond which is satisfactory.

Sec. 6. Expiration of contract and extensions of time. This contract will expire on 12/31/2025 unless an extension of time is granted in accordance with the provisions of 36 CFR 228.53(b). Written application for an extension of time may be made by Purchaser between 30 and 90 days before the expiration date of the contract.

Sec. 7. Duties of Purchaser. Purchaser must take fire precaution and conservation measures and must dispose of slash and other debris resulting from operations hereunder in accordance with written instructions from the Authorized Officer.

Sec. 8. Notice of operations. Purchaser must notify the Authorized Officer immediately of the commencement and termination of operations hereunder. A report of production will be furnished at least annually by Purchaser to the Authorized Officer.

Sec. 9. Responsibility for damages. Purchaser is liable in damages for the loss or destruction of all Government property for which Purchaser is directly or indirectly responsible under this contract, or resulting from Purchaser's failure to perform under this contract in accordance with the instruction of the Authorized Officer, as well as for costs incurred by Government resulting from Purchaser's breach of any of the terms hereof, or Purchaser's failure to engage in proper conservation practice. For damages resulting from willful action or gross negligence of Purchaser, Purchaser's contractors or subcontractors, or any of their employees, Purchaser is liable for triple the appraised value of damaged or destroyed materials as determined by the Authorized Officer. If the Authorized Officer determines that the damage or destruction did not result from Purchaser's willful action or gross negligence, lesser damages may be charged, buy not less than the actual appraised value of the materials. Purchaser must pay the Government for such damages within 30 days after a written demand therefor by the Authorized Officer.

Miguel Martinez (Designer) Strikethrough performance of this contract, the bonds will be canceled, or if cash or United States securities were furnished in lieu of a security bond, such cash or securities will be returned to Purchaser.

(c) Whenever any bond furnished under this contract is found unsatisfactory by the Authorized Officer, the Authorized Officer may require a new bond which is satisfactory.

Sec. 6. Expiration of contract and extensions of time. This contract will expire on 12/31/2025 unless an extension of time is granted in accordance with the provisions of 36 CFR 228.53(b). Written application for an extension of time may be made by Purchaser between 30 and 90 days before the expiration date of the contract.

Sec. 7. Duties of Purchaser. Purchaser must take fire precaution and conservation measures and must dispose of slash and other debris resulting from operations hereunder in accordance with written instructions from the Authorized Officer.

Sec. 8. Notice of operations. Purchaser must notify the Authorized Officer immediately of the commencement and termination of operations hereunder. A report of production will be furnished at least annually by Purchaser to the Authorized Officer.

Sec. 9. Responsibility for damages. Purchaser is liable in damages for the loss or destruction of all Government property for which Purchaser is directly or indirectly responsible under this contract, or resulting from Purchaser's failure to perform under this contract in accordance with the instruction of the Authorized Officer, as well as for costs incurred by Government resulting from Purchaser's breach of any of the terms hereof, or Purchaser's failure to engage in proper conservation practice. For damages resulting from willful action or gross negligence of Purchaser, Purchaser's contractors or subcontractors, or any of their employees, Purchaser is liable for triple the appraised value of damaged or destroyed materials as determined by the Authorized Officer. If the Authorized Officer determines that the damage or destruction did not result from Purchaser's willful action or gross negligence, lesser damages may be charged, buy not less than the actual appraised value of the materials. Purchaser must pay the Government for such damages within 30 days after a written demand therefor by the Authorized Officer.

Sec. 10. Violations, suspension, and cancellation.

(a) If Purchaser violates any provision of this contract, the Authorized Officer may, after giving written notice, suspend any further operations for the Purchaser under this contract, except such operations as may be necessary to remedy any violations. The Authorized Officer may grant Purchaser an additional 30 days, after service of written notice, to correct any violations. If Purchaser fails to remedy all violations, the Authorized Officer may, by written notice, cancel this contract and take appropriate action to recover all damages suffered by the Government by reason of such violations, including application toward payment of such damages of any advance payments and bonds.

(b) If Purchaser extracts or removes any mineral materials sold under this contract during any period of suspension, or if Purchaser extracts any of such material after expiration of the time for extraction or the cancellation of this contract, such extraction or removal is in trespass and renders Purchaser liable for triple damages.

Sec. 11. Time for removal of personal property. Purchaser has the right within onemonths after expiration of the time for extraction and removal of mineral materials, if not in default, to remove equipment, improvements, or other personal property from Government lands or rights-of-way. Any improvements such as road surfacing, culverts, and bridges which have become a permanent part of a Government road may not be removed. Any equipment, improvements, or other personal property remaining on Government lands and rights-of-way at the end of the period for removal as set forth herein becomes the property of the Government.

Sec. 12. Assignments. This contract or any portion of it may not be assigned without written approval of the Authorized Officer.

Sec. 13. Tenure. Unless otherwise provided by this contract, Purchaser has the right to extract and remove the materials until the termination of the contract, notwithstanding any subsequent appropriation or disposition under the general land laws, including the mining and mineral leasing laws.

Sec. 14. Appeal. Unless specifically excluded by 36 CFR 251.80, Purchaser may appeal any decision by the Authorized Officer regarding this sale of mineral materials.

Miguel Martinez (Designer) Strikethrough Sec. 10. Violations, suspension, and cancellation.

Miguel Martinez (Designer) Strikethrough

(a) If Purchaser violates any provision of this contract, the Authorized Officer may, after giving written notice, suspend any further operations for the Purchaser under this contract, except such operations as may be necessary to remedy any violations. The Authorized Officer may grant Purchaser an additional 30 days, after service of written notice, to correct any violations. If Purchaser fails to remedy all violations, the Authorized Officer may, by written notice, cancel this contract and take appropriate action to recover all damages suffered by the Government by reason of such violations, including application toward payment of such damages of any advance payments and bonds.

(b) If Purchaser extracts or removes any mineral materials sold under this contract during any period of suspension, or if Purchaser extracts any of such material after expiration of the time for extraction or the cancellation of this contract, such extraction or removal is in trespass and renders Purchaser liable for triple damages.

Sec. 11. Time for removal of personal property. Purchaser has the right within onemonths after expiration of the time for extraction and removal of mineral materials, if not in default, to remove equipment, improvements, or other personal property from Government lands or rights-of-way. Any improvements such as road surfacing, culverts, and bridges which have become a permanent part of a Government road may not be removed. Any equipment, improvements, or other personal property remaining on Government lands and rights-of-way at the end of the period for removal as set forth herein becomes the property of the Government.

Sec. 12. Assignments. This contract or any portion of it may not be assigned without written approval of the Authorized Officer.

Sec. 13. Tenure. Unless otherwise provided by this contract, Purchaser has the right to extract and remove the materials until the termination of the contract, notwithstanding any subsequent appropriation or disposition under the general land laws, including the mining and mineral leasing laws.

Sec. 14. Appeal. Unless specifically excluded by 36 CFR 251.80, Purchaser may appeal any decision by the Authorized Officer regarding this sale of mineral materials.

PURCHASER THE UNITED STATES OF AMERICA

COLORADO DEPARTMENT OF

TRANSPORTATION MONTE WILLIAMS

425 CORPORATE CIRCLE, FOREST SUPERVISOR

GOLDEN, CO 80401

By: By: .

(Signature) (Signature)

Date: Date: .

If this contract is executed by a corporation, it must affix its corporate seal.

Matthew Smith Digitally signed by Matthew Smith

DN: C=US,

E=matthew.smith@state.co.us, O=CDOT, OU=Reg1 West, CN=Matthew Smith Date: 2024.03.01 14:00:10-07'00'

Miguel Martinez (Designer) Strikethrough

PURCHASER THE UNITED STATES OF AMERICA

Miguel Martinez (Designer) Strikethrough

COLORADO DEPARTMENT OF

TRANSPORTATION MONTE WILLIAMS

425 CORPORATE CIRCLE, FOREST SUPERVISOR

GOLDEN, CO 80401

Miguel Martinez (Designer) Strikethrough By: By:

Miguel Martinez (Designer) Strikethrough If this contract is executed by a corporation, it must affix its corporate seal.

Miguel Martinez (Designer) Line

Line

ATTACHMENT B

Mineral Materials Use Specifications

MM-2024-021007-01

CDOT Highway 5

CDOT shall be responsible for site safety, erosion control, and site reclamation.

Free use mineral materials permit conditions are outlined in the mineral materials policy and regulations under 36 CFR 228.62.

Those materials may be used during construction activities for highway repair.

CDOT must notify the Liaison upon completion of mineral materials removal.

Excess materials remaining at the end of the project are required to be removed from NFS land by CDOT or its contractor.

Subsequent use of those excess materials removed from NFS land must be used for public projects and may not be sold.

Miguel Martinez (Designer) Strikethrough

ATTACHMENT B

Mineral Materials Use Specifications

MM-2024-021007-01

CDOT Highway

Miguel Martinez (Designer) Strikethrough CDOT shall be responsible for site safety, erosion control, and site reclamation.

Free use mineral materials permit conditions are outlined in the mineral materials policy and regulations under 36 CFR 228.62.

Those materials may be used during construction activities for highway repair.

CDOT must notify the Liaison upon completion of mineral materials removal.

Excess materials remaining at the end of the project are required to be removed from NFS land by CDOT or its contractor.

Subsequent use of those excess materials removed from NFS land must be used for public projects and may not be sold.