BID TABS - 6982AF22B000028 CA FTFW SOBO TRAIL (1) Rock Hill Trail.pdf
PDF 773 KB Posted
- Attached to
- CA FTFW SOBO TRAIL (1) ROCK HILL TRAIL
- Solicitation number
- 6982AF22B000028
About this file
This document contains a tabulation of bids report for the CA FTFW SOBO TRAIL (1) ROCK HILL TRAIL federal contract opportunity. Patrick F. Pepiot dba: P F Pepiot Contracting submitted the lowest bid of $1,177,755.00, while Empire Equipment Service, Inc. submitted the highest bid of $1,663,420.06. The engineer's estimate for the project was $1,115,410.00. Key work items for the project include roadway aggregate, roadway reconditioning, selective clearing and grubbing, embankment construction, separation-stabilization geotextile, and the construction of an accessibility ramp. The project involves rehabilitation of approximately one mile of an existing natural surface trail located in the Sonny Bono Salton Sea National Wildlife Refuge in California's Imperial Valley.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 12/21/22
1 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF22B000028
Division: Central Federal Lands
State: CA County: Imperial
Federal Land: Sonny Bono Salton Sea NWR Opened at: Lakewood Colorado
Opened by: Sheri Walsh
Date: 12/01/22
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Patrick F. Pepiot dba: P F Pepiot Contracting $1,177,755.00 176 Camas Ct Sutherlin, OR 97479
C&C Contracting, Inc $1,410,780.00 25 Stanford Place Montclair, NJ
Pyramid Construction and Aggregates, Inc. $1,483,500.00 839 Dogwood Road Heber, CA 92249
Fasone Construction, Inc. $1,554,053.17 9124 Norwalk Blvd Santa Fe Springs, CA 90670
D. J. Miller, Inc $1,597,560.00 608 Terrace Circle Brawley, CA 92227
Empire Equipment Service, Inc $1,663,420.06 5271 Agate St Riverside, CA 92509
Engineer's Estimate $1,115,410.00
2 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0100 15101-0000 MOBILIZATION
Patrick F. Pepiot Lump Sum $90,000.00 C&C Contracting, Inc Lump Sum $145,000.00 Pyramid Construction and Aggregates, Inc. Lump Sum $92,600.00 Fasone Construction, Inc. Lump Sum $113,711.67 D. J. Miller, Inc Lump Sum $250,000.00 Empire Equipment Service, Inc Lump Sum $346,233.20 Engineer's Estimate ALL LPSM Lump Sum $128,800.00
A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING
Patrick F. Pepiot Lump Sum $20,000.00 C&C Contracting, Inc Lump Sum $32,900.00 Pyramid Construction and Aggregates, Inc. Lump Sum $23,500.00 Fasone Construction, Inc. Lump Sum $41,619.47 D. J. Miller, Inc Lump Sum $80,000.00 Empire Equipment Service, Inc Lump Sum $31,304.90 Engineer's Estimate ALL LPSM Lump Sum $17,600.00
A0140 15301-0000 CONTRACTOR QUALITY CONTROL
Patrick F. Pepiot Lump Sum $45,500.00 C&C Contracting, Inc Lump Sum $50,000.00 Pyramid Construction and Aggregates, Inc. Lump Sum $200,000.00 Fasone Construction, Inc. Lump Sum $25,310.82 D. J. Miller, Inc Lump Sum $125,000.00 Empire Equipment Service, Inc Lump Sum $82,414.90 Engineer's Estimate ALL LPSM Lump Sum $17,600.00
A0160 15401-0000 CONTRACTOR TESTING
Patrick F. Pepiot Lump Sum $32,000.00 C&C Contracting, Inc Lump Sum $16,300.00 Pyramid Construction and Aggregates, Inc. Lump Sum $30,000.00 Fasone Construction, Inc. Lump Sum $58,052.80 D. J. Miller, Inc Lump Sum $60,000.00 Empire Equipment Service, Inc Lump Sum $66,929.90 Engineer's Estimate ALL LPSM Lump Sum $17,600.00
A0180 15501-0000 CONSTRUCTION SCHEDULE
Patrick F. Pepiot Lump Sum $21,000.00 C&C Contracting, Inc Lump Sum $12,000.00 Pyramid Construction and Aggregates, Inc. Lump Sum $10,000.00 Fasone Construction, Inc. Lump Sum $42,392.51 D. J. Miller, Inc Lump Sum $30,000.00 Empire Equipment Service, Inc Lump Sum $20,429.80 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
3 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0200 15701-0000 SOIL EROSION CONTROL
Patrick F. Pepiot Lump Sum $19,500.00 C&C Contracting, Inc Lump Sum $38,500.00 Pyramid Construction and Aggregates, Inc. Lump Sum $12,000.00 Fasone Construction, Inc. Lump Sum $23,714.87 D. J. Miller, Inc Lump Sum $50,000.00 Empire Equipment Service, Inc Lump Sum $43,603.50 Engineer's Estimate ALL LPSM Lump Sum $26,400.00
A0220 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Patrick F. Pepiot Lump Sum $13,000.00 C&C Contracting, Inc Lump Sum $8,500.00 Pyramid Construction and Aggregates, Inc. Lump Sum $12,000.00 Fasone Construction, Inc. Lump Sum $17,455.74 D. J. Miller, Inc Lump Sum $5,000.00 Empire Equipment Service, Inc Lump Sum $12,898.60 Engineer's Estimate ALL LPSM Lump Sum $17,600.00
A0240 20101-0000 CLEARING AND GRUBBING
Patrick F. Pepiot $12,000.00 $12,000.00 C&C Contracting, Inc $16,600.00 $16,600.00 Pyramid Construction and Aggregates, Inc. $30,000.00 $30,000.00 Fasone Construction, Inc. $51,868.48 $51,868.48 D. J. Miller, Inc $5,000.00 $5,000.00 Empire Equipment Service, Inc $87,195.80 $87,195.80 Engineer's Estimate 1.0 ACRE $35,000.00 $35,000.00
A0260 20205-0000 SELECTIVE CLEARING AND GRUBBING
Patrick F. Pepiot $12,000.00 $19,200.00 C&C Contracting, Inc $18,500.00 $29,600.00 Pyramid Construction and Aggregates, Inc. $15,000.00 $24,000.00 Fasone Construction, Inc. $10,286.42 $16,458.27 D. J. Miller, Inc $18,750.00 $30,000.00 Empire Equipment Service, Inc $51,963.60 $83,141.76 Engineer's Estimate 1.6 ACRE $44,000.00 $70,400.00
A0280 20220-1000 REMOVAL, INDIVIDUAL TREE
Patrick F. Pepiot $1,300.00 $2,600.00 C&C Contracting, Inc $2,600.00 $5,200.00 Pyramid Construction and Aggregates, Inc. $2,000.00 $4,000.00 Fasone Construction, Inc. $4,314.06 $8,628.12 D. J. Miller, Inc $4,000.00 $8,000.00 Empire Equipment Service, Inc $1,475.90 $2,951.80 Engineer's Estimate 2 EACH $3,000.00 $6,000.00
4 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0300 20301-0080 REMOVAL OF BENCH
Patrick F. Pepiot $1,000.00 $4,000.00 C&C Contracting, Inc $1,000.00 $4,000.00 Pyramid Construction and Aggregates, Inc. $2,000.00 $8,000.00 Fasone Construction, Inc. $688.88 $2,755.52 D. J. Miller, Inc $1,200.00 $4,800.00 Empire Equipment Service, Inc $299.40 $1,197.60 Engineer's Estimate 4 EACH $1,250.00 $5,000.00
A0320 20301-2400 REMOVAL OF SIGN
Patrick F. Pepiot $160.00 $640.00 C&C Contracting, Inc $300.00 $1,200.00 Pyramid Construction and Aggregates, Inc. $500.00 $2,000.00 Fasone Construction, Inc. $501.85 $2,007.40 D. J. Miller, Inc $400.00 $1,600.00 Empire Equipment Service, Inc $194.20 $776.80 Engineer's Estimate 4 EACH $200.00 $800.00
A0340 20301-3400 REMOVAL OF WHEELSTOP
Patrick F. Pepiot $200.00 $1,800.00 C&C Contracting, Inc $150.00 $1,350.00 Pyramid Construction and Aggregates, Inc. $500.00 $4,500.00 Fasone Construction, Inc. $389.29 $3,503.61 D. J. Miller, Inc $200.00 $1,800.00 Empire Equipment Service, Inc $247.60 $2,228.40 Engineer's Estimate 9 EACH $230.00 $2,070.00
A0360 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
Patrick F. Pepiot $100.00 $800.00 C&C Contracting, Inc $500.00 $4,000.00 Pyramid Construction and Aggregates, Inc. $250.00 $2,000.00 Fasone Construction, Inc. $4,014.82 $32,118.56 D. J. Miller, Inc $90.00 $720.00 Empire Equipment Service, Inc $593.90 $4,751.20 Engineer's Estimate 8 SQYD $90.00 $720.00
A0380 20420-0000 EMBANKMENT CONSTRUCTION
Patrick F. Pepiot $86.00 $86,000.00 C&C Contracting, Inc $34.00 $34,000.00 Pyramid Construction and Aggregates, Inc. $60.00 $60,000.00 Fasone Construction, Inc. $216.33 $216,330.00 D. J. Miller, Inc $75.00 $75,000.00 Empire Equipment Service, Inc $200.20 $200,200.00 Engineer's Estimate 1,000 CUYD $140.00 $140,000.00
5 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0400 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A
Patrick F. Pepiot $5.00 $42,000.00 C&C Contracting, Inc $8.75 $73,500.00 Pyramid Construction and Aggregates, Inc. $4.00 $33,600.00 Fasone Construction, Inc. $12.08 $101,472.00 D. J. Miller, Inc $9.50 $79,800.00 Empire Equipment Service, Inc $4.80 $40,320.00 Engineer's Estimate 8,400 SQYD $5.00 $42,000.00
A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2
Patrick F. Pepiot $130.00 $299,000.00 C&C Contracting, Inc $175.00 $402,500.00 Pyramid Construction and Aggregates, Inc. $73.00 $167,900.00 Fasone Construction, Inc. $100.56 $231,288.00 D. J. Miller, Inc $135.00 $310,500.00 Empire Equipment Service, Inc $87.60 $201,480.00 Engineer's Estimate 2,300 TON $130.00 $299,000.00
A0440 30303-3000 ROADWAY RECONDITIONING
Patrick F. Pepiot $9.80 $80,360.00 C&C Contracting, Inc $13.50 $110,700.00 Pyramid Construction and Aggregates, Inc. $18.00 $147,600.00 Fasone Construction, Inc. $13.35 $109,470.00 D. J. Miller, Inc $12.00 $98,400.00 Empire Equipment Service, Inc $5.10 $41,820.00 Engineer's Estimate 8,200 SQYD $10.00 $82,000.00
A0460 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
Patrick F. Pepiot $288.00 $40,320.00 C&C Contracting, Inc $315.00 $44,100.00 Pyramid Construction and Aggregates, Inc. $1,200.00 $168,000.00 Fasone Construction, Inc. $973.42 $136,278.80 D. J. Miller, Inc $300.00 $42,000.00 Empire Equipment Service, Inc $544.70 $76,258.00 Engineer's Estimate 140 SQYD $300.00 $42,000.00
A0480 60915-1000 WHEELSTOP, CONCRETE
Patrick F. Pepiot $250.00 $2,500.00 C&C Contracting, Inc $275.00 $2,750.00 Pyramid Construction and Aggregates, Inc. $300.00 $3,000.00 Fasone Construction, Inc. $461.33 $4,613.30 D. J. Miller, Inc $500.00 $5,000.00 Empire Equipment Service, Inc $704.00 $7,040.00 Engineer's Estimate 10 EACH $400.00 $4,000.00
6 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 61501-0100 SIDEWALK, CONCRETE
Patrick F. Pepiot $250.00 $9,000.00 C&C Contracting, Inc $320.00 $11,520.00 Pyramid Construction and Aggregates, Inc. $1,500.00 $54,000.00 Fasone Construction, Inc. $1,165.10 $41,943.60 D. J. Miller, Inc $390.00 $14,040.00 Empire Equipment Service, Inc $690.80 $24,868.80 Engineer's Estimate 36 SQYD $220.00 $7,920.00
A0520 61902-0000 GATE
Patrick F. Pepiot $3,000.00 $3,000.00 C&C Contracting, Inc $4,500.00 $4,500.00 Pyramid Construction and Aggregates, Inc. $6,000.00 $6,000.00 Fasone Construction, Inc. $7,331.41 $7,331.41 D. J. Miller, Inc $3,000.00 $3,000.00 Empire Equipment Service, Inc $10,183.30 $10,183.30 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
A0540 62201-0400 BACKHOE LOADER, 2 CUBIC F00T MINIMUM RATED CAPACITY BUCKET, 12-INCH WIDTH
Patrick F. Pepiot $225.00 $9,000.00 C&C Contracting, Inc $250.00 $10,000.00 Pyramid Construction and Aggregates, Inc. $220.00 $8,800.00 Fasone Construction, Inc. $333.52 $13,340.80 D. J. Miller, Inc $200.00 $8,000.00 Empire Equipment Service, Inc $155.00 $6,200.00 Engineer's Estimate 40 HOUR $140.00 $5,600.00
A0560 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY
Patrick F. Pepiot $180.00 $3,600.00 C&C Contracting, Inc $400.00 $8,000.00 Pyramid Construction and Aggregates, Inc. $400.00 $8,000.00 Fasone Construction, Inc. $458.21 $9,164.20 D. J. Miller, Inc $200.00 $4,000.00 Empire Equipment Service, Inc $155.00 $3,100.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
A0580 62201-2750 MOTOR GRADER
Patrick F. Pepiot $230.00 $9,200.00 C&C Contracting, Inc $325.00 $13,000.00 Pyramid Construction and Aggregates, Inc. $400.00 $16,000.00 Fasone Construction, Inc. $408.33 $16,333.20 D. J. Miller, Inc $225.00 $9,000.00 Empire Equipment Service, Inc $210.00 $8,400.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
7 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0600 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM
Patrick F. Pepiot $160.00 $6,400.00 C&C Contracting, Inc $240.00 $9,600.00 Pyramid Construction and Aggregates, Inc. $220.00 $8,800.00 Fasone Construction, Inc. $282.09 $11,283.60 D. J. Miller, Inc $175.00 $7,000.00 Empire Equipment Service, Inc $210.00 $8,400.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00
A0620 62301-0000 GENERAL LABOR
Patrick F. Pepiot $121.00 $12,100.00 C&C Contracting, Inc $125.00 $12,500.00 Pyramid Construction and Aggregates, Inc. $100.00 $10,000.00 Fasone Construction, Inc. $289.89 $28,989.00 D. J. Miller, Inc $100.00 $10,000.00 Empire Equipment Service, Inc $85.00 $8,500.00 Engineer's Estimate 100 HOUR $100.00 $10,000.00
A0640 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Patrick F. Pepiot $375.00 $7,500.00 C&C Contracting, Inc $200.00 $4,000.00 Pyramid Construction and Aggregates, Inc. $150.00 $3,000.00 Fasone Construction, Inc. $617.18 $12,343.60 D. J. Miller, Inc $200.00 $4,000.00 Empire Equipment Service, Inc $250.00 $5,000.00 Engineer's Estimate 20 HOUR $300.00 $6,000.00
A0660 63301-0000 SIGN SYSTEM
Patrick F. Pepiot $250.00 $500.00 C&C Contracting, Inc $600.00 $1,200.00 Pyramid Construction and Aggregates, Inc. $5,000.00 $10,000.00 Fasone Construction, Inc. $1,533.61 $3,067.22 D. J. Miller, Inc $2,000.00 $4,000.00 Empire Equipment Service, Inc $4,361.40 $8,722.80 Engineer's Estimate 2 EACH $900.00 $1,800.00
A0680 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
Patrick F. Pepiot $225.00 $1,125.00 C&C Contracting, Inc $400.00 $2,000.00 Pyramid Construction and Aggregates, Inc. $1,000.00 $5,000.00 Fasone Construction, Inc. $426.41 $2,132.05 D. J. Miller, Inc $1,500.00 $7,500.00 Empire Equipment Service, Inc $3,056.50 $15,282.50 Engineer's Estimate 5 EACH $600.00 $3,000.00
8 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0700 63309-0100 DELINEATOR, TYPE 1
Patrick F. Pepiot $350.00 $2,800.00 C&C Contracting, Inc $420.00 $3,360.00 Pyramid Construction and Aggregates, Inc. $500.00 $4,000.00 Fasone Construction, Inc. $446.99 $3,575.92 D. J. Miller, Inc $125.00 $1,000.00 Empire Equipment Service, Inc $1,868.80 $14,950.40 Engineer's Estimate 8 EACH $110.00 $880.00
A0720 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
Patrick F. Pepiot $7.00 $1,540.00 C&C Contracting, Inc $20.00 $4,400.00 Pyramid Construction and Aggregates, Inc. $25.00 $5,500.00 Fasone Construction, Inc. $44.88 $9,873.60 D. J. Miller, Inc $10.00 $2,200.00 Empire Equipment Service, Inc $13.80 $3,036.00 Engineer's Estimate 220 LNFT $5.00 $1,100.00
A0740 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
Patrick F. Pepiot $500.00 $1,000.00 C&C Contracting, Inc $500.00 $1,000.00 Pyramid Construction and Aggregates, Inc. $1,000.00 $2,000.00 Fasone Construction, Inc. $4,937.48 $9,874.96 D. J. Miller, Inc $1,000.00 $2,000.00 Empire Equipment Service, Inc $12,257.70 $24,515.40 Engineer's Estimate 2 EACH $600.00 $1,200.00
A0760 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
Patrick F. Pepiot $500.00 $1,000.00 C&C Contracting, Inc $750.00 $1,500.00 Pyramid Construction and Aggregates, Inc. $300.00 $600.00 Fasone Construction, Inc. $2,468.74 $4,937.48 D. J. Miller, Inc $700.00 $1,400.00 Empire Equipment Service, Inc $8,177.90 $16,355.80 Engineer's Estimate 2 EACH $280.00 $560.00
A0780 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Patrick F. Pepiot $285.00 $570.00 C&C Contracting, Inc $1,000.00 $2,000.00 Pyramid Construction and Aggregates, Inc. $300.00 $600.00 Fasone Construction, Inc. $1,689.46 $3,378.92 D. J. Miller, Inc $400.00 $800.00 Empire Equipment Service, Inc $4,138.40 $8,276.80 Engineer's Estimate 2 EACH $530.00 $1,060.00
9 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0800 64603-0000 FIXTURE , OVERLOOK
Patrick F. Pepiot $246,400.00 $246,400.00 C&C Contracting, Inc $188,000.00 $188,000.00 Pyramid Construction and Aggregates, Inc. $240,000.00 $240,000.00 Fasone Construction, Inc. $93,388.20 $93,388.20 D. J. Miller, Inc $200,000.00 $200,000.00 Empire Equipment Service, Inc $51,990.50 $51,990.50 Engineer's Estimate 1 EACH $70,000.00 $70,000.00
A0820 64603-0000 FIXTURE , DIAMOND PIER FOUNDATIONS
Patrick F. Pepiot $550.00 $11,000.00 C&C Contracting, Inc $2,750.00 $55,000.00 Pyramid Construction and Aggregates, Inc. $2,500.00 $50,000.00 Fasone Construction, Inc. $1,623.43 $32,468.60 D. J. Miller, Inc $1,750.00 $35,000.00 Empire Equipment Service, Inc $2,784.90 $55,698.00 Engineer's Estimate 20 EACH $500.00 $10,000.00
A0840 64603-0300 FIXTURE, BENCH
Patrick F. Pepiot $2,500.00 $12,500.00 C&C Contracting, Inc $6,500.00 $32,500.00 Pyramid Construction and Aggregates, Inc. $3,100.00 $15,500.00 Fasone Construction, Inc. $1,524.88 $7,624.40 D. J. Miller, Inc $3,500.00 $17,500.00 Empire Equipment Service, Inc $3,086.00 $15,430.00 Engineer's Estimate 5 EACH $1,890.00 $9,450.00
A0860 64620-0300 REMOVE AND RESET BENCH
Patrick F. Pepiot $4,500.00 $4,500.00 C&C Contracting, Inc $12,600.00 $12,600.00 Pyramid Construction and Aggregates, Inc. $500.00 $500.00 Fasone Construction, Inc. $1,820.38 $1,820.38 D. J. Miller, Inc $2,000.00 $2,000.00 Empire Equipment Service, Inc $3,715.60 $3,715.60 Engineer's Estimate 1 EACH $1,100.00 $1,100.00
A0880 64620-0600 REMOVE AND RESET TRASH RECEPTACLE
Patrick F. Pepiot $2,800.00 $2,800.00 C&C Contracting, Inc $1,400.00 $1,400.00 Pyramid Construction and Aggregates, Inc. $500.00 $500.00 Fasone Construction, Inc. $2,132.09 $2,132.09 D. J. Miller, Inc $2,500.00 $2,500.00 Empire Equipment Service, Inc $17,618.00 $17,618.00 Engineer's Estimate 1 EACH $1,150.00 $1,150.00
10 out of 10Source Selection Information - See FAR 2.101 & 3.104
Project No: CA FTFW SOBO TRAIL(1)
Project Name: Rock Hill Trail
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Patrick F. Pepiot $1,177,755.00 C&C Contracting, Inc $1,410,780.00 Pyramid Construction and Aggregates, Inc. $1,483,500.00 Fasone Construction, Inc. $1,554,053.17 D. J. Miller, Inc $1,597,560.00 Empire Equipment Service, Inc $1,663,420.06 Engineer's Estimate $1,115,410.00
| 2022-12-21T12:06:22-0700 | |
| KELLY JANE PALMER |
File details come from the government source that posted it. Updated .