QnA 6.19.22.pdf
PDF 140 KB Posted
- Attached to
- AZ NP GRCA 272(1) Mather Point Campground Loops Federal contract opportunity
- Solicitation number
- 6982AF22B000017
About this file
This document contains questions and answers from a pre-solicitation conference for a federal infrastructure project. The solicitation involves rehabilitating approximately 2.37 miles of campground roads and parking stalls at Mather Point Campground within Grand Canyon National Park. The project includes work on Juniper Loops 1 and 2, Maple Loop, and Oak Loops 1 and 2, as well as optional work on Pine Loop and Sage Loops 1 through 4. Contractors may view the project site as the campground loops are open to the public. There will be no teleconference for the public bid opening, which interested parties must attend in person to obtain bid results. The solicitation does not include escalation clauses for fuel, bituminous products, or economic concessions. Dust control is considered a subsidiary obligation of the contractor per the included clauses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Tabulation Mather Pt.pdf | ||
| Bid Opening Summary AZ NP GRCA 272 Mather Point.pdf | ||
| Questions and Answers During Solicitation AZ NP GRCA 272(1) MATHER POINT CAMPGROUND LOOPS 06172022.pdf | ||
| A001.pdf | ||
| QnA 6.10.22.pdf | ||
| QnA 6.7.22.pdf | ||
| Plan GRCA 272(1)_2022-04-26_Stamped.pdf | ||
| 6982AF22B000017.pdf | ||
| FP-14.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for AZ NP GRCA 272(1) Mather Point Campground Loops
June 19, 2022
Questions Answers 1 Is it possible, and how can I, schedule 1 or more site visits to view the campground loops?
All contractors may view the campground loops. The loops are open to the public. If the gate is locked, the contractor has the option to walk the loops.
2 This is a sealed bid IFB, will there be a public bid opening via teleconference?
The public can attend the bid opening in person, there will not be a teleconference. Results will be posted to sam.gov after bid opening.
3 What is the construction duration? The RFP/Solicitation refers to subsection 108.01 but even still that subsection does not provide duration. Please advise.
Refer to FAR clause 52.211-10 on page C-3 of the IFB for the expected notice to proceed date. Refer to SCR’s 108.01 (a) on page E-16 of the IFB for the contract completion date.
4 Who is assigned as the Construction Operations Engineer? No Construction Operations Engineer has been assigned.
5 Who is assigned as the Project Engineer? No Project Engineer has been assigned.
6 Due to the current volatility in the oil market will the Government add an escalation clause for bituminous products?
No escalation for bituminous products will be included in the contract.
7 Due to the current volatility in the oil market will the Government add an escalation clause for fuel?
No escalation for fuel will be included in the contract.
8 Due to the current volatility in the economic market, will the Government allow for price increases and/or documented increases?
Economic concessions will not be included in the contract.
9 There is no item for watering for dust control in the bid items. It is normally present in CFL contracts, should pricing for this be added to a certain item?
Refer to FP-14 109.05(b) Indirect Payment. Work for which direct payment is not provided (in an item number) is a subsidiary obligation of the contractor. Payment for such work is indirectly included under other pay items listed in the bid schedule.