Bid Tabulation Mather Pt.pdf

PDF 663 KB Posted

Attached to
AZ NP GRCA 272(1) Mather Point Campground Loops Federal contract opportunity
Solicitation number
6982AF22B000017
Issued by
Department of Transportation Federal Highway Administration

About this file

This bid tabulation report details bids received for the AZ NP GRCA 272(1) Mather Point Campground Loops federal contract opportunity issued by the Department of Transportation Federal Highway Administration. The solicitation seeks rehabilitation of approximately 2.37 miles of campground roads and parking stalls at the Mather Point Campground in Grand Canyon National Park, including 1.51 miles under Schedule A, 0.47 miles under Option Y, and 0.39 miles under Option Z. The bid tabulation evaluates three bids for the base schedule and two options, listing unit prices and totals for Monitor Construction Company, Stormwater Plans LLC, and the independent government cost estimate. Monitor Construction's total for Schedule A is $2,103,004 while Stormwater Plans' bid is $3,983,454 and the government estimate is $1,841,854.94. The report notes the solicitation was opened on June 23rd and signed on June 27th but does not indicate an award date or awardee.

View the file

Other files for this federal contract opportunity

Other files attached to AZ NP GRCA 272(1) Mather Point Campground Loops, newest first.
File Type Posted
Bid Opening Summary AZ NP GRCA 272 Mather Point.pdf PDF
QnA 6.19.22.pdf PDF
Questions and Answers During Solicitation AZ NP GRCA 272(1) MATHER POINT CAMPGROUND LOOPS 06172022.pdf PDF
A001.pdf PDF
QnA 6.10.22.pdf PDF
QnA 6.7.22.pdf PDF
Plan GRCA 272(1)_2022-04-26_Stamped.pdf PDF
6982AF22B000017.pdf PDF
FP-14.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 06/27/22

1 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Contractor Responsive?

Engineer's Estimate

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving

Base Schedule A

$1,841,854.94

$2,103,004.00

$3,983,454.00

Option: Y

$543,263.68

$579,310.00

$1,094,470.00

Option: Z

$286,645.26

$304,774.00

$591,700.00

Contractor Responsive?

Engineer's Estimate

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving

Total Base Schedule A and Option(s): Y

$2,385,118.62

$2,682,314.00

$5,077,924.00

Total Base Schedule A and Option(s): YZ

$2,671,763.88

$2,987,088.00

$5,669,624.00

Total Base Schedule A and Option(s): Z

$2,128,500.20

$2,407,778.00

$4,575,154.00

2 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF22B000017

Division: Central Federal Lands

State: AZ County: Coconino

Federal Land: Grand Canyon National Park Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 06/23/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Monitor Construction Company, Inc. $2,103,004.00 8 Old Highway Lane Sonoita, AZ 85637

Stormwater Plans, LLC dba SWP Contracting and Paving $3,983,454.00 5624 N. 54th Avenue Glendale, AZ 85301

Engineer's Estimate $1,841,854.94

Contract Specialist

06/29/2022

3 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0001 15101-0000 MOBILIZATION

Monitor Construction Company, Inc. Lump Sum $290,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $882,000.00 Engineer's Estimate ALL LPSM Lump Sum $167,441.36

A0002 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Monitor Construction Company, Inc. $6,000.00 $9,060.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50,000.00 $75,500.00 Engineer's Estimate 1.51 MILE $15,000.00 $22,650.00

A0003 15215-1000 SURVEY AND STAKING, APPROACH ROAD (CAMPSITE PARKING STALLS)

Monitor Construction Company, Inc. $236.00 $37,760.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $80,000.00 Engineer's Estimate 160 EACH $500.00 $80,000.00

A0004 15301-0000 CONTRACTOR QUALITY CONTROL

Monitor Construction Company, Inc. Lump Sum $65,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,486.79

A0005 15401-0000 CONTRACTOR TESTING

Monitor Construction Company, Inc. Lump Sum $6,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,486.79

A0006 15501-0000 CONSTRUCTION SCHEDULE

Monitor Construction Company, Inc. Lump Sum $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

A0007 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Monitor Construction Company, Inc. $15.00 $3,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $21.00 $5,250.00 Engineer's Estimate 250 LNFT $7.00 $1,750.00

4 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0008 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Monitor Construction Company, Inc. $10.00 $2,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $13.00 $3,250.00 Engineer's Estimate 250 LNFT $5.00 $1,250.00

A0009 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

Monitor Construction Company, Inc. $75.00 $15,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $22.00 $4,400.00 Engineer's Estimate 200 SQYD $9.00 $1,800.00

A0010 20402-0000 SUBEXCAVATION

Monitor Construction Company, Inc. $500.00 $50,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $340.00 $34,000.00 Engineer's Estimate 100 CUYD $55.00 $5,500.00

A0011 30202-2000 ROADWAY AGGREGATE, METHOD 2

Monitor Construction Company, Inc. $115.00 $138,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $210.00 $252,000.00 Engineer's Estimate 1,200 TON $60.00 $72,000.00

A0012 30402-1000 FULL DEPTH RECLAMATION, METHOD 1

Monitor Construction Company, Inc. $6.00 $150,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14.00 $350,000.00 Engineer's Estimate 25,000 SQYD $9.00 $225,000.00

A0013 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Monitor Construction Company, Inc. $315.00 $17,325.00 Stormwater Plans, LLC dba SWP Contracting and Paving $230.00 $12,650.00 Engineer's Estimate 55.0 TON $300.00 $16,500.00

A0014 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Monitor Construction Company, Inc. $217.00 $1,193,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $1,375,000.00 Engineer's Estimate 5,500 TON $175.00 $962,500.00

5 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0015 40601-0000 FOG SEAL

Monitor Construction Company, Inc. $750.00 $10,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,500.00 $20,400.00 Engineer's Estimate 13.6 TON $1,700.00 $23,120.00

A0016 41101-1000 PRIME COAT, METHOD 1

Monitor Construction Company, Inc. $700.00 $14,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,200.00 $24,000.00 Engineer's Estimate 20.0 TON $1,500.00 $30,000.00

A0017 41201-0000 TACK COAT

Monitor Construction Company, Inc. $930.00 $8,463.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,700.00 $24,570.00 Engineer's Estimate 9.1 TON $1,300.00 $11,830.00

A0018 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Monitor Construction Company, Inc. $110.00 $3,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving $160.00 $4,800.00 Engineer's Estimate 30 HOUR $140.00 $4,200.00

A0019 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Monitor Construction Company, Inc. $100.00 $3,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $170.00 $5,100.00 Engineer's Estimate 30 HOUR $120.00 $3,600.00

A0020 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Monitor Construction Company, Inc. $130.00 $3,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $5,250.00 Engineer's Estimate 30 HOUR $140.00 $4,200.00

A0021 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Monitor Construction Company, Inc. $180.00 $5,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $185.00 $5,550.00 Engineer's Estimate 30 HOUR $165.00 $4,950.00

6 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0022 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM

Monitor Construction Company, Inc. $90.00 $2,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $4,200.00 Engineer's Estimate 30 HOUR $120.00 $3,600.00

A0023 62301-0000 GENERAL LABOR

Monitor Construction Company, Inc. $50.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $8,500.00 Engineer's Estimate 100 HOUR $80.00 $8,000.00

A0024 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Monitor Construction Company, Inc. $200.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $220.00 $4,400.00 Engineer's Estimate 20 HOUR $130.00 $2,600.00

A0025 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Monitor Construction Company, Inc. $220.00 $2,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $220.00 $2,200.00 Engineer's Estimate 10 HOUR $195.00 $1,950.00

A0026 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Monitor Construction Company, Inc. $8.00 $576.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.00 $144.00 Engineer's Estimate 72 LNFT $2.50 $180.00

A0027 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Monitor Construction Company, Inc. $550.00 $9,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $300.00 $5,400.00 Engineer's Estimate 18 EACH $350.00 $6,300.00

A0028 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Monitor Construction Company, Inc. Lump Sum $12,450.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $32,500.00

7 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0029 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH

Monitor Construction Company, Inc. $35.00 $700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50.00 $1,000.00 Engineer's Estimate 20 EACH $60.00 $1,200.00

A0030 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Monitor Construction Company, Inc. $90.00 $1,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $115.00 $2,300.00 Engineer's Estimate 20 EACH $80.00 $1,600.00

A0031 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL

Monitor Construction Company, Inc. $55.00 $2,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $95.00 $3,800.00 Engineer's Estimate 40 EACH $70.00 $2,800.00

A0032 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Monitor Construction Company, Inc. $15,000.00 $15,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $35,000.00 $35,000.00 Engineer's Estimate 1 EACH $8,000.00 $8,000.00

A0033 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Monitor Construction Company, Inc. $600.00 $3,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $325.00 $1,950.00 Engineer's Estimate 6 EACH $250.00 $1,500.00

A0034 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Monitor Construction Company, Inc. $80.00 $5,120.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $5,440.00 Engineer's Estimate 64 LNFT $65.00 $4,160.00

A0035 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Monitor Construction Company, Inc. $40.00 $9,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $20,400.00 Engineer's Estimate 240 HOUR $55.00 $13,200.00

8 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Monitor Construction Company, Inc. $2,103,004.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,983,454.00 Engineer's Estimate $1,841,854.94

9 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Y

Schedule Type: Options

Solcitation No: 6982AF22B000017

Division: Central Federal Lands

State: AZ County: Coconino

Federal Land: Grand Canyon National Park Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 06/23/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Monitor Construction Company, Inc. $579,310.00 8 Old Highway Lane Sonoita, AZ 85637

Stormwater Plans, LLC dba SWP Contracting and Paving $1,094,470.00 5624 N. 54th Avenue Glendale, AZ 85301

Engineer's Estimate $543,263.68

10 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y0001 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Monitor Construction Company, Inc. $5,500.00 $2,585.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50,000.00 $23,500.00 Engineer's Estimate 0.47 MILE $15,000.00 $7,050.00

Y0002 15215-1000 SURVEY AND STAKING, APPROACH ROAD (CAMPSITE PARKING STALLS)

Monitor Construction Company, Inc. $236.00 $12,980.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $27,500.00 Engineer's Estimate 55 EACH $500.00 $27,500.00

Y0003 15301-0000 CONTRACTOR QUALITY CONTROL

Monitor Construction Company, Inc. Lump Sum $15,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $155,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,051.84

Y0004 15401-0000 CONTRACTOR TESTING

Monitor Construction Company, Inc. Lump Sum $2,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $165,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,051.84

Y0005 30202-2000 ROADWAY AGGREGATE, METHOD 2

Monitor Construction Company, Inc. $115.00 $40,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $210.00 $73,500.00 Engineer's Estimate 350 TON $60.00 $21,000.00

Y0006 30402-1000 FULL DEPTH RECLAMATION, METHOD 1

Monitor Construction Company, Inc. $6.00 $45,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14.00 $105,000.00 Engineer's Estimate 7,500 SQYD $9.00 $67,500.00

Y0007 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Monitor Construction Company, Inc. $315.00 $6,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving $230.00 $4,600.00 Engineer's Estimate 20.0 TON $300.00 $6,000.00

11 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y0008 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Monitor Construction Company, Inc. $217.00 $434,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $500,000.00 Engineer's Estimate 2,000 TON $175.00 $350,000.00

Y0009 40601-0000 FOG SEAL

Monitor Construction Company, Inc. $750.00 $3,075.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,100.00 $8,610.00 Engineer's Estimate 4.1 TON $1,700.00 $6,970.00

Y0010 41101-1000 PRIME COAT, METHOD 1

Monitor Construction Company, Inc. $700.00 $4,270.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,700.00 $10,370.00 Engineer's Estimate 6.1 TON $1,500.00 $9,150.00

Y0011 41201-0000 TACK COAT

Monitor Construction Company, Inc. $900.00 $2,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,700.00 $7,560.00 Engineer's Estimate 2.8 TON $1,300.00 $3,640.00

Y0012 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Monitor Construction Company, Inc. $100.00 $1,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $160.00 $1,600.00 Engineer's Estimate 10 HOUR $140.00 $1,400.00

Y0013 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Monitor Construction Company, Inc. $110.00 $1,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $170.00 $1,700.00 Engineer's Estimate 10 HOUR $120.00 $1,200.00

Y0014 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Monitor Construction Company, Inc. $130.00 $1,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $1,750.00 Engineer's Estimate 10 HOUR $140.00 $1,400.00

12 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y0015 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Monitor Construction Company, Inc. $175.00 $1,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $185.00 $1,850.00 Engineer's Estimate 10 HOUR $165.00 $1,650.00

Y0016 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM

Monitor Construction Company, Inc. $90.00 $900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $1,400.00 Engineer's Estimate 10 HOUR $120.00 $1,200.00

Y0017 62301-0000 GENERAL LABOR

Monitor Construction Company, Inc. $50.00 $2,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $4,250.00 Engineer's Estimate 50 HOUR $80.00 $4,000.00

Y0018 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Monitor Construction Company, Inc. $7.00 $280.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.00 $80.00 Engineer's Estimate 40 LNFT $2.50 $100.00

Y0019 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Monitor Construction Company, Inc. $500.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $300.00 $1,200.00 Engineer's Estimate 4 EACH $350.00 $1,400.00

Total Schedule - All Items

Monitor Construction Company, Inc. $579,310.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,094,470.00 Engineer's Estimate $543,263.68

13 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Z

Schedule Type: Options

Solcitation No: 6982AF22B000017

Division: Central Federal Lands

State: AZ County: Coconino

Federal Land: Grand Canyon National Park Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 06/23/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Monitor Construction Company, Inc. $304,774.00 8 Old Highway Lane Sonoita, AZ 85637

Stormwater Plans, LLC dba SWP Contracting and Paving $591,700.00 5624 N. 54th Avenue Glendale, AZ 85301

Engineer's Estimate $286,645.26

14 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0001 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Monitor Construction Company, Inc. $6,000.00 $2,340.00 Stormwater Plans, LLC dba SWP Contracting and Paving $50,000.00 $19,500.00 Engineer's Estimate 0.39 MILE $15,000.00 $5,850.00

Z0002 15215-1000 SURVEY AND STAKING, APPROACH ROAD (CAMPSITE PARKING STALLS)

Monitor Construction Company, Inc. $236.00 $2,124.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $4,500.00 Engineer's Estimate 9 EACH $500.00 $4,500.00

Z0003 15301-0000 CONTRACTOR QUALITY CONTROL

Monitor Construction Company, Inc. Lump Sum $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $85,000.00 Engineer's Estimate ALL LPSM Lump Sum $9,980.13

Z0004 15401-0000 CONTRACTOR TESTING

Monitor Construction Company, Inc. Lump Sum $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $95,000.00 Engineer's Estimate ALL LPSM Lump Sum $9,980.13

Z0005 30202-2000 ROADWAY AGGREGATE, METHOD 2

Monitor Construction Company, Inc. $115.00 $24,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $34,650.00 Engineer's Estimate 210 TON $60.00 $12,600.00

Z0006 30402-1000 FULL DEPTH RECLAMATION, METHOD 1

Monitor Construction Company, Inc. $6.00 $27,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14.00 $64,400.00 Engineer's Estimate 4,600 SQYD $9.00 $41,400.00

Z0007 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Monitor Construction Company, Inc. $315.00 $3,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $230.00 $2,300.00 Engineer's Estimate 10.0 TON $300.00 $3,000.00

15 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0008 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Monitor Construction Company, Inc. $217.00 $217,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $250,000.00 Engineer's Estimate 1,000 TON $175.00 $175,000.00

Z0009 40601-0000 FOG SEAL

Monitor Construction Company, Inc. $800.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $7,500.00 Engineer's Estimate 2.5 TON $1,700.00 $4,250.00

Z0010 41101-1000 PRIME COAT, METHOD 1

Monitor Construction Company, Inc. $700.00 $2,590.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,200.00 $8,140.00 Engineer's Estimate 3.7 TON $1,500.00 $5,550.00

Z0011 41201-0000 TACK COAT

Monitor Construction Company, Inc. $900.00 $1,530.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,000.00 $6,800.00 Engineer's Estimate 1.7 TON $1,300.00 $2,210.00

Z0012 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Monitor Construction Company, Inc. $110.00 $1,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $160.00 $1,600.00 Engineer's Estimate 10 HOUR $140.00 $1,400.00

Z0013 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Monitor Construction Company, Inc. $100.00 $1,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $170.00 $1,700.00 Engineer's Estimate 10 HOUR $120.00 $1,200.00

Z0014 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Monitor Construction Company, Inc. $130.00 $1,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $1,750.00 Engineer's Estimate 10 HOUR $140.00 $1,400.00

16 out of 16

Project No: AZ NP GRCA 272(1)

Project Name: Mather Point Campground Loops

Schedule: Z

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Z0015 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Monitor Construction Company, Inc. $175.00 $1,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $185.00 $1,850.00 Engineer's Estimate 10 HOUR $165.00 $1,650.00

Z0016 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM

Monitor Construction Company, Inc. $90.00 $900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $1,400.00 Engineer's Estimate 10 HOUR $120.00 $1,200.00

Z0017 62301-0000 GENERAL LABOR

Monitor Construction Company, Inc. $50.00 $2,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $4,250.00 Engineer's Estimate 50 HOUR $80.00 $4,000.00

Z0018 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Monitor Construction Company, Inc. $8.00 $240.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.00 $60.00 Engineer's Estimate 30 LNFT $2.50 $75.00

Z0019 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Monitor Construction Company, Inc. $500.00 $2,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $325.00 $1,300.00 Engineer's Estimate 4 EACH $350.00 $1,400.00

Total Schedule - All Items

Monitor Construction Company, Inc. $304,774.00 Stormwater Plans, LLC dba SWP Contracting and Paving $591,700.00 Engineer's Estimate $286,645.26