QnA 6.10.22.pdf

PDF 87 KB Posted

Attached to
AZ NP GRCA 272(1) Mather Point Campground Loops Federal contract opportunity
Solicitation number
6982AF22B000017
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains questions and answers from a pre-bid meeting for a federal construction contract. The solicitation is for the AZ NP GRCA 272(1) Mather Point Campground Loops project located in Grand Canyon Village, Arizona. The project scope involves rehabilitating approximately 2.37 miles of campground roads and campsite parking stalls across five loops at the Mather Point Campground within Grand Canyon National Park. Schedule A covers 1.51 miles across two loops, with options to additionally rehabilitate 0.47 miles of one loop under Option Y and 0.39 miles of four loops under Option Z. Bids are to be submitted sealed with no teleconference for public bid opening. The expected notice to proceed and contract completion dates refer to clauses in the solicitation document.

View the file

Other files for this federal contract opportunity

Other files attached to AZ NP GRCA 272(1) Mather Point Campground Loops, newest first.
File Type Posted
Bid Tabulation Mather Pt.pdf PDF
Bid Opening Summary AZ NP GRCA 272 Mather Point.pdf PDF
QnA 6.19.22.pdf PDF
Questions and Answers During Solicitation AZ NP GRCA 272(1) MATHER POINT CAMPGROUND LOOPS 06172022.pdf PDF
A001.pdf PDF
QnA 6.7.22.pdf PDF
Plan GRCA 272(1)_2022-04-26_Stamped.pdf PDF
6982AF22B000017.pdf PDF
FP-14.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for AZ NP GRCA 272(1) Mather Point Campground Loops

June 10, 2022

Questions Answers 1 Is it possible, and how can I, schedule 1 or more site visits to view the campground loops?

All contractors may view the campground loops. The loops are open to the public. If the gate is locked, the contractor has the option to walk the loops.

2 This is a sealed bid IFB, will there be a public bid opening via teleconference?

The pubic can attend the bid opening in person, there will not be a teleconference. Results will be posted to sam.gov after bid opening.

3 What is the construction duration? The RFP/Solicitation refers to subsection 108.01 but even still that subsection does not provide duration. Please advise.

Refer to FAR clause 52.211-10 on page C-3 of the IFB for the expected notice to proceed date. Refer to SCR’s 108.01 (a) on page E-16 of the IFB for the contract completion date.