Bid Tabs - Repairs on Wawona Road.pdf
PDF 661 KB Posted
- Attached to
- CA FTNP YOSE 14(7) Repairs on Wawona Road
- Solicitation number
- 6982AF20B000022
About this file
This document summarizes a bid tabulation report for repairs on Wawona Road within Yosemite National Park. The project includes repairs at four sites requiring excavation, rock excavation, rock bolts, special rock embankment, and drainage improvements including new pipe culverts and riprap. Key quantities include 3,800 cubic yards of excavation, 490 cubic yards of embankment, 200 linear feet of rock dowels, and 220 linear feet of pipe culverts. The project is estimated to cost between $1-2 million. Five contractors submitted bids ranging from $1.6 million by Genesis Design and Development, LLC to $5 million by MX Construction. The anticipated award date is August 2020, with construction to be completed by December 2020. The bid was solicited by the Federal Highway Administration as a total small business set aside.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 08/12/20
1 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF20B000022
Division: Central Federal Lands
State: CA County: Mariposa
Federal Land: Yosemite National Park Opened at: Lakewood
Opened by: Jorey Deml
Date: 08/10/20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Genesis Design and Development, LLC $1,621,398.00 7033 Kalgan Rd NE Rio Rancho, NM 87144
Gustav Keoni DBA Precision Construction Services $2,768,947.23 3480 S Higuera St Suite 130 San Luis Obispo, CA 93401
LB CIVIL CONSTRUCTION, INC $2,900,410.00
11585 Sorrento Valley Blvd. #104 San Diego, CA 92121
T.L. Peterson, Inc. $3,982,560.00 21265 Rolling Oaks Dr.
Red Bluff, CA 96080
MX Construction $4,988,839.53 720 S Frontage Road, Suite 106 Nipomo, CA 93444
Engineer's Estimate $1,718,300.00
2 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Genesis Design and Development, LLC Lump Sum $150,000.00 Gustav Keoni DBA Precision Construction Services Lump Sum $272,024.74 LB CIVIL CONSTRUCTION, INC Lump Sum $203,000.00 T.L. Peterson, Inc. Lump Sum $550,000.00 MX Construction Lump Sum $1,105,370.01 Engineer's Estimate ALL LPSM Lump Sum $183,810.00
A0040 15205-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Genesis Design and Development, LLC Lump Sum $25,000.00 Gustav Keoni DBA Precision Construction Services Lump Sum $8,334.06 LB CIVIL CONSTRUCTION, INC Lump Sum $25,000.00 T.L. Peterson, Inc. Lump Sum $35,000.00 MX Construction Lump Sum $39,477.50 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0060 15214-2000 SURVEY AND STAKING, RETAINING WALL (SPECIAL ROCK EMBANKMENT)
Genesis Design and Development, LLC Lump Sum $25,000.00 Gustav Keoni DBA Precision Construction Services Lump Sum $22,941.47 LB CIVIL CONSTRUCTION, INC Lump Sum $30,000.00 T.L. Peterson, Inc. Lump Sum $20,000.00 MX Construction Lump Sum $45,117.14 Engineer's Estimate ALL LPSM Lump Sum $11,000.00
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Genesis Design and Development, LLC $7,500.00 $22,500.00 Gustav Keoni DBA Precision Construction Services $18,552.56 $55,657.68
LB CIVIL CONSTRUCTION, INC $10,000.00 $30,000.00
T.L. Peterson, Inc. $2,500.00 $7,500.00 MX Construction $6,541.99 $19,625.97 Engineer's Estimate 3 EACH $1,500.00 $4,500.00
A0100 15301-0000 CONTRACTOR QUALITY CONTROL
Genesis Design and Development, LLC Lump Sum $50,000.00 Gustav Keoni DBA Precision Construction Services Lump Sum $56,730.49 LB CIVIL CONSTRUCTION, INC Lump Sum $25,000.00 T.L. Peterson, Inc. Lump Sum $135,000.00 MX Construction Lump Sum $56,396.43 Engineer's Estimate ALL LPSM Lump Sum $46,000.00
3 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0120 15401-0000 CONTRACTOR TESTING
Genesis Design and Development, LLC Lump Sum $50,000.00 Gustav Keoni DBA Precision Construction Services Lump Sum $29,561.31 LB CIVIL CONSTRUCTION, INC Lump Sum $100,000.00 T.L. Peterson, Inc. Lump Sum $85,000.00 MX Construction Lump Sum $39,477.50 Engineer's Estimate ALL LPSM Lump Sum $46,000.00
A0140 15501-0000 CONSTRUCTION SCHEDULE
Genesis Design and Development, LLC Lump Sum $10,000.00 Gustav Keoni DBA Precision Construction Services Lump Sum $5,812.55 LB CIVIL CONSTRUCTION, INC Lump Sum $1,000.00 T.L. Peterson, Inc. Lump Sum $30,000.00 MX Construction Lump Sum $24,814.43 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Genesis Design and Development, LLC $10.00 $4,540.00 Gustav Keoni DBA Precision Construction Services $10.94 $4,966.76
LB CIVIL CONSTRUCTION, INC $15.00 $6,810.00
T.L. Peterson, Inc. $21.00 $9,534.00 MX Construction $56.49 $25,646.46 Engineer's Estimate 454 LNFT $11.50 $5,221.00
A0180 20103-0000 CLEARING AND GRUBBING
Genesis Design and Development, LLC $15.00 $30,000.00 Gustav Keoni DBA Precision Construction Services $31.57 $63,140.00
LB CIVIL CONSTRUCTION, INC $100.00 $200,000.00
T.L. Peterson, Inc. $50.00 $100,000.00 MX Construction $28.20 $56,400.00 Engineer's Estimate 2,000 SQYD $4.00 $8,000.00
A0200 20302-2100 REMOVAL OF PIPE CULVERT
Genesis Design and Development, LLC $250.00 $1,500.00 Gustav Keoni DBA Precision Construction Services $693.37 $4,160.22
LB CIVIL CONSTRUCTION, INC $600.00 $3,600.00
T.L. Peterson, Inc. $1,220.00 $7,320.00 MX Construction $1,466.31 $8,797.86 Engineer's Estimate 6 LNFT $300.00 $1,800.00
4 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 20401-0000 ROADWAY EXCAVATION
Genesis Design and Development, LLC $100.00 $380,000.00 Gustav Keoni DBA Precision Construction Services $319.08 $1,212,504.00
LB CIVIL CONSTRUCTION, INC $185.00 $703,000.00
T.L. Peterson, Inc. $385.00 $1,463,000.00 MX Construction $422.97 $1,607,286.00 Engineer's Estimate 3,800 CUYD $150.00 $570,000.00
A0240 20441-0000 WASTE
Genesis Design and Development, LLC $55.00 $55,000.00 Gustav Keoni DBA Precision Construction Services $33.53 $33,530.00
LB CIVIL CONSTRUCTION, INC $70.00 $70,000.00
T.L. Peterson, Inc. $150.00 $150,000.00 MX Construction $189.49 $189,490.00 Engineer's Estimate 1,000 CUYD $33.00 $33,000.00
A0260 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
Genesis Design and Development, LLC $600.00 $22,800.00 Gustav Keoni DBA Precision Construction Services $883.87 $33,587.06
LB CIVIL CONSTRUCTION, INC $1,300.00 $49,400.00
T.L. Peterson, Inc. $2,012.00 $76,456.00 MX Construction $1,127.93 $42,861.34 Engineer's Estimate 38 CUYD $410.00 $15,580.00
A0280 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
Genesis Design and Development, LLC $450.00 $220,500.00 Gustav Keoni DBA Precision Construction Services $199.39 $97,701.10
LB CIVIL CONSTRUCTION, INC $450.00 $220,500.00
T.L. Peterson, Inc. $320.00 $156,800.00 MX Construction $242.50 $118,825.00 Engineer's Estimate 490 CUYD $490.00 $240,100.00
A0300 26002-0000 ROCK DOWEL
Genesis Design and Development, LLC $340.00 $68,000.00 Gustav Keoni DBA Precision Construction Services $287.53 $57,506.00
LB CIVIL CONSTRUCTION, INC $900.00 $180,000.00
T.L. Peterson, Inc. $832.00 $166,400.00 MX Construction $355.30 $71,060.00 Engineer's Estimate 200 LNFT $650.00 $130,000.00
5 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0310 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
Genesis Design and Development, LLC $109.00 $2,398.00 Gustav Keoni DBA Precision Construction Services $2,273.75 $50,022.50
LB CIVIL CONSTRUCTION, INC $950.00 $20,900.00
T.L. Peterson, Inc. $275.00 $6,050.00 MX Construction $451.17 $9,925.74 Engineer's Estimate 22 SQYD $200.00 $4,400.00
A0320 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Genesis Design and Development, LLC $75.00 $22,350.00 Gustav Keoni DBA Precision Construction Services $44.13 $13,150.74
LB CIVIL CONSTRUCTION, INC $450.00 $134,100.00
T.L. Peterson, Inc. $285.00 $84,930.00 MX Construction $451.17 $134,448.66 Engineer's Estimate 298 SQYD $200.00 $59,600.00
A0340 60201-0600 18-INCH PIPE CULVERT
Genesis Design and Development, LLC $90.00 $720.00 Gustav Keoni DBA Precision Construction Services $6,324.45 $50,595.60
LB CIVIL CONSTRUCTION, INC $1,300.00 $10,400.00
T.L. Peterson, Inc. $1,000.00 $8,000.00 MX Construction $1,438.11 $11,504.88 Engineer's Estimate 8 LNFT $410.00 $3,280.00
A0360 60201-0800 24-INCH PIPE CULVERT
Genesis Design and Development, LLC $286.00 $45,760.00 Gustav Keoni DBA Precision Construction Services $455.58 $72,892.80
LB CIVIL CONSTRUCTION, INC $680.00 $108,800.00
T.L. Peterson, Inc. $680.00 $108,800.00 MX Construction $563.96 $90,233.60 Engineer's Estimate 160 LNFT $290.00 $46,400.00
A0380 60201-1000 36-INCH PIPE CULVERT
Genesis Design and Development, LLC $325.00 $16,250.00 Gustav Keoni DBA Precision Construction Services $848.14 $42,407.00
LB CIVIL CONSTRUCTION, INC $1,000.00 $50,000.00
T.L. Peterson, Inc. $1,100.00 $55,000.00 MX Construction $806.47 $40,323.50 Engineer's Estimate 50 LNFT $410.00 $20,500.00
6 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0400 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Genesis Design and Development, LLC $1,200.00 $1,200.00 Gustav Keoni DBA Precision Construction Services $1,246.57 $1,246.57
LB CIVIL CONSTRUCTION, INC $1,600.00 $1,600.00
T.L. Peterson, Inc. $9,500.00 $9,500.00 MX Construction $4,850.09 $4,850.09 Engineer's Estimate 1 EACH $900.00 $900.00
A0420 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
Genesis Design and Development, LLC $2,000.00 $2,000.00 Gustav Keoni DBA Precision Construction Services $3,306.88 $3,306.88
LB CIVIL CONSTRUCTION, INC $1,900.00 $1,900.00
T.L. Peterson, Inc. $12,750.00 $12,750.00 MX Construction $5,526.85 $5,526.85 Engineer's Estimate 1 EACH $1,400.00 $1,400.00
A0440 60404-1000 CATCH BASIN, FLH TYPE 1
Genesis Design and Development, LLC $7,500.00 $7,500.00 Gustav Keoni DBA Precision Construction Services $15,438.72 $15,438.72
LB CIVIL CONSTRUCTION, INC $20,000.00 $20,000.00
T.L. Peterson, Inc. $38,000.00 $38,000.00 MX Construction $22,558.57 $22,558.57 Engineer's Estimate 1 EACH $5,000.00 $5,000.00
A0460 60409-0000 INLET TOP, METAL FRAME AND GRATE
Genesis Design and Development, LLC $2,500.00 $2,500.00 Gustav Keoni DBA Precision Construction Services $1,448.15 $1,448.15
LB CIVIL CONSTRUCTION, INC $5,500.00 $5,500.00
T.L. Peterson, Inc. $12,000.00 $12,000.00 MX Construction $16,354.96 $16,354.96 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
A0480 60704-0000 CLEANING CULVERT IN PLACE
Genesis Design and Development, LLC $10,000.00 $10,000.00 Gustav Keoni DBA Precision Construction Services $10,095.02 $10,095.02
LB CIVIL CONSTRUCTION, INC $25,000.00 $25,000.00
T.L. Peterson, Inc. $4,000.00 $4,000.00 MX Construction $76,699.14 $76,699.14 Engineer's Estimate 1 EACH $2,600.00 $2,600.00
7 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
Genesis Design and Development, LLC $2,500.00 $2,500.00 Gustav Keoni DBA Precision Construction Services $15,197.05 $15,197.05
LB CIVIL CONSTRUCTION, INC $29,000.00 $29,000.00
T.L. Peterson, Inc. $50,000.00 $50,000.00 MX Construction $250,400.15 $250,400.15 Engineer's Estimate 1 EACH $18,000.00 $18,000.00
A0520 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
Genesis Design and Development, LLC $3,500.00 $3,500.00 Gustav Keoni DBA Precision Construction Services $17,020.70 $17,020.70
LB CIVIL CONSTRUCTION, INC $38,000.00 $38,000.00
T.L. Peterson, Inc. $50,000.00 $50,000.00 MX Construction $250,400.15 $250,400.15 Engineer's Estimate 1 EACH $25,000.00 $25,000.00
A0540 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Genesis Design and Development, LLC $275.00 $2,750.00 Gustav Keoni DBA Precision Construction Services $282.71 $2,827.10
LB CIVIL CONSTRUCTION, INC $225.00 $2,250.00
T.L. Peterson, Inc. $160.00 $1,600.00 MX Construction $314.69 $3,146.90 Engineer's Estimate 10 HOUR $180.00 $1,800.00
A0560 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
Genesis Design and Development, LLC $350.00 $3,500.00 Gustav Keoni DBA Precision Construction Services $244.99 $2,449.90
LB CIVIL CONSTRUCTION, INC $300.00 $3,000.00
T.L. Peterson, Inc. $300.00 $3,000.00 MX Construction $699.32 $6,993.20 Engineer's Estimate 10 HOUR $210.00 $2,100.00
A0580 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Genesis Design and Development, LLC $350.00 $3,500.00 Gustav Keoni DBA Precision Construction Services $273.31 $2,733.10
LB CIVIL CONSTRUCTION, INC $350.00 $3,500.00
T.L. Peterson, Inc. $210.00 $2,100.00 MX Construction $744.43 $7,444.30 Engineer's Estimate 10 HOUR $220.00 $2,200.00
8 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0600 62301-0000 GENERAL LABOR
Genesis Design and Development, LLC $90.00 $900.00 Gustav Keoni DBA Precision Construction Services $130.22 $1,302.20
LB CIVIL CONSTRUCTION, INC $150.00 $1,500.00
T.L. Peterson, Inc. $71.00 $710.00 MX Construction $180.47 $1,804.70 Engineer's Estimate 10 HOUR $90.00 $900.00
A0620 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Genesis Design and Development, LLC $150.00 $1,500.00 Gustav Keoni DBA Precision Construction Services $395.12 $3,951.20
LB CIVIL CONSTRUCTION, INC $650.00 $6,500.00
T.L. Peterson, Inc. $293.00 $2,930.00 MX Construction $428.61 $4,286.10 Engineer's Estimate 10 HOUR $280.00 $2,800.00
A0640 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
Genesis Design and Development, LLC $25.00 $15,250.00 Gustav Keoni DBA Precision Construction Services $91.89 $56,052.90
LB CIVIL CONSTRUCTION, INC $60.00 $36,600.00
T.L. Peterson, Inc. $21.00 $12,810.00 MX Construction $12.97 $7,911.70 Engineer's Estimate 610 SQYD $9.00 $5,490.00
A0660 62511-1000 SEEDING, DRY METHOD
Genesis Design and Development, LLC $2.00 $1,220.00 Gustav Keoni DBA Precision Construction Services $8.51 $5,191.10
LB CIVIL CONSTRUCTION, INC $15.00 $9,150.00
T.L. Peterson, Inc. $20.00 $12,200.00 MX Construction $12.97 $7,911.70 Engineer's Estimate 610 SQYD $5.00 $3,050.00
A0680 62516-1000 MULCHING, DRY METHOD
Genesis Design and Development, LLC $1.50 $915.00 Gustav Keoni DBA Precision Construction Services $10.94 $6,673.40
LB CIVIL CONSTRUCTION, INC $15.00 $9,150.00
T.L. Peterson, Inc. $20.00 $12,200.00 MX Construction $12.97 $7,911.70 Engineer's Estimate 610 SQYD $5.00 $3,050.00
9 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0700 63301-0000 SIGN SYSTEM
Genesis Design and Development, LLC $2,500.00 $5,000.00 Gustav Keoni DBA Precision Construction Services $4,254.57 $8,509.14
LB CIVIL CONSTRUCTION, INC $2,000.00 $4,000.00
T.L. Peterson, Inc. $940.00 $1,880.00 MX Construction $13,535.14 $27,070.28 Engineer's Estimate 2 EACH $550.00 $1,100.00
A0720 63308-2000 OBJECT MARKER, TYPE 2
Genesis Design and Development, LLC $150.00 $900.00 Gustav Keoni DBA Precision Construction Services $411.38 $2,468.28
LB CIVIL CONSTRUCTION, INC $450.00 $2,700.00
T.L. Peterson, Inc. $546.00 $3,276.00 MX Construction $197.39 $1,184.34 Engineer's Estimate 6 EACH $260.00 $1,560.00
A0740 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Genesis Design and Development, LLC $3.50 $4,270.00 Gustav Keoni DBA Precision Construction Services $5.38 $6,563.60
LB CIVIL CONSTRUCTION, INC $20.00 $24,400.00
T.L. Peterson, Inc. $6.50 $7,930.00 MX Construction $11.28 $13,761.60 Engineer's Estimate 1,220 LNFT $7.00 $8,540.00
A0760 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
Genesis Design and Development, LLC $50.00 $2,500.00 Gustav Keoni DBA Precision Construction Services $30.39 $1,519.50
LB CIVIL CONSTRUCTION, INC $70.00 $3,500.00
T.L. Peterson, Inc. $15.50 $775.00 MX Construction $140.99 $7,049.50 Engineer's Estimate 50 EACH $30.00 $1,500.00
A0780 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
Genesis Design and Development, LLC $200.00 $10,000.00 Gustav Keoni DBA Precision Construction Services $36.47 $1,823.50
LB CIVIL CONSTRUCTION, INC $170.00 $8,500.00
T.L. Peterson, Inc. $33.00 $1,650.00 MX Construction $281.98 $14,099.00 Engineer's Estimate 50 EACH $61.00 $3,050.00
10 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0800 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Genesis Design and Development, LLC $50.00 $100.00 Gustav Keoni DBA Precision Construction Services $4,802.27 $9,604.54
LB CIVIL CONSTRUCTION, INC $3,000.00 $6,000.00
T.L. Peterson, Inc. $3,750.00 $7,500.00 MX Construction $28,198.21 $56,396.42 Engineer's Estimate 2 EACH $6,500.00 $13,000.00
A0820 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Genesis Design and Development, LLC $100.00 $5,000.00 Gustav Keoni DBA Precision Construction Services $13.43 $671.50
LB CIVIL CONSTRUCTION, INC $100.00 $5,000.00
T.L. Peterson, Inc. $132.00 $6,600.00 MX Construction $140.99 $7,049.50 Engineer's Estimate 50 LNFT $40.00 $2,000.00
A0840 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
Genesis Design and Development, LLC $150.00 $27,000.00 Gustav Keoni DBA Precision Construction Services $109.96 $19,792.80
LB CIVIL CONSTRUCTION, INC $350.00 $63,000.00
T.L. Peterson, Inc. $125.00 $22,500.00 MX Construction $253.78 $45,680.40 Engineer's Estimate 180 LNFT $98.00 $17,640.00
A0860 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Genesis Design and Development, LLC $25.00 $2,575.00 Gustav Keoni DBA Precision Construction Services $3.78 $389.34
LB CIVIL CONSTRUCTION, INC $50.00 $5,150.00
T.L. Peterson, Inc. $53.00 $5,459.00 MX Construction $338.38 $34,853.14 Engineer's Estimate 103 SQFT $43.00 $4,429.00
A0880 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Genesis Design and Development, LLC $150.00 $96,000.00 Gustav Keoni DBA Precision Construction Services $193.00 $123,520.00
LB CIVIL CONSTRUCTION, INC $155.00 $99,200.00
T.L. Peterson, Inc. $90.00 $57,600.00 MX Construction $169.19 $108,281.60 Engineer's Estimate 640 HOUR $93.00 $59,520.00
11 out of 11
Project No: CA FTNP YOSE 14(7)
Project Name: Repairs on Wawona Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0900 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Genesis Design and Development, LLC $175.00 $28,000.00 Gustav Keoni DBA Precision Construction Services $145.13 $23,220.80
LB CIVIL CONSTRUCTION, INC $155.00 $24,800.00
T.L. Peterson, Inc. $100.00 $16,000.00 MX Construction $225.59 $36,094.40 Engineer's Estimate 160 HOUR $128.00 $20,480.00
A0920 63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Genesis Design and Development, LLC $7,500.00 $60,000.00 Gustav Keoni DBA Precision Construction Services $5,805.27 $46,442.16
LB CIVIL CONSTRUCTION, INC $6,500.00 $52,000.00
T.L. Peterson, Inc. $4,600.00 $36,800.00 MX Construction $11,279.29 $90,234.32 Engineer's Estimate 8 WEEK $4,000.00 $32,000.00
A0940 65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH
Genesis Design and Development, LLC $425.00 $119,000.00 Gustav Keoni DBA Precision Construction Services $686.65 $192,262.00
LB CIVIL CONSTRUCTION, INC $850.00 $238,000.00
T.L. Peterson, Inc. $1,200.00 $336,000.00 MX Construction $485.01 $135,802.80 Engineer's Estimate 280 SQYD $100.00 $28,000.00
Total Schedule - All Items
Genesis Design and Development, LLC $1,621,398.00 Gustav Keoni DBA Precision Construction Services $2,768,947.23
LB CIVIL CONSTRUCTION, INC $2,900,410.00
T.L. Peterson, Inc. $3,982,560.00 MX Construction $4,988,839.53 Engineer's Estimate $1,718,300.00
| 2020-08-17T16:09:37-0600 | |
| JOREY M DEML |
File details come from the government source that posted it. Updated .