Amend_A001_Attachments.pdf
PDF 1 MB Posted
- Attached to
- NM FLAP US60(1) Federal contract opportunity
- Solicitation number
- 6982AF18B000023
About this file
Amendment A001 E Section Special Contract Requirements (SCRs) and Plans page S9
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NM_FLAP_US60(1)_Bid_Tabulation_6982AF18B000023.pdf | ||
| Bid_Opening_Summary_8.8.18.pdf | ||
| Amendment_A002_final.pdf | ||
| QA_8.7.2018.pdf | ||
| SF30_Amend_A001_7_30_2018.pdf | ||
| NM_FLAP_US60(1)_CrossSections.pdf | ||
| NM_FLAP_US60(1)_Old_US60_Bridge_Final_Plan_set.pdf | ||
| ROW_CERT_FLAP_US60(1)_Old_US60_Bridge_Signed.pdf | ||
| NM_FLAP_US60(1)_-_UtilityDataQualityLevelCertification.pdf | ||
| 6982AF18B000023_Solicitation_NM_FLAP_US60(1).pdf | ||
| NM_FLAP_US60(1)_Utility_Certification_Signed.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-1
NM FLAP US60(1)
Old US 60 Bridge Amendment A001 / 7/30/2018
SPECIAL CONTRACT REQUIREMENTS
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges, on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.
Section 101. – TERMS, FORMAT, AND DEFINITIONS
101.03 Abbreviations.
(a) Acronyms. Add the following:
EEBACS — Engineer’s Estimating, Bidding, Award, and Construction System
GSA – General Services Administration
(b) US Customary abbreviations and symbols. Delete the text and add the following:
A — ampere electric current
ac. — acre area BTU — British Thermal Unit energy
cu. in. or in3 — cubic inches volume
cu. ft., cf, ft3 or CUFT — cubic feet volume
cu. yd., cy, yd3 or CUYD — cubic yards volume D — day time deg. or º — degree plane angle Fc — foot-candles luminous intensity
fl. oz. — fluid ounces volume
ft. or ' — foot or feet length gal. or GAL — gallon volume H — Henry inductance
hr. or HR — hour time Hz — hertz (s-1) frequency
in. or " inch or inches length K — kelvin temperature lb or LB, lbs — pound, pounds mass Lbf — pound-force force lnft or LNFT linear foot length
mi. — miles length min. or m — minute time min. or ' — minute plane angle
E-2
Old US 60 Bridge Amendment A001 / 7/30/2018
ºF — degrees Fahrenheit temperature
oz. — ounces mass Psi — pounds/square inch pressure Q — cubic feet/second flow rate sec. or s — second time sec. or " — second plane angle
sq. in. or in2 — square inches area
sq. ft., sf, ft2 or SQFT — square feet area
sq. yd., sy, yd2 or SQYD — square yards area T — short ton (2000 lbs) mass V — volt (W/A) electric potential W — watt (J/s) power YD — yard or yards length Ω — ohm V/A electric resistance
(c) Metric unit abbreviations and symbols. Delete the text and add the following:
A — ampere electric current Cd — candella luminous intensity oC — degree Celsius temperature D — day time deg. or º — degree plane angle g or gram — gram mass H — Henry inductance Ha — hectare area
hr. or HR — hour time Hz — hertz (s-1) frequency J — Joule (N.m) energy K — kelvin temperature Kg — kilogram mass L — liter volume Lx — lux illuminance M — meter length mm — millimeter length m2 — meter squared area m3 — cubic meter volume min. or m — minute time min. or ' — minute plane angle N — Newton (kg.m/s2) force Pa — Pascal (N/m2) pressure sec. or s — second time sec. or " — second plane angle Sta. — station Length
E-3
Old US 60 Bridge Amendment A001 / 7/30/2018
T — metric ton Mass V — volt (W/A) electric potential W — watt (J/s) Power Ω — ohm V/A electric resistance
101.04 Definitions.
Add the following:
EEBACS — Engineer’s Estimating, Bidding, Award, and Construction System. A web-based system used by the Government, Construction Contractors, and Subcontractors on this Government contract to prepare “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes and field measurement documentation).
Refuge – Sevilleta National Wildlife Refuge
Roadway Prism Delete the text and substitute the following:
Roadway Prism – The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance between the centroids (geometric center) of the area.
Subcontractor Delete the text and substitute the following:
Subcontractor – An individual or legal entity with which the Contractor sublets part of the work.
This includes subcontractors and material suppliers at any tier.
Section 105. — CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements. Add the following:
Materials containing petroleum-based solvents such as cutback asphalts and traffic paints may be restricted from use by local laws or ordinances in certain geographic areas. Upon presenting proof of such restrictions, alternate materials considered acceptable to the CO may be substituted for the materials specified in the contract.
Add the following:
Certify, according to Subsection 107.10 (d)(2), that sources of rock, sand, gravel, earth, subsoil, or other natural material imported into the project construction limits are noxious weed free.
E-4
Old US 60 Bridge Amendment A001 / 7/30/2018
105.02 Material Sources
(a) Government-provided sources. Add the following:
Material for use as unclassified borrow under Section 204 may be obtained from three potential sites on BLM land identified on map located in Appendix A or roadway obliteration locations identified in the plans. Material will be tested to meet requirements in Subsection 704.06 before use. If roadway obliteration material is used as unclassified borrow, then this material will be buried at least 12 inches beneath exposed finished slopes.
105.04 Storing and Handling Material. Add the following after the third sentence of the second paragraph:
For Contractor-located, non-commercial staging, storing, and material handling areas, secure environmental clearances according to Subsection 107.10.
Add the following:
The Contractor may use any suitable area outside the active channel within Project Boundary Limits as identified on the site map of the plans for staging, storage, and stockpile areas.
Configure staging, storage, or stockpile areas to allow continuous access of the existing road and bridge for public traffic use. The active channel is defined as all area below elevation 4730 feet.
Section 106. — ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements. Delete (a) and (b) and substitute the following:
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method
(2) Number of samples
(3) Sample transport
(4) Test procedures
(5) Testing laboratories
(6) Reporting
(7) Estimated time and costs
(8) Validation process
E-5
Old US 60 Bridge Amendment A001 / 7/30/2018
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
Add the following after (b):
The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.
Where sample/testing procedures make reference to AASHTO, ASTM, or other standards (designated as FLH T), the procedure as modified in the Materials Manual shall govern. Where the specifications make reference to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” shall be the procedure followed.
Where the specifications make reference to AASHTO Test T310, “Direct Transmission Method of In-Place Nuclear Density and Moisture Content” shall be the procedure followed.
106.02 Visual Inspection. Delete the Subsection and substitute the following:
106.02 Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract requirements. In the absence of specific contract requirements or tolerances, use prevailing industry standards.
106.03 Certification. Add the following after the second paragraph:
See Table 106-3 for schedule for full or partial acceptance by material certification. Submit certification and sample of material for testing as required.
Delete the third bullet of the third paragraph and substitute the following:
Check certifications before incorporating the material into the work to ensure that the requirements of the contract have been met. Mark the certifications with the following information:
• Project number and name;
• Pay item number and description;
E-6
Old US 60 Bridge Amendment A001 / 7/30/2018
• Contractor signed certification stating “to the best of our knowledge the materials certified by the attached certification represent the materials incorporated into the work of this contract”; and
• Date.
Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification. Add Table 106-3 following Table 106-2.
Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification
Section Description Material Material Property Or Specification
Frequency Certification Sample
302 Minor Crushed Aggregate Crushed Aggregate Source, Quality and Gradation 1 per source 1 per source
312 Dust Palliative
Calcium Chloride Magnesium Chloride, Lignosulfonate, As specified 1 per shipment First shipment
403 Asphalt Concrete Aggregate Asphalt Mix
Source quality, Gradation, Stability, and Grade
1 per mix 1 per source
634 and
Permanent Pavement Markings, Temporary Traffic Control
634.02 as applicable, 635 as applicable As specified 1 per source -----
701 Hydraulic Cement
Portland Cement, Blended Hydraulic Cement, Masonry and Mortar Cement
AASHTO M 85, M
240, ASTM C 91 and ASTM C1392 as applicable
1 per shipment 1 per 100 tons
702.01 Asphalt Material Asphalt Cement
AASHTO M 226
or M 320, as applicable
1 per shipment 1 per shipment
702.02 Asphalt Material Emulsified Asphalt
AASHTO M 140
or
M 208 as applicable
1 per shipment 1 per shipment
702.03 Asphalt Material
Asphalt Materials used for Damproofing and Waterproofing
Concrete and Masonry Surfaces
As specified for each type of asphalt material 1 per shipment -----
702.05 Antistrip As specified As applicable 1 per shipment -----
706 Concrete and Plastic Pipe As specified As applicable 1 per shipment -----
707 Metal Pipe As specified As applicable 1 per shipment -----
E-7
Old US 60 Bridge Amendment A001 / 7/30/2018
Section Description Material Material Property Or Specification
Frequency Certification Sample
708 Plastic Pipe As specified As applicable 1 per shipment -----
709 Reinforcing and Prestressing Steel As specified As applicable 1 per shipment
For 709.01 submit 3, 1-yard (1-meter) bars of each size and grade of bar furnished.
709.02 submit
6-foot (2-meter) length for each size furnished
710 Fence and Guardrail As specified As applicable 1 per shipment -----
Concrete Curing
Material and Admixtures
As specified As applicable 1 per material source per material type
712 Joint Material (all) As specified As applicable 1 per shipment -----
Roadside
Improvement Materials (all)
As specified As applicable 1 per shipment -----
714 Geosynthetic Material (all) As specified As applicable 1 per shipment 1 per project per type 715 Piling As specified As applicable 1 per shipment -----
716 Material for Timber Structures
Timber and Hardware As applicable 1 per shipment -----
717 Structural Metal As specified As applicable 1 per shipment
717.01(e) minimum
6 per shipment for each size used.
717.10
1 per project
Traffic Signing and Marking Material (all)
As specified As applicable 1 per shipment -----
719 Paint As specified As applicable 1 per batch\lot
1 sample for quantities
> 25 gallons (100L)
Structural Wall and Stabilized Embankment Material (all)
As specified As applicable 1 per shipment per material type
E-8
Old US 60 Bridge Amendment A001 / 7/30/2018
Section Description Material Material Property Or Specification
Frequency Certification Sample
Electrical and Illumination Material (all)
As specified As applicable 1 per shipment per material type
722 Anchor Material As specified As applicable 1 per shipment per material type
725 Miscellaneous materials As specified As applicable
1 per shipment per material type
Section 107. - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed. Add the following:
Section 401 and 404 of the Clean Water Act.
Comply with the terms and conditions of any permits that are issued for the performance of work within the jurisdictional waters of the U.S., including Section 404 permits and Section 401water quality certifications.
Notify New Mexico Environment Department (NMED) at least five days before starting construction to allow time to schedule monitoring or inspections. Immediately notify NMED if the project results in an exceedance of applicable water quality standards.
National Pollutant Discharge Elimination System (NPDES) in New Mexico
Comply with the requirements of the EPA NPDES Construction General Permit (CGP) NMR100000 for erosion and sediment control due to storm water runoff. A copy of the 2017 permit is located at:
https://www.epa.gov/npdes/epas-2017-construction-general-permit-cgp-and-related-documents
This permit is scheduled to expire on 02/16/2022. Amend the SWPPP and site plan when the new permit goes into effect to meet new permit conditions.
(a) General. Designate a qualified Erosion Control Supervisor according to Subsection 157.03.
Obtain a separate NPDES permit associated with industrial activity for any mobile asphalt and concrete plants that provide material for the project. Provide a copy of the permit and acknowledgement letter to the CO for their records.
(b) Preparation of the Storm Water Pollution Prevention Plan (SWPPP). The Government has prepared a preliminary SWPPP. Update the preliminary SWPPP and site plans for the project or develop a new SWPPP and provide to the CO for review. When the SWPPP is https://www.epa.gov/npdes/epas-2017-construction-general-permit-cgp-and-related-documents
E-9
Old US 60 Bridge Amendment A001 / 7/30/2018 accepted by the CO and signed by both the CO and the Contractor, it will be the document in force on the project. Implement the SWPPP as required throughout the construction period.
Modify the erosion control details and layout sheets included in the plans, as necessary, to accommodate project site conditions and proposed construction operations and include them in the SWPPP.
(c) Notice of Intent (NOI). All operators are required to submit a notice of intent at least 14 days prior to start of earth disturbance. Provide a copy of the contractor’s NOI and confirmation letter to the CO. The Government will also file a NOI and provide that information to the Contractor for inclusion in the SWPPP. Do not perform any ground disturbing activities including clearing, grubbing, or earthwork until an acknowledgement letter is received from the EPA and the SWPPP has been approved and implemented.
Post all project authorization numbers and other requirements at a location accessible to the public according to Section 1.5 of the CGP.
(d) Inspections and Revisions to the SWPPP. Perform inspections as required in the CGP.
Document inspections and retain records in the SWPPP. Update the SWPPP and ensure that all procedures, practices, and inspections are current.
Place the SWPPP and all updates in a three-ring binder so that completed inspection forms and other records may be inserted. Make the SWPPP available for public inspection and for use by the CO.
Revisions to the SWPPP may be necessary during construction to make improvements or to respond to unforeseen conditions noted during construction or site inspections. For that purpose, specify in the SWPPP the mechanism whereby revisions may be proposed by the Contractor or the CO and incorporated into the plan, including review and approval of minor changes. Jointly approve and sign each revision to the SWPPP. Implement approved changes according to the
CGP.
(e) Notice of Termination (NOT). File a NOT when the conditions listed in the CGP have been met or transfer the permit to FHWA when project has reached final acceptance.
At the completion of the project, provide the CO with the complete SWPPP, including inspection forms, logs, and all other required documentation added during the project.
107.02 Protection and Restoration of Property and Landscape
Add the following at the end of this subsection:
The locations of the utilities shown in the plans have been certified to a Quality Level C, with spot locations certified to a Quality Level C according to the CFLHD Utility Data Quality Certification requirements:
http://flh.fhwa.dot.gov/resources/row/cfl/documents/UtilityDataQualityLevelCertification.doc http://flh.fhwa.dot.gov/resources/row/cfl/documents/UtilityDataQualityLevelCertification.doc
E-10
107.05 Responsibility for Damage Claims. Add the following after the first sentence of the third paragraph:
Certify that policies will not be changed or canceled until 30 days written notice has been given to the Government.
107.10 Environmental Protection.
(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq. Add the following:
(4) Do not ford running streams with construction equipment. Obtain approval from the CO to use temporary bridges or other structures whenever crossings are necessary.
(5) Immediately clear ephemeral drainages, intermittent and perennial streams, lakes and reservoirs of all work items, debris or other obstructions placed by or resulting from construction operations.
(6) Locate machinery servicing and refueling areas away from streambeds and washes to reduce the possibility and minimize the impacts of accidental spills or discharges.
(7) Do not store fuel, oil, hydraulic fluid, lubricants, or other petrochemicals within project limits. Refuel equipment at least 100 feet from surface water.
(b) Oil and hazardous substances. Add the following to the end of the third paragraph:
Sand or soils are not approved absorbent materials.
Use drip pans or absorbent pads for petroleum product transfers, loading, unloading, and other oil handling activities to minimize potential spills.
Add the following to the end of the fourth paragraph:
Report the spill to the appropriate federal, state, and local authorities as required by the SPCC plan or hazardous spill plan.
(c) Vehicles and equipment. Add the following:
All vehicles and equipment entering the project area must be clean of noxious weeds and free from oil leaks and are subject to inspection. Wash all construction equipment to thoroughly remove all dirt, plant, and other foreign material prior to entering the project. Particular attention must be shown to the under carriage and any surface where soil containing exotic seeds may exist. Allow the CO to inspect each piece of equipment before entering the project. Provide the cleaning and inspection records to the CO. Equipment found operating on the project that has not been inspected, or has oil leaks will be shut down and subject to citation.
E-11
(d) Clearances for Contractor-selected, noncommercial areas. Add the following to the end of the first paragraph:
Do not import into the project limits rock, sand, gravel, earth, subsoil, or other natural materials from a Contractor-selected non-commercial materials source, that have not been certified free of noxious weeds. Materials imported into the project limits which do not include a noxious weed free certification may be rejected and ordered by the CO to be removed from the project limits. The CO has the discretion of requesting inspection of certified materials by a third party, and rejecting the use of the source if noxious weeds or seeds thereof are found to be present.
Add the following:
(5) Any required Certifications.
107.11 Protection of Forests, Parks, and Public Lands. Add the following:
A fire prevention plan involving emergency curtailment of operations is included in the Appendix and is in effect on this project. The CO will order the suspension of burning and other operations when directed to do so. No adjustment in the contract completion date will be made for partial or total suspensions of burning operations.
Section 108. — PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work. Add the following:
Limit operations as follows:
(a) Maintain access of the existing road and bridge to public traffic during construction of the new US60 Bridge.
(b) All construction equipment crossing the existing bridge must meet existing bridge restrictions including maximum vertical clearance of 14 feet; maximum horizontal width of 10 feet; and maximum weight of 10 tons.
(c) Remove stream diversion by July 24, 2019. See Section 650 for construction requirements for the stream diversion.
(d) Perform all clearing of vegetation activities between September 1 and April 14.
Perform no work except to maintain traffic control devices, erosion control devices, the roadway driving surface, and to control dust during the listed Federal holidays and surrounding days as shown in Table 108-2.
E-12
Table 108-2 Federal Holidays and Surrounding Days
Federal Holiday Time Remarks
Memorial Day 12:00 Noon Friday to 6:00 am Tuesday -
Independence Day
12:00 Noon July 3 to 6:00 am July 5
If July 4 falls on a weekend, Friday, or Monday, do not work the weekend.
Labor Day 12:00 Noon Friday to 6:00 am Tuesday -
Thanksgiving 12:00 Noon
Wednesday to 6:00 am Monday
Christmas / New Year’s
12:00 Noon December 23 to
6:00 am January 2
If December 23 or January 1 falls on a Monday, do not work the adjacent weekend and do not work on December 23. If January 1 falls on a Friday, do not work the weekend.
Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Provide at least 2 weeks notice before changing the scheduled days off.
Exemptions to scheduled days off may be granted by written approval from the CO for specific project operations and/or for periods of limited duration.
Add the following:
A Notice to Proceed must be issued before commencement of any work. The contract completion date is April 23, 2019.
Add the following:
Use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes and field measurement documentation).
Attend a training session on the use of EEBACS. The training session will require up to 4 hours.
No more than 3 Contractor staff may attend the training unless the CO approves in advance attendance by more than 3 Contractor staff. The Contractor is responsible for training additional staff.
E-13
Old US 60 Bridge Amendment A001 / 7/30/2018
Complete and electronically submit “EEBACS User Account Form” (Form EEBACS-001) for each Contractor staff requiring EEBACS access. Submit forms to the CO at least 10 days prior to the EEBACS training. As needed, request additional system access using Form EEBACS-001 and allow 7 days for system access.
Maintain active EEBACS accounts for all Contractor staff using EEBACS and notify the CO within 24 hours after an account holder is reassigned to a position not needing EEBACS system access or no longer employed by the Contractor. Within 24 hours after an account holder no longer needs EEBACS system access, submit an EEBACS-001 form requesting the account be disabled.
The electronic version of EEBACS-001 is available at:
http://flh.fhwa.dot.gov/resources/pse/estimate/accounts.htm
108.02 Subcontracting. Delete the third paragraph and substitute the following:
Within 14 days of subcontract award, submit a completed SF 1413 and 1413S. Complete Part I for each Subcontractor, and include Part II when the Subcontractor performs on-site work.
Complete other forms that may be required by the Government to show the work subcontracted and the total dollar amount of the subcontract. Submit the above required information for each Subcontractor at lower tiers.
Section 109. — MEASUREMENT AND PAYMENT
109.01 Measurement of Work. Add the following after the sixth paragraph:
Prepare, sign, and submit electronic measurement notes (pay notes and supporting field documentation) using EEBACS. Measurement notes will be reviewed by the CO. Unacceptable measurement notes will be electronically rejected and returned. Correct rejected measurement notes and resubmit electronically.
109.02 Measurement Terms and Definitions.
(o) Square foot and Square yard (Square meter). Add the following: Do not measure overlaps.
109.08 Progress Payments.
(b) Closing date and invoice submittal date. Delete the text and substitute the following:
Submit invoices to the designated billing office by the 7th day after the closing date. Invoices received by the designated billing office after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following months invoice.
http://flh.fhwa.dot.gov/resources/pse/estimate/accounts.htm
E-14
Old US 60 Bridge Amendment A001 / 7/30/2018
(d) Government’s receiving report. Delete the first sentence and substitute the following:
The Government’s receiving report will be developed using the measurements and quantities from Pay Notes received by the CO in EEBACS and determined acceptable.
(e) Processing progress payment requests.
(1) Proper invoices. Delete the title and text and substitute the following:
(1) Invoices received by the 7th day following the closing date.
(a) Proper invoices. If the invoice meets the requirements of Subsection 109.08(c), and the quantities and unit prices shown on the Contractor's invoice agree with the corresponding quantities and unit prices shown on the Government's receiving report, the invoice will be paid.
(b) Defective invoices. If the invoice does not meet the requirements of Subsection 109.08(c), or if any of the quantities or unit prices shown on the Contractor's invoice exceed the corresponding quantities and unit prices shown on the Government's receiving report, the invoice will be deemed defective and the Contractor so notified according to FAR Clause 52.232-27(a)(2). Defective invoices will not be corrected by the Government and will be returned to the Contractor within 7 days after the Government's designated billing office receives the invoice.
Revise and resubmit returned invoices by the 18th day following the closing date. The CO will evaluate the revised invoice. If the invoice still does not meet the requirements of Subsection 109.08(c), the Contractor will be so notified according to FAR Clause 52.232- 27(a)(2), and no progress payment will be made that month. Correct the deficiencies and resubmit the invoice the following month.
If the revised invoice meets the requirements of Subsection 109.08(c), but still had quantities or unit prices exceeding the corresponding quantities and unit prices shown on the Government's receiving report, the Government's data for that item or work will be used.
The Contractor's invoice, as revised by the Government's receiving report, will be forwarded for processing by the 23rd day following the closing date. The Contractor will be notified by the 23rd day following the closing date of the reasons for any changes to the invoice.
(2) Defective invoices. Delete the title and text and substitute the following:
(2) Invoices received between the 8th and 16th day following the closing date.
(a) Proper invoices. If the invoice meets the requirements of Subsection 109.08(c), and the quantities and unit prices shown on the Contractor's invoice agree with the corresponding quantities and unit prices shown on the CO's receiving report, the invoice will be deemed proper and forwarded for processing within 7 days of receipt.
(b) Defective invoices. If the invoice does not meet the requirements of Subsection 109.08(c), the invoice will be deemed defective, the Contractor so notified according to
E-15
Old US 60 Bridge Amendment A001 / 7/30/2018
FAR Clause 52.232-27(a)(2), and no progress payment will be made that month. Correct the deficiencies and resubmit the invoice the following month.
If the invoice meets the requirements of Subsection 109.08(c), but has quantities or unit prices exceeding the corresponding quantities and unit prices shown on the Government's receiving report, the Government's data for that item of work will be used. The Contractor's invoice, as revised by the Government's receiving report, will be forwarded for processing within 7 days of the Government's receipt of the invoice. The Contractor will be notified of the reasons for any changes to the invoice.
(f) Partial payments. Delete the subsection and substitute the following:
(f) Partial payments. Progress payments may include partial payment for material to be incorporated in the work according to FAR Clause 52.232-5(b)(2), provided the material meets the requirements of the contract and is delivered on, or in the vicinity of, the project site or stored in acceptable storage places.
Partial payments for stockpiled manufactured material (aggregates) will be based on Contractor process control test results. If test results show the material to be out-of-specification, or in “reject” where statistical evaluation procedures are used, no payment for stockpiled materials will be made.
Partial payment for material does not constitute acceptance of such material for use in completing items of work. Partial payments will not be made for living or perishable material until incorporated into the project.
Individual and cumulative partial payments for preparatory work and material will not exceed the lesser of:
(1) 80 percent of the contract bid price for the item; or
(2) 100 percent of amount supported by copies of invoices submitted.
The quantity paid will not exceed the corresponding quantity estimated in the contract. The CO may adjust partial payments as necessary to protect the Government.
Section 152. — CONSTRUCTION SURVEY AND STAKING
Construction Requirements
152.04 General. Add the following to the second paragraph:
The Government will establish basic survey control points for vertical and horizontal control of the project.
E-16
Old US 60 Bridge Amendment A001 / 7/30/2018
The Government will furnish the following:
(1) 3D coordinates and offset distance from centerline for subgrade and surface course finishing stakes at 50-foot (20-meter) intervals and miscellaneous intermediate stations.
(2) Slope stake data containing centerline grade and slope staking information at 50-foot (20-meter) station intervals and miscellaneous intermediate stations.
(3) Computer listings containing: horizontal alignment, vertical alignment, earthwork quantities, and staking details showing superelevation template data and slope information.
(4) Digital terrain model of existing ground.
(5) Digital terrain model of proposed design.
Delete the last sentence of the fourth paragraph from the bottom of the subsection and substitute the following:
Reestablish missing control points and stakes before slope staking begins.
152.05 Survey and Staking Requirements.
(f) Grade-finishing stakes. Delete paragraph (1) AMG method.
(g) Culverts. Delete the first paragraph and substitute the following:
Field verify the location of each individual culvert for the roadway diversion with the CO prior to surveying, designing, and staking culverts. Perform the following at each proposed culvert location:
(4) Delete the first paragraph and substitute the following:
Plot the centerline of the proposed culvert at a clear and readable scale. Show the natural ground, the flow line, the roadway section, and the culvert including end treatments and other appurtenances. Provide the elevations, grade, culvert length, degree of elbow, catch points, and hinge points on the plot.
152.05 Survey and Staking Requirements.
(f) Grade-finishing stakes. Delete paragraph (1) AMG method.
E-17
Old US 60 Bridge Amendment A001 / 7/30/2018
Measurement
152.07 Add the following to the third paragraph:
Reestablishing missing control points and stakes will be measured under Special labor, hired survey services when it is paid by the hour.
Delete the fourth paragraph and substitute the following:
Do not measure miscellaneous survey and staking.
152.07 Add the following:
Survey and culvert plotting required under 152.05(g)(1) through (4) will be measured under Special labor, Hired survey services when it is paid by the hour.
Section 153. — CONTRACTOR QUALITY CONTROL
Description
153.01 Add the following:
This work also consists of using EEBACS to prepare electronic “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes), including entering labor, equipment, subcontractors, and inspection records into the system.
Construction Requirements
153.02 Qualifications.
(a)(1) Full-time, on-site QCM. Delete subsections (a) and (b) and substitute the following:
(a) Four years of experience managing quality control on highway construction projects of similar type and scope, and
(b) National Institute for Certification in Engineering Technologies (NICET) Level III certification, or equivalent, in highway construction or highway material.
(a)(2) Part-time, on-site QCM. Delete the paragraph and substitute the following:
Furnish a QCM who has at least two years of experience in highway construction, inspection, quality control, material testing, and (NICET) Level III certification, or equivalent, in highway construction or highway material.
E-18
Old US 60 Bridge Amendment A001 / 7/30/2018
153.03 Quality Control Plan (QCP).
(b) Quality control procedures
(2) Add the following: List the material to be tested by pay item, tests to be conducted, the location of sampling, and the frequency of testing.
Add the following:
(d) Subcontractors and suppliers. Include the work of all subcontractors. If a subcontractor is to perform work under this Section, explain how the subcontractor’s inspection plan will interface with the Prime Contractor first tier subcontractors and lower tier subcontractors and organizations, and the CO. Include the work of major suppliers and suppliers of structural and geotechnical services and materials.
Add the following:
Modifications or additions may be required to any part of the plan that is not adequately covered.
Acceptance of the quality control plan will be based on the inclusion of the required information.
Acceptance does not imply any warranty by the Government that the plan will result in consistent contract compliance. It remains the responsibility of the Contractor to demonstrate such compliance.
153.04 Prosecution of Work. Delete the sentence and substitute the following:
Address each of the subjects shown for each phase of construction:
(a) Preparatory phase.
(1) Delete the paragraph and substitute the following:
In a preparatory phase meeting, review the contract requirements for the work; the process for constructing the work; and the plan for inspecting, testing, measuring, and reporting the work. Include the project superintendent, the quality control supervisor (QCS), the foreman for the work to be performed, and the CO in the meeting.
Schedule and conduct a preparatory meeting for each type of work to be performed at least one week prior to beginning the work.
(b) Start-up phase.
(1) Delete the paragraph and substitute the following:
In a start-up phase meeting, review the contract requirements and the processes for constructing the work with the personnel who will be performing the work. Invite the CO, project superintendent, QCS, testers, and inspectors of the work being performed, and the personnel directly supervising and performing the work. Review the planned testing, inspection, and reporting requirements with the quality control personnel responsible for the testing and inspection. Explain the reporting procedures
E-19
Old US 60 Bridge Amendment A001 / 7/30/2018 to be used when defective work is identified. Conduct a start-up meeting for each type of work to be performed upon beginning the work.
(c) Production phase. Add the following:
(4) Provide feedback on processes and deficiencies. Identify root causes of deficiencies, and make timely and effective changes to work processes to prevent repeated deficiencies.
153.05 Sampling and Testing. Delete the text and substitute the following:
153.05 Sampling and Testing.
Perform sampling and testing required by the accepted QCP. As a minimum perform process control testing according to the Sampling, Testing and Acceptance Requirements tables at the end of each Section where applicable. Where no minimums are specified, submit proposed tests to be performed and the proposed sampling and testing frequencies.
(a) Sample Splitting. Schedules and times or locations for obtaining on-site split samples for Government use will be provided by the CO using a procedure for random sampling.
Sample any material that appears defective or inconsistent with similar material being produced, unless such material is voluntarily removed and replaced or otherwise corrected according to Subsection 106.01
(b) Testing. Furnish a laboratory equipped with all test equipment necessary to satisfy the requirements of the contract. Ensure test equipment has been checked, calibrated, standardized and/or otherwise verified in accordance with AASHTO and ASTM standards by an individual qualified to perform the work. Perform an equipment inspection after the laboratory has been moved to its permanent location on the project site, and anytime it is moved thereafter. Inspect equipment within 45 days of actual use for project testing, and at least once a year thereafter. Do not use equipment that has not been inspected or is found to be deficient. Mark deficient equipment and take it out-of-service until repaired or replaced and shown by subsequent inspection to perform as required. Maintain records documenting laboratory equipment inspections. Provide certification(s) stating the equipment conforms to testing requirements and provide evidence of current inspection. Keep laboratory facilities clean and maintain equipment in proper working condition. Allow the CO unrestricted access to the laboratory for inspection and review.
The CO may require a demonstration of proficiency in sampling and testing capabilities.
One or more proficiency samples may be provided by the Government to verify basic qualifications. Provide the results of the proficiency samples to the CO within 48 hours of receipt of the material.
E-20
Old US 60 Bridge Amendment A001 / 7/30/2018
153.06 Certifications. Delete the text and substitute the following:
For materials or work accepted by certification according to Subsection 106.03, review all certifications to insure compliance with the requirements of the contract prior to incorporating materials into the work and provide a signed copy of the reviewed certification(s) to the CO.
According to FAR Subpart 46.407, materials or work without proper certification will be rejected in writing, and payment for such material or work will be withheld until proper certification has been provided to the CO.
153.07 Records and Control Charts. Delete the first sentence and substitute the following:
Maintain complete testing and inspection records by pay item number and make them accessible to the CO.
(a) Quality control and construction operations reports. Delete the text and substitute the following:
For each day of work, prepare an "Inspector's Daily Record of Construction Operations" (Contractors Daily Reports (CDR)) using EEBACS.
Enter in EEBACS initial data for Labor/Equipment and Subcontractors prior beginning any work. Maintain and update the Labor/Equipment and Subcontractors data to reflect ongoing changes as they occur. Report operations or items of work separately, with manpower and equipment assigned to each operation separately. Detail inspection results, including deficiencies observed and corrective actions taken. Complete a CDR for each contractor and subcontractor working that day.
When submitting test results on material being incorporated into the work, report test results within the reporting times indicated in the sampling and testing requirements at the end of each section or as specified in the contract.
Enter the following data into EEBACS:
(1) Subcontractors data.
(2) Labor/Equipment.
(a) All manpower and equipment, including contractor and subcontractors. Complete all data fields.
(b) Labor: Type/classification, move-in date, move-out date, hourly rate, the contractor or subcontractor, and name.
(c) Equipment: Type/classification, move-in date, move-out date, make, model, and year of equipment manufacture.
Certify all CDR’s using the following statement:
E-21
Old US 60 Bridge Amendment A001 / 7/30/2018
“It is hereby certified that the information contained in this record is accurate and that all work documented herein complies with the requirements of the contract. Any exceptions to this certification are documented as part of this record.”
Submit certified CDR’s that have been signed by a person who has both responsibility for the inspection system and signature authority.
Submit the record and certification within 24 hours of the work being performed. If the CDR is incomplete, in error, or otherwise misleading, the CDR will be rejected and returned within EEBACS with corrections noted. Correct rejected CDRs and resubmit the revised CDR within 24 hours. When chronic errors or omissions occur, correct the procedures by which the records are produced.
153.08 Acceptance. Add the following:
Performance of the work may be stopped according to Subsection 108.05, either in whole or in part, for failure to comply with the requirements of this Section. The Government may charge to the Contractor the cost of any additional inspections required when the work being inspected is found not to comply with contract requirements during the initial inspection. Work stop orders, due to recurring deficiencies of work required by this Section, will be rescinded after the Contractor demonstrates to the CO that changes were made to the quality control plan and system which resulted in the correction of those deficiencies. There will be no adjustment in the contract time, or payments to the Contractor for any impacts, delays or other costs due to any periods of work stoppage resulting from failure to comply with the requirements of this Section.
EEBACS electronic documentation will be evaluated under Subsection 106.02.
153.09 Measurement and Payment. Delete the text and substitute the following:
Measurement
153.09 Measure contractor quality control according to Subsection 109.02.
Do not measure EEBACS electronic documentation for payment.
Payment
153.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 153 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for Contractor quality control will be paid as follows:
(1) 25 percent of the item amount, not to exceed 0.5 percent of the original contract amount, will be paid after the contractor quality control plan is accepted; all testing facilities are in place; qualified quality control supervisor, inspection, and sampling and
E-22
Old US 60 Bridge Amendment A001 / 7/30/2018 testing personnel are in position to provide quality control activities; and the work being inspected or tested has started.
(2) 65 percent of the total lump sum will be prorated for payment based on the completed portion of the total work not including the original 25 percent completed under (1) above.
(3) Payment of the remaining 10 percent of the lump sum will be paid when all inspections, test results, submittals, and reports are complete and accepted.
Section 154. — CONTRACTOR SAMPLING AND TESTING
Construction Requirements
154.03 Sampling. Add the following:
Perform the initial curing of all concrete test cylinders. Provide packaged verification cylinders ready for shipping to the CO for transport for transporting the government verification cylinders to the FHWA-Central Federal Lands Highway’s Laboratory unless other testing facilities are authorized by the CO.
Label each concrete mold with the name and number of the Project, the cylinder number, date molded, location of the sample, and the test age (i.e. – 7, 14, or 28 days). Label the mold after casting and the cylinder after stripping to ensure the sample can be identified throughout the entire curing process.
Provide the required cylinder molds.
154.04 Testing Add the following:
Where Process Control Sampling and Testing frequencies are identical to the Sampling, Testing, and Acceptance Tables at the end of each Section for all applicable work, the Process Control Samples may be used for acceptance.
154.04B Field Laboratory (Contractor-Furnished). Furnish a laboratory equipped with all test equipment necessary to satisfy the requirements of the contract.
The sampling and testing services of a commercial laboratory meeting or exceeding the requirements described herein may be used if all contract sampling and testing requirements are satisfied by the use of the commercial facility.
Ensure test equipment has been checked, calibrated, standardized and/or otherwise verified in accordance with AASHTO and ASTM standards by an individual qualified to do this work.
Ensure mobile laboratories receive an equipment inspection after the laboratory has been moved to its permanent location on the project site and anytime it is moved thereafter. Inspect
E-23
Old US 60 Bridge Amendment A001 / 7/30/2018 equipment within 45 days of actual use in project testing and at least once a year thereafter. Do not use equipment that has not been inspected or is found to be deficient. Mark deficient equipment and it take out-of-service until it is repaired or replaced and shown by subsequent inspection to perform as required. Maintain records documenting these inspections in the laboratory. Provide certification(s) stating the equipment conforms to testing requirements and provide evidence of current inspection.
The CO may require the Contractor to perform testing to demonstrate acceptable equipment and an acceptable level of technician competence. The CO may also check equipment and inspection records to verify condition. Repair or replace equipment not meeting applicable requirements.
Keep laboratory facilities clean and maintain equipment in proper working condition. Provide the CO unrestricted access to the laboratory for inspection and review.
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
Construction Requirements
155.05 Initial and Baseline Construction Schedule.
(f) Submission and approval. Add the following to the end of the second paragraph:
No progress payments will be made until an initial construction schedule is approved by the CO.
155.06 Baseline Schedule Updates. Delete the second paragraph and substitute the following:
Unless previously approved by the CO, changes to the construction schedule for the work that is still to be completed, can only be changed with a Time Impact Analysis according to Subsection 108.03, and a Baseline Construction Schedule revision according to Subsection 155.07. Receipt of a baseline construction schedule update with negative float does not constitute agreement by the Government of the revised completion date.
Add the following:
(f) Working Schedule. At each construction progress meeting, provide the CO with a written summary detailing the work completed in the previous week and the proposed work activities for the following two weeks. Provide detail of proposed operations that will affect traffic flow, residents and businesses adjacent to the project. Provide the CO with a schedule revision if the written summary significantly differs from the baseline construction schedule or the latest construction schedule revision.
155.07 Baseline Schedule Revision. Delete the first paragraph and substitute the following:
Submit a time impact analysis when requesting approval of a baseline schedule revision.
Submitting a proposed baseline schedule revision is not considered a notification of delay or of
E-24
Old US 60 Bridge Amendment A001 / 7/30/2018 other basis for change. Continue to submit monthly schedule updates according to Subsection
155.06 until a baseline construction schedule revision is approved.
Section 156. — PUBLIC TRAFFIC
Construction Requirements
156.05 Maintaining Roadways During Work.
(a) Add the following:
Do not construct diversions outside of the clearing limits or use alternate route detours for public traffic without the approval of the CO.
156.07 Limitations on Construction Operations.
(c) Delete the first sentence and substitute the following:
For alternate one-way traffic control, provide a minimum lane width of 9 feet (3 meters). For two-way traffic, provide a minimum roadway width of 20 feet (6.1 meters).
(i) Delete the text and substitute the following:
Limit construction-caused delays to public traffic to a maximum of 15 minutes per passage.
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
157.04 General. Add the following:
Do not designate the project superintendent as the Erosion Control Supervisor.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Description
203.01 Add the following:
This work also includes the removal of the existing cattle guard and partial removal of the existing bridge.
E-25
Old US 60 Bridge Amendment A001 / 7/30/2018
Partial removal of the existing bridge includes removal of structural elements from the existing timber abutments and wing walls to the concrete piers on the North and South side of the existing steel trusses. Structural elements include but are not limited to the following: timber piles, concrete incased timber piles, timber and steel substructure and substructure, asphalt overlay, and timber bridge rail.
Construction Requirements
203.04 Removing Material.
(b) General. Delete the second sentence in the fifth paragraph and substitute the following:
Remove structures and obstructions outside the roadbed to the greater of 24 inches (600 millimeters) below finished ground or to the natural stream bottom.
Add the following:
Do not disturb the existing timber abutments and wing walls when partially removing the bridge.
203.05 Disposing of Material.
(a) Remove from Project. Add the following:
Secure clearances according to Subsection 107.10.
(b) Burn. Delete the subsection.
(c) Bury. Delete the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.