Annual Inspection Report- Elgin TRACON 2025 Sprinkler.pdf

PDF 472 KB Posted

Attached to
Fire Alarm System Testing & Inspection- Elgin, IL TRACON
Solicitation number
697DCK-26-C-00139
Issued by

About this file

This is an Annual Fire Sprinkler Inspection Report prepared by Allegiant Fire Protection for Convergint Technologies at 1100 Bowes, Elgin, Illinois 60123, dated October 9, 2025. The inspection was conducted by technician Jon Rocke (NICET #151246) under Job Number 43232892, with owner representative Greg Stritzel present. The facility features 13 fire suppression systems across two floors with mixed deck heights (approximately 10-20 feet) and a single Fire Department Connection (FDC).

The inspection confirmed that the building is currently occupied, all fire protection systems are in service, and all visible sprinkler equipment is free of damage, corrosion, and properly maintained. All piping, hangers, bracing, and fire department connections were found to be in good condition with no leaks or mechanical damage. Control valves across all systems are in correct positions, locked or supervised, accessible, and operational. Main drain and waterflow tests across all 12 systems yielded consistent results with static pressure of 80 PSI before and residual pressure of 65 PSI, with pressure after waterflow at 75 PSI and waterflow times within 60 seconds. The inspector identified two necessary improvements: (1) completion of 5-year internal pipe and check valve inspection and FDC hydrostatic testing for the 13 risers, and (2) replacement of 26 water gauges rated 0-300 PSI that are due for replacement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2760 Beverly Dr.

Suite 9 Aurora, IL 60502 630.506.5535 www.allegiantfire.net

IL FSC#: FSC0392

Report to:

Property:

Address:

City:

State: Zip:

Date:

Job Number:

Technician:

FIRE SPRINKLER INSPECTION REPORT

CONTROL VALVES Continued

Description Type Size Location Note # System #11 - Environmental Supply - West System #12 - Administration - Penthouse

System #13- Kitchen / Penthouse System (Locked)

OS&Y 4”

OS&Y 4”

OS&Y 4”

Post Indicator 8”

Riser Room Riser Room Riser Room Near Dock

Convergint Technologies Convergint - FAA-Central Logistics Svc Area, 1100 Bowes

1100 Bowes Elgin

IL 60123

10/09/2025 07:00am CDT 43232892

Jon Rocke

Suite 9 Aurora, IL 60502 630.506.5535 www.allegiantfire.net

IL FSC#: FSC0392

Report to:

Property:

Address:

City:

State: Zip:

Date:

Job Number:

Technician:

FIRE SPRINKLER INSPECTION REPORT

MAIN DRAIN AND WATERFLOW TEST RESULTS Continued

System # Riser Size Size of Test Pipe

PSI Static Pressure Before

PSI Residual Pressure

PSI Pressure After

Waterflow Time (sec) Note #

System #13 - 2nd. Flr - Kitchen / Penthouse 4” 2” 80 65 75 Within 60

10/09/2025 07:00am CDT 43232892

Jon Rocke

Convergint Technologies Convergint - FAA-Central Logistics Svc Area, 1100 Bowes

1100 Bowes Elgin

IL 60123

Suite 9 Aurora, IL 60502 630.506.5535 www.allegiantfire.net

IL FSC #: FSC0392

Report to:

Property:

Address:

City:

State: Zip:

Date:

Job Number:

Technician:

Annual FIRE SPRINKLER INSPECTION REPORT

Central Station POS/Acct Out IN

GENERAL YES NO N/A Note # Is the building currently occupied?

Has the occupancy classification and hazard of contents remained the same since the last inspection?

Are all fire protection systems in service?

Has the system remained in service without modifications or actuations of devices/alarms since last inspection?

Fire pump onsite?

SPRINKLERS (visible) YES NO N/A Note # Free of damage or leaks?

Free of corrosion, foreign material, or paint, loading?

Installed in proper orientation?

Fluid in glass bulbs?

Spare head box contains proper number and type of heads, including wrench(s)?

Escutcheon plates are present and installed correctly?

Minimum clearance between sprinklers and storage?

Sprinklers tested or replaced per appropriate testing schedule?

Sprinkler heads in use and earliest date on heads:

Standard: Quick Response: ESFR: Dry Pendant:

PIPING YES NO N/A Note # In good condition with no external corrosion?

No leaks or mechanical damage?

Correct alignment/No external loads?

Wet Sprinkler piping not exposed to freezing temperatures?

Hangers/bracing not damaged or loose?

FIRE DEPARTMENT CONNECTIONS YES NO N/A Note # Visible and accessible?

Couplings swivel and operate properly?

Plugs or caps in place?

Identification signs are in place?

Ball drip valve is functional/not leaking?

ANTI-FREEZE SYSTEMS YES NO N/A Note # Have all anti-freeze systems been tested?

Proper signage and placard info in place?

LOCATION / AREA PROTECTED TEMP Note # LOCATION / AREA PROTECTED TEMP Note # 1 3 2 4

(*Any additional anti-freeze system results will be listed in Note # Section)

Convergint Technologies 10/09/2025

Convergint - FAA-Central Logistics Svc Area, 1100 Bowes 43232892 1100 Bowes

Elgin Jon Rocke

IL 60123

Handled By Customer -

✔ ✔1994 2016

Suite 9 Aurora, IL 60502 630.506.5535 www.allegiantfire.net

IL FSC #: FSC0392

Report to:

Property:

Address:

City:

State: Zip:

Date:

Job Number:

Technician:

Annual FIRE SPRINKLER INSPECTION REPORT

CONTROL VALVES YES NO N/A Note # All Control Valves in the correct (open or closed) position?

Locked or supervised?

Easily accessible?

Free from damage or leaks?

Proper signage in place?

Tamper Switches operate properly?

All Control Valves operated through full range and return to normal position?

OS&Y Valves properly lubricated?

Description Type Size Location Note #

(*Any additional control valves will be listed on a separate sheet.)

MAIN DRAIN AND WATERFLOW TEST RESULTS YES NO N/A Note #

Do main drain test results differ more than 10% from previous test?

System # Riser Size Size of Test

Pipe

PSI Static Pressure Before

PSI Residual Pressure

PSI Pressure After

Waterflow Time (sec) Note #

(*Any additional main drain/waterflow results will be listed on a separate sheet.)

FIVE YEAR REQUIREMENTS YES NO N/A Note # Have all Check Valves, Pre-action or Deluge Valves been internally inspected within the last 5 years?

Has the piping in all systems been checked for obstructive materials within the last 5 years?

System Gauges tested or replaced within the last 5 years?

Convergint Technologies 10/09/2025

Convergint - FAA-Central Logistics Svc Area, 1100 Bowes 43232892 1100 Bowes

IL

Jon RockeElgin

60123

System before backflow

System #2 - 1st Flr. Admin. / Elev.

System #3 - 1st Flr. Equip. Rm.

System #4 - 1st Flr. Equip. Repair Rm.

System #5 - 1st Flr. Equip. Rm.

System #6 - 2nd. Flr. Operations / Lobby System #7 - 2nd. Flr. Operations

System #8 - Catwalk System #9 - Administration Wing

System #10 - 2nd. Flr. Administration Wing

System after backflow System #1 - 1st Flr. Environmental

OS&Y 8” Riser Room OS&Y 8” Riser Room OS&Y 4” Riser Room OS&Y 2 1/2” Riser Room OS&Y 2 1/2” Riser Room OS&Y 4” Riser Room OS&Y 4” Riser Room OS&Y 4” Riser Room OS&Y 6” Riser Room OS&Y 6” Riser Room OS&Y 4” Riser Room OS&Y 4” Riser Room

80 65 75 Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

Within 60

System #1 - 1st Flr. - Environmental 4” 2” System #2 - 1st Flr. - Administration - Elev. 2 1/2” 2” System #3 - 1st Flr. - Equipment Room 2 1/2” 2” System #4 - 1st Flr. - Equipment Repair 4” 2” System #5 - 1st Flr. - Equipment Room 4” 2” System #6 - 2nd. Flr - Operations / Lobby 4” 2” System #7 - 2nd. Flr - Operations 6” 2” System #8 - 2nd. Flr - Catwalk 6” 2” System #9 - 2nd. Flr - Administration Wing 4” 2” System #10 - 2nd. Flr - 2nd Flr. Administration Wing 4” 2” System #11 - 2nd. Flr - Environmental Supply West 4” 2” System #12 - 2nd. Flr - Administration / Penthouse 4” 2”

Suite 9 Aurora, IL 60502 630.506.5535 www.allegiantfire.net

IL FSC #: FSC0392

Report to:

Property:

Address:

City:

State: Zip:

Date:

Job Number:

Technician:

Annual FIRE SPRINKLER INSPECTION REPORT

INSPECTION & SUGGESTED IMPROVEMENTS WERE DISCUSSED WITH THE UNDERSIGNED OWNER OR OWNERS REPRESENTATIVE:

By this signature, I certify: I state that the information on this form is correct at the time and place of my inspection, and that all equipment tested now was left in operational condition upon completion of this inspection except as noted in comments above.

OWNER / REPRESENTATIVE SIGNATURE INSPECTOR SIGNATURE

IL License #

PRINT NAME DATE PRINT NAME NICET #

Note #

THE INSPECTOR SUGGESTS THE FOLLOWING NECESSARY IMPROVEMENTS:

(these suggestions are not the result of an engineering survey)

MODIFICATIONS OR CORRECTIONS MADE DURING THIS INSPECTION:

Convergint Technologies 10/09/2025

Convergint - FAA-Central Logistics Svc Area, 1100 Bowes 43232892 1100 Bowes

Elgin Jon Rocke

IL 60123

1 5 Year internal pipe and check valve internal pipe and check valve inspection and FDC Hydro (13 Risers, Mixed deck height (~10''-20'', Single FDC).

2 (26) 0-300 Water Gauges due for replacement.

Greg Stritzel 10/09/2025 Jon Rocke 151246

FSI0238

File details come from the government source that posted it. Updated .