This is Amendment 0001 to Solicitation 697DCK-26-R-00139, issued by the Federal Aviation Administration (FAA), AAQ-500 Regional Acquisitions in Fort Worth, Texas, with an effective date of March 12, 2026. The amendment extends the offer due date to March 26, 2026 at 5:00 PM Central Time and makes several substantive changes to the original solicitation. The base contract start date has been shifted from April 1, 2026 to May 1, 2026, with the base year running from May 1, 2026 through March 31, 2027 (11 months), followed by four optional one-year periods extending through March 31, 2031. The contract requires Fire Alarm System Testing and Inspection Services at the FAA's Chicago Terminal Radar Control Facility (TRACON) located at 1100 Bowes Road, Elgin, Illinois. The NAICS code is 561621 (Security Systems Services except Locksmiths) with a small business size standard of $22 million. Offerors must be registered in the System for Award Management (SAM).

The work scope includes inspection, testing, and maintenance of the EST3 Fire Alarm and Detection System and associated fire protection equipment, including thirteen sprinkler zones requiring semi-annual testing, annual inspection, annual hydrant inspection, and a five-year internal inspection in accordance with NFPA 25. Normal work hours are 0600–1600 Monday through Friday, though night work between 2200 and 0400 may be required, with one night needed during the annual fire alarm inspection for operations floor work. The contractor must provide all labor, materials, supplies, and equipment in accordance with FAA Statements of Work and Department of Labor Wage Determinations. Pricing must include monthly rates for the base year and each option year, with replacement parts and major repairs requiring separate Government authorization and coordination with the Contracting Officer. The amendment includes 26 questions and answers addressing service call procedures, parts invoicing, work hours, sprinkler system details, technician certification requirements, and monitoring services clarification, along with updated attachments including a revised Statement of Work (v2, dated March 11, 2026) and the latest Annual Inspection Reports for Fire and Sprinkler systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 6

0001 03/12/2026

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

10101 HILLWOOD PARKWAY

FORT WORTH TX 76177-1524

AAQ520FTW-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-26-R-00139

1 copies to the issuing office.

02/12/2026

(x)

Solicitation/SIR# 697DCK-26-R-00139 Amendment 0001

The purpose of Amendment 0001 is to:

1) Provide answers to submitted questions. Answers to questions are provided below;

2) Change contract start date for base year from 4/1/2026 to 5/1/2026. Section B & Base

CLIN updated.

3) Publish latest Annual Inspection Reports for Fire and Sprinkler systems.

4) Replace Attachment 1- Statement of Work with revised version (v2), dated 3/11/2026.

5) Hereby extend the offer due date for this solicitation to March 26, 2026 at 5:00 PM CT.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Alicia M. Grant

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-26-R-00139/0001

All other terms and conditions remain unchanged.

*Submission of signed copy of this amendment is required for acknowledgement (Per SIR Amendment

Block # 11).

Furnish all labor, supervision, equipment, tools and transportation necessary to provide Fire

Alarm System Testing and Inspection Services at the FAA, Chicago Terminal Radar Control Facility

(TRACON), Elgin, Illinois, in accordance with the requirements specified herein.

Period of Performance: May 1, 2026 through March

31, 2031 with option to extend services for an additional 4 Option Years.

Base Year: 5/1/2026 – 3/31/2027

Option Year 1: 4/1/2027 - 3/31/2028

Option Year 2: 4/1/2028 - 3/31/2029

Option Year 3: 4/1/2029 - 3/31/2030

Option Year 4: 4/1/2030 - 3/31/2031

FAA FACILITY:

Chicago TRACON (C90) Environmental Building

1100 Bowes Road

Elgin, IL 60123

The NAICS code for this acquisition is 561621

Security Systems Services (except Locksmiths) with a small business size standard of $22 million.

Interested offerors must be registered in the

System for Award Management (SAM), www.sam.gov.

Period of Performance: 05/01/2026 to 03/31/2031

Change Item 00001 to read as follows(amount shown is the obligated amount):

00001 Base Year

Provide Fire Alarm Testing & Inspection Services at the Elgin, IL TRACON (C90) for the 11-month period of 5/1/2026 – 3/31/2027.

Electronic & IT: 03

Period of Performance: 05/01/2026 to 03/31/2027

LIST OF CHANGES:

Section B - Supplies or Services/Prices was revised as follows.

Section B - Schedule was revised as follows.

Provide all labor, materials, supplies and equipment to perform Fire Alarm System Testing and Inspection Services at the FAA, Chicago Terminal Radar Control Facility (TRACON), Elgin, Illinois. All Work shall be in accordance with FAA SOWs and DOL Wage Determinations.

The Prime Contractor is responsible for all items of work identified in the attached FAA SOW and provision of the contract as described in Section J.

C90 TRACON Fire Alarm Services- Elgin, IL Base Year- 5/1/2026 – 3/31/2027 (11 months) Monthly Price $______________Total Price $______________ Option Year 1 :

4/1/2027 – 3/31/2028 (12 months) Monthly Price $______________ Total Price $______________ Option Year 2:

4/1/2028 – 3/31/2029 (12 months) Monthly Price $______________ Total Price $______________ Option Year 3:

4/1/2029 – 3/31/2030 (12 months) Monthly Price $______________ Total Price $______________ Option Year 4:

4/1/2030 – 3/31/2031 (12 months) Monthly Price $______________ Total Price $______________

Combined Total for Base + 4 Option Years: $_________________________

Note: Offeror must provide a price on Base Period plus Option Years for all sites below in order to be responsive to this Request for Offer (RFO). The Government does not guarantee to exercise any of the option years under this contract.

Section J - List of Documents, Exhibits and Other Attachments was revised as follows.

Attachment List was revised as follows.

Table has been revised and now reads as follows:

ATTACHMENT TITLE DATE NO. OF

PAGES

J-1 Statement of Work v2 03/11/2026 5 J-1 Statement of Work 12/16/2024 5 J-2 Wage Determination 2015-5017 (Rev 27) 12-3-25 12/13/2025 10 J-3 Customer Satisfaction Survey 02/05/2026 1 J-4 Contractor Staffing Questionnaire 02/05/2026 2

QUESTIONS & ANSWERS

SOLICITATION # 697DCK-26-R-00139

FIRE ALARM TESTING & INSPECTION SERVICES

C90 TRACON - ELGIN, IL

1. Question: Can you provide us with the following documents for the site visit? - Fire Alarm Annual Inspection Report - Fire Sprinkler Annual Inspection Report FAA Response: Annual Fire Alarm and Sprinkler Inspection Reports have been provided as attachments to this solicitation.

2. Question: This is for inspections only, correct? I just want to make sure we’re not also supposed to be including labor for service calls as well.

FAA Response: The contract includes inspection and testing services as well as service call support. Troubleshooting labor during normal service hours is included. Replacement parts and major components require Government authorization.

3. Question: Does any of this have to be completed after hours? Based on J-1; F. Work Periods (page ), it states 0700-1600 hours so I believe they want it done during normal business hours but on the same document, first paragraph under Description of Work, last sentence, it states “All items requiring NIGHT WORK, must begin no earlier than 10:00 PM, and be completed by 4:00AM”. I’d like to verify that if it can all be done during the day or if maybe horns and strobes are required to be done at night?

FAA Response:

Normal work hours are 0600–1600 Monday through Friday. Work outside these hours may be required to minimize operational impact or when coordinated with the Government POC. Night work may occur between 2200 and 0400 when required.

Night will be needed for 1 night during the fire alarm annual for the OPS floor work.

4. Question: Is this for an annual fire alarm inspection only? Does the FAA also require semi-annual visual inspections as well?

FAA Response: The contractor shall perform inspection, testing, and maintenance of the EST3 Fire Alarm and Detection System and associated fire protection equipment located at C90 TRACON. Please see Section 1 of revised Statement of Work.

5. Question: Are there sprinkler inspections we’re supposed to be doing? It’s not listed in the List of Equipment; page 5 of J-1, but is mentioned on page 4; J-1 under 4. Sprinkler System.

FAA Response: Yes. The contract includes inspection, testing, and maintenance of the facility sprinkler system in accordance with NFPA 25.

6. Question: Can you please confirm the fire sprinkler system frequencies. Is it semi-annual for the fire sprinkler and an annual for fire hydrant test and inspection? Will this stay the same or change to annual fire sprinkler and no hydrants?

FAA Response: The sprinkler system requires semi-annual testing, annual inspection, annual hydrant inspection, and a five-year internal inspection beginning this contract year in accordance with NFPA 25.

7. Question: Invoicing for replacement parts - Please confirm that replacement parts and components will be invoiced separately from the monthly maintenance fee and will not be included in the monthly price listed on page 5 of the bid specifications.

FAA Response: Invoicing for replacement parts would be separate from monthly maintenance fees. Advanced coordination would need to be made with the Contracting Officer for approval.

8. Question: 2025 inspection reports - Please provide copies of all fire alarm and sprinkler inspection reports for 2025. If these are accessible via an online portal, please share access instructions and report identifiers; if not, please specify the timeline for delivery.

FAA Response: Please see response to question #1.

9. Question: Exclusions and hourly-rate mechanism - Acts of Nature, Faulty Wiring, and Vandalism are exclusions from normal wear and tear for Fire & Life Safety systems.

Where within the bid documents would you like us to add the hourly rate for such exclusions?

FAA Response: These items would be addressed if/when there is an occurrence.

Pricing and scheduling would be coordinated with the Contracting Officer’s Representative (COR) and Contracting Officer prior to services being rendered for approval.

10. Question: Can you verify the correct number of sprinkler systems?

FAA Response: The facility contains thirteen (13) sprinkler zones.

11. Question: How many wet sprinkler systems are there?

FAA Response: Please see response to question #10.

12. Question: Are there any dry sprinkler systems?

FAA Response: There are no dry sprinkler zones/systems.

13. Question: On Attachment 1, Equipment Information, both waterflow switches and valve supervisory switches do not specify a quantity. Can you please provide a quantity for both? And what does PBO under the Model No. column?

FAA Response: PBO indicates existing devices or provided by others. Property Book Only indicates the item is tracked in the government property inventory, but the exact manufacturer/model information may not be recorded in the equipment list.

14. Question: Sprinkler coverage in square footage?

FAA Response: This information is unavailable.

15. Question: Can you send us photos of the sprinkler systems?

FAA Response: Photos will not be provided. Please review revised SOW.

16. Question: Are there any under floor smoke detectors?

FAA Response: Yes, there are under the floor detectors.

17. Question: Are there any special suppression systems, e.g. VESDA?

FAA Response: There are no special suppression systems.

18. Question: For the areas where work must be done between 10 PM and 4 AM, how many devices are in those areas?

FAA Response: This information is unavailable. Please review revised SOW.

19. Question: NICET I/II certified techs typically perform this kind of work as opposed to NICET III certified persons who are supervisory, would the FAA consider allowing NICET I/II techs handle the labor? This would be a significant cost savings for this contract.

FAA Response: Technicians must meet the certification requirements specified in the Statement of Work.

20. Question: Some of the devices are located very high and in difficult to access ceilings. Can you give us the height of those ceilings/room dimensions?

FAA Response: This information is unavailable.

21. Question: What month are annual inspections performed? When they were last performed, or when the FAA would like them performed under this contract.

FAA Response: Inspection scheduling will be coordinated with the Government after contract award.

22. Question: Can you please provide previous annual inspection reports for bidding purposes?

FAA Response: Please see response to question #1.

23. Question: Section 3 Special Provisions, item d. states to provide unlimited service calls. Can you please clarify how these service calls are paid for? Will there be a separate line item funded after award to pay for service calls? Or do you need us to provide hourly rates, minimum service call rates, etc.?

FAA Response: Service calls include troubleshooting labor during normal service hours. Replacement parts and major repairs require Government authorization.

Advanced coordination would need to be made with the Contracting Officer for pricing quote and approval. Approved special provisions will be invoiced against additional line item added via contract modification.

24. Question: How many service calls are typical for these systems in the past 3 years?

FAA Response: Historical service call data is not available.

25. Question: Section 3 Special Provisions, item e. states to provide parts and component replacements. Can you please clarify how this will be paid for? Will there be a separate line item funded after award to pay for parts?

FAA Response: Please see response to question #23.

26. Question: Can you please confirm monthly fire alarm system monitoring through a 3rd party UL Listed central monitoring station is not included in this scope of work?

FAA Response: Third-party fire alarm monitoring services are not included in this scope of work.