This is a Price Proposal Form for the LAW ATCT Replacement Project at the Lawton - Ft. Sill Regional Airport in Lawton, OK. The solicitation (No. 697DCK-25-R-00367) is issued by the FAA Eastern Region Acquisition Service Area for a new Airport Traffic Control Tower construction project. The procurement is full and open, with a NAICS code of 236220 and a size standard of $45.0 million. The project has a price range of $35-45 million and a performance period of 542 calendar days after the Notice to Proceed.
The price proposal form includes line items for various construction divisions such as general requirements, concrete, masonry, structural steel, roofing, electrical, plumbing, HVAC, and site utilities. There are two versions of the form - a non-PLA (Project Labor Agreement) and a PLA version, both showing a $150,000 allowance for furnishings. The solicitation is managed under the FAA's Acquisition Management System (AMS), with the point of contact being Walter Parker at 817-559-1484. The solicitation closure date is 7/30/25, and additional engineering documents can be downloaded from the FAA's KSN site.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Non-PLA
| LAW ATCT Replacment Project |
| Lawton, OK |
| Pricing Breakdown Form |
| The Contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever to construct an Airport Traffic Control Tower located at the Lawton - Ft. Sill Regional Airport in Lawton, OK in strict conformance with the solicitation/contract at the following prices (including OH & P): | ||||||
| ATCT Costs | ||||||
| Item | Division | Description | $ Materials | $ Labor | $ Material & Labor | |
| 1 | 01 | General Requirements | ||||
| 2 | 01 | Permits | ||||
| 3 | 03 | Concrete - Cast In Place | ||||
| 4 | 03 | Concrete - Pre-Cast | ||||
| 5 | 04 | Masonry | ||||
| 6 | 05 | Structural Steel | ||||
| 7 | 05 | Cold Form Metal Framing | ||||
| 8 | 05 | Misc. Metals | ||||
| 9 | 06 | Rough Carpentry | ||||
| 10 | 07 | Waterproofing Dampproofing Sealants | ||||
| 11 | 07 | Cladding/Composite Panels | ||||
| 12 | 07 | Roofing | ||||
| 13 | 07 | Fire Proofing | ||||
| 14 | 08 | Doors Frames Hardware | ||||
| 15 | 08 | Entrances Storefronts | ||||
| 16 | 08 | Windows | ||||
| 17 | 08 | Louvers And Vents | ||||
| 18 | 09 | Drywall | ||||
| 19 | 09 | Tile & Stone | ||||
| 20 | 09 | Acoustical Ceilings | ||||
| 21 | 09 | Carpet Resilient Flooring | ||||
| 22 | 09 | Wall Finishes | ||||
| 23 | 09 | Painting And Wallcovering | ||||
| 24 | 10 | Misc. Specialties Signage | ||||
| 25 | 10 | Specialties | ||||
| 26 | 10 | Lockers | ||||
| 27 | 11 | Equipment | ||||
| 28 | 12 | Window Treatment | ||||
| 29 | 12 | Casework | ||||
| 30 | 12 | Furnishings | - | - | $ 150,000.00 | * Allowance |
| 31 | 14 | Elevators Conveying | ||||
| 32 | 21 | Fire Protection | ||||
| 33 | 22 | Plumbing | ||||
| 34 | 23 | HVAC | ||||
| 35 | 26 | Electrical | ||||
| 36 | 26 | Security | ||||
| 37 | 31 | Site Prep | ||||
| 38 | 32 | Site Improvements | ||||
| 39 | 32 | Ductbank | ||||
| 40 | 33 | Site Utilities |
| Subtotal | $ 150,000.00 |
| Overhead | |
| Profit | |
| Bond | |
| Total |
PLA
| LAW ATCT Replacment Project |
| Lawton, OK |
| Pricing Breakdown Form - PLA |
| The Contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever to construct an Airport Traffic Control Tower located at the Lawton - Ft. Sill Regional Airport in Lawton, OK in strict conformance with the solicitation/contract at the following prices (including OH & P): | ||||||
| ATCT Costs | ||||||
| Item | Division | Description | $ Materials | $ Labor | $ Material & Labor | |
| 1 | 01 | General Requirements | ||||
| 2 | 01 | Permits | ||||
| 3 | 03 | Concrete - Cast In Place | ||||
| 4 | 03 | Concrete - Pre-Cast | ||||
| 5 | 04 | Masonry | ||||
| 6 | 05 | Structural Steel | ||||
| 7 | 05 | Cold Form Metal Framing | ||||
| 8 | 05 | Misc. Metals | ||||
| 9 | 06 | Rough Carpentry | ||||
| 10 | 07 | Waterproofing Dampproofing Sealants | ||||
| 11 | 07 | Cladding/Composite Panels | ||||
| 12 | 07 | Roofing | ||||
| 13 | 07 | Fire Proofing | ||||
| 14 | 08 | Doors Frames Hardware | ||||
| 15 | 08 | Entrances Storefronts | ||||
| 16 | 08 | Windows | ||||
| 17 | 08 | Louvers And Vents | ||||
| 18 | 09 | Drywall | ||||
| 19 | 09 | Tile & Stone | ||||
| 20 | 09 | Acoustical Ceilings | ||||
| 21 | 09 | Carpet Resilient Flooring | ||||
| 22 | 09 | Wall Finishes | ||||
| 23 | 09 | Painting And Wallcovering | ||||
| 24 | 10 | Misc. Specialties Signage | ||||
| 25 | 10 | Specialties | ||||
| 26 | 10 | Lockers | ||||
| 27 | 11 | Equipment | ||||
| 28 | 12 | Window Treatment | ||||
| 29 | 12 | Casework | ||||
| 30 | 12 | Furnishings | - | - | $ 150,000.00 | * Allowance |
| 31 | 14 | Elevators Conveying | ||||
| 32 | 21 | Fire Protection | ||||
| 33 | 22 | Plumbing | ||||
| 34 | 23 | HVAC | ||||
| 35 | 26 | Electrical | ||||
| 36 | 26 | Security | ||||
| 37 | 31 | Site Prep | ||||
| 38 | 32 | Site Improvements | ||||
| 39 | 32 | Ductbank | ||||
| 40 | 33 | Site Utilities |
| Subtotal | $ 150,000.00 |
| Overhead | |
| Profit | |
| Bond | |
| Total |