Delivery Scheme 2 - 4th Floor.pdf
PDF 617 KB Posted
- Attached to
- Design, Fabrication, Delivery and Installation of the Center Console at the Boston Air Traffic Control Tower
- Solicitation number
- 697DCK-25-R-00210
About this file
The image is a floor plan for the Fourth Floor of an Air Traffic Control Tower (ATCT) Improvements - Phase 1 project, dated 08/28/2025. The plan shows a detailed layout of the floor, including multiple zones and access points. Key elements include:
Delivery and Access Details:
- Two MPA Contractor Work Zones centrally located
- Terminal B and C vertical access nodes on opposite sides
- Public stair and elevator access to the 4th floor of the garage
- Covered walkways providing access to the tower entrance
- Existing parking spaces to remain captured
Delivery Logistics:
- Deliveries will be made to the ground floor as shown in Scheme 1
- Materials will be brought to the 4th floor via Terminal B elevators
- Specific elevators designated for console deliveries
- Detailed delivery route mapped from ground to ATCT
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOBBY
LOBBY
421 420
411410
VESTIBULE
STORAGE
STORAGE
VESTIBULE
CLOSET
ELEC.
CLOSET
ELEC.
PED BRIDGE
VA
N
VA
N
VA
N
VANVAN
VAN
VAN VAN
VAN
VAN
VAN
VAN
LEVEL 4 - DEMO
07/15/2024
AIR TRAFFIC CONTROL TOWER
(ATCT) IMPROVEMENTS - PHASE 1
Fourth Floor
08/28/2025
Terminal C vertical Access Node
Elevator Access to 4th Flr of Garage
Public Stair to 4th Floor of garage
Currently Claimed Parking Spaces to remain captured
MPA Contr Work Zone
MPA Contr Work Zone
Access Via Covered walkway to Tower Entrance
Access Via Covered walkway to Tower Entrance
Terminal B vertical Access Node
Elise Daudier Cross-Out
Elise Daudier Callout These elevators shall be used for console deliveries.
Elise Daudier Text Box Deliveries shall be made to Ground Floor as shown in Scheme 1. Materials will be brought to 4th floor via Terminal B elevators and then follow delivery route to ATCT as shown.
Elise Daudier Line
Elise Daudier PolyLine
Elise Daudier Text Box Delivery Scheme 2 - 4th Floor
File details come from the government source that posted it. Updated .