697DCK-24-R-00168 Amendment 0001.pdf

PDF 104 KB Posted

Attached to
QKA Cattle Guard Replacement
Solicitation number
697DCK-24-R-00168
Issued by

About this file

This document is an amendment to Solicitation 697DCK-24-R-00168 for the QKA Cattle Guard Replacement project in Waialua, Honolulu, HI. The key changes are:

(A) Adding an attachment with photos of the cattle guards, (B) updating Sections L and M, and (C) establishing a new proposal due date of June 21, 2024 at 3:00 PM ET. Section L changes include revisions to the requirements for Relevant Experience/References and Technical Proposal content. Section M updates the technical evaluation criteria for these factors. The estimated cost range for this Firm Fixed Price contract is $250,000 to $500,000, with a period of performance of approximately 45 calendar days. This requirement is set-aside for small business concerns under NAICS code 237310 - Highway, Street, and Bridge Construction. An optional site visit is scheduled for June 6, 2024 at 10:00 AM.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 6

0001 02/21/2024

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-24-R-00168

1 copies to the issuing office.

02/21/2024

(x)

The purpose of this amendment is to (A) include an attachment with photos of the cattle guards, (B) provide updated aspects of Sections L and M, and (C) establish a new due date for proposal submissions.

(A) Document "QKA Cattle Guards 1 thru 5 photos.pdf" is hereby added to this solicitation.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Marc R. LeMay

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-24-R-00168/0001

(B) Section L changes: PLEASE NOTE: all other terms and conditions in Section L that are not listed in this amendment are still applicable.

** Aspects of Clause SA18 PROPOSAL CONTENT are hereby changed to read as follows:

Proposals are due Jun 21, 2024 at 3:00 PM ET.

Factor 1: Relevant Experience/References

Offerors must demonstrate relevant experience by submitting a List of Relevant Work

Experience/References containing at least three

(3) contracts over the past five (5) years on projects with the same or similar size (i.e., road construction, culverts, concrete spillways, trenches, cattle guards, road paving/asphalt, or road drainage) and scope requirements as this acquisition as of the final submission date of the SIR.

The List of Relevant Experiences/References must include projects where the Offeror furnished all labor, products, equipment, materials, supervision, permits, and insurance, etc.

necessary for Cattle Guard Road Drainage Repair and Cattle Guard Replacement (or comparable projects with similar size and scope).

Offerors will be evaluated as to whether their company has a proven track record of timeliness of performance, quality of service, financial stability, and customer satisfaction. The FAA reserves the right to contact customers listed as references and apply its findings in the final determination.

Offerors are strongly advised to submit the List of Relevant Work History/References in the following format. If other formatting is used, Offerors MUST provide the following information for each contract:

Agency or Company Contract Issued By

Period of Performance/Project Date

Contracting Officer/Contact

Phone #/Email Address

Contract #

Dollar Value

Continued ...

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-24-R-00168/0001

Location

Description of Work Performed

Factor 2: Technical Proposal

Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to design and perform the work described in the Specifications and/or Drawings.

Offerors are cautioned to be responsive to all the requirements and provide sufficient information to allow evaluation of the proposals as listed in this Solicitation.

The technical proposal must be well written and presented in a clear straightforward manner.

Absolutely NO pricing information shall be included in the technical proposal. For ease of evaluation, offerors are to submit the technical proposal organized into the following three (3) parts:

A. Plan of Action - The offeror must present an organized and detailed narrative that meets the specifications listed in the Scope of Work. In addition, the offeror must submit a schedule in order to verify the requirements described for this project will be completed in a timely and efficient manner.

B. Statement of Understanding - The offeror must submit a brief statement that demonstrates that it understands the objectives the Government has established for QKA Road Drainage Repair and

Cattle Guard Replacement, Honolulu, HI. This cannot be a repeat or mere summary of the materials provided in this Solicitation, but rather the offeror’s statement of their understanding of that work.

C. Equipment and Materials - The offeror must submit a brief statement that describes the specific equipment and materials (or the equivalents), as outlined within the Summary of

Work, to be used within this project.

PLEASE NOTE: all other terms and conditions in clause SA18 PROPOSAL CONTENT that are not listed

4 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-24-R-00168/0001

in this amendment are still applicable.

** Aspects of Clause SA19 QUESTIONS REGARDING THE

SOLICITATION are hereby changed to read as followed:

The Offeror may begin submitting questions and comments immediately after release of this amendment and up to Jun 10, 2024 at 3:00 PM ET.

PLEASE NOTE: all other terms and conditions in clause SA19 QUESTIONS REGARDING THE SOLICITATION that are not listed in this amendment are still applicable.

** Aspects of Clause SA30 SITE VISIT are hereby changed to read as followed:

There is an optional site visit on Jun 6, 2024;

10:00am

c. To attend the site visit, advanced notice via

Paul.shibe@faa.gov is required by Jun 4, 2024, at

3:00pm ET to the FAA point of contact listed below. You are required to provide your company representative's name. Note, the site visit will be canceled without notice, if no advanced notices of attendance are received.

PLEASE NOTE: all other terms and conditions in

Clause SA30 SITE VISIT that are not listed in this amendment are still applicable.

Section M changes: PLEASE NOTE: all other terms and conditions in Section M that are not listed in this amendment are still applicable.

** Aspects of Clause SA59 TECHNICAL EVALUATION

CRITERIA are hereby changed to read as followed:

II. TECHNICAL EVALUATION – After meeting the eligibility qualifications, technical acceptability will be rated overall as either

“acceptable” or “unacceptable” based on the

(non-cost/price) evaluation factors stated below.

5 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-24-R-00168/0001

Any proposal determined to be “unacceptable” in any evaluated area or criteria is rendered to be unacceptable and therefore rejected from further consideration.

Factor 1: Relevant Experience/References

The degree to which the Offeror demonstrates its

Relevant Experience/References in performing at least three (3) contracts over the past five (5) years on projects with the same or similar size

(i.e., road construction, culverts, concrete spillways, trenches, cattle guards, road paving/asphalt, or road drainage) and scope requirements as this acquisition as of the final submission date of the SIR.

Rating Description:

ACCEPTABLE: Offeror demonstrates relevant experience performing at least three (3) contracts over the past five (5) years on projects with the same or similar size and scope requirements as this acquisition as of the final submission date of the SIR.

UNACCEPTABLE: Offeror DOES NOT demonstrate relevant experience performing at least three (3) contracts over the past five (5) years on projects with the same or similar and scope

(requirements as this acquisition as of the final submission date of the SIR.

Factor 2: Technical Proposal

The degree to which the Offeror submitted a comprehensive and complete technical proposal that demonstrates their understanding and ability to perform the work described in the Statement of

Work and Specification (attachment 1).

Rating Description:

ACCEPTABLE: Offeror submitted a comprehensive and complete technical proposal that demonstrates an adequate understanding and ability to perform the work described in the Statement of Work and applicable attachments that included a Plan of

Action, schedule, Statement of Action, and an

Equipment and Materials statement.

6 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-24-R-00168/0001

UNACCEPTABLE: Offeror DID NOT submit a comprehensive and complete technical proposal that demonstrates an adequate understanding and ability to perform the work described in the

Statement of Work and applicable attachment and/or the approach proposed fails to adequately meet acceptable performance expectations.

Proposal did not include any of the following: a

Plan of Action, schedule, Statement of Action, and an Equipment and Materials statement.

PLEASE NOTE: all other terms and conditions in clause SA59 TECHNICAL EVALUATION CRITERIA that are not listed in this amendment are still applicable.

PLEASE NOTE: all other terms and conditions in

Sections L and M that are not listed in this amendment are still applicable.

(C) As stated above in clause SA18 - Proposals are due Jun 21, 2024 at 3:00 PM ET.

All other terms and conditions listed in this solicitation remain unchanged and are still applicable.