This amendment to a federal solicitation provides answers to questions regarding a construction project for modernization of an air traffic control center. The Federal Aviation Administration is seeking offers for the Mod 4 Area Phase II Modernization Project at the Miami Air Route Traffic Control Center. Work includes completing a fire detection conduit loop on the first floor and extending an existing attic loop to new heat detector locations in the mechanical room. Viking heat detectors will be government-furnished equipment. Offerors must attend a mandatory site visit on June 7, 2023 to be eligible for award of this set-aside for Service-Disabled Veteran-Owned Small Businesses. The estimated price range for this requirement is $500,000 to $1 million, and payment and performance bonds are required.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 1

0008 08/10/2023

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1200 DISTRICT AVENUE

BURLINGTON MA 01803

AAQ510BOS-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-23-R-00403

copies to the issuing office.

05/15/2023

(x)

Amendment 0008 is issued for the following Questions and Answers:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan J. Newcomb

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0008

697DCK-23-R-00403

1. Nowhere in the plans or the specifications have we found any information covering these Heat Detectors.

a. What is to be supplied & installed both MI wire & heat detector modules?

Answer: The Viking heat detectors are being provided as GFE from the original contract.

Contractor to provide 2HR MI cable for entire 1st floor loop plus amount required to extend existing attic loop to new Viking locations in mechanical room. Note: Heat detection conduit loop for 1st floor needs to be completed and the attic loop needs to be redirected and extended to new Viking location in mechanical room.

b. Who supplies the heat detector modules?

Answer: Viking heats are GFE.

c. If contractor supplied what type of heat detector modules are to be supplied?

Answer: See b above

d. How many heat detector modules total are to be installed?

Answer: Please reference Project drawing Y201. General location of all heats is designated with an “H” symbol.

e. Where are all the exact locations stated in the bid documents these are to be installed at in each room & hallways.

Answer: See answer to d. Reference Viking Heat detector data sheets for distance requirement from individual space sprinkler heads

f. What is the connection point from what we believe to understand is contractors are to install a junction box at a conduit run that ends by mechanical room.

Answer: The Viking heat detection loops start and ens at the main Viking panels in the Mod 4 mechanical room.

g. If Heat Detectors are to be installed in all locations are these daisy chained back to this junction box or will each heat detectors have a separate homerun MI cable to each heat detector connected at a location.

Answer: Reference Viking heat detector data sheet for installation information. In general heat detectors are installed in a single loop daisy chain style format.

h. Then does each heat detector connection runs back to a control panel so when heat is detected FAA has an alarm response to the exact area that is alarming.

Answer: No. All heats are part of the same loop and do not provide any zone location information other than affected space.