Amendment 05.pdf

PDF 374 KB Posted

Attached to
Pontiac ATCT Fire Life Safety Upgrades
Solicitation number
697DCK-22-R-00560
Issued by

About this file

This solicitation seeks proposals for life-safety upgrades at the Pontiac Airport Traffic Control Tower and terminal building located at Oakland County International Airport in Waterford, Michigan. The scope of work includes installing a new fire detection and alarm system and modifying the existing fire suppression system. Additional requirements are replacement of fire-rated components, sealing wall and floor penetrations, applying fireproofing, installing new fire doors and hardware, and training personnel. The selected contractor must complete construction within 150 calendar days and comply with all airport and FAA rules while minimizing disruption. Proposals are due by November 1st, 2022 and the period of performance is November 1st, 2022 through December 31st, 2023. The contracting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
Amendment 06.pdf PDF
Amendment 04.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Amendment 1.pdf PDF
PTK ATCT FLS Upgrade 6-21-22Drawings.pdf PDF
DB-F100199141.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
PTK ATCT Fire Life Safety Upgrade Specs 6_21_2022.pdf PDF
697DCK-22-R-00560 (4).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 1

0005 10/03/2022

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

2200 S. 216TH STREET

DES MOINES WA 98198-6547

AAQ530ANM-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-22-R-00560

copies to the issuing office.

10/03/2022

(x)

The following is hereby added to the subject RFO:

Answers to received questions, see attached.

Period of Performance: 11/01/2022 to 12/31/2023

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Q. Can one person fill multiple roles? i.e. Superintendent fill the Safety role?

A. Yes

Q. Can we use CPARS in lieu of PPQ’s

A. CPARS may be provided as additional information, but the Past Performance Survey included with the RFO must be used per Section M.

Q. Section M request Electrical & Mechanical Subs for PPQ’s. Is that Correct or is it needing to be Fire Alarm & Fire Suppression Subs?

A. You are correct, Fire Alarm and Fire Suppression Subs, NOT Electrical and Mechanical

File details come from the government source that posted it. Updated .