Site Visit Presentation.pdf
PDF 23 MB Posted
- Attached to
- Replace Roof and Exhaust Fans - Houston ARTCC
- Solicitation number
- 697DCK-22-R-00018
About this file
This solicitation package outlines requirements for replacing the roof and exhaust fans at the Houston Air Route Traffic Control Center. The Federal Aviation Administration seeks offers to complete construction with a magnitude between $1,000,000 to $5,000,000. Interested firms must attend a mandatory site visit on January 3rd and submit any requests for information by January 10th. Offers are due by January 24th and shall be emailed with file sizes under 10MB due to FAA system limitations. The pre-announcement of site visit attendees is required by December 30th.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Site Photos.pdf | ||
| 2. Drawings (1.31.22).pdf | ||
| 1. Specifications (1.31.22).pdf | ||
| RFI Responses.pdf | ||
| 4. Customer Satisfaction Survey.doc | DOC document | |
| Amendment 0004.pdf | ||
| 3. Wage Determination TX20210253 (1.21.22).pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| 2. Drawings.pdf | ||
| 697DCK-22-R-00018.pdf | ||
| 4. Customer Satisfaction Survey.doc | DOC document | |
| 1. Specifications.pdf | ||
| 3. Wage Determination TX20210253-7.9.21.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HHoustonn Airr Routee Trafficc Controll Centerr Buildingg AA Rooff Replacementt Project/
Replacee Exhaustt Fanss inn Buildingg AA andd EGG Buildingg Project
Solicitation No.
Virtual Pre-Bid Conference
Contracting Officer: Mark Salum Fort Worth Engineering Services Central Service Area
A. Welcome. Mark Salum, CO B. Introduction of participants. ES Team C. Project Summary. ES Team
a) Drawings
b) Specifications
D. Safety, Health & Emergency Procedures. ES + ZHU Teams E. Submittals: Design and Installation Data. ES Team F. O&M Deliverables. ES Team G. Demonstration & Training. ES + ZHU Team H. Project Closeout Procedures. ES + ZHU Team
Agenda
File details come from the government source that posted it. Updated .