Site Visit Presentation.pdf

PDF 23 MB Posted

Attached to
Replace Roof and Exhaust Fans - Houston ARTCC
Solicitation number
697DCK-22-R-00018
Issued by

About this file

This solicitation package outlines requirements for replacing the roof and exhaust fans at the Houston Air Route Traffic Control Center. The Federal Aviation Administration seeks offers to complete construction with a magnitude between $1,000,000 to $5,000,000. Interested firms must attend a mandatory site visit on January 3rd and submit any requests for information by January 10th. Offers are due by January 24th and shall be emailed with file sizes under 10MB due to FAA system limitations. The pre-announcement of site visit attendees is required by December 30th.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Site Photos.pdf PDF
2. Drawings (1.31.22).pdf PDF
1. Specifications (1.31.22).pdf PDF
RFI Responses.pdf PDF
4. Customer Satisfaction Survey.doc DOC document
Amendment 0004.pdf PDF
3. Wage Determination TX20210253 (1.21.22).pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
2. Drawings.pdf PDF
697DCK-22-R-00018.pdf PDF
4. Customer Satisfaction Survey.doc DOC document
1. Specifications.pdf PDF
3. Wage Determination TX20210253-7.9.21.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HHoustonn Airr Routee Trafficc Controll Centerr Buildingg AA Rooff Replacementt Project/

Replacee Exhaustt Fanss inn Buildingg AA andd EGG Buildingg Project

Solicitation No.

Virtual Pre-Bid Conference

Contracting Officer: Mark Salum Fort Worth Engineering Services Central Service Area

A. Welcome. Mark Salum, CO B. Introduction of participants. ES Team C. Project Summary. ES Team

a) Drawings

b) Specifications

D. Safety, Health & Emergency Procedures. ES + ZHU Teams E. Submittals: Design and Installation Data. ES Team F. O&M Deliverables. ES Team G. Demonstration & Training. ES + ZHU Team H. Project Closeout Procedures. ES + ZHU Team

Agenda

File details come from the government source that posted it. Updated .