1. Specifications.pdf
PDF 8 MB Posted
- Attached to
- Replace Roof and Exhaust Fans - Houston ARTCC
- Solicitation number
- 697DCK-22-R-00018
About this file
This federal contract solicitation seeks offers to replace the roof and exhaust fans at the Houston Air Route Traffic Control Center. Key details include the estimated construction magnitude is between $1 million to $5 million. A site visit is scheduled for January 3, 2022 at 9:00am Central Time. Requests for information must be submitted by January 10, 2022. Offers are due by January 24, 2022 and must be emailed with total file size under 10MB. The Federal Aviation Administration's Southwestern Region is the contracting agency. The scope of work involves replacing the roof and exhaust fans at the Houston ARTCC located at 16600 John F Kennedy Blvd, Houston, TX 77032.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Site Photos.pdf | ||
| 2. Drawings (1.31.22).pdf | ||
| 1. Specifications (1.31.22).pdf | ||
| RFI Responses.pdf | ||
| 4. Customer Satisfaction Survey.doc | DOC document | |
| Amendment 0004.pdf | ||
| Site Visit Presentation.pdf | ||
| 3. Wage Determination TX20210253 (1.21.22).pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| 2. Drawings.pdf | ||
| 697DCK-22-R-00018.pdf | ||
| 4. Customer Satisfaction Survey.doc | DOC document | |
| 3. Wage Determination TX20210253-7.9.21.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Property of the United States Government Copying, Dissemination or Distribution of These Documents to Unauthorized Personnel is Prohibited
Public availability to be determined under 5 USC 552
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
CENTRAL SERVICE AREA
ENROUTE ENGINEERING CENTER
FORT WORTH, TEXAS
PROJECT SPECIFICATIONS
FY19 MC #6 REPLACE BUILDING A ROOF
MC#42 REPLACE EXHAUST FANS IN EG ROOMS 501 AND 503
LS REPLACE REMAINING BLDG A EXHAUST FANS NOT REPLACED IN 2011 FAN
REPLACEMENT PROJECT
HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER
(ZHU - ARTCC)
HOUSTON, TEXAS
MARCH 30, 2021
HOUSTON ARTCC (ZHU) MARCH 30, 2021
HOUSTON, TEXAS 100%
ZHU REPLACE BUILDING A ROOF
Property of the United States Government Copying, Dissemination or Distribution of These Documents to Unauthorized Personnel is Prohibited
THIS PAGE INTENTIONALLY LEFT BLANK
ZHU BUILDING A ROOF REPLACEMENT
TABLE OF CONTENTS 00 01 00-1
DOCUMENT 000100 - TABLE OF CONTENTS
DIVISION
NUMBER
SECTION NAME
PAGES
000100 TABLE OF CONTENTS…………………..………………………………... 4
DIVISION 1 – GENERAL REQUIREMENTS……………………………………………………
01 10 00 SUMMARY……………………………………………………………
01 31 00 PROJECT MANAGEMENT & COORDINATION………………
RFI FORM…………………………………………………………………… 2
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION…………………
01 33 00 SUBMITTAL PROCEDURES………………………………………………. 10
01 35 29 SAFETY, HEALTH, & EMERGENCY RESPONSE PROCEDURES…
01 35 53 SECURITY PROCEDURES………………………………………………… 4
01 40 00 QUALITY REQUIREMENTS………………………………………………. 10
01 42 00 REFERENCES……………………………………………………………….. 14
01 50 00 TEMPORARY FACILITIES & CONTROLS………………………………. 11
01 73 00 EXECUTION………………………………………………………………… 8
01 73 29 CUTTING & PATCHING…………………………………………
01 74 19 CONSTRUCTION WASTE MANAGEMENT & DISPOSAL……………... 4
01 74 23 FINAL CLEANING……………………………………………………
01 77 00 CLOSEOUT PROCEDURES…………………………………………
01 78 23 OPEERATION & MAINTENANCE DATA………………………………... 7
01 78 39 PROJECT RECORD DOCUMENTS…………………………………
DIVISION 2 – EXISTING CONDITIONS…………………………………………………………
02 41 19 SELECTIVE STRUCTURE DEMOLITION………………………………... 9
DIVISION 3 – CONCRETE………………………………………………………………………... NOT USED
DIVISION 4 – MASONRY…………………………………………………………………………. NOT USED
DIVISION 5 – METALS…………………………………………………………………………….
05 31 00 STEEL DECKING…………………………………………………………….. 6
05 52 13 PIPE AND TUBE RAILINGS………………………………………………. 10
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES……………………………………….
06 10 53 MISCELLANEOUS ROUGH CARPENTRY………………………………… 10
06 10 00 SHEATHING………………………………………………………………….. 6
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 01 50.19 PREPARATION FOR REROOFING……………………………………….. 11
07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING……………………. 24
07 62 00 SHEET METAL FLASHING AND TRIM…………………………………. 11
07 71 00 ROOF SPECIALTIES………………………………………………………. 12
07 72 00 ROOF ACCESSORIES……………………………………………………… 14
07 84 13 PENETRATION FIRESTOPPING………………………………………… 6
TABLE OF CONTENTS 00 01 00-2
07 92 00 JOINT SEALANTS…………………………………………………………… 9
DIVISION 8 – OPENINGS NOT USED
DIVISION 9 – FINISHES
09 96 00 HIGH PERFORMANCE COATINGS………………………………………. 6
DIVISION 10 – SPECIALTIES……………………………………………………………………. NOT USED
DIVISION 11 – EQUIPMENT…………………………….............................................................. NOT USED
DIVISION 12 – FURNISHINGS…………………………………………………………………… NOT USED
DIVISION 13 – SPECIAL CONSTRUCTION……………………………………………............. NOT USED
DIVISION 14 – CONVEYING EQUIPMENT …………………………………………................ NOT USED
DIVISION 21 – FIRE SUPPRESSION…………………………………………………………….. NOT USED
DIVISION 22 – PLUMBING………………………………………………………………………..
22 14 23 STORM DRAINAGE PIPING SPECIALTIES………………………………. 3
DIVISION 23 – HEATING VENTILATION AND AIR CONDITIONING…………………….
23 05 00 COMMON WORK RESULTS FOR HVAC…………………………………. 12
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT………. 4
23 05 53 IDENTIFICATION FOR HVAC…………………………………………….. 4
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC……………….. 10
23 31 13 METAL DUCTS……………………………………………………………… 12
23 34 23 HVAC POWER VENTILATORS…………………………………………… 12
23 35 33 LISTED KITCHEN VENTILATION SYSTEM EXHAUST DUCTS……….. 4
23 38 13 COMMERCIAL KITCHEN HOODS……………………………………….. 12
DIVISION 26 – ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL………………………… 12
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 8
26 05 26 GROUNDING & BONDING FOR ELECTRICAL SYSTEMS……………… 15
26 05 29 HANGERS & SUPPORTS FOR ELECTRICAL SYSTEMS………………… 6
26 05 33 RACEWAYS AMD BOXES FOR ELECTRICAL SYSTEMS………………. 10
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS………………………… 6
26 41 13 LIGHTNING PROTECTION FOR STUCTURES………………………… 5
DIVISION 27 – COMMUNICATIONS……………………………………………………............ NOT USED
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY…………………………………… NOT USED
DIVISION 31 – EARTHWORK…………………………………………………………………… NOT USED
TABLE OF CONTENTS 00 01 00-3
DIVISION 32 – EXTERIOR IMPROVEMENTS…………………………………………............ NOT USED
DIVISION 33 - UTILITIES………………………………………………………………………... NOT USED
ATTACHMENT NO. 1 FAA-STD-19F…………………………………………………. 128
ATTACHMENT NO 2. FAA-C-1217H…………………………………………………. 40
ATTACHMENT NO. 2 REFERENCE PLANS………………………………………… 59
END OF DOCUMENT 000100
TABLE OF CONTENTS 00 01 00-4
SUMMARY 01 10 00 - 1
SECTION 011000 – SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Coordination with occupants.
5. Work restrictions.
6. Specification and drawing conventions.
B. Related Section:
1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
C. Intent of Specifications: All material, labor and equipment required to perform work must be furnished by the Contractor. All work performed and all materials and equipment used must be approved by the Contracting Officer (CO). This shall include, but is not limited to, testing, inspection, scheduling, reporting, and submittals.
1.3 PROJECT INFORMATION
A. Project Identification: Houston Air Route Traffic Control Center (ZHU ARTCC). Simply referred to as
ZHU.
1. Project Location: 16600 John F Kennedy Blvd, Houston, Texas, 77032 .
B. Owner: U.S. Department of Transportation, Federal Aviation Administration (FAA).
1. Government Representative:
a. Resident Engineer (COR/RE): All work performed and all materials and equipment used are subject to approval by the “Contracting Officer Representative” (COR). The drawings make reference to “Resident Engineer” (RE), which is equivalent to COR/RE.
C. The Work of the Project is defined by the Contract Documents and consists of the following:
1. These specifications, together with the referenced specifications, standards, and drawings specified in the Contract Documents, cover the requirements of the FAA for design and
SUMMARY 01 10 00 - 2
construction to replace the ZHU Building A Roof. All work and scheduling must be coordinated with the COR/RE and all other contractors present at the ZHU facility. All field conditions, measurements, and quantities must be field verified by the contractor prior to bidding. This work includes, but is not limited to, the following listed items:
a. DEMOLITION: Contractor must supply adequate waste disposal dumpster on project site for all waste associated with project.
1) Demolish existing 47-mil Sarnafil single ply roofing system on Building A.
2) Demolish existing flashing around the perimeter of Building A roof.
3) Demolish existing equipment cage near Courtyard 3.
4) Demolish existing grounding, bonding, and lightning protection system and grounding pads as indicated.
5) Demolish existing roof drains.
6) For each existing exhaust fan on the Engine Generator Building (SBEX-1, SBEX-2, SBEX-4, SBEX-5, SBEX-6, SBEX-7, SBEX-9, SBEX-10): Disconnect and remove existing motor starters, conduit conductors, disconnect switch, and control wiring back to the panelboards. Where conduits are embedded in concrete, leave in place. Do not remove any of the motor starters or control wiring at the MCC’s.
Review drawings ZHU-D-ARTCC-D021-D026 for more details.
7) For each existing exhaust fan on Building A (AEX1, AEX2, E10, E12, EF403, EF14, BEX1, EF510): Disconnect and remove existing motor starters, conduit conductors, disconnect switch, and control wiring back to the panelboards. Where conduits are embedded in concrete, leave in place. Do not remove any of the motor starters or control wiring at the MCC’s.
b. ARCHITECTURAL: All civil work must be done according to the 2012 International Building Code (2012 IBC).
1) Install new Thermoplastic Polyolefin (TPO) roofing system on Building A.
2) Install new TPO roofing system on Building A Roof.
3) Install new passive fall protection around Courtyards 1,2, and 3.
4) Install new TPO walking pads as indicated.
c. MECHANICAL: All mechanical work must be done according to the 2012
International Mechanical Code (2012 IMC) and International Plumbing Code (2012 IPC), respectively.
1) For exhaust fans in Engine Generator Building (SBEX-1, SBEX-2, SBEX-4, SBEX-5, SBEX-6, SBEX-7, SBEX-9, SBEX-10), the Contractor shall furnish and install new exhaust fans. The Contractor shall furnish and install new stainless steel exterior hoods for each exhaust fan. Review drawings ZHU-D-ARTCC-M074 and ZHU-D-ARTCC-M119 for more information on the new work to be performed on the Engine Generator Building exhaust fans.
2) For exhaust fans in Building A (AEX1, AEX2, E10, E12, EF403, EF14, BEX1, EF510) new exhaust fans. The Contractor shall furnish and install new stainless steel exterior hoods for each exhaust fan. Review Construction Drawings ZHU-D- ARTCC-M117-M119 for more information on the new work to be performed on the Building A exhaust fans.
3) The Contractor shall furnish and install new labels on each exhaust fan and exterior hood with identification number, fan model number, serial number, and motor and fan data, use exterior grade UV resistant or aluminum labels. Rivet/attach labels in conspicuous location of exterior hood and fan housing. Coordinate with COR/RE to accurately verify corresponding name and data of each exhaust fan with it’s exterior hood.
SUMMARY 01 10 00 - 3
4) The Contractor shall reconnect control sensors and devices to new exhaust fans.
Control wiring and conduit are to be protected and reused to the fullest extent possible.
5) Modify existing fan enclosure to provide easier accessibility to exhaust fans for maintenance.
6) The Contractor shall furnish and install remote grease lines, fittings, and grease port manifold. The Contractor shall coordinate installation with ESU and COR/RE.
d. ELECTRICAL: All electrical work must be done according to the National Electric Code (NEC) and FAA Standard 19F(see Attachment No. 1)
1) Reinstall lightning protection and grounding system.
2) For exhaust fans in Engine Generator Building (SBEX-1, SBEX-2, SBEX-4, SBEX-5, SBEX-6, SBEX-7, SBEX-9, SBEX-10), the Contractor shall furnish and install new 3-10 AWG in ¾” conduit and terminate to the existing panelboard/MCC. The Contractor shall field verify the locations of the panelboards and branch circuits during the Pre-construction site visit with COR. Review drawing ZHU-D-ARTCC-E106 for more information on the new work to be performed on the Engine Generator Building exhaust fans.
3) For exhaust fans in Engine Generator Building (SBEX-1, SBEX-2, SBEX-4, SBEX-5, SBEX-6, SBEX-7, SBEX-9, SBEX-10), the Contractor shall furnish and install new heavy duty disconnect switch, non-fused rated 30 AMP, NEMA Type 1.
The Contractor shall field coordinate the exact mounting location of the disconnect switch with the COR. The length of the liquid tight metal conduit must not exceed 6 feet.
4) For exhaust fans in Building A (AEX1, AEX2, E10, E12, EF403, EF14, BEX1, EF510), the Contractor shall furnish and install new 3-10 AWG in ¾” conduit and terminate to the existing panelboard/MCC. The Contractor shall field verify the locations of the panelboards and branch circuits during the Pre-construction site visit with COR. Review Construction and ZHU-D-ARTCC-E118-119 for more information on the new work to be performed on the Building A exhaust fans.
5) For exhaust fans in Building A (AEX1, AEX2, E10, E12, EF403, EF14, BEX1, EF510), the Contractor shall furnish and install new heavy duty disconnect switch, non-fused rated 30 AMP, NEMA Type 1. The Contractor shall field coordinate the exact mounting location of the disconnect switch with the COR. The length of the liquid tight metal conduit must not exceed 6 feet.
e. BID OPTION: N/A
f. AS-BUILTS:
1) Contractor must create and submit as-built drawings of the Building A Roof.
a) Full sized plan set – 3 copies
b) Prepare Record Drawings in Autodesk AutoCAD (CAD). Produce 1
CD- ROM copy for the FAA Project Engineer.
c) One copy as PDF.
g. SPARE PARTS:
SUMMARY 01 10 00 - 4
1) Furnish 5% spare parts/materials (but no less than 1 of each). To be delivered to COR/RE at completion of project. Coordinate with COR/RE.
2. Project will be constructed under a single prime contract.
a. Contractor must supply a full item by item breakdown of their bid.
1.4 ACCESS TO SITE
A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
B. Use of Site: Limit use of Project site to the ZHU. Do not disturb portions of project site beyond areas in which the work is indicated. See limits of work on construction plans.
1. Limits: Space availability within the ZHU is extremely limited. The contractor must limit, confine, and coordinate operations, activities, storage of materials, placement of work trailer, and employee parking within the designated areas, as indicated on the construction staging plan, or as directed by the COR/RE. Refer to general and civil drawings for more information.
2. Access: Contractor and subcontractor equipment, personnel, and material delivery access route shall be through the East Entrance, or as designated by the COR/RE. Access to all parking areas must be kept unobstructed. If temporary access obstruction is unavoidable, the contractor must advise the COR/RE immediately. Vehicles transporting materials shall not be loaded beyond the capacity prescribed by federal, state, or local laws and shall contain only materials for the project being constructed and described in Part 1.3, section C of this Section (011000 – Summary). Obstruction of existing roadways and driveways to the ARTCC is strictly prohibited. Contractor is responsible for unloading delivery truck. See site and construction staging plan for entrance details.
3. Damage to Site: Damage to existing paving, lawns, curbs, sidewalks, and utilities caused by the contractor's activities must be repaired immediately. Any damage to the building, interior or exterior, that are a result of the contractor’s activities must be repaired. Any damage to adjacent finishes or new work by other contractors must be repaired immediately. The contractor must pay all costs of repairs. After notice to proceed and prior to the commencement of construction, the contractor and COR/RE shall conduct joint inspections of the existing areas affected by the construction. Existing damage or defects shall be noted and will be used as the basis for determination of damages caused by the contractor's operations.
4. Safety: The safety of the ZHU personnel is of UTMOST importance. Contractor MUST ensure that all construction debris, tools, and materials are out of reach or stored in an adequate locked box when contractor is not present or working. The job site/construction area MUST be kept clean at all times.
1.5 COORDINATION WITH OCCUPANTS
A. Partial Owner Occupancy: FAA personnel will occupy the premises during the entire construction period, with the exception of areas under construction. Cooperate with COR/RE during construction operations to minimize conflicts and facilitate continual usage of facility. Perform the Work so as not to interfere with facility operations. Maintain existing exits unless otherwise indicated.
SUMMARY 01 10 00 - 5
1. Existing Facility Operations: The ZHU is a 24-hour, 7 days per week operating facility. It will be necessary to coordinate all construction activities so as not to interfere with the facility’s operation. Work must be scheduled and planned by the contractor, and coordinated with the COR/RE so that normal facility operations may continue WITHOUT disruption and/or interference.
2. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO and/or COR/RE.
3. The General Contractor (GC) must not block the ZHU facility’s main entrance during the entire construction period, especially during controller shift changes, 06:30AM - 08:00AM and 02:30PM - 04:00PM. Extensive coordination between the general contractor and FAA personnel (COR/RE) shall be required at all times.
4. Contractor must coordinate all night and weekend work with COR/RE.
5. GC must provide, on a weekly basis, a two-week look ahead schedule of work. Schedules must be submitted by 0500 hrs, every Thursday, to the COR/RE.
6. Provide not less than seventy-two (72) hours’ notice to COR/RE of activities that will affect the ZHU facility operations.
B. Project Coordination: The contractor must prepare a detailed schedule of work and work layout to resolve conflicts and to ensure coordination of the work by different trades. It shall be the duty of the contractor to resolve all coordination conflicts that arise among his subcontractors. The contractor shall coordinate all day-to-day schedules in advance with the COR/RE to prevent delays. Specific coordination may periodically be required. See Section 013100 (Project Management and Coordination) for more information.
C. Work Affecting Operational Systems: The contractor must coordinate all work, which has or may have any impact on any operation of the ZHU facility, through the COR/RE. The contractor must immediately cease any work, which is adversely impacting the operation of the ZHU facility, and must immediately repair or restore any portion of the facility that has been damaged or suffered diminished performance as a result of the contractor's activities.
D. Local Permits and Coordination: The Contractor shall be responsible for obtaining permits, payment of all building fees, inspection fees, utility connection charges and any other fees or charges which may be incurred in the performance of this contract.
E. Applicable Documents: The contractor shall comply with all local city, county, and state construction codes.
1.6 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and other requirements of authorities having jurisdiction.
B. On-Site Work Hours: All work hours, shifts, and overtime work must be coordinated with the COR/RE fourteen (14) days in advance. This is important due to security requirements. Before commencing construction, furnish to the COR/RE a statement of hours per day and days per week to normally be
SUMMARY 01 10 00 - 6
worked and approximate number of persons on the job for a normal work shift. The work hours for the project are to be from 08:00AM – 05:00PM, Monday through Friday. The contractor must observe all Federal Holidays and no overtime work will be allowed unless a request has been submitted and approved in writing at least 14 days in advance. Weekend work must be coordinated with the COR/RE and the ZHU facility at least 14 days in advance.
C. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to the ZHU facility.
1. Notify COR/RE not less than two (2) days in advance of proposed disruptive operations.
2. Obtain CO’s written permission before proceeding with disruptive operations.
3. Submit a Material Safety Data Sheet (MSDS) with samples of all potential vapor emitting materials to COR/RE. Allow a minimum of seven (7) days for review and approval of materials submitted.
4. Night work is permissible but must be coordinated with the COR/RE and approved by the facility management.
D. Nonsmoking Building: Smoking is not permitted within the building or within twenty-five (25) feet (8
m) of entrances, operable windows, or outdoor air intakes.
E. Controlled Substances: Use of tobacco products and other controlled substances within the existing building or the Project site is not permitted.
F. Employee Identification: See section 1.8 MICELLANEOUS PROVISIONS of this specification.
G. Employee Screening: Comply with FAA requirements regarding drug and background screening of Contractor personnel working on the Project site. See section 1.8 MISCELLANEOUS PROVISIONS of this specification.
1. Maintain an updated list of approved screened personnel with COR/RE.
1.7 HAZARDOUS MATERIAL CERTIFICATION
A. Asbestos free materials must be used on this project
1. Provide letters of certification for the project at completion, certifying that no asbestos was used.
B. Lead-free materials
1. Provide letters of certification for the project at completion, certifying that only lead-free paints, plumbing materials, and flashings were used.
1.8 ACCEPTANCE AND WARRANTIES
A. Upon substantial completion of work, the FAA will conduct Contractor Acceptance Inspections (CAI).
At the appropriate stage after the CAI, the work will be considered Substantially Complete, and the FAA will assume occupancy of the work at a date identified as Beneficial Occupancy Date (BOD). Other contractor acceptance inspections will be conducted prior to partial FAA occupancies. A final inspection, called Joint Acceptance Inspection (JAI), to determine FAA acceptance of the total work, will then be conducted.
SUMMARY 01 10 00 - 7
B. Contractor must provide written warranty for material and equipment furnished by the various manufacturers for the following periods:
1. General construction: 2-year warranty.
2. Mechanical and Plumbing: 2-year warranty, unless otherwise stated.
3. Electrical: 2-year warranty, unless otherwise stated.
4. All other equipment and finishes: 2-year warranty
1.9 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "must," "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on the Drawings are described in detail in the Specifications. One or more of the following are used on the Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.
3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.
1.10 MISCELLANEOUS PROVISIONS
A. Security Requirements
1. Security Guard: Contractor must use the existing guard house on the east entrance to the facility to check in prior to starting work for the day. See the construction staging plan for details. Unless otherwise directed by the CO or COR/RE during the pre-construction meeting.
2. Personnel List: Contractor must provide the COR/RE with a list of contractor's personnel who will require access to the site within twenty-four (24) hrs of arrival to site. The list must be kept current during project duration.
3. Security Investigation and Identification: Contractor's personnel may be subject to security investigation by FAA. Upon request by the CO, the contractor must promptly complete all security forms provided by the CO. If Contractor's personnel do not hold a “yellow” security badge or a contractor PIV card, then they must report to the FAA security guard at entrance to the facility and submit proper identification when signing in to obtain a “red” FAA visitor badge which will be worn on an outside garment at all times while on the facility premises. This badge must be returned daily to the security guard when leaving the premises, unless otherwise noted.
4. Vehicle Identification: Contractors and contractor's employees' vehicles must park as designated in the staging plans or as directed by the COR/RE.
SUMMARY 01 10 00 - 8
5. Escort Requirement: Work shall be arranged so that contractor's personnel can be escorted, when required by the FAA, in certain areas which are considered to be classified. Contractor's personnel shall not violate any security regulations pertaining to the ARTCC facility.
Contractor employee badging shall be per FAA Order 1600.72. This order defines two types of clearances (or security background checks) “Suitability Agency Clearance (SAC) (yellow badge), and National Agency Check with Inquires (NACI) (blue badge). SAC and NACI background checks may require up to one-hundred twenty (120) days. Typically contractors that are expected to be at the site over forty-five (45) days need to get badged with a SAC background check as a minimum. Other workers not expected to be at the site over forty-five (45) days can obtain a visitor badge on a daily basis, however, only those employees with a NACI Badge (blue) can escort daily visitors. The contractor must obtain the adequate number of NACI badges (blue) to be able to escort daily visitors, or obtain SAC badges (yel-low) for ALL expected workers.
6. Right to Search: Current procedures at FAA facilities include the "right to search." If in the judgment of the FAA a cause to search a vehicle or the person of personnel exists, such search will be made.
7. Replacement of Lost Identification: The FAA will provide personnel badges and vehicle identification tags as described above. It is the contractor's responsibility to return these badges and tags daily and upon completion of the project. The contractor shall be liable to pay for any FAA badge or tag not returned or replaced at the completion of the work. The payment for a lost I.D. shall be $100.00 for each and every tag or badge not returned or replaced.
8. Physical Security: At the end of each workday, the contractor shall secure all construction areas by closing and locking all doors and gates. The contractor is responsible for the security of the staging area, and shall provide the required measures at no additional expense to the government.
9. Weapons: ABSOLUTELY NO WEAPONS in any way, shape, or form are allowed on the job site, facility premises, or inside contractor vehicles (company or personally owned). Any weapons found by Security guards, (Refer to No. 6: Right to Search), may be subject to confiscation.
Security guards also reserve the right to contact local law enforcement and/or Homeland Security.
Contractor will then be banned for life from any access to the ZHU facility.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. General project coordination procedures.
2. Administrative and supervisory personnel.
3. Requests for Information (RFIs).
4. Project meetings.
B. Related Sections:
1. Division 01 Section "Construction Progress Documentation" for preparing and submitting Contractor’s construction schedule.
2. Division 01 Section "Closeout Procedures" for coordinating closeout of the Contract.
1.3 DEFINITIONS
A. RFI: Request from COR/RE, Construction Manager, Project Engineer, or Contractor seeking information from each other during construction.
1.4 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for CO and separate contractors if coordination of their Work is required.
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of the schedule of values.
2. Installation and removal of temporary facilities and controls.
3. Delivery and processing of submittals.
4. Project closeout activities.
5. Startup and adjustment of systems.
6. Project closeout activities.
D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.
1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. Refer to other Sections for disposition of salvaged materials that are designated as Owner's property.
1.5 KEY PERSONNEL
A. Key Personnel Names: Within ten (10) days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site.
Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home, office, and cellular telephone numbers and email addresses. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project.
1. Post copies of list in project meeting room, in temporary field office, and by each temporary telephone. Keep list current at all times.
1.6 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. CO will return RFIs submitted to CO by other entities controlled by Contractor with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Project name.
2. Project number.
3. Date.
4. Name of Contractor.
5. Name of CO and Construction Manager.
6. RFI number, numbered sequentially.
7. RFI subject.
8. Specification Section number and title and related paragraphs, as appropriate.
9. Drawing number and detail references, as appropriate.
10. Field dimensions and conditions, as appropriate.
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3
11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
12. Contractor's signature.
13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Forms: See attached form at end of this section (RFI #XXX Form).
D. CO's and Construction Manager's Action: COR/RE will review each RFI, determine action required, and respond. Allow five (5) working days for COR/RE response for each RFI. RFIs received by COR/RE after 1:00 p.m. will be considered as received the following working day.
1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for coordination information already indicated in the Contract Documents.
d. Requests for adjustments in the Contract Time or the Contract Sum.
e. Requests for interpretation of COR/RE actions on submittals.
f. Incomplete RFIs or inaccurately prepared RFIs.
2. COR/RE action may include a request for additional information, in which case COR/RE time for response will date from time of receipt of additional information.
3. COR/RE action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Division 01 Section "Contract Modification Procedures."
a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify CO in writing within five (5) days of receipt of the RFI response.
E. On receipt of COR/RE action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify CO within five (5) days if Contractor disagrees with response.
F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly.
1. Project name.
2. Name and address of Contractor.
3. Name and address of CO and FAA.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date COR/RE response was received.
8. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal
Request, as appropriate.
9. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.
1.7 PROJECT MEETINGS
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 4
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify COR/RE of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including COR/RE, within three (3) days of the meeting.
B. Preconstruction Conference: COR/RE will schedule and conduct a preconstruction conference before starting construction, at a time convenient to COR/RE, but no later than fifteen (15) days after execution of the Agreement.
1. Conduct the conference to review responsibilities and personnel assignments.
2. Attendees: Authorized representatives of the FAA, COR/RE, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
3. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Designation of key personnel and their duties.
c. Lines of communications.
d. Procedures for processing field decisions and Change Orders.
e. Procedures for RFIs.
f. Submittal procedures.
g. Use of the premises and existing building.
h. Work restrictions.
i. Working hours.
j. Owner's occupancy requirements.
k. Procedures for disruptions and shutdowns.
l. Construction waste management and recycling.
m. Parking availability.
n. First aid.
o. Security.
p. Progress cleaning.
4. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.
C. Project Closeout Conference: COR/RE will schedule and conduct a Project closeout conference, at a time convenient to the FAA and COR/RE, but no later than ninety (90) days prior to the scheduled date of Substantial Completion.
1. Conduct the conference to review requirements and responsibilities related to Project closeout.
2. Attendees: Authorized representatives of FAA, COR/RE, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the meeting. Participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
3. Agenda: Discuss items of significance that could affect or delay Project closeout, including the following:
a. Procedures required prior to inspection for Substantial Completion and for final inspection for acceptance.
b. Submittal of written warranties.
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 5
c. Preparation of Contractor's punch list.
d. Responsibility for removing temporary facilities and controls.
4. Minutes: Entity conducting meeting will record and distribute meeting minutes.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 013100
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 6
Central Service Area 10101 Hillwood Parkway
Fort Worth, TX 76177
Texas, Louisiana, New Mexico, Oklahoma, Arkansas, Kansas, Iowa, Illinois, Indiana, Ohio, Minnesota, North Dakota, South Dakota, Missouri, Nebraska, Michigan, Wisconsin
REQUEST FOR INFORMATION No.
CONTRACTOR: CONTRACT #:
ADDRESS: PROJECT:
BUILDING A ROOF
REPLACEMENT
ZHU
Houston, TX
01 31 00_RFI #XXX Form Page 1 of 2
SUBJECT:
REQUEST/PROBLEM:
ATTACHMENTS: URGENT?
REPLY:
01 31 00_RFI #XXX Form Page 2 of 2
CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 1
SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:
1. Start-up construction schedule.
2. Contractor's construction schedule.
3. Daily construction reports.
B. Related Sections:
1. Division 01 Section "Submittal Procedures" for submitting schedules and reports.
2. Division 01 Section "Quality Requirements" for submitting a schedule of tests and inspections.
1.3 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.
1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.
2. Predecessor Activity: An activity that precedes another activity in the network.
3. Successor Activity: An activity that follows another activity in the network.
B. Cost Loading: The allocation of the schedule of values for the completion of an activity as scheduled.
The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by CO.
C. Event: The starting or ending point of an activity.
D. Float: The measure of leeway in starting and completing an activity.
1. Float time is not for the exclusive use or benefit of either FAA or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.
2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.
3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.
CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 2
E. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled.
1.4 INFORMATIONAL SUBMITTALS
A. Format for Submittals: Submit required submittals in the following format:
1. PDF electronic file.
2. Two (2) paper copies.
B. Start-up construction schedule:
1. Approval of cost-loaded start-up construction schedule will not constitute approval of schedule of values for cost-loaded activities.
C. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.
1. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.
D. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.
1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.
2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.
3. Total Float Report: List of all activities sorted in ascending order of total float.
4. Earnings Report: Compilation of Contractor's total earnings from the Notice to Proceed until most recent Application for Payment.
E. Daily Construction Reports: Submit at weekly intervals.
1.5 COORDINATION
A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.
B. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.
1. Secure time commitments for performing critical elements of the Work from entities involved.
2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.
PART 2 - PRODUCTS
CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 3
2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of final completion.
1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.
B. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:
1. Activity Duration: Define activities so no activity is longer than twenty (20) days, unless specifically allowed by CO.
2. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule.
Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.
3. Submittal Review Time: Include review and resubmittal times indicated in Division 01 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's construction schedule with submittal schedule.
4. Startup and Testing Time: Include not less than fifteen (15) days for startup and testing.
5. Substantial Completion: Indicate completion in advance of date established for Substantial
Completion, and allow time for CO's administrative procedures necessary for certification of Substantial Completion.
C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.
1. Phasing: Arrange list of activities on schedule by phase.
D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.
E. Cost Correlation: At the head of schedule, provide a cost correlation line, indicating planned and actual costs. On the line, show dollar volume of the Work performed as of dates used for preparation of payment requests.
F. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:
1. Unresolved issues.
2. Unanswered RFIs.
3. Rejected or unreturned submittals.
4. Notations on returned submittals.
G. Recovery Schedule: When periodic update indicates the Work is fourteen (14) or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, and equipment required to achieve compliance and date by which recovery will be accomplished.
H. Computer Scheduling Software: Prepare schedules using current version of a program that has been developed specifically to manage construction schedules.
CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 4
2.2 START-UP CONSTRUCTION SCHEDULE
A. Bar-Chart Schedule: Submit start-up horizontal bar-chart-type construction schedule within seven (7) days of date established for the Notice to Proceed.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. Outline significant construction activities for first ninety (90) days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities.
2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)
A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type, Contractor's construction schedule within thirty (30) days of date established for the Notice to Proceed.
Base schedule on the start-up construction schedule and additional information received since the start of Project.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
1. For construction activities that require three months or longer to complete, indicate an estimated completion percentage in ten (10) percent increments within time bar.
PART 3 - EXECUTION
3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Contractor's Construction Schedule Updating: At weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.
3. As the Work progresses, indicate final completion percentage for each activity.
B. Distribution: Distribute copies of approved schedule to CO, COR/RE, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.
1. Post copies in Project meeting rooms and temporary field offices.
2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.
END OF SECTION 013200
SUBMITTAL PROCEDURES 01 33 00 - 1
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals including the following:
1. Submittal schedule
2. Shop drawings
3. Product data
4. Samples
5. Quality assurance submittals
6. Operation and maintenance manuals
B. Administrative Submittals: Refer to other Sections of the Contract Documents for requirements for administrative submittals. Such submittals include, but are not limited to, the following:
1. Permits where required
2. Applications for payment
3. Performance and payment bonds
4. Insurance certificates
5. List of subcontractors
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require COR/RE’s responsive action. Action submittals are those submittals indicated in individual Specification Sections as action submittals.
B. Coordination Drawings show the relationship and integration of different construction elements that require careful coordination during fabrication or installation to fit in the space provided or to function as intended.
C. Field samples: Full-size physical examples erected on-site to illustrate finishes, coatings, or finish materials.
This is the start of the file's text. The full file is on GovTribe.