Attachment 3 SOW Hilo.pdf
PDF 160 KB Posted
- Solicitation number
- 697DCK-18-R-00238
About this file
Attachment 3 SOW Hilo (pdf)
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Scope | of | Work | |
| HILO | ATCT | Janitorial | Services |
1. GENERAL
| The | contractor | must | furnish | all | labor, | equipment, | materials, | supplies, | and | supervision | necessary | to | |
| provide | complete | janitorial | services | at | the | Federal | Aviation | Administration | (FAA) | HILO | Air | Traffic | |
| Control | Tower | (ATCT) | and | base | building | located | at | the | HILO | International | Airport, | Ailolo | Street, |
| Hilo, | Hawaii | 96740. |
| Access | for | the | contractor, | sub‐contractors, | employees, | deliveries, | etc., | must | be | through | the | main |
| entry | gate | of | the | facility | at | Ailolo | Street, | Hilo, | Hawaii. |
The building consists of approximately 6,624 square feet (SF) of total floor space.
| The | ATCT | has | 8 | levels, | including | the | ground | and | cab | levels. | The | ATCT | cab | has | approximately | 324 | |||
| SF. | The | ATCT | has | an | elevator | shaft | running | from | ground | level | to | the | 6th | floor | (or | junction | level). | ||
| The | ATCT | also | has | a | stairwell | running | from | the | ground | level | to | the | cab | level. | The | square | footage | of | |
| the | elevator | shaft | and | stairwell | are | not | subtracted | from | any | of | the | tower | level | square | footages | ||||
| listed | here. |
| All | areas | as | described | by | the | contract | may | be | categorized | as | I) | administrative | space, | II) | mechanical |
| and | equipment | space, | and | III) | air | traffic | space. |
The Hilo ATCT and base building are located at:
| Federal | Aviation | Administration | ||
| Hilo | Airport | Traffic | Control | Tower |
| Ailolo | Street | |||
| Hilo, | Hawaii | 96720 |
2. SERVICE REQUIREMENTS
| The | facility | areas | will | require | service, | per | the | attached | schedules | in | Attachment | #1. | Cleaning | must | |
| take | place | between | the | hours | of | 7:30a.m. | and | 3:30p.m., | Monday | thru | Friday. | The | service | schedule | |
| must | be | coordinated | with | the | Contracting | Officer’s | Representative | (COR), | unless | specified |
otherwise.
| Holidays | observed | by | the | government | during | the | term | of | this | contract | are | as | follows: | New | Year’s | |||||
| Day, | Martin | Luther | King’s | Birthday, | Presidents’ | Day, | Memorial | Day, | Independence | Day | (4th | of | July), | |||||||
| Labor | Day, | Columbus | Day, | Veteran’s | Day, | Thanksgiving | Day, | and | Christmas | Day. | If | the | holiday | falls | ||||||
| on | a | Saturday, | it | is | observed | on | Friday. | If | the | holiday | falls | on | a | Sunday, | it | is | observed | on | Monday. | |
| No | work | is | to | be | performed | on | holidays. |
3. CONTRACTOR PERSONNEL
| Project | Manager/Supervisor: | Contractor | is | to | provide | a | Project | Manager/Supervisor | who | will | be | |||||||
| responsible | for | the | performance | of | the | work. | The | name | of | this | person | and | an | alternate(s), | who | will | ||
| be | acting | on | behalf | of | the | contractor | when | the | manager | is | absent, | is | to | be | designated | in | writing | to |
| the | COR | prior | to | contract | start | date. | The | manager | and | alternate | are | to | be | knowledgeable | and | in | ||
| complete | control | of | the | contract | office | files | and | records. |
| 1) The | Project | Manager | must | have | full | authority | to | act | on | behalf | of | the | contractor | on | all |
| matters | relating | to | daily | functions | of | the | contract. |
| 2) The | Project | Manager | or | alternate | must | be | available | during | normal | duty | hours | to | meet |
| with | the | COR | to | discuss | immediate | problems. | The | Project | Manager | or | alternate | must | |
| respond | within | 2 | hours | after | notification. | The | contractor | must | provide | a | telephone | ||
| number | for | the | Project | Manager/alternate. |
3) The Project Manager must be able to read, write, speak, and understand the English language.
| Contractor | Employees: | Within | 14 | days, | the | contractor | must | submit | to | the | COR | a | list | of | names | of | |
| his/her | employees | who | will | be | working | at | the | facility | and | have | them | complete | all | necessary | |||
| security | clearance | forms. | The | list | must | include | a | Project | Manager/Supervisor’s | name | appointed | by | |||||
| the | contractor. | Thereafter, | the | contractor | must | notify | the | COR | of | any | additions | and/or | |||||
| terminations | within | 24 | hours | of | such | action. |
4. STANDARDS OF CONDUCT
| The | contractor | and | his | employees | will | be | subject | to | all | rules | and | regulations | relative | to | entering |
| and | leaving | the | site. | The | selection, | assignment, | reassignment, | transfer, | supervision, | management, | |||||
| and | control | of | contractor | employees | in | performance | of | the | work | is | the | responsibility | and | ||
| prerogative | of | the | contractor, | however, | the | contractor | must | comply | with | the | general | intent | and | ||
| specific | policies | set | forth | in | the | Statement | of | Work | and | in | FAA | regulations | concerning | the | conduct |
| of | employees | as | referenced | herein. | When | the | government | directs, | the | contractor | must | restrict | the | ||
| employment | under | the | contract | or | remove | from | performance | on | the | contract | any | person | who | is | |
| identified | as | a | potential | threat | to | the | health, | safety, | security, | or | operation | of | the | described | facilities. |
All employees will be physically able to do their assigned work and is to be free of communicable diseases.
| Contractor | employees | will | not | disturb | papers | on | desks, | open | desk | drawers, | or | cabinets. | Negligence | |||
| of | duties | will | not | be | condoned: | sleeping | on | duty, | unreasonable | delay, | or | failure | to | carry | out | |
| assigned | tasks, | conducting | personal | affairs | during | duty | hours, | or | using | the | telephone | for | other‐ | |||
| than‐official | business. |
| Contractor | employees | will | report | fires, | hazardous | conditions, | and | items | in | need | of | repair, | flickering |
| or | non‐operating | lights, | leaky | faucets, | toilet | stoppage, | etc. |
| Contractor | will | assure | that | specified | rooms | are | locked | after | cleaning | and | key | are | returned | to | the |
| designated | recipient. |
Contractor will assure that all articles found by employees are given to the COR.
| Disorderly | conduct, | use | of | abusive | or | offensive | language, | quarreling, | intimidation | by | words, | actions, | |
| or | fighting, | participation | in | activities | that | interfere | with | efficient | government | operations | will | not | be |
tolerated.
| While | on | duty | employees | are | not | to | possess, | sell, | consume, | or | be | under | the | influence | of | intoxicants, |
| drugs, | or | substances | which | produce | similar | effects. |
| The | contractor | must | not | employ | any | person | who | is | an | employee | of | the | United | States | Government | if |
| the | employment | of | that | person | would | create | a | conflict | of | interest. |
5. MATERIALS
| Contractor | will | furnish | all | supplies, | materials, | and | equipment | necessary | to | complete | contract | work, |
| including, | but | not | limited | to: |
Cleaners Detergents Polishes
| Plain | rags | |
| Hand | soap | (liquid) |
Disinfectants
| Floor | wax | |
| Dust | control | cloths |
Receptacles
| Toilet | paper, | unscented, | two‐ply | |||
| Toilet | seat | protective | covers | |||
| Plastic | liners | for | trash | containers/sanitary | napkin | receptacles |
| Dish | soap | (liquid) | ||||
| Paper | towels | (bathroom, | kitchen | and | cab) | |
| Tile | cleaner |
Deodorants
| All | materials | or | methods | not | specified | and | that | the | contractor | proposes | to | use | must | first | be | ||
| approved | by | the | COR. | It | is | not | intended | to | preclude | the | use | of | new, | accepted, | and | approved | |
| products | or | methods. |
6. EQUIPMENT
| Within | 48 | hours | after | contract | award, | the | contractor | is | to | submit | to | the | COR, | for | approval, | a |
| complete | list | of | equipment | to | be | utilized. |
| Equipment | used | must | be | safe | and | in | good | condition. | Electrical | appliances | must | be | the | most | |
| suitable | for | the | purpose | intended. | Electrical | receptacles | in | equipment | racks | are | not | to | be | used | |
| for | janitorial | purposes. |
7. UTILITIES
| Electrical | power | for | the | operation | of | equipment | will | be | furnished | by | the | government | at | existing |
| power | outlets. |
| Hot | and | cold | water | will | be | available | for | the | contractor | to | utilize | in | order | to | perform | contract | work. |
| 8. STORAGE | SPACE | / | JANITOR’S | CLOSET | / | LOCKER | ROOMS |
| Space | may | be | assigned | to | the | contractor | by | the | COR | for | the | storage | of | bulk | supplies | and | the |
| equipment | to | be | used | in | performance | of | the | contract | work. |
| If | space, | closets, | or | lockers | are | assigned | by | the | COR | to | be | used | by | the | contractor | employees, | any |
| government | furniture | or | equipment | placed | there, | such | as | tables, | desks, | chairs, | etc., | may | be | used, | |||
| but | are | to | be | returned | to | the | government | at | contract | termination | in | the | same | existing | condition | as | |
| was | upon | contract | award, | minus | reasonable | and | ordinary | wear | and | tear. | These | areas | are | to | be | ||
| swept | daily | and | kept | neat | and | clean. |
| Failure | to | keep | any | of | the | facilities | described | above | in | a | clean | and | orderly | condition | may | result | in |
| the | withdrawal | of | their | use. |
| The | government | will | not | be | held | responsible | for | damage | and/or | loss | to | contractor | employees’ |
| items | occasioned | by | fire, | theft, | accident, | or | otherwise. |
| Contractor | must | supply | a | cabinet | suitable | for | storing | flammable | supplies. | Material | Safety | Data | |||||||
| Sheets | are | to | be | kept | with | the | supplies, | and | a | list | of | such | supplies | will | be | submitted | to | the | COR. |
9. WORK SCHEDULE
| Within | fourteen | (14) | days | after | receipt | of | contract | award, | the | contractor | will | submit | to | the | COR, | for |
| approval, | a | complete | schedule | of | intended | work, | identifying | both | month | and | day | work | is | scheduled | ||
| to | be | accomplished. |
10. SAFETY PRECAUTIONS
| Contractor | will | instruct | his/her | employees | of | appropriate | safety | measures | and | will | not | permit | ||||||
| them | to | place | mops, | brooms, | machines, | or | other | equipment | in | trafficked | areas | or | other | locations | in | |||
| such | a | manner | as | to | create | a | safety | hazard. | Appropriate | signs | are | to | be | provided | by | the | contractor | |
| to | mark | areas | that | are | slippery | due | to | cleaning | or | waxing | operations. |
11. COMBUSTIBLE MATERIALS
| Rags, | mops, | brushes, | waxes, | and | other | materials | which | contain | a | residue | of | animal, | vegetable, | or | |
| mineral | oils | and | are | subject | to | spontaneous | combustion, | will | be | disposed | of | outside | the | building | in |
| an | approved, | tightly | covered | metal | containers | furnished | by | the | contractor. |
12. SANITARY CONDITIONS
| Dirty | water | and | cleaning | solutions | will | be | disposed | of | in | slop | sinks | for | floor | drains | designated | by | ||
| the | COR. | Floors | and | fixtures | where | water | is | obtained | and | disposed | of | will | be | kept | clean, | neat, | and | |
| sanitary | at | all | times. |
13. INSPECTIONS
| Mandatory | monthly | inspections | of | all | areas | will | be | made | jointly | by | the | COR | and | the | contractor. |
| Inspections | will | be | documented | on | FAA | Form | 4665‐3, | Contractor | Performance | Inspection | form | ||||
| (available | at | the | site). |
14. REDUCTION IN PAYMENT
| Upon | receipt | of | written | notification | by | the | Contracting | Officer | regarding | nonconformance | of | |||||
| contractual | services, | the | contractor | will | be | given | 24 | hours | to | provide | the | required | corrective | action. | ||
| If | after | 24 | hours | the | corrective | action | has | not | been | performed, | the | government | reserves | the | right | to |
| have | corrective | work | completed | by | another | source. | If | such | work | obtained | from | another | source, | the | ||
| amount | will | be | deducted | from | the | contractor’s | monthly | invoice | payment. |
| Repeated | failures | to | perform | work | as | required | by | the | Statement | of | Work | and | contract | documents |
| may | result | in | termination | of | the | contract. |
REQUIREMENT STANDARDS FOR SATISFACTORY PERFORMANCE
| ADMINISTRATIVE | AREAS: | Administrative | areas | are | all | areas | that | are | open | to | the | general | |||
| circulation | of | FAA | employees, | all | offices | and | break | rooms, | all | elevator | lobbies | and | vestibules | in | the |
| ATCT, | and | the | ATCT | stairwell. | See | later | sections | for | additional | descriptions | of | other | areas. |
| 1. TRASH: | All | trash | containers | must | contain | liners | and | are | to | be | replaced, | as | necessary. | All | waste, | ||
| including | paper, | bottles, | cups, | garbage, | packing | material, | and | empty | shipping | containers, | both | ||||||
| loose | and | in | waste | containers, | etc., | are | to | be | removed | by | the | contractor | daily. | Trash | containers | ||
| are | to | be | washed | and | disinfected | when | liners | rupture | or | leak, | or | as | needed. | Contractor | |||
| employees | must | not | disturb | papers | on | desks | or | open | desk | drawers | or | cabinets. | No | boxes | are | to | |
| be | removed | unless | placed | on | top | of | or | beside | a | trash | container. |
2. FLOORS: Carpet, vinyl, ceramic tile, sealed concrete, entry mats, runners, baseboards, and stairs.
| a. Carpet | – | Vacuum | all | carpet | with | an | agitating | brush | cleaner | daily. | Steam‐clean | all | carpet | by | spot | |
| cleaning, | shampooing, | and | dry | methods, | using | only | products | and | methods | recommended | by | |||||
| manufacturer’s | instructions | and | stain | removal | chart. | Carpet | is | to | be | free | of | spots, | stains, | dust, | ||
| and | dirt. | Scheduling | of | shampooing | is | to | be | coordinated | with | the | COR. |
| b. Vinyl | and | ceramic | tile | – | Sweep, | mop, | strip, | and | was | floors. | Floors | must | be | free | of | swirls, | |
| streaks, | scuffmarks, | and | greasy | film. | Floors | are | to | have | a | uniform, | glossy | appearance. |
| c. Rubber | tile | – | Sweep | and | mop | floors. | Do | not | use | wax | on | rubber | tiles. | |
| d. Sealed | concrete | (stairs | and | most | mechanical | areas) | – | Sweep | and | mop | floors | with | a | mild |
detergent. Do not use wax on sealed concrete surfaces.
| The | contractor | will | notify | the | COR | within | 24 | hours | of | 1) | any | cleaning | which | does | not | remove | stains |
| and/or | 2) | any | encountered | barriers | to | accomplishing | contract | requirements. | The | contractor | is | to | |||||
| recommend, | for | approval, | an | appropriate | course | of | action | to | correct | the | problem. | ||||||
| 3. LOW | CLEANING | – | WITHOUT | A | LADDER: | Walls | and | items | which | are | part | of | the | wall | (such | as |
| switch | plates), | items | installed | against | a | wall | (such | as | air | handling | units), | partitions, | doors, |
| window | sills, | wainscoting, | vents, | fire | extinguishers, | venetian | blinds, | chalk/white | boards, | etc. |
| a. Walls | are | to | be | free | of | dust, | fingerprints, | spots, | scuff, | and | other | marks. | |
| b. Formica | cabinets | and | decorative | woodwork | is | to | be | wiped | clean | and | treated | with | furniture |
| polish, | resulting | in | surfaces | free | of | dust, | spots, | fingerprints, | scuffs, | and | other | marks. |
| c. Unpainted | metalwork, | doorknobs, | switch | plates, | hardware, | and | fire | extinguishers, | etc., | are | to | be |
| free | of | dust | and | polished. | |||||||||||
| d. Boards | (both | chalk | and | white) | are | to | be | free | of | chalk | marks, | fingerprints, | streaks, | haze | and |
| written | material, | unless | marked | to | the | contrary. | ||
| e. Use | stainless | steel | cleaner/polish | on | all | stainless | steel | surfaces. |
| 4. HIGH | CLEANING | – | WITH | A | LADDER: | Ceiling | and | items | which | are | part | of | the | ceiling | (such | as | |
| light | fixtures) | and | those | areas | and | items | not | covered | in | previous | paragraphs; | overheads, | pipes, | ||||
| ducts, | air | discharge | assemblies, | tops | of | lockers | and | cabinets, | windows | and | window | ledges, | exit | ||||
| signs, | clocks, | venetian | blinds. | ELECTRONIC | EQUIPMENT | IS | EXCLUDED. |
| a. When | dusting | does | not | remove | accumulated | dirt | and | grime, | contractor | is | to | wash | area | with | a |
| suitable | cleaner, | resulting | in | dust‐free | high | areas. |
| b. Windows | and | other | glass | items | are | to | be | free | of | dust, | fingerprints, | streaks, | and | haze, | both | inside |
| and | outside. |
| 5. FURNITURE: | All | furniture | with | fabric | parts | will | be | cleaned | with | a | solution | that | will | not | damage | |
| the | fabric. | A | suitable | polish | and | cleaner | is | to | be | used | on | metal | and | wood | furniture. |
| a. Furniture | is | to | be | free | of | dust, | spots, | stains, | scuff | and | other | marks | that | are | removable | without |
| refinishing | the | furniture. |
| b. Waste | containers, | recycling | bins, | and | ash | receptacles | are | to | be | washed | inside | and | outside | and | ||||||
| are | to | be | free | of | trash, | ash, | spots, | dirty | marks, | and | odors. | The | ash | receptacles | are | to | be | full | of | |
| sand | or | appropriate | material | at | all | times | to | prevent | fires. |
| c. Drinking | fountains | are | to | be | wiped | and | polished | and | be | free | of | spots, | stains, | scale, | and | other |
| dirty | marks. | All | stainless | steel | surfaces | are | to | be | polished | with | stainless | steel | cleaner. |
6. RESTROOMS:
| a. Toilets, | floors, | sinks, | and | shelves | are | to | be | free | of | scum, | film, | scuffmarks, | water | spots, | and | odors. |
| Disinfectants | and | deodorizers | are | to | be | used | in | the | restrooms. |
| b. Fixtures, | dispensers, | and | visible | plumbing | are | to | be | free | of | dust, | film, | watermarks, | fingerprints, | |||
| and | other | marks | and | disinfected. | Polish | all | chrome | by | wiping | surface | with | a | clean | dry | cloth | |
| after | washing. |
| c. All | dispensers | are | to | be | filled | sufficiently | to | assure | constant, | adequate | supply. | Soap | dispensers |
| are | to | be | free | from | clogs. |
| d. Mirrors | are | to | be | free | of | spots, | streaks, | haze, | and | film. |
| e. Stainless | steel | surfaces | are | to | be | polished | with | stainless | steel | cleaner. |
| f. Abrasive‐type | cleaners | or | abrasive | cleaning | materials, | such | as | dry | cleanser, | “scotch |
| bright” | or | similar‐type | pads | are | not | to | be | used. | “Soft | scrub” | or | similar | products | with | a | stiff | |
| nylon | brush | may | be | used. | Cleaners | that | could | stain | or | discolor | surfaces | are | not | to | be | used. |
| 7. GLASS: | Includes | all | glass | partitions, | interior | and | exterior | glass | doors, | display | cases, | directory | |||
| boards, | tower | windows | (inside (Weekly) | and | outside(Monthly) | curtain | wall | glass | and | cab | |||||
| glass), | mirrors, | and adjacent | trim. | Windows | including | frames, | casings, | and | sills, | are | to | be | free | of | |
| spots, | dust, | dirt, streaks, | smudges, | water | deposits, | and | other | foreign | matter. |
| 8. OUTSIDE | GLASS: | Incudes | all | exterior | glass | doors, | tower | and | base | building | windows | (inside | and | ||
| outside), | and | adjacent | trim. | Windows, | including | frames, | casings, | and | sills, | are | to | be | free | of | |
| spots, | dust, | dirt, | streaks, | smudges, | water | deposits, | and | other | foreign | matter. | A | hose | bib | is | |
| available | on | the | walkway | of | the | cab | for | rinsing | glass | and | exterior | frames. |
| 9. MINI‐BLINDS: | Mini‐blinds | throughout | the | building | are | to | be | dusted. | If | dusting | is | insufficient | to | ||
| remove | accumulated | dirt, | blinds | are | to | be | removed | and | cleaned | with | an | ultrasonic | was | method. |
| 10. REFRIGERATOR: | Clean | and | deodorize | the | refrigerators. | Clean | the | outside | of | refrigerators, | |
| removing | handprints, | dirt, | and | scuffmarks. |
| 11. MICROWAVE | OVENS | & | OVEN/RANGE: | Interior | and | exterior | of | microwave | oven | and | ||
| oven/range | are | to | be | clean | and | free | of | handprints, | soil, | and | food | particles. |
| 12. COUNTERS, | SINKS, | AND | FIXTURES: | A | commercial | solution | should | be | used | to | remove | streaks, | ||
| stains, | smudges, | etc. | All | stainless | steel | surfaces | are | to | be | cleaned/polished | with | stainless | steel |
cleaner.
| 13. ELEVATOR: | All | plastic | laminate | and | vertical | surfaces | are | to | be | wiped | down | with | a | mild | |||
| detergent | solution. | Stainless | steel | surfaces | are | to | be | cleaned/polished | with | stainless | steel | ||||||
| cleaner | inside | car | and | at | car | call | buttons. | Plastic | light | diffuser | lens’ | are | to | be | removed | and | |
| dusted | or | washed. | Vinyl | tile | floor | is | to | be | mopped | and | waxed, | as | described | above. |
| 14. STAIRWELLS: | All | stairs | and | landings | are | to | be | swept | regularly | and | mopped, | as | needed. | Do | not | ||
| use | wax | on | rubber | treads. | All | horizontal | surfaces, | tops | of | lights, | handrails, | and | cove‐bases | are | |||
| to | be | washed | with | a | mild | detergent, | as | needed. |
| 15. LIGHTS: | Furnish, | replace, | and | properly | dispose | of | all | light | bulbs | that | burn | out | in | any | |
| administrative | space | inside | the | building. | Use | lamps | identical | to | the | type | replaced, | including | |||
| wattage, | energy | star | rating, | and | use | only | low | mercury | lamps | (green | ends | on | bulbs). | Contractor | |
| is | not | responsible | for | any | lights | inside | the | tower | cab, | in | any | mechanical | area, | inside | the elevator, |
| or | outside | the | building. |
| MECHANICAL | AND | EQUIPMENT | AREAS: | Mechanical | areas | consist | of | the | areas | secured | from | use | |
| by | the | general | flow | of | FAA | personnel. |
| 1. Trash | ‐ | Empty | all | trash | containers. | ||||||
| 2. Dusting | – | Dust | all | horizontal | surfaces, | equipment | fronts, | and | coverbases. | Use | electrostatic |
| dusters | and | be | cautious | around | equipment. | Do | no | put | yourself | in | the | position | of | hitting | any | |
| switches | or | wires | in | any | area. | Ensure | that | you | are | properly | supervised | by | Airways | Facilities | ||
| Maintenance | Personnel | (aka: | the | building | engineer) | to | protect | yourself | and | the | building | from | ||||
| inadvertently | taking | an | essential | piece | of | equipment | off‐line. |
| 3. Wiping | with | detergent | solution | – | Clean | all | surfaces | that | have | grime | or | dirt | that | cannot | be |
| removed | with | a | duster. |
| 4. Sweeping/Vacuuming | – | Sweep | and | vacuum | all | floors. | Steam‐clean | carpet | according | to |
| administrative | schedule. |
5. Mop and wax – Mop, as needed. Wax all vinyl tiles, according to the administrative schedule.
| AIR | TRAFFIC | AREAS: | The | air | traffic | areas | consist | of | the | ATCT | control | cab | and | the | ATCT | cab | stair. | |
| Cleaning | requirements | are | identical | to | the | administrative | areas | as | described | above | with | the | ||||||
| following | exceptions: |
| 1. The | ATCT | cab | console | instruments | are | to | be | free | of | dust, | spillage, | etc. | The | contractor | must | NOT | |
| use | any | cleaning | fluids | on | the | console | sloping | surface. | When | needed, | coordinate | with | airport | ||||
| traffic | controllers | and | pull | up | Plexiglas | writing | surface | to | clean | under | glass. | Do | not | touch | |||
| equipment | surfaces. |
| 2. Cab | glass | cleaning | includes | all | ATCT | windows | (inside | and | outside | cab | glass). | Windows, | |||
| including | frames, | casings, | and | sills, | are | to | be | free | of | spots, | dust, | dirt, | streaks, | smudges, | water |
| deposits, | and | other | foreign | matters. |
| 3. Tower | blinds | are | to | be | dry‐dusted | with | a | dry | electrostatic | medium | at | the | same | time | of | cab | glass |
| cleaning. | Pull | shades | completely | down | and | dust | both | sides. | Take | care | to | use | the | proper | |||
| equipment | to | prevent | damage | to | the | electronics | consoles. |
| 4. The | tower | cab | console | windows | are | to | be | cleaned | inside | and | outside | to | remove | all | dust, | ||
| fingerprints, | streaks, | haze, | etc. | This | service | is | to | be | on | an | as | needed | basis | due | to | occasional | |
| dust | storms. | Time | is | to | be | coordinated | with | the | COR, | during | daylight | hours, | to | accomplish | this |
task.
| Kona | International | Airport | Traffic | Control | Tower | (ATCT) | and | Base | Building |
| JANITORIAL | FREQUENCY | SCHEDULE |
Required Cleaning Days
| SOW | REF. | AREA | REQUIREMENT: | FREQUENCY: |
| ADMINISTRATIVE | AREAS |
| 1 | Empty | Trash | 4 | days | per | week |
| 2a | Vacuum | Floors | 1 | day | per | week |
| 2b,c,d | Sweep | Floors | 1 | day | per | week | |||
| 2b,c,d | Mop | & | Wax | Floors | 2 | days | per | month | |
| 2e | Steam | Clean | Carpet | 1st | day | of | Spring | and | Fall |
| 3 | Low | Cleaning | 1 | day | per | week | |||
| 4 | High | Cleaning | 1 | day | per | quarter | |||
| 5 | Furniture | 1 | day | per | week | ||||
| 6 | Restrooms | 4 | days | per | week | ||||
| 7 | Glass | Doors | and | Mirrors | 1 | day | per | week | |
| 8 | Mini‐blinds | 1st | day | of | Winter, | Spring, | Summer, | and | Fall |
| 9 | Outside | Glass | 2 | days | per | month | |||
| 10 | Refrigerator | 1 | day | per | week | ||||
| 11 | Microwave | & | Oven/range | 1 | day | per | week | ||
| 12 | Counters, | Sinks, | & | Fixtures | 1 | day | per | week | |
| 13 | Elevator | 2 | days | per | month | ||||
| 14 | Stairwells | 1 | day | per | week | ||||
| 15 | Lights | As | needed |
MECHANICAL/EQUIPMENT
AREAS
| 1 | Empty | Trash | 1 | day | per | week | |
| 2 | Dusting | 1 | day | per | week | ||
| 3 | Wipe | Down | 1 | day | per | week | |
| 4 | Sweeping/Vacuuming | 1 | day | per | week | ||
| 5 | Mop | & | Wax | 2 | days | per | month |
| AIR | TRAFFIC | AREAS | |||||
| 1 | ATCT | Tower | Consoles | 2 | days | per | month |
| 2 | Interior | & | Exterior | ATCT | Cab | Glass | Inside (Weekly) and Outside (Monthly) |
| 3 | ATCT | Cab | Blinds | 2 | days | per | month |
| 4 | Tower | Cab | Console | Windows | Inside (Weekly) and Outside (Monthly) |
| ***SPECIAL | CLEANING | REQUIREMENT: | Tower | Cab | cleaning | must | be | coordinated | with | local |
| Air | Traffic | Manager. |
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
| The | following | schedule | outlines | the | Government’s | plan | for | ensuring | contract | performance; | ||||||
| including | maximum | deductions | which | may | be | taken | should | deficiencies | be | found | for | the | noted | |||
| services. | The | Government | may, | at | its | option, | require | corrective | action | or | take | a | deduction | from | the | |
| monthly | invoice. | The | Contractor | will | be | notified | of | any | discrepancies | found, | and | will | have | an | ||
| opportunity | to | respond | to | the | deficiencies. | The | Government | has | the | right | to | inspect | services | at | any | |
| time. | Any | random | inspection | will | take | into | consideration | the | normally | scheduled | times | and | ||||
| frequencies | required | for | service | performance. | The | Contractor | is | entitled | to | a | joint | monthly | ||||
| inspection | each | month. | The | Contractor | is | to | coordinate | with | the | Contracting | Officer’s | |||||
| Representative | (COR) | when | a | joint | inspection | is | needed. | The | COR | may | also | initiate | a | joint | ||
| inspection, | which | will | be | coordinated | with | the | Contractor | Quality | Control | Representative | or | |||||
| his/her | designee. |
| Upon | request, | the | COR | is | entitled | to | review | the | results | of | the | Contractor’s | quality | control | program |
| and | internal | inspections. |
REQUIRED
SERVICE
PERFORMANCE
STANDARD
ALLOWABLE
DEVIATION
METHOD OF
SURVEILLANCE
MAX.
DEDUCTION
FOR DEVIATION
Remove Waste
| Per | SOW | and |
| Frequency | Schedule |
5 defects per month
Random Sampling 6%
Wash Wastebaskets
| Per | SOW | and |
| Frequency | Schedule |
None
Random Sampling 2%
Low Cleaning
| Per | SOW | and |
| Frequency | Schedule |
5 defects per month
Random Sampling 5%
High Cleaning
| Per | SOW | and |
| Frequency | Schedule |
None
Random Sampling 5%
| Spot | Clean |
| Woodwork, | Walls, |
| & | Partitions |
| Per | SOW | and |
| Frequency | Schedule |
5 defects per month
Random Sampling 5%
Clean Light Fixtures
| Per | SOW | and |
| Frequency | Schedule |
None
Random Sampling 3%
Sweep Floors & Hallways
| Per | SOW | and |
| Frequency | Schedule |
3% of area swept
Random Sampling 5%
Floor Maintenance
| Per | SOW | and |
| Frequency | Schedule |
3% of area maintained
Random Sampling
8%
Mop Floors
| Per | SOW | and |
| Frequency | Schedule |
3% of area mopped
Random Sampling 6%
Vacuum Carpet
| Per | SOW | and |
| 3% | of | carpeted |
Random Sampling 6%
Frequency Schedule area
Shampoo Carpet
| Per | SOW | and |
| Frequency | Schedule |
1% of carpeted area
100% Inspection
5%
Clean/Refill Restroom Dispensers
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
7%
| Clean | Restroom | |
| Fixtures | & | Floors |
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
8%
| Wash | Restroom | |
| Walls | & | Doors |
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
5%
Glass Cleaning
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
2%
Wash Windows
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
8%
Clean Refrigerators
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
3%
Clean Microwaves
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
3%
Clean Oven/Range
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
2%
| Clean | Counters, | |
| Sinks, | & | Fixtures |
| Per | SOW | and |
| Frequency | Schedule |
2 defects per month
Random Sampling
4%
Entrance/Entrance Mats Maintenance
| Per | SOW | and |
| Frequency | Schedule |
1 defect per month
Random Sampling
2%
File details come from the government source that posted it.