| Scope | of | Work | |
| Kona | ATCT | Janitorial | Services |
1. GENERAL
| The | contractor | must | furnish | all | labor, | equipment, | materials, | supplies, | and | supervision | necessary | to | |
| provide | complete | janitorial | services | at | the | Federal | Aviation | Administration | (FAA) | Kona | Air | Traffic | |
| Control | Tower | (ATCT) | and | base | building | located | at | the | Kona | International | Airport, | 73‐230 | Wekeula |
| Street, | Kailua‐Kona, | Hawaii | 96740. |
| Access | for | the | contractor, | sub‐contractors, | employees, | deliveries, | etc., | must | be | through | the | main |
| entry | gate | of | the | facility | at | 73‐230 | Weke’ula | Street, | Kailua‐Kona, | Hawaii. |
| The | building | consists | of | approximately | 7,242 | square | feet | (SF) | of | total | floor | space. | This | includes | all |
| room | in | the | base | building, | hallways, | and | Link. |
| The | ATCT | has | 7 | levels, | including | the | ground | and | cab | levels. | The | actual | building | area | contains | ||||
| approximately | 3,780 | SF. | The | ATCT | cab | has | approximately | 386 | SF. | The | ATCT | has | an | elevator | shaft | ||||
| running | from | ground | level | to | the | 6th | floor | (or | junction | level). | The | ATCT | also | has | a | stairwell | running | ||
| from | the | ground | level | to | the | cab | level. | The | square | footage | of | the | elevator | shaft | and | stairwell | are | not | |
| subtracted | from | any | of | the | tower | level | square | footages | listed | here. |
| All | areas | as | described | by | the | contract | may | be | categorized | as | I) | administrative | space, | II) | mechanical |
| and | equipment | space, | and | III) | air | traffic | space. |
The Kona ATCT and base building are located at:
| Federal | Aviation | Administration | ||
| Kona | Airport | Traffic | Control | Tower |
| 73‐230 | Weke‐ula | Street | ||
| Kailua‐Kona, | Hawaii | 96740 |
2. SERVICE REQUIREMENTS
| The | facility | areas | will | require | service, | per | the | attached | schedules | in | Attachment | #1. | Cleaning | must | |
| take | place | between | the | hours | of | 7:30a.m. | and | 3:30p.m., | Monday | thru | Friday. | The | service | schedule | |
| must | be | coordinated | with | the | Contracting | Officer’s | Representative | (COR), | unless | specified |
otherwise.
| Holidays | observed | by | the | government | during | the | term | of | this | contract | are | as | follows: | New | Year’s | |||||
| Day, | Martin | Luther | King’s | Birthday, | Presidents’ | Day, | Memorial | Day, | Independence | Day | (4th | of | July), | |||||||
| Labor | Day, | Columbus | Day, | Veteran’s | Day, | Thanksgiving | Day, | and | Christmas | Day. | If | the | holiday | falls | ||||||
| on | a | Saturday, | it | is | observed | on | Friday. | If | the | holiday | falls | on | a | Sunday, | it | is | observed | on | Monday. | |
| No | work | is | to | be | performed | on | holidays. |
3. CONTRACTOR PERSONNEL
| Project | Manager/Supervisor: | Contractor | is | to | provide | a | Project | Manager/Supervisor | who | will | be | |||||||
| responsible | for | the | performance | of | the | work. | The | name | of | this | person | and | an | alternate(s), | who | will | ||
| be | acting | on | behalf | of | the | contractor | when | the | manager | is | absent, | is | to | be | designated | in | writing | to |
| the | COR | prior | to | contract | start | date. | The | manager | and | alternate | are | to | be | knowledgeable | and | in | ||
| complete | control | of | the | contract | office | files | and | records. |
| 1) The | Project | Manager | must | have | full | authority | to | act | on | behalf | of | the | contractor | on | all |
| matters | relating | to | daily | functions | of | the | contract. |
| 2) The | Project | Manager | or | alternate | must | be | available | during | normal | duty | hours | to | meet |
| with | the | COR | to | discuss | immediate | problems. | The | Project | Manager | or | alternate | must | |
| respond | within | 2 | hours | after | notification. | The | contractor | must | provide | a | telephone | ||
| number | for | the | Project | Manager/alternate. |
3) The Project Manager must be able to read, write, speak, and understand the English language.
| Contractor | Employees: | Within | 14 | days, | the | contractor | must | submit | to | the | COR | a | list | of | names | of | |
| his/her | employees | who | will | be | working | at | the | facility | and | have | them | complete | all | necessary | |||
| security | clearance | forms. | The | list | must | include | a | Project | Manager/Supervisor’s | name | appointed | by | |||||
| the | contractor. | Thereafter, | the | contractor | must | notify | the | COR | of | any | additions | and/or | |||||
| terminations | within | 24 | hours | of | such | action. |
4. STANDARDS OF CONDUCT
| The | contractor | and | his | employees | will | be | subject | to | all | rules | and | regulations | relative | to | entering |
| and | leaving | the | site. | The | selection, | assignment, | reassignment, | transfer, | supervision, | management, | |||||
| and | control | of | contractor | employees | in | performance | of | the | work | is | the | responsibility | and | ||
| prerogative | of | the | contractor, | however, | the | contractor | must | comply | with | the | general | intent | and | ||
| specific | policies | set | forth | in | the | Statement | of | Work | and | in | FAA | regulations | concerning | the | conduct |
| of | employees | as | referenced | herein. | When | the | government | directs, | the | contractor | must | restrict | the | ||
| employment | under | the | contract | or | remove | from | performance | on | the | contract | any | person | who | is | |
| identified | as | a | potential | threat | to | the | health, | safety, | security, | or | operation | of | the | described | facilities. |
All employees will be physically able to do their assigned work and is to be free of communicable diseases.
| Contractor | employees | will | not | disturb | papers | on | desks, | open | desk | drawers, | or | cabinets. | Negligence | |||
| of | duties | will | not | be | condoned: | sleeping | on | duty, | unreasonable | delay, | or | failure | to | carry | out | |
| assigned | tasks, | conducting | personal | affairs | during | duty | hours, | or | using | the | telephone | for | other‐ | |||
| than‐official | business. |
| Contractor | employees | will | report | fires, | hazardous | conditions, | and | items | in | need | of | repair, | flickering |
| or | non‐operating | lights, | leaky | faucets, | toilet | stoppage, | etc. |
| Contractor | will | assure | that | specified | rooms | are | locked | after | cleaning | and | key | are | returned | to | the |
| designated | recipient. |
Contractor will assure that all articles found by employees are given to the COR.
| Disorderly | conduct, | use | of | abusive | or | offensive | language, | quarreling, | intimidation | by | words, | actions, | |
| or | fighting, | participation | in | activities | that | interfere | with | efficient | government | operations | will | not | be |
tolerated.
| While | on | duty | employees | are | not | to | possess, | sell, | consume, | or | be | under | the | influence | of | intoxicants, |
| drugs, | or | substances | which | produce | similar | effects. |
| The | contractor | must | not | employ | any | person | who | is | an | employee | of | the | United | States | Government | if |
| the | employment | of | that | person | would | create | a | conflict | of | interest. |
5. MATERIALS
| Contractor | will | furnish | all | supplies, | materials, | and | equipment | necessary | to | complete | contract | work, |
| including, | but | not | limited | to: |
| Cleaners | Receptacles | |||||||||
| Detergents | Light | bulbs | (for | regular | use | and | exit | signs) | ||
| Polishes | Toilet | paper, | unscented, | two‐ply | ||||||
| Plain | rags | Toilet | seat | protective | covers | |||||
| Hand | soap | (liquid) | Plastic | liners | for | trash | containers/sanitary | napkin | receptacles | |
| Disinfectants | Dish | soap | (liquid) | |||||||
| Floor | wax | Paper | towels | (bathroom, | kitchen | and | cab) | |||
| Dust | control | cloths | Tile | cleaner |
Deodorants
| All | materials | or | methods | not | specified | and | that | the | contractor | proposes | to | use | must | first | be | ||
| approved | by | the | COR. | It | is | not | intended | to | preclude | the | use | of | new, | accepted, | and | approved | |
| products | or | methods. |
6. EQUIPMENT
| Within | 48 | hours | after | contract | award, | the | contractor | is | to | submit | to | the | COR, | for | approval, | a |
| complete | list | of | equipment | to | be | utilized. |
| Equipment | used | must | be | safe | and | in | good | condition. | Electrical | appliances | must | be | the | most | |
| suitable | for | the | purpose | intended. | Electrical | receptacles | in | equipment | racks | are | not | to | be | used | |
| for | janitorial | purposes. |
7. UTILITIES
| Electrical | power | for | the | operation | of | equipment | will | be | furnished | by | the | government | at | existing |
| power | outlets. |
| Hot | and | cold | water | will | be | available | for | the | contractor | to | utilize | in | order | to | perform | contract | work. |
| 8. STORAGE | SPACE | / | JANITOR’S | CLOSET | / | LOCKER | ROOMS |
| Space | may | be | assigned | to | the | contractor | by | the | COR | for | the | storage | of | bulk | supplies | and | the |
| equipment | to | be | used | in | performance | of | the | contract | work. |
| If | space, | closets, | or | lockers | are | assigned | by | the | COR | to | be | used | by | the | contractor | employees, | any |
| government | furniture | or | equipment | placed | there, | such | as | tables, | desks, | chairs, | etc., | may | be | used, | |||
| but | are | to | be | returned | to | the | government | at | contract | termination | in | the | same | existing | condition | as | |
| was | upon | contract | award, | minus | reasonable | and | ordinary | wear | and | tear. | These | areas | are | to | be | ||
| swept | daily | and | kept | neat | and | clean. |
| Failure | to | keep | any | of | the | facilities | described | above | in | a | clean | and | orderly | condition | may | result | in |
| the | withdrawal | of | their | use. |
| The | government | will | not | be | held | responsible | for | damage | and/or | loss | to | contractor | employees’ |
| items | occasioned | by | fire, | theft, | accident, | or | otherwise. |
| Contractor | must | supply | a | cabinet | suitable | for | storing | flammable | supplies. | Material | Safety | Data | |||||||
| Sheets | are | to | be | kept | with | the | supplies, | and | a | list | of | such | supplies | will | be | submitted | to | the | COR. |
9. WORK SCHEDULE
| Within | fourteen | (14) | days | after | receipt | of | contract | award, | the | contractor | will | submit | to | the | COR, | for |
| approval, | a | complete | schedule | of | intended | work, | identifying | both | month | and | day | work | is | scheduled | ||
| to | be | accomplished. |
10. SAFETY PRECAUTIONS
| Contractor | will | instruct | his/her | employees | of | appropriate | safety | measures | and | will | not | permit | ||||||
| them | to | place | mops, | brooms, | machines, | or | other | equipment | in | trafficked | areas | or | other | locations | in | |||
| such | a | manner | as | to | create | a | safety | hazard. | Appropriate | signs | are | to | be | provided | by | the | contractor | |
| to | mark | areas | that | are | slippery | due | to | cleaning | or | waxing | operations. |
11. COMBUSTIBLE MATERIALS
| Rags, | mops, | brushes, | waxes, | and | other | materials | which | contain | a | residue | of | animal, | vegetable, | or | |
| mineral | oils | and | are | subject | to | spontaneous | combustion, | will | be | disposed | of | outside | the | building | in |
| an | approved, | tightly | covered | metal | containers | furnished | by | the | contractor. |
12. SANITARY CONDITIONS
| Dirty | water | and | cleaning | solutions | will | be | disposed | of | in | slop | sinks | for | floor | drains | designated | by | ||
| the | COR. | Floors | and | fixtures | where | water | is | obtained | and | disposed | of | will | be | kept | clean, | neat, | and | |
| sanitary | at | all | times. |
13. INSPECTIONS
| Mandatory | monthly | inspections | of | all | areas | will | be | made | jointly | by | the | COR | and | the | contractor. |
| Inspections | will | be | documented | on | FAA | Form | 4665‐3, | Contractor | Performance | Inspection | form | ||||
| (available | at | the | site). |
14. REDUCTION IN PAYMENT
| Upon | receipt | of | written | notification | by | the | Contracting | Officer | regarding | nonconformance | of | |||||
| contractual | services, | the | contractor | will | be | given | 24 | hours | to | provide | the | required | corrective | action. | ||
| If | after | 24 | hours | the | corrective | action | has | not | been | performed, | the | government | reserves | the | right | to |
| have | corrective | work | completed | by | another | source. | If | such | work | obtained | from | another | source, | the | ||
| amount | will | be | deducted | from | the | contractor’s | monthly | invoice | payment. |
| Repeated | failures | to | perform | work | as | required | by | the | Statement | of | Work | and | contract | documents |
| may | result | in | termination | of | the | contract. |
REQUIREMENT STANDARDS FOR SATISFACTORY PERFORMANCE
| ADMINISTRATIVE | AREAS: | Administrative | areas | are | all | areas | that | are | open | to | the | general | |||
| circulation | of | FAA | employees, | all | offices | and | break | rooms, | all | elevator | lobbies | and | vestibules | in | the |
| ATCT, | and | the | ATCT | stairwell. | See | later | sections | for | additional | descriptions | of | other | areas. |
1. TRASH: All trash containers must contain liners and are to be replaced, as necessary. All waste,
| including | paper, | bottles, | cups, | garbage, | packing | material, | and | empty | shipping | containers, | both | ||||||
| loose | and | in | waste | containers, | etc., | are | to | be | removed | by | the | contractor | daily. | Trash | containers | ||
| are | to | be | washed | and | disinfected | when | liners | rupture | or | leak, | or | as | needed. | Contractor | |||
| employees | must | not | disturb | papers | on | desks | or | open | desk | drawers | or | cabinets. | No | boxes | are | to | |
| be | removed | unless | placed | on | top | of | or | beside | a | trash | container. |
2. FLOORS: Carpet, vinyl, ceramic tile, sealed concrete, entry mats, runners, baseboards, and stairs.
a. Carpet – Vacuum all carpet with an agitating brush cleaner daily. Steam‐clean all carpet by spot
| cleaning, | shampooing, | and | dry | methods, | using | only | products | and | methods | recommended | by | ||||
| manufacturer’s | instructions | and | stain | removal | chart. | Carpet | is | to | be | free | of | spots, | stains, | dust, | |
| and | dirt. | Scheduling | of | shampooing | is | to | be | coordinated | with | the | COR. |
| b. Vinyl | and | ceramic | tile | – | Sweep, | mop, | strip, | and | was | floors. | Floors | must | be | free | of | swirls, | |
| streaks, | scuffmarks, | and | greasy | film. | Floors | are | to | have | a | uniform, | glossy | appearance. |
| c. Rubber | tile | – | Sweep | and | mop | floors. | Do | not | use | wax | on | rubber | tiles. | |
| d. Sealed | concrete | (stairs | and | most | mechanical | areas) | – | Sweep | and | mop | floors | with | a | mild |
detergent. Do not use wax on sealed concrete surfaces.
| The | contractor | will | notify | the | COR | within | 24 | hours | of | 1) | any | cleaning | which | does | not | remove | stains |
| and/or | 2) | any | encountered | barriers | to | accomplishing | contract | requirements. | The | contractor | is | to | |||||
| recommend, | for | approval, | an | appropriate | course | of | action | to | correct | the | problem. | ||||||
| 3. LOW | CLEANING | – | WITHOUT | A | LADDER: | Walls | and | items | which | are | part | of | the | wall | (such | as |
| switch | plates), | items | installed | against | a | wall | (such | as | air | handling | units), | partitions, | doors, |
| window | sills, | wainscoting, | vents, | fire | extinguishers, | venetian | blinds, | chalk/white | boards, | etc. |
| a. Walls | are | to | be | free | of | dust, | fingerprints, | spots, | scuff, | and | other | marks. | |
| b. Formica | cabinets | and | decorative | woodwork | is | to | be | wiped | clean | and | treated | with | furniture |
| polish, | resulting | in | surfaces | free | of | dust, | spots, | fingerprints, | scuffs, | and | other | marks. |
| c. Unpainted | metalwork, | doorknobs, | switch | plates, | hardware, | and | fire | extinguishers, | etc., | are | to | be |
| free | of | dust | and | polished. | |||||||||||
| d. Boards | (both | chalk | and | white) | are | to | be | free | of | chalk | marks, | fingerprints, | streaks, | haze | and |
| written | material, | unless | marked | to | the | contrary. | ||
| e. Use | stainless | steel | cleaner/polish | on | all | stainless | steel | surfaces. |
4. HIGH CLEANING – WITH A LADDER: Ceiling and items which are part of the ceiling (such as
| light | fixtures) | and | those | areas | and | items | not | covered | in | previous | paragraphs; | overheads, | pipes, |
| ducts, | air | discharge | assemblies, | tops | of | lockers | and | cabinets, | windows | and | window | ledges, | exit |
| signs, | clocks, | venetian | blinds. | ELECTRONIC | EQUIPMENT | IS | EXCLUDED. |
a. When dusting does not remove accumulated dirt and grime, contractor is to wash area with a
| suitable | cleaner, | resulting | in | dust‐free | high | areas. | ||||||||||
| b. Windows | and | other | glass | items | are | to | be | free | of | dust, | fingerprints, | streaks, | and | haze, | both | inside |
and outside.
5. FURNITURE: All furniture with fabric parts will be cleaned with a solution that will not damage the fabric. A suitable polish and cleaner is to be used on metal and wood furniture.
a. Furniture is to be free of dust, spots, stains, scuff and other marks that are removable without
| refinishing | the | furniture. | ||||||||||||
| b. Waste | containers, | recycling | bins, | and | ash | receptacles | are | to | be | washed | inside | and | outside | and |
| are | to | be | free | of | trash, | ash, | spots, | dirty | marks, | and | odors. | The | ash | receptacles | are | to | be | full | of |
| sand | or | appropriate | material | at | all | times | to | prevent | fires. |
| c. Drinking | fountains | are | to | be | wiped | and | polished | and | be | free | of | spots, | stains, | scale, | and | other |
| dirty | marks. | All | stainless | steel | surfaces | are | to | be | polished | with | stainless | steel | cleaner. |
6. RESTROOMS:
a. Toilets, floors, sinks, and shelves are to be free of scum, film, scuffmarks, water spots, and odors.
| Disinfectants | and | deodorizers | are | to | be | used | in | the | restrooms. | ||||
| b. Fixtures, | dispensers, | and | visible | plumbing | are | to | be | free | of | dust, | film, | watermarks, | fingerprints, |
| and | other | marks | and | disinfected. | Polish | all | chrome | by | wiping | surface | with | a | clean | dry | cloth |
| after | washing. |
| c. All | dispensers | are | to | be | filled | sufficiently | to | assure | constant, | adequate | supply. | Soap | dispensers |
| are | to | be | free | from | clogs. |
| d. Mirrors | are | to | be | free | of | spots, | streaks, | haze, | and | film. |
| e. Stainless | steel | surfaces | are | to | be | polished | with | stainless | steel | cleaner. |
| f. Abrasive‐type | cleaners | or | abrasive | cleaning | materials, | such | as | dry | cleanser, | “scotch |
| bright” | or | similar‐type | pads | are | not | to | be | used. | “Soft | scrub” | or | similar | products | with | a | stiff | |
| nylon | brush | may | be | used. | Cleaners | that | could | stain | or | discolor | surfaces | are | not | to | be | used. |
| 7. GLASS: | Includes | all | glass | partitions, | interior | and | exterior | glass | doors, | display | cases, | directory | ||||
| boards, | tower | windows | (inside | and | outside | curtain | wall | glass | and | cab | glass), | mirrors, | and | |||
| adjacent | trim. | Windows | including | frames, | casings, | and | sills, | are | to | be | free | of | spots, | dust, | dirt, | |
| streaks, | smudges, | water | deposits, | and | other | foreign | matter. |
8. OUTSIDE GLASS: Incudes all exterior glass doors, tower and base building windows (inside and
| outside), | and | adjacent | trim. | Windows, | including | frames, | casings, | and | sills, | are | to | be | free | of | |
| spots, | dust, | dirt, | streaks, | smudges, | water | deposits, | and | other | foreign | matter. | A | hose | bib | is | |
| available | on | the | walkway | of | the | cab | for | rinsing | glass | and | exterior | frames. |
9. MINI‐BLINDS: Mini‐blinds throughout the building are to be dusted. If dusting is insufficient to remove accumulated dirt, blinds are to be removed and cleaned with an ultrasonic was method.
10. REFRIGERATOR: Clean and deodorize the refrigerators. Clean the outside of refrigerators, removing handprints, dirt, and scuffmarks.
11. MICROWAVE OVENS & OVEN/RANGE: Interior and exterior of microwave oven and oven/range are to be clean and free of handprints, soil, and food particles.
12. COUNTERS, SINKS, AND FIXTURES: A commercial solution should be used to remove streaks, stains, smudges, etc. All stainless steel surfaces are to be cleaned/polished with stainless steel cleaner.
13. ELEVATOR: All plastic laminate and vertical surfaces are to be wiped down with a mild
| detergent | solution. | Stainless | steel | surfaces | are | to | be | cleaned/polished | with | stainless | steel | ||||||
| cleaner | inside | car | and | at | car | call | buttons. | Plastic | light | diffuser | lens’ | are | to | be | removed | and | |
| dusted | or | washed. | Vinyl | tile | floor | is | to | be | mopped | and | waxed, | as | described | above. |
14. STAIRWELLS: All stairs and landings are to be swept regularly and mopped, as needed. Do not
| use | wax | on | rubber | treads. | All | horizontal | surfaces, | tops | of | lights, | handrails, | and | cove‐bases | are | |
| to | be | washed | with | a | mild | detergent, | as | needed. |
15. LIGHTS: Furnish, replace, and properly dispose of all light bulbs that burn out in any
| administrative | space | inside | the | building. | Use | lamps | identical | to | the | type | replaced, | including | |||
| wattage, | energy | star | rating, | and | use | only | low | mercury | lamps | (green | ends | on | bulbs). | Contractor | |
| is | not | responsible | for | any | lights | inside | the | tower | cab, | in | any | mechanical | area, | inside | the |
| elevator, | or | outside | the | building. |
| MECHANICAL | AND | EQUIPMENT | AREAS: | Mechanical | areas | consist | of | the | areas | secured | from | use | |
| by | the | general | flow | of | FAA | personnel. |
| 1. Trash | ‐ | Empty | all | trash | containers. | ||||||
| 2. Dusting | – | Dust | all | horizontal | surfaces, | equipment | fronts, | and | coverbases. | Use | electrostatic |
| dusters | and | be | cautious | around | equipment. | Do | no | put | yourself | in | the | position | of | hitting | any | |
| switches | or | wires | in | any | area. | Ensure | that | you | are | properly | supervised | by | Airways | Facilities | ||
| Maintenance | Personnel | (aka: | the | building | engineer) | to | protect | yourself | and | the | building | from | ||||
| inadvertently | taking | an | essential | piece | of | equipment | off‐line. |
| 3. Wiping | with | detergent | solution | – | Clean | all | surfaces | that | have | grime | or | dirt | that | cannot | be |
| removed | with | a | duster. |
| 4. Sweeping/Vacuuming | – | Sweep | and | vacuum | all | floors. | Steam‐clean | carpet | according | to |
| administrative | schedule. |
5. Mop and wax – Mop, as needed. Wax all vinyl tiles, according to the administrative schedule.
| AIR | TRAFFIC | AREAS: | The | air | traffic | areas | consist | of | the | ATCT | control | cab | and | the | ATCT | cab | stair. | |
| Cleaning | requirements | are | identical | to | the | administrative | areas | as | described | above | with | the | ||||||
| following | exceptions: |
1. The ATCT cab console instruments are to be free of dust, spillage, etc. The contractor must NOT
| use | any | cleaning | fluids | on | the | console | sloping | surface. | When | needed, | coordinate | with | airport | ||
| traffic | controllers | and | pull | up | Plexiglas | writing | surface | to | clean | under | glass. | Do | not | touch | |
| equipment | surfaces. |
| 2. Cab | glass | cleaning | includes | all | ATCT | windows | (inside | and | outside | cab | glass). | Windows, | |||
| including | frames, | casings, | and | sills, | are | to | be | free | of | spots, | dust, | dirt, | streaks, | smudges, | water |
| deposits, | and | other | foreign | matters. |
| 3. Tower | blinds | are | to | be | dry‐dusted | with | a | dry | electrostatic | medium | at | the | same | time | of | cab | glass |
| cleaning. | Pull | shades | completely | down | and | dust | both | sides. | Take | care | to | use | the | proper | |||
| equipment | to | prevent | damage | to | the | electronics | consoles. |
| 4. The | tower | cab | console | windows | are | to | be | cleaned | inside | and | outside | to | remove | all | dust, | ||
| fingerprints, | streaks, | haze, | etc. | This | service | is | to | be | on | an | as | needed | basis | due | to | occasional | |
| dust | storms. | Time | is | to | be | coordinated | with | the | COR, | during | daylight | hours, | to | accomplish | this |
task.
| Kona | International | Airport | Traffic | Control | Tower | (ATCT) | and | Base | Building |
| JANITORIAL | FREQUENCY | SCHEDULE |
Required Cleaning Days
SOW REF. AREA REQUIREMENT: FREQUENCY:
| ADMINISTRATIVE | AREAS | |||||
| 1 | Empty | Trash | 3 | days | per | week |
| 2a | Vacuum | Floors | 1 | day | per | week |
| 2b,c,d | Sweep | Floors | 1 | day | per | week | |||
| 2b,c,d | Mop | & | Wax | Floors | 2 | days | per | month | |
| 2e | Steam | Clean | Carpet | 1st | day | of | Spring | and | Fall |
| 3 | Low | Cleaning | 1 | day | per | week | |||
| 4 | High | Cleaning | 1 | day | per | quarter | |||
| 5 | Furniture | 1 | day | per | week | ||||
| 6 | Restrooms | 3 | days | per | week | ||||
| 7 | Glass | Doors | and | Mirrors | 1 | day | per | week | |
| 8 | Mini‐blinds | 1st | day | of | Winter, | Spring, | Summer, | and | Fall |
| 9 | Outside | Glass | 2 | days | per | month | |||
| 10 | Refrigerator | 1 | day | per | week | ||||
| 11 | Microwave | & | Oven/range | 1 | day | per | week | ||
| 12 | Counters, | Sinks, | & | Fixtures | 1 | day | per | week | |
| 13 | Elevator | 2 | days | per | month | ||||
| 14 | Stairwells | 1 | day | per | week | ||||
| 15 | Lights | As | needed | ||||||
| MECHANICAL/EQUIPMENT |
AREAS
| 1 | Empty | Trash | 1 | day | per | week | ||||
| 2 | Dusting | 1 | day | per | week | |||||
| 3 | Wipe | Down | 1 | day | per | week | ||||
| 4 | Sweeping/Vacuuming | 1 | day | per | week | |||||
| 5 | Mop | & | Wax | 2 | days | per | month | |||
| AIR | TRAFFIC | AREAS | ||||||||
| 1 | ATCT | Tower | Consoles | 2 | days | per | month | |||
| 2 | Interior | & | Exterior | ATCT | Cab | Glass | 2 | days | per | month |
| 3 | ATCT | Cab | Blinds | 2 | days | per | month | |||
| 4 | Tower | Cab | Console | Windows | As | needed |
| ***SPECIAL | CLEANING | REQUIREMENT: | Tower | Cab | cleaning | must | be | coordinated | with | local |
| Air | Traffic | Manager. |
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
| The | following | schedule | outlines | the | Government’s | plan | for | ensuring | contract | performance; | ||||||
| including | maximum | deductions | which | may | be | taken | should | deficiencies | be | found | for | the | noted | |||
| services. | The | Government | may, | at | its | option, | require | corrective | action | or | take | a | deduction | from | the | |
| monthly | invoice. | The | Contractor | will | be | notified | of | any | discrepancies | found, | and | will | have | an | ||
| opportunity | to | respond | to | the | deficiencies. | The | Government | has | the | right | to | inspect | services | at | any | |
| time. | Any | random | inspection | will | take | into | consideration | the | normally | scheduled | times | and | ||||
| frequencies | required | for | service | performance. | The | Contractor | is | entitled | to | a | joint | monthly | ||||
| inspection | each | month. | The | Contractor | is | to | coordinate | with | the | Contracting | Officer’s | |||||
| Representative | (COR) | when | a | joint | inspection | is | needed. | The | COR | may | also | initiate | a | joint | ||
| inspection, | which | will | be | coordinated | with | the | Contractor | Quality | Control | Representative | or | |||||
| his/her | designee. |
| Upon | request, | the | COR | is | entitled | to | review | the | results | of | the | Contractor’s | quality | control | program |
| and | internal | inspections. |
REQUIRED
SERVICE
PERFORMANCE
STANDARD
ALLOWABLE
DEVIATION
METHOD OF
SURVEILLANCE
MAX.
DEDUCTION
FOR DEVIATION
Remove Waste
| Per | SOW | and |
| Frequency | Schedule |
5 defects per month
Random Sampling 6%
Wash Wastebaskets
| Per | SOW | and |
| Frequency | Schedule |
None
Random Sampling 2%
Low Cleaning
| Per | SOW | and |
| Frequency | Schedule |
5 defects per month
Random Sampling 5%
High Cleaning
| Per | SOW | and |
| Frequency | Schedule |
None
Random Sampling 5%
| Spot | Clean |
| Woodwork, | Walls, |
| & | Partitions |
| Per | SOW | and |
| Frequency | Schedule |
5 defects per month
Random Sampling 5%
Clean Light Fixtures
| Per | SOW | and |
| Frequency | Schedule |
None
Random Sampling 3%
Sweep Floors & Hallways
| Per | SOW | and |
| Frequency | Schedule |
3% of area swept
Random Sampling 5%
Floor Maintenance
| Per | SOW | and |
| Frequency | Schedule |
3% of area maintained
Random Sampling
8%
Mop Floors
| Per | SOW | and |
| Frequency | Schedule |
3% of area mopped
Random Sampling 6%
Vacuum Carpet
| Per | SOW | and |
| 3% | of | carpeted |
Random Sampling 6%
Frequency Schedule area
Shampoo Carpet
| Per | SOW | and |
| Frequency | Schedule |
1% of carpeted area
100% Inspection
5%
Clean/Refill Restroom Dispensers
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
7%
| Clean | Restroom | |
| Fixtures | & | Floors |
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
8%
| Wash | Restroom | |
| Walls | & | Doors |
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
5%
Glass Cleaning
| Per | SOW | and |
| Frequency | Schedule |
3 defects per month
Random Sampling
2%
Wash Windows
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
8%
Clean Refrigerators
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
3%
Clean Microwaves
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
3%
Clean Oven/Range
| Per | SOW | and |
| Frequency | Schedule |
None
100% Inspection
2%
| Clean | Counters, | |
| Sinks, | & | Fixtures |
| Per | SOW | and |
| Frequency | Schedule |
2 defects per month
Random Sampling
4%
Entrance/Entrance Mats Maintenance
| Per | SOW | and |
| Frequency | Schedule |
1 defect per month
Random Sampling
2%