HTI ARSR Blank SOV.pdf
PDF 112 KB Posted
- Solicitation number
- 6973GH-26-R-00147
About this file
This is a Government Estimate template for a federal construction project. The document is marked "FOR OFFICIAL USE ONLY" and relates to Project HTI ARSR (Job Control Number 22002285), which involves refurbishment of a radar main building, replacement of a security gate, and electrical upgrades.
The estimate is structured across five major cost categories: General Conditions, Construction Materials, Demolition Work, Equipment Rental, and Miscellaneous expenses. General Conditions include mobilization/demobilization, foreman and crew vehicles, and dumpster services. Construction Materials encompass structural components (galvanized steel ribbed, rigid insulation, polyurethane sealant, wall and rust grip paint), security elements (burglar-proof windows, chain link fence with posts and footings, swing and slide gates), and comprehensive electrical infrastructure (800A and 400A panelboards, molded case breakers, heavy-duty disconnect switches, surge protection devices, and various gauge copper conductors and conduits). Demolition Work includes removal of radar building vents/openings, chain link fencing, gates, distribution panels, and main feeder power cables. Equipment Rental covers vacuum excavators, compactors, and bucket trucks/cranes. Miscellaneous work includes HAZMAT abatement, arc flash hazard analysis, third-party ground penetrating radar services, and site regravel for disturbed areas. The estimate template provides columns for material costs, labor costs, equipment costs, and other costs per unit and in total, with lines for subtotal calculations and additions for overhead, bonds/insurance, and profit percentages. The basis for estimate is identified as RSMeans & Previous Experience, and the document indicates it is Sheet 1 of 1.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT MEAS. # UNITS PER UNIT TOTAL PER UNIT TOTAL PER UNIT TOTAL PER UNIT TOTAL
GENERAL CONDITIONS $ - -
Mobilization /Demobilization Foreman vehicle Crew vehicle Dumpster Load, Haul dump
CONSTRUCTION MATERIALS
Steel Gal. ribbed Rigid insulation Polyurethane Sealant Wall Paint Rust Grip paint Fixed windows w/burglar proof Latch guards
Chain link fence inlcuding posts, footing & Gnd Double swing gate Slide gate including gate operator
800A NEMA1 panleboard assembly (MCB) 400A molded case breaker (I-line) W/ shunt 400A molded case breaker (I-line) 100A molded case breaker(I-Line) 15A-60A modled case breaker(QOB) 200 Amps heavy duty disconnect switch Raycap SPD 120VAC-3Ph #500 MCM Cu XHHW #3/0 AWG Cu THWN #1/0 AWG Cu XHHW #10 AWG Cu XHHW #6 AWG Cu THWN 4" PVC Coated RGS conduit 3/4" PVC Coated RGS conduit Miscellaneous electrical materials
DEMOLITION WORK
Main Radar building vents/openigs demolition Chain link fence demoltion Main gate demolition (chain link) Side gate demolition (chain link) 600A distribution panel demolition Main feeder power cable demolition
EQUIPMENT RENTAL
Vacuum Excavator Compactor Bucket Truck/Crane
MISCELLANEOUS
HAZMAT Abatement Arc flash hazard analysis (power study) GPR (3rd Party Ground Penetrating Radar) Regravel Site (Any Disturb Area)
SUBTOTAL
Overhead (%) Bonds/Insurance (%) Profit (%)
TOTAL
CLASS OF WORK Construction ESTIMATOR: CHECKED BY:
ORNAGANIZATION QUANTITY MATERIAL COST LABOR COST BY
SUBSYSTEM
TOTAL ITEM
COST
EQUIP COST OTHER
PROJECT: HTI ARSR - Refurbish Radar main building, replace security gate and electrical upgrades
BASIS FOR ESTIMATE
RSMEANS & Previous Experience
JCN: 22002285
FOR OFFICIAL USE ONLY
GOVERNMENT ESTIMATE Date Prepared SHEET ____1____ OF ____1____
HTI ARSR IGCE
File details come from the government source that posted it. Updated .