This document is a Questions and Answers (Q&A) sheet for Solicitation Number 6973GH-25-R-00157 for the FSM Parking Lot project. The Q&A addresses seven key questions from potential contractors, covering topics such as project scheduling, testing protocols, weather-related performance extensions, NAICS codes, and past performance requirements. Notable responses include: the period of performance is firm and will only be extended under severe adverse conditions, no specific testing protocols are required beyond FAA on-site representative inspections, either NAICS code 236220 or 238990 is acceptable, and past performance must demonstrate at least two projects within the last three years. The Q&A provides clarification on project expectations and requirements, helping potential bidders understand the scope and constraints of the federal contract opportunity for repairing a parking lot and installing a drainage pipe system at the Fort Smith Regional Airport.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6973GH-25-R-00157_Amd 0001.pdf | ||
| Contractors Release Form DOT F 4220.4.doc | DOC document | |
| SF-24_BidBond.pdf | ||
| SF-25_PerformanceBond.pdf | ||
| 6973GH-25-R-00157.pdf | ||
| SF-25A_PaymentBond.pdf | ||
| SOW_FSM ATCT Parking Lot.pdf | ||
| Wage Determination_Sebastion Co_AR.pdf | ||
| Offeror Organizational Experience Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Sheet
6973GH-25-R-00157; FSM Parking Lot
Q1. During the site visit, it was noted that phases 1, 2, and 3 are scheduled to be completed over the weekend. Considering the drying and curing times required for these phases, is it possible to extend the blockage of these areas if additional time is necessary?
A. I do not recall any discussion during the walkthrough requiring work being done over the weekend. We discussed that traffic may be routed around and that traffic plates could be utilized.
Q2. What specific testing and inspection protocols must be followed during and after the construction process to ensure compliance, quality, and safety?
A. The SOW does not require any specific testing protocols. Inspections will be performed by FAA on-site Representative.
Q3. Will the FAA extend the period of performance on the contract should the weather (specifically rain, snow, ice or cold temperatures below 50 degrees) not allow progress to occur on the project?
A. The period of performance listed in this requirement is firm and there would have to be a severe adverse condition for this to be extended.
Q4. Will Herbicide applications be required?
A. No
Q5. Will contractor be required to have a Quality Control person on site during working hours?
A. Contractor must have an onsite Superintendent in Accordance with Section 3.
PERSONNEL in the Statement of Work.
Q6. The SAM.gov posting states the NAICS is 236220 - Commercial and Institutional Building Construction. Page 55 of the Solicitation in Section 3.6.1-17 states the NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE (OCT 2022) The North American Industry Classification System (NAICS) code for this procurement is: 238990 which is “All Other Specialty Trade Contractors.” Will the government please confirm which is the correct NAICS for this requirement?
A. Either 236220 or 238990 are acceptable since they were both included.
Q7. Will the government change the past performance requirement from “at least two (2) projects underway or completed in the past three (3) years” to “at least two (2) projects underway or completed in the past five (5) years”?
A. The past performance requirement will stay within the last three (3) years.