Tab 21 SIR Amendment 6973GH-24-R-00262-00002.pdf
PDF 306 KB Posted
- Solicitation number
- 6973GH-24-R-00262
About this file
This is Amendment 0002 to solicitation 6973GH-24-R-00262, issued by the FAA AAQ-710 Logistics Center ACQ to provide responses to site visit RFIs (Requests for Information) for a roof replacement project. The amendment includes clarification that only the base building roof (not the Tower CAB) is included in scope, permission for contractors to photograph work areas but not other areas, guidance on pricing ACM abatement as a unit price bid option, confirmation that tapered rigid insulation should be included for concrete pitch, safety oversight requirements including an OSHA-defined competent person on-site, and worker training requirements.
Additional clarifications state that fully adhered single ply PVC roofing systems are acceptable, contractors must provide their own portable toilets, there are no liquidated damages or retainage requirements, and workers must be able to gain site access with no felony records. The proposal due date remains March 14, 2025 at 1700 EDT. This is an Infrastructure Investment and Jobs Act (IIJA) project being administered by the FAA Aeronautical Center in Oklahoma City.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 1
0002 03/05/2025
AAQ-710 LOGISTICS CENTER ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ710-AFN
OKLAHOMA CITY OK 73125
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-24-R-00262
1 copies to the issuing office.
02/11/2025
(x)
This requirement is an Infrastructure Investment and Jobs Act (IIJA) project.
JCN: 2008207
This Amendment 0002 is to provide site visit RFI's (Attachment 9 RFI's) rcvd along with the responses. No changes to the responses date as proposals will be due on 03/14/2025 at 1700
EDT. No other changes.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bryon R. Nolan
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
This Amendment 0002 is to provide site visit RFI's (Attachment 9 RFI's) rcvd along with the responses. No changes to the responses date as proposals will be due on 03/14/2025 at 1700 EDT. No other changes.
Tab 16 SIR 6973GH-24-R-00262 Attach 9- RFI’s
1. Question: Does this project include a roof replacement of the Tower CAB roof, base building of the ATCT roof, or both?
Response: The scope and intent of this project was only to address the base building.
2. Question: Will we be permitted to take photos of the roofing and components on the roof? In particular one item is the lightning protection system, as it will need to be removed during roof replacement then reinstalled.
Response: Yes, pictures will be permitted to be taken of the work areas and items included in the SOW. Any other photography not directly related to the project work elements is prohibited.
3. There is a large cost difference in abatement depending on what is found to be ACM. How would you like us to price the abatement cost?
Response: Bidders should submit their offers reflective of a unit price bid option covering the potential ACM abatement. This bid option can be exercised once the existing roof assembly is systematically demo’d and the sub layers are exposed fully. This bid option will be exercised on a unit basis depending on the magnitude of ACM present, if any.
4. Original RFP has metal decking, the core cuts indicated that there is concrete. Is there any indication of if the concrete has pitch or do we need to include pricing for tapering.
Response: There are no current drawings indicating pitch of concrete. Please plan to incorporate in pricing. This can be completed via tapered rigid insulation.
5. Is there any requirement for full-time safety oversight. If so what are the experience requirements for that role.
Response:
Training and Oversight
• Worker Training – All personnel should be trained in fall protection, ladder safety, and proper use of PPE.
• Competent Person Oversight – An OSHA-defined competent person should be on-site to inspect safety measures daily.
• Emergency Plan – Have a plan in place for rescue and first aid in case of an accident.
Daily Safety Inspections
• Verify that handrails are secure and can withstand required loads.
• Inspect harnesses, lanyards, and anchor points before use.
• Check for trip hazards, loose materials, or debris.
6. Is there any site specific training requirements
Response: No, but be aware that all workers will need to be able to gain access to the base/site. No felonies, etc.
7. Will there be liquidated damages in the contract, and if so, what is the daily amount?
Response: No there will not be liquidated damages in the contract.
8. Will any retainage be held for billing?
Response: No there will not be any retainage held for billing.
ADDITIONAL SIR MODIFICATION
1. The old drawing did not show a concrete deck, which we found when we took core samples at the bid walk. In order to expedite installation and keep noise levels down, a fully adhered single ply PVC roofing system will be considered an acceptable solution.
2. It was discussed that the site facilities are limited and the preference is for contractors to provide their own portable toilets. Please plan for this accordingly in the bid pricing.
File details come from the government source that posted it. Updated .