This document is a collection of Questions and Answers related to a Request for Information (RFI) for a federal contract opportunity for pre-assembled fiberglass equipment shelters.
The key details are: The Federal Aviation Administration (FAA) has a requirement for pre-assembled fiberglass equipment shelters to house electronic equipment at various government sites. The contract is for 1 year with 9 one-year option periods. Technical evaluation will be conducted prior to award and first article testing after. The shelters must be pre-assembled, insulated, dust-proof, and watertight. The NAICS code is 238990 - All Other Specialty Trade Contractors. This is a 100% small business set-aside. Proposals are due by April 25, 2024. The Q&A covers details about the foundation requirements, delivery logistics, shelter specifications, pricing, and other contract-related information.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6973GH-24-R-00004
20240429 RFIs
1. Are the 6' foundation designs the only requirement or construction/provision of foundations required at "ALL" delivery locations also?
Yes, the 6’ foundation is the standard foundation design.
2. Will any delivery locations have designated prepared spaces available or do we plan and price estimate providing all foundations that have to be constructed/prefabbed and brought in?
The delivery location will ensure that space is available and/or all construction of the foundation for the shelter is completed prior to its arrival.
3. Will there be FAA/Airport facilities teams at any locations during delivery/offload to confirm assist or be involved in completing electrical, utilities, anchoring or anything pertaining to final delivery/setup?
Yes, the delivery and offloading of the shelters will be coordinated with the site technicians/managers. The vendor will be responsible for the offloading and the delivery of the shelter. The site is responsible for the completing the electrical, utilities, anchoring of the shelter.
4. How many estimated shelters will go to FAA OK location?
Approximately 40 shelters per fiscal year.
5. Will foundations, set, install be required for deliveries to the FAA OK location?
Yes.
6. For the testing lot, will FAA need to do a visit of facility prior?
Yes.
7. Does past performance to local and state government merit first article test deliveries?
SIR provision AC0123(a)(1) specifically states, “…in production of the item for a federal government prime contract…”
8. Does the dust free requirement refer to airtight?
Yes, the shelters will house expensive aeronautical equipment within the shelters that will have to be dust free and airtight to protect it.
9. Page 10-11 reads that ISO 9001:2000 Standard shall Exist. We asked previously to learn this is N/A, just confirming again this is not required?
Requirement for ISO compliance/certification as removed from the specification. It was overlooked in the SIR. This is not a requirement.
10. Is 45 days the maximum delivery/installation time extension allowed?
Yes.
11. How frequent were electrical upgrades, cabling changes and any other modifications requested or needed?
Very frequent. The shelters requirements are mostly custom projects and designs.
12. Is travel compensation reimbursed if contractor needs to meet for inspections, upgrades, repairs, modifications?
Travel is not included in this contract.
13. Aluminum doors previously were a requirement, we did not see that listed is it no longer a requirement?
No, the aluminum door is still a requirement. Please see Section 15 “Door” within the FAA Shelter Equipment Specifications Doc below:
15.0 Door – The door must be of sufficient depth and strength to provide durability, insulation, and security to the structure. Manufacturer’s door must be equivalent or superior design to JRJ Alum-Fab part number D-C\D00053HL (hinge left) or D-C\D00053HR (hinge right).
14. It says the contractor is responsible to provide any cement/steel shelters if requested,..how many cement or steel shelters have been requested in the past contract?
Yes, during our current vendor contract we have provided 6 concrete shelters and two steel shelters.
15. Is the contractor allowed to determine what rating to provide for climate shelter will be going or all shelters built to maximum wind speed, snow, weather ratings?
No, all shelters will be built to maximum wind speed, snow, weather ratings.
16. Are Shelters required to be collapsible if hit by aircraft?
Yes, our standard fiber glassed shelters are provided to the airports because of their frangibility.
17. What is the highest quota anticipated for any month?
20 shelters a month.
18. To prebuild a few extra shelters to be proactive and shorten lead time, what is the most common shelter size ordered?
Our most common shelter dimensions requested are 10x12, 10x16, and 8x16 shelters. However, the FAA is not responsible for costs of any units “prebuilt” by the contractor for which a requirement does not exist or develop.
19. On the pricing schedule we are calculating a projection of 144 shelters per annual and 1440 shelters for full duration of the contract, is that procurement's estimate as well?
Under previous contracts, an average of 50 to 60 shelters a year have been ordered, for an estimated 500-600 shelters for the full duration of the contract.
20. With this quota being double from the previous year quantity of 70 shelters, and the product difference between the incumbent lightweight fiberglass shelters, which is less expensive than our vendor's high-quality fiberglass shelter product that is single-piece molded fiberglass reinforced plastic.
We anticipate a higher quote than the stated maximum contract value of $75,000.000.00 Has the contract value been considered to be doubled or is FAA procurement flexible to regard this increased valuation?
The maximum contract value can be changed after final contract is negotiated if lowest-priced/technical-acceptable proposal is greater than that amount.
21. Our vendor has been in business well over 2 decades and services federal government customers such as the US Coast Guard, US Navy, US Air Force and also Space Force, with an approved waiver of the First Article Testing shelters how soon can we anticipate beginning service or transition for our team to integrate FAA shelter orders into our current work orders? If by July, we prefer notice mid or even early May to ramp up personnel and supply orders at both facilities.
FAA will have to approve waiver for this contract. Contract start date/transition will be determined after proposals have been evaluated.
22. Is proof of insurance with 1. USA FAA statement and 2. required provisional statement due at proposal or to be awarded?
Proof of insurance is required after contract award.
23. Will we be able to submit any other questions based on FAA responses?
It is the FAA’s intent to receive proposals and begin evaluation as soon as possible. Further questions may be considered as time allows.