HAR RCAG Roof Details and Extra Pictures.pdf
PDF 7 MB Posted
- Solicitation number
- 6973GH-24-Q-00225
About this file
This document is a Solicitation for a federal contract opportunity to install a new roofing system on the Capital City Airport (HAR) Remote Communications Air-Ground (RCAG) building in New Cumberland, PA.
The solicitation, number 6973GH-24-Q-00225, is issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services. It is a 100% Set-Aside for Small Businesses, with an estimated value of $15k-$25k. The FAA intends to award one (1) Firm Fixed Price contract to the lowest price offeror eligible for award. The performance period is 30 calendar days after receiving Notice to Proceed. Key requirements include mechanically fastening 1.5" insulation board to the concrete deck, installing a fully adhered 60 mil EPDM roof membrane, and sealing joints between the concrete roof deck and exterior wall. Offerors must submit a completed RFQ 6973GH-24-Q-00225 document, including all representations and certifications. Responses are due by 8/5/24 at 1600 Central Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA Sheet HAR RCAG Roof.pdf | ||
| Contractors Release Form DOT F 4220.4.doc | DOC document | |
| Wage Determination_Cumberland PA_PA20240085.pdf | ||
| 6973GH-24-Q-00225.pdf | ||
| SOW - HAR RCAG Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTED BY:
APPROVED BY:
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
RCAG
INSTALLATION OF RCAG BUILDING ROOF
DETAILS
HARRISBURG HARRISBURG PA
DWG NO REV
SKETCH #1
SHEET SK 1DATE
07/11/2023
CLEAN EXISTING CONCRETE ROOF DECK
PRIOR TO INSTALLING NEW ROOFING SYSTEM
FULLY ADHERED 60 MIL EPDM
ROOF MEMBRANE
FASTEN AND INSTALL DRIP EDGE AND
CLEATE PER ROOFING SYSTEM
MANUFACTURERS DETAILS
MECHANICALLY
FASTEN 1 1/2"
INSULATION BOARD
TO CONCRTE DECK
2" X 6" PRESSURE TREATED NAILER FASTENED TO
EXISTING CONCRETE ROOF DECK. FASTENER SHALL
BE OFFSET FROM THE CONCRETE EDGE IN
ACCORDANCE WITH THE FASTNER REQUIREMENTS
ROOFING DETAILS
27'-0"
RCAG BUILDING WALL
PRESSURE SENSITIVE RUBBER FLASHING AND SEALANT PER
ROOFING SYSTEM MANUFACTURERS DETAILS
EXISTING 5" CONCRETE ROOF DECK
'-0
ROOF DECK PLAN
NTS
INSTALL CAULKING IN JOINT
BETWEEN THE CONCRETE ROOF
DECK AND THE EXTERIOR WALL
| HAR RCAG Roof Details and Extra Pictures |
| Page-1� |
HAR RCAG Extra Pictures
File details come from the government source that posted it. Updated .