About this file

This document is a Solicitation for a federal contract opportunity to install a new roofing system on the Capital City Airport (HAR) Remote Communications Air-Ground (RCAG) building in New Cumberland, PA.

The solicitation, number 6973GH-24-Q-00225, is issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services. It is a 100% Set-Aside for Small Businesses, with an estimated value of $15k-$25k. The FAA intends to award one (1) Firm Fixed Price contract to the lowest price offeror eligible for award. The performance period is 30 calendar days after receiving Notice to Proceed. Key requirements include mechanically fastening 1.5" insulation board to the concrete deck, installing a fully adhered 60 mil EPDM roof membrane, and sealing joints between the concrete roof deck and exterior wall. Offerors must submit a completed RFQ 6973GH-24-Q-00225 document, including all representations and certifications. Responses are due by 8/5/24 at 1600 Central Time.

View the file

Other files

File Type Posted
QandA Sheet HAR RCAG Roof.pdf PDF
Contractors Release Form DOT F 4220.4.doc DOC document
Wage Determination_Cumberland PA_PA20240085.pdf PDF
6973GH-24-Q-00225.pdf PDF
SOW - HAR RCAG Roof.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTED BY:

APPROVED BY:

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER

RCAG

INSTALLATION OF RCAG BUILDING ROOF

DETAILS

HARRISBURG HARRISBURG PA

DWG NO REV

SKETCH #1

SHEET SK 1DATE

07/11/2023

CLEAN EXISTING CONCRETE ROOF DECK

PRIOR TO INSTALLING NEW ROOFING SYSTEM

FULLY ADHERED 60 MIL EPDM

ROOF MEMBRANE

FASTEN AND INSTALL DRIP EDGE AND

CLEATE PER ROOFING SYSTEM

MANUFACTURERS DETAILS

MECHANICALLY

FASTEN 1 1/2"

INSULATION BOARD

TO CONCRTE DECK

2" X 6" PRESSURE TREATED NAILER FASTENED TO

EXISTING CONCRETE ROOF DECK. FASTENER SHALL

BE OFFSET FROM THE CONCRETE EDGE IN

ACCORDANCE WITH THE FASTNER REQUIREMENTS

ROOFING DETAILS

27'-0"

RCAG BUILDING WALL

PRESSURE SENSITIVE RUBBER FLASHING AND SEALANT PER

ROOFING SYSTEM MANUFACTURERS DETAILS

EXISTING 5" CONCRETE ROOF DECK

'-0

ROOF DECK PLAN

NTS

INSTALL CAULKING IN JOINT

BETWEEN THE CONCRETE ROOF

DECK AND THE EXTERIOR WALL

HAR RCAG Roof Details and Extra Pictures
Page-1�

HAR RCAG Extra Pictures

File details come from the government source that posted it. Updated .