This document is a statement of work for an indefinite delivery/indefinite quantity contract to provide analytical, technical, and safety support services to the Federal Aviation Administration's Associate Administrator for Aviation Safety. Services include program and project management, analytical and technical support, safety management system support, surveillance and broadcast services support, performance based navigation support, data communications support, aviation weather support, low visibility operations support, flight procedures support, flight simulation and safety analysis support, and unmanned aircraft systems integration support. Key personnel requirements and labor categories are defined. The contractor must submit monthly status reports and maintain schedules for leave, travel, and training. The period of performance is from February 2021 to January 2026.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 4
0001 09/14/2020
AAQ-731 FAC. & AVIATION SAFETY ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ0731-AFN
OKLAHOMA CITY OK 73125
AAQ-731 FAC. & AVIATION SAFETY ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ731-AFN
OKLAHOMA CITY OK 73125
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-20-R-00137
1 copies to the issuing office.
09/14/2020
(x)
The purpose of this amendment is to revise various SIR clauses and provisions, incorporate revised Section J, Attachment 1, Section B, Pricing Schedules, incorporate new Section J, Attachment 10, Revised Statement of Work as well as provide Questions and Answers 1 through
15.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Cynthia L. Cooper
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-20-R-00137/0001
FIRST: Section J, Attachment 1, Section B, Pricing Schedule included in the original SIR is hereby superseded and replaced with Section J, Attachment 1, Section B, Pricing Schedule, Revised September 23, 2020.
SECOND: Provision C.1, Statement of Work is hereby removed in its entirety. Attachment 10, Statement of Work, Revision 1 is hereby added to
Section J as follows:
Attachment 10, Statement of Work, Revision 1, dated September 23, 2020, 30 pages
THIRD: Provision F.1, Transition Period and
Period of Performance is hereby revised to read as follows:
This contract includes a 30-day transition period that will be scheduled at contract award, followed by the base year performance period. The base year is followed by four 1-year option periods to be exercised at the sole discretion of the Government. In the event award is not made sufficiently in advance to provide the stated transition period, if required, the beginning and ending dates for the base year period of performance will be adjusted accordingly.
FOURTH: AMS Clause 3.2.2.3-38, Requirements for
Certified Cost or Pricing Data or Other
Information, Alternate II, (JUL 2010) is hereby revised as follows:
(a) The FAA does not require certified cost or pricing data.
(b) The offeror must provide the following information:
1. Information contained in
2. Provision L.3, subparagraph (o) of
3. Instructions for Preparation and Submission of
Proposals
4. [__________"__________________________]
(JUL 2010) - ALTERNATE II (JUL 2010)
FIFTH: AMS Clause 3.8.2-9, Site Visit, is hereby deleted from the SIR.
SIXTH: Paragraph (l)(1) of SIR Provision L.3, Continued ...
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-20-R-00137/0001
Instructions for Preparation and Submission of
Proposals is hereby revised as follows:
(l) Volume I - Contract Documentation: This section will be in FAA format. This will provide information to the FAA for preparing the contract document and supporting file. Offerors must complete and submit:
(1) Section A, Solicitation, Offer and Award
(SF33), Blocks 12 through 17;
(2) Section J, Attachment 1, Supplies or Services and Prices/Costs
(3) Section K, Representations and
Certifications; and,
(4) Subcontracting Plan as referenced in AMS
3.6.1-4 Small Disadvantaged, Women-Owned and
Service-Disabled Veteran-Owned Small Business
Subcontracting Plan (July 2019) and Provision
L.6, Small Business and Small Disadvantaged
Business Subcontracting Plan. NOTE: A subcontracting plan is only required if the
Offeror is considered a large business in relation to this acquisition.
SEVENTH: Paragraph (a) of SIR Provision M.4, Evaluation of Cost/Price (Factor 3) is hereby revised as follows:
(a) The Government will confirm the accuracy of each offeror’s total price calculation and assess the realism andreasonableness of the proposed costs for the unit prices in addition to assessing the total evaluated price for performing all services. The Government may make adjustments for any mathematical errors discovered in the price evaluation process. For evaluation purposes, the figures of $350,000 for the Base Period, $400,000 for Option I, $450,000 for Option II, $500,000 for Option III and
$550,000 for Option IV will be utilized for the estimated Other Direct Costs and will be multiplied by the offerors Proposed Material and
Handling Rate to establish the offerors proposal amount for Contract Line Items 0002, 1002, 2002, 3002 and 4002 respectively. The offeror’s total evaluated price will be determined by totaling the sums for Other Direct Costs as well as the sum of the proposed composite hourly rates per service area multiplied by the estimated labor hours per service area to arrive at a total
Continued ...
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-20-R-00137/0001
estimated contract value. The total evaluated price will consist of the total of the Base
Period and Option years One (1) through Four (4).
EIGHTH: Paragraph (n) of SIR Provision L.3, Instructions for Preparation and Submission of
Proposals is hereby revised as follows:
n) Volume III (Factor 2) – Past Performance and
Experience Information
All offerors are required to provide the Past
Performance Survey (PPS) Section J, Attachment 8) along with the Client Authorization Letter
(Section J, Attachment 9), to clients (primary and alternate reference for each contract) who are familiar with work demonstrated on previous contracts of a similar nature. Offerors shall provide a minimum of two (2) with a maximum of four (4) Past Performance Surveys. Only contracts that have been performed within the past 5 years will be considered, however, offerors are allowed to utilize one (1) contract where at least one year of performance has been completed.
Note: Alteration and or deletion of data fields contained in the PPS may result in the offeror being eliminated from further consideration.
CAUTION: Offerors are cautioned that the FAA may use the data provided by other sources in evaluating past performance. Offerors will be given an opportunity to rebut information considered negative and relevant to the evaluation. While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the
Offeror.
NINTH: Questions 1 through 15 are provided for all interested offerors.
Period of Performance: 02/01/2021 to 01/31/2026
EST
QUANTITY
ITEM SUPPLIES/SERVICES *
UNIT OF
ISSUE
UNIT
PRICE
EXTENDED
TOTAL
0001 ORIENTATION/PHASE IN
SERVICES PROVIDED IAW PARAGRAPH 1 LOT PRICED
C.16.1 OF THE SOW
0002 OTHER DIRECT COSTS: 1 LOT $350,000.00
TRAVEL, MATERIALS, CONSULTANTS
IAW SOW, COST REIMBURSABLE
CONTRACTOR IS TO QUOTE A FIXED
M&H RATE TO BE APPLIED TO ODC 1 LOT _____________%
0003 LABOR CATEGORY EST HRS EASTERN EST HRS CENTRAL EST HRS WESTERN TOTAL PRICE
Sr. Program Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Project Manager 10,560 $__________ 0 $__________ 0 $_________ $_____________ Task Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Sub-Task Lead 2,880 $__________ 0 $__________ 0 $_________ $_____________ Project Control Analyst 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Senior Technical Writer 3,840 $__________ 0 $__________ 0 $_________ $_____________ Technical Writer/Editor 1,920 $__________ 0 $__________ 0 $_________ $_____________ Program Support 3,840 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert I 1,920 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert II 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Subject Matter Expert III 5,760 $__________ 7,680 $__________ 0 $_________ $_____________ Subject Matter Expert IV 960 $__________ 14,400 $__________ 0 $_________ $_____________ Human Factors Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ UAS Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ UAS Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ Senior Program Management Analyst 5,760 $__________ 1,920 $__________ 0 $_________ $_____________ Program Management Analyst 3,840 $__________ 0 $__________ 0 $_________ $_____________ Communication Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Aviation Meterorologist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Operations Environmental Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________ KSN Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________
PROPOSED COMPOSITE HOURLY RATES PER SERVICE AREA
BASE YEAR ESTIMATED LABOR
PART I - SECTION B
SUPPLIES OR SERVICES AND PRICES/COST
The contractor shall furnish all personnel, materials, equipment, training, supplies, and other items necessary to provide the services set forth below and in accordance with (IAW) all terms, conditions, and provisions set forth herein. Detailed descriptions of the services to be furnished can be found in the Statement of Work (SOW). For additional information regarding the below Contract Line Item Numbers (CLINs) refer to Section B, Schedule Notes.
COST REIMBURSABLE CLINs
NOT SEPARATELY P
BASE CONTRACT PERIOD (FIRST YEAR)
Section J, Attachment 1, Section B, Pricing Schedule Revised September 23, 2020
6973GH-20-R-00137
SECTION B
ITEM SUPPLIES/SERVICES
EST
QUANTIT
UNIT OF
ISSUE
UNIT
PRICE
EXTENDED
TOTAL
1002 OTHER DIRECT COSTS: 1 LOT $400,000.00
TRAVEL, MATERIALS, CONSULTANTS
IAW SOW, COST REIMBURSABLE
CONTRACTOR IS TO QUOTE A FIXED
M&H RATE TO BE APPLIED TO ODC 1 LOT _____________%
1003 LABOR CATEGORY EST HRS EASTERN EST HRS CENTRAL EST HRS WESTERN TOTAL PRICE
Sr. Program Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Project Manager 10,560 $__________ 0 $__________ 0 $_________ $_____________ Task Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Sub-Task Lead 2,880 $__________ 0 $__________ 0 $_________ $_____________ Project Control Analyst 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Senior Technical Writer 3,840 $__________ 0 $__________ 0 $_________ $_____________ Technical Writer/Editor 1,920 $__________ 0 $__________ 0 $_________ $_____________ Program Support 3,840 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert I 1,920 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert II 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Subject Matter Expert III 5,760 $__________ 7,680 $__________ 0 $_________ $_____________ Subject Matter Expert IV 960 $__________ 14,400 $__________ 0 $_________ $_____________ Human Factors Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ UAS Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ UAS Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ Senior Program Management Analyst 5,760 $__________ 1,920 $__________ 0 $_________ $_____________ Program Management Analyst 3,840 $__________ 0 $__________ 0 $_________ $_____________ Communication Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Aviation Meterorologist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Operations Environmental Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________ KSN Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________
$________________________OPTION I ESTIMATED LABOR
PART I - SECTION B
SUPPLIES OR SERVICES AND PRICES/COST
COST REIMBURSABLE CLINs
PROPOSED COMPOSITE HOURLY RATES PER SERVICE AREA
OPTION I CONTRACT PERIOD (SECOND YEAR)
ITEM SUPPLIES/SERVICES
EST
QUANTIT
UNIT OF
ISSUE
UNIT
PRICE
EXTENDED
TOTAL
2002 OTHER DIRECT COSTS: 1 LOT $450,000.00
TRAVEL, MATERIALS, CONSULTANTS
IAW SOW, COST REIMBURSABLE
CONTRACTOR IS TO QUOTE A FIXED
M&H RATE TO BE APPLIED TO ODC 1 LOT _____________%
2003 LABOR CATEGORY EST HRS EASTERN EST HRS CENTRAL EST HRS WESTERN TOTAL PRICE
Sr. Program Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Project Manager 10,560 $__________ 0 $__________ 0 $_________ $_____________ Task Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Sub-Task Lead 2,880 $__________ 0 $__________ 0 $_________ $_____________ Project Control Analyst 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Senior Technical Writer 3,840 $__________ 0 $__________ 0 $_________ $_____________ Technical Writer/Editor 1,920 $__________ 0 $__________ 0 $_________ $_____________ Program Support 3,840 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert I 1,920 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert II 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Subject Matter Expert III 5,760 $__________ 7,680 $__________ 0 $_________ $_____________ Subject Matter Expert IV 960 $__________ 14,400 $__________ 0 $_________ $_____________ Human Factors Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ UAS Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ UAS Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ Senior Program Management Analyst 5,760 $__________ 1,920 $__________ 0 $_________ $_____________ Program Management Analyst 3,840 $__________ 0 $__________ 0 $_________ $_____________ Communication Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Aviation Meterorologist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Operations Environmental Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________ KSN Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________
COST REIMBURSABLE CLINs
PROPOSED COMPOSITE HOURLY RATES PER SERVICE AREA
OPTION II CONTRACT PERIOD (THIRD YEAR)
OPTION II ESTIMATED LABOR
ITEM SUPPLIES/SERVICES
EST
QUANTITY
UNIT OF
ISSUE
UNIT
PRICE
EXTENDED
TOTAL
3002 OTHER DIRECT COSTS: 1 LOT $500,000.00
TRAVEL, MATERIALS, CONSULTANTS
IAW SOW, COST REIMBURSABLE
CONTRACTOR IS TO QUOTE A FIXED
M&H RATE TO BE APPLIED TO ODC 1 LOT _____________%
3003 LABOR CATEGORY EST HRS EASTERN EST HRS CENTRAL EST HRS WESTERN TOTAL PRICE
Sr. Program Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Project Manager 10,560 $__________ 0 $__________ 0 $_________ $_____________ Task Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Sub-Task Lead 2,880 $__________ 0 $__________ 0 $_________ $_____________ Project Control Analyst 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Senior Technical Writer 3,840 $__________ 0 $__________ 0 $_________ $_____________ Technical Writer/Editor 1,920 $__________ 0 $__________ 0 $_________ $_____________ Program Support 3,840 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert I 1,920 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert II 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Subject Matter Expert III 5,760 $__________ 7,680 $__________ 0 $_________ $_____________ Subject Matter Expert IV 960 $__________ 14,400 $__________ 0 $_________ $_____________ Human Factors Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ UAS Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ UAS Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ Senior Program Management Analyst 5,760 $__________ 1,920 $__________ 0 $_________ $_____________ Program Management Analyst 3,840 $__________ 0 $__________ 0 $_________ $_____________ Communication Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Aviation Meterorologist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Operations Environmental Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________ KSN Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________
COST REIMBURSABLE CLINs
PROPOSED COMPOSITE HOURLY RATES PER SERVICE AREA
OPTION III CONTRACT PERIOD (FOURTH YEAR)
OPTION III ESTIMATED LABOR
ITEM SUPPLIES/SERVICES
EST
QUANTITY
UNIT OF
ISSUE
UNIT
PRICE
EXTENDED
TOTAL
4002 OTHER DIRECT COSTS: 1 LOT $550,000.00
TRAVEL, MATERIALS, CONSULTANTS
IAW SOW, COST REIMBURSABLE
CONTRACTOR IS TO QUOTE A FIXED
M&H RATE TO BE APPLIED TO ODC 1 LOT _____________%
4003 LABOR CATEGORY EST HRS EASTERN EST HRS CENTRAL EST HRS WESTERN TOTAL PRICE
Sr. Program Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Project Manager 10,560 $__________ 0 $__________ 0 $_________ $_____________ Task Manager 1,920 $__________ 0 $__________ 0 $_________ $_____________ Sub-Task Lead 2,880 $__________ 0 $__________ 0 $_________ $_____________ Project Control Analyst 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Senior Technical Writer 3,840 $__________ 0 $__________ 0 $_________ $_____________ Technical Writer/Editor 1,920 $__________ 0 $__________ 0 $_________ $_____________ Program Support 3,840 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert I 1,920 $__________ 0 $__________ 0 $_________ $_____________ Subject Matter Expert II 1,920 $__________ 1,920 $__________ 0 $_________ $_____________ Subject Matter Expert III 5,760 $__________ 7,680 $__________ 0 $_________ $_____________ Subject Matter Expert IV 960 $__________ 14,400 $__________ 0 $_________ $_____________ Human Factors Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ UAS Senior Regulatory Analyst 3,840 $__________ 1,920 $__________ 0 $_________ $_____________ Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ UAS Aviation Analyst 1,920 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst I 10,560 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst II 5,760 $__________ 0 $__________ 0 $_________ $_____________ Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ UAS Senior Aviation Analyst III 24,960 $__________ 12,480 $__________ 0 $_________ $_____________ Senior Program Management Analyst 5,760 $__________ 1,920 $__________ 0 $_________ $_____________ Program Management Analyst 3,840 $__________ 0 $__________ 0 $_________ $_____________ Communication Specialist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Aviation Meterorologist 1,920 $__________ 0 $__________ 0 $_________ $_____________ Operations Environmental Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________ KSN Specialist 1,920 $__________ 0 $__________ 1920 $_________ $_____________
TOTAL ESTIMATED AMOUNT ALL YEARS $________________________
OPTION IV CONTRACT PERIOD (FIFTH YEAR)
OPTION IIV ESTIMATED LABOR
COST REIMBURSABLE CLINs
PROPOSED COMPOSITE HOURLY RATES PER SERVICE AREA
Section J, Attachment 10, Statement of Work
STATEMENT OF WORK
AVS SAFETY, ANALYTICAL AND TECHNICAL SUPPORT SERVICES
C.1.0 INTRODUCTION
The Associate Administrator for Aviation Safety (AVS) oversees the safety of the world’s largest, most complex aviation system – an aviation system that affects millions who fly for business and pleasure. AVS does this through investments and programs to promote continued operational safety (surveillance, oversight, education, inspections), establish safety rules and regulations (rulemaking), and certify the aviation competency of people (pilots) and organizations (individual airlines) and the airworthiness of aircraft and equipment.
C.2.0 SCOPE
This effort provides administrative, analytical and technical subject matter expert services required to support safety-related programs for the FAA that fall within Associate Administrator for Aviation Safety (AVS) oversight as well as AVS investment teams in preparation for Acquisition Management System (AMS) investment decisions for safety programs. Activities required to support FAA safety goals, strategies, interventions, investments, and the safety-related aspects of capacity and efficiency programs included at a minimum as follows:
• Safety and Capacity Improvements;
• New Flight Technology and System Engineering;
• Business Processes;
• Program Management;
• Program Analysis;
• Information and Data Analysis;
• AVS portfolio of investment from strategic planning to in-service management;
• The Unmanned Aircraft Systems (UAS) Integration efforts to safely integrate UAS into the National Airspace System;
• Operational Concepts – in both technological and operational domains;
• Standards and Criteria for Communication, Navigation, and Surveillance (CNS);
• Instrument Flight Procedures;
• All Weather Operations
• Aviation Safety Inspector Support;
• Aviation Weather Initiatives;
• Data and Aeronautical Communications;
• Systems and processes to enhance operational safety;
• NAS plan, research and development plan;
• Improvements to flight simulation capabilities for purposes of research;
• Automated Dependent Surveillance-Broadcast (ADS-B) and Multilateration related technology development, certification, and deployment support;
• Introduction of new aircraft, air traffic enhancements, and separation assurance;
• Systems to forecast the impacts of National Air Space (NAS) trends on safety performance;
• Enhancements to aviation safety analysis, monitoring methodologies, and tools;
• Coordination of regulatory and guidance material updates;
• AVS transitioning itself and the industry it oversees to a Safety Management System
(SMS) business model in accordance with FAA and International Civil Aviation Organization (ICAO) requirements;
• Development of a common safety framework across the government agencies;
• Provide aviation safety expertise to perform work environment assessments and objectivity studies at FAA Certificate Management Offices and other FAA facilities and work environments as designated and scheduled by the FAA.
C.3.0 OBJECTIVES
This effort sets forth the requirements for services to accomplish the strategic planning, development, acquisition, implementation and life cycle activities necessary to achieve the goals and objectives identified with FAA strategic initiatives. This contract also provides the necessary program/project management, aviation, technical, analytical and operations research subject matter expert support to meet AVS goals and objectives and other FAA LOBs, as required.
C.4.0 CONTRACTOR RESPONSIBILITIES
The Contractor must furnish all personnel, management and technical supervision, and other items and services necessary to successfully perform the tasks that are defined in the following sections of this SOW. The support services specified are mission critical and time sensitive. The recurring tasks specified in this SOW will be ordered by “task orders” signed and issued by the Contracting Officer (CO), with well-defined deliverables and acceptance criteria for each deliverable, due dates and milestone dates. During the performance of this contract, support tasks will be added that are required and that are within the basic scope of this SOW. These tasks, when identified by the Government, must be funded on a case-by-case basis.
The contractor must fill any vacancies within a minimum of 5 calendar days and a maximum of 60 calendar days after receipt of the Contracting Officer’s Representative’s (COR) request to backfill. When new "task order(s)" are officially authorized in writing by the CO, the contractor must have a minimum of 5 calendar days and a maximum of 60 calendar days to provide qualified support personnel for the desired task. The range of 5 – 60 calendar days for filling vacancies includes processing security checks through the FAA Servicing Security Element. The FAA reserves the right to request a shorter turn around time to fill vacancies in certain situations.
The Contractor may also be required to interface with other subject matter expert contractors, industry representatives, equipment manufacturers, airport personnel, aircraft pilots, and various U.S. Government and international organizations.
The contract effort is to be performed using facilities and materials provided by the Government. Services will be performed at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, Oklahoma, FAA facilities in Washington, D.C., and other facilities designated by the FAA.
The Contractor must assist the FAA in developing integrated plans for future avionics and avionics policy, update regulatory and guidance materials, review draft documents for consistency with AVS and other LOBs planning, prepare briefings regarding the plans and planning process and provide recommendations on how to improve planning.
C.4.1 DOCUMENTATION
The Contractor must update and maintain all pertinent (unclassified only) Government documentation for the following Tasks and all other documentation required by FAA Government personnel. Documentation should be available in hard copy and electronic format.
The Contractor must coordinate with the FAA LOB task related Technical Task Manager (TTM) (or designated POC) on all reports, letters, memoranda, project documentation, minutes of meetings, press releases, monthly reports, telephone conversation reports, trip reports and other written material. All documents must coordinate through the Contracting Officer’s Representative (COR) or designee prior to distribution. Further, all documents that must be distributed or posted electronically inside or outside the FAA must be reviewed for sensitive and/or classified information and approved prior to any distribution of either drafts or final versions of those documents.
All documents prepared by the contractor must be on the behalf of the FAA. The Contractor may not independently publish or distribute any document without prior written permission from the CO. The Contractor must review and provide written comments on the technical accuracy and completeness of each document. No documents, reports, information, etc.
may be released to the public or provided to any party other than the FAA and its contractors without Security Sensitive Information and classification review by the COR and written approval of the CO.
C.5.0 TASKS
C.5.1. TASK 1 – PROGRAM AND PROJECT MANAGEMENT SUPPORT
The Contractor must, provide overall program and project management, focus, direction and guidance in support of FAA activities.
The Contractor must oversee all resources dedicated for efforts defined and required by AVS and other FAA LOBs in which AVS must provide safety oversight. The Contractor must attend meetings, briefings and discussions as required in order to support AVS initiatives and investments. The Contractor must manage performance under this contract to ensure all the necessary system engineering, technical, analytical, business planning; organizing;
managing; coordinating; and tracking (e.g., cost, schedule, deliverables), performance management, risk management, component-procurement management, system engineering management, resource management, data management, and subcontract management required to perform all the activities successfully as required by this SOW.
The contractor must provide oversight and daily management of all task orders to include organizing, directing and coordinating the planning and production of all task support activities. This support involves multiple groups of personnel at multiple locations. At a minimum, evidence of support required is planning, organizing, managing, coordinating, and tracking via the processes of report management and cost schedule and performance measurement. The contractor must have a thorough understanding of AMS and FAA Capital Investment Plan, C.5.2. TASK 2 – PROGRAM AND ANALYTICAL SUPPORT
The Contractor must provide overall programmatic and analytical support and guidance for AVS activities and investments. The contractor must analyze project requirements in the areas of business and financial management, program and project scheduling, in addition to performing any other related analyst and management activities. The contractor must use various software and systems to analyze program data for developing trends based on analysis, perform risk based data analysis and prepare reports based on findings to include detailed data breakdowns and proposed solutions. The contractor must have a thorough understanding of AMS, FAA Capital Investment Plan, accounting and purchasing systems, including Regis, Delphi and Prism, in addition to being able to adeptly utilize Microsoft Office applications, such as Excel, PowerPoint, Microsoft Project, web based applications, such as SharePoint and Knowledge Services Network Responsibilities to prepare tracking documents, spreadsheets, briefing and summary reports as requested.
The Contractor must provide programmatic and analytical support to all task areas contained within the scope of this SOW, and at a minimum, all the bullets identified below:
• Monitors and reports program/project progress;
• Provides business analysis support;
• Provides assistance to develop, revise, edit and update computer spreadsheets used in tracking data, task orders, travel, etc.;
• Performs report tracking, assembly and distribution;
• Assists in supporting portfolio management governance, budget formulation and investment analysis for various AMS decisions;
• Assists in preparation of various AMS and other related documentation;
• Prepares, coordinates and distributes meeting and conference agendas;
• Assists FAA officials in planning and scheduling conferences and meetings,
• Provides meeting support including preparation of meeting materials, coordinating venues, arranging displays, providing equipment and any other meeting requirements;
• Provides Freedom of Information Act (FOIA), Media, Office of Inspector General (OIG), Government Accounting Office (GAO) requests from multiple Systems of Record;
• Provides business process re-engineering support to the Flight Standards Inspector
Resource Program, Accident Incident Modernization effort, Aviation Data Exchange, FOIA modernization;
• Performs editorial reviews of highly technical material concerning airman training, testing, and certification documents and reviews responses to public and congressional inquiries;
• Provides support in the development of illustrations, diagrams, and PowerPoint slides;
• Assists with the development, transition and training support for Microsoft SharePoint;
• Provides business analysis support;
• Provides information and data analysis support
• Provides discovery, organizational design, including functional descriptions for the FAA organizations, roles and responsibilities definition, project management, and change management support consistent with Project Management and Change Management Guide, as established.
• Provide change management support to the FAA Aviation Safety mission with updating and implementing the Project Management and Change Management Guides (PM/CM Guide), including lessons learned loops, templates and tools to support completed implementation. Support the evolution to interactive automation (e.g., RPA, establishing BOTs, and other automation techniques).
C.5.3. TASK 3 – TECHNICAL AND ANALYTICAL SUPPORT
The Contractor must provide overall and qualified technical support and guidance in support of FAA activities and to all task areas contained within the scope of this SOW, and at a minimum, all the bullets identified below:
• Assists in updating and revising aviation safety related programs to meet the needs and objectives of stakeholders;
• Provides technical analysis in support of programs that could advance the safety, capacity and efficiency to help meet aviation stakeholder expectations and requirements;
• Provide technical support to developing, evaluating and presenting work products and materials for off-site work groups, industry events, conferences and AVS related events;
• Provide technical expertise in support of FAA efforts developing response to GAO audits, congressional responses and other stake holder reporting;
• Provides a full range of support for international program activities to include participation in team meetings, working groups, program reviews, industry coordination, tracking existing program configuration, and support for development of program status charts, position papers, presentations, outreach program, etc.
o Record (including electronic recording), coordinate, and electronically post meeting notes for international meetings and conferences;
o Perform technical review and editing of U.S. ICAO documents and correspondence, including integration into the Interagency Group on International Aviation (IGIA) process;
o Collect, collate and maintain electronic repository of documents, issue papers and associated comment sheets;
o Provides technical writing, coordination and editing.
• Provide Program Management, Analyst and SME support to the implementation of efficient and repeatable organizational processes of collecting and analyzing information from Lead Participants, Stakeholders, planners and support IPP success planning.
Provide analysis, coordination, communications, recommendations and supporting material.
o Specialized community engagement expertise including experience with FAA policy and guidance for community engagement o Experience and expertise conducting analysis of IPP programs and successes o Knowledge of international initiative and strategies related to FAA, Aviation and UAS o Speciated experience with commercial industry including outreach and support for
UAS activities
• Provide technical and program management support to planning and executing CSP
(Comprehensive Strategic Plan) project initiatives, refining the functional FAA Office of Aviation Safety divisions defining accountabilities through decision rights, and building additional capabilities as identified within the aviation safety mission.
C.5.4 TASK 4 – SAFETY MANAGEMENT SYSTEM SUPPORT
The Contractor must provide Safety Management, program, and technical support with applicable expertise where required to all task areas contained within the scope of this SOW as well as other tasks required to support the SMS, and as a minimum, all the bullets identified below:
• Assisting AVS management in the implementation of system safety engineering and management activities;
• Participating in the development and review of hazard analyses and risk assessments;
• Determining system safety verification and validation strategies and developing plans to meet those strategies;
• Implementing hazard tracking and risk resolution;
• Assisting in conducting hazard analysis and risk assessment;
• Provide technical and program support for the development business of practices that enable AVS to meet requirements for an SMS as defined in FAA Order VS8000.367B, AVS SMS Requirements; and VS8000.370B, AVS Safety Policy;
• Review and evaluate how existing plans, systems, planning tools/models can be effectively employed;
• In parallel with the transition plan efforts, validate that safety is equal to current standards or improved throughout the transition;
• Provide assistance and recommendations on technical/operational concepts and mitigation strategies relating to CNS;
• Support the SMS program office in the definition, development, management, and implementation of the changes required to evolve AVS to an SMS business model including the elements required to perform oversight of industry safety management systems;
• Support the SMS program office in the definition, development, management, and implementation of products required for a Joint Resource Council (JRC) commitment to invest in the SMS changes needed to achieve FAA Flight Plan goals;
• Support the SMS program office in the definition, development, management, and implementation of the industry changes needed to meet FAA and ICAO SMS requirements;
• Provide a full range of support for international program activities to support SMS.
C.5.5 TASK 5 – SURVEILLANCE & BROADCAST SERVICES (SBS) SUPPORT
The Contractor must provide a full range of subject matter expert and other support for Surveillance and Broadcast Services, and as a minimum, all bullets identified in this section.
This support must include participation in team meetings, working groups, program reviews, tracking existing program configuration, and support for development of program status charts, position papers, and presentations.
The Contractor must provide support in the updating of Technical Standard Orders (TSO) for surveillance ground stations and avionics, determine the automation interfaces, validate aircraft separation, manage safety and risk, conduct configuration management, assess the computer/human interface, as well as other tasks required to support SBS for development in areas such as:
• Systems concepts of operation;
• Feasibility analyses, safety hazard analyses, risk assessment and management, configuration management;
• Automation standards and integration to include Human Factors;
• System architecture definition;
• Ground station requirements;
• Avionics requirements;
• Assisting in the development or updating analysis and tracking of Technical
Performance Measures and other system and service metrics;
• Assisting in the development or updating of separation standards and participation in separation standards working groups with Air Traffic Organization (ATO), ICAO, and other users and stakeholders;
• Assisting in requirements modeling, definition, validation, analysis and management;
and reliability, maintainability, availability (RMA) analyses;
• Provide technical support with FAA work on radio frequency spectrum issues, support work with International Telecommunication Union (ITU) and other stakeholders.
The Contractor must provide technical support in the development of ADS-B avionics standards in the following areas:
• Assisting in the development or updating of service descriptions, safety and performance requirements, and interoperability requirements;
• Assisting in updating of Radio Technical Commission for Aeronautics (RTCA) Minimum
Operational Performance Standards (MOPS), Minimum Aviation System Performance Standards (MASPS) and Security Assurance and Assessment Processes and Methods https://en.wikipedia.org/wiki/International_Telecommunication_Union
(SAAPM) documents associated with ADS-B;
• Support for FAA participation in ICAO, RTCA, European Organization for Civil Aviation
Equipment (EUROCAE), and European Organization for the Safety of Air Navigation (EUROCONTROL) activities, and harmonization of airborne and ground equipment requirements for domestic and international standards for ADS-B systems and applications.
The Contractor must provide technical support in the development of certification standards, equipage requirements, and operational rules/guidance for the installation and use of ADS-B avionics in all the following areas:
• Support for updates of Technical Standard Orders (TSOs) for ADS-B avionics and associated systems;
• Coordination of TSOs with appropriate RTCA and Society of Automotive Engineers
(SAE) groups and documents;
• Support for the development or updates of SBS sponsored Notice of Proposed
Rulemaking (NPRMs), including airspace mandates and operational rules;
• Support for development or updates of SBS related Advisory Circulars and Operational
Specifications (OPSPECs); and
• Participation in working groups with the SBS program office, ATO, AVS, and other US and international stakeholders;
• Provide a full range of support for international program activities to support SBS.
The Contractor must support FAA Product Teams in the preparation of position papers, preparation of budgetary information, review and critique of draft technical and other materials (e.g., TSOs, Advisory Circulars (ACs), RTCA MOPS/MASPS/SAAPM, ICAO papers, Outreach information) or updates
The Contractor must support the development of training and outreach material associated with the deployment of ADS-B technology throughout the NAS. This support must include preparation and presentation of technical, operational and training materials, preparation, conduct and delivery, and analysis of user surveys and interviews, participation at aviation air shows, tradeshows, and conferences.
C.5.6 TASK 6 - PERFORMANCE BASED NAVIGATION (PBN) SUPPORT
The Contractor must provide a full range of support to PBN activities. This support must include participation in team meetings, including rulemaking under the Administrative Procedures Act, working groups, program reviews, industry coordination, tracking existing program configuration, and support for development of program status charts, position papers, presentations, outreach program, etc.
The Contractor must provide technical expertise working directly with the program staff responsible for PBN efforts and activities. Contractor duties, at a minimum include, but are not limited to, all the following tasks:
• Support PBN activities including operational approvals;
• Assists in drafting publications to promulgate policies or provide guidance to FAA and aviation industry personnel;
• Coordinate with other FAA offices and aviation industry groups on current and future aviation PBN technologies;
• Provides a full range of support for international program activities to support PBN activities.
C.5.7 TASK 7 – DATA COMMUNICATIONS (DATA COMM) / AERONAUTICAL
COMMUNICATIONS SUPPORT
The Contractor must provide technical expertise working directly with the program staff responsible for communications (including voice and data) efforts and activities to include at a minimum, all the following tasks:
• Assists in rulemaking efforts;
• Assist efforts with industry coordination groups;
• Support communications activities including operational approvals;
• Assists in drafting publications to promulgate policies or provide guidance to FAA and aviation industry personnel;
• Aeronautical communication outreach efforts;
• Provides a full range of support for international program activities to support aeronautical communication;
• .Provide technical support with FAA work on radio frequency spectrum issues, support work with International Telecommunication Union (ITU) and other stakeholders.
C.5.8 TASK 8 – AVIATION WEATHER PROGRAM ACTIVITIES SUPPORT
The Contractor must provide a full range of support from general administrative support, program management and areas requiring technical subject matter expertise for aviation weather activities. This support must include participation in team meetings, working groups, program reviews, industry coordination, tracking existing program configuration, and support for development of program status charts, position papers, presentations, outreach program, etc.
The Contractor must provide technical support for aviation weather efforts and activities to all task areas contained within the scope of this SOW, and at a minimum, all the bullets identified below:
• Assists in the development, operational approval, and implementation of new aviation weather technologies;
• Preparing appropriate regulatory and guidance documentation, and maintaining a website to disseminate information for internal and external customers;
• Serve as a point of contact for weather product developers/providers;
• AVS Weather Technical Community Representative Group (TCRG) support;
https://en.wikipedia.org/wiki/International_Telecommunication_Union
• Evaluation of Needs Statements and the translation of needs statements into specific, detailed AVS weather Research Engineering and Development (R,E&D) requirements;
• Status monitoring and reporting of R,E&D project timelines and milestones; and
• Provide guidance and recommendations to program management on RE&D provider’s ability to meet AVS requirements;
• Provide a full range of support for international program activities to support aviation weather.
C.5.9 TASK 9 – LOW VISIBILITY OPERATIONS SUPPORT
The Contractor must provide a full range of support from general administrative support, program management and areas requiring technical subject matter expertise for Low Visibility Operations, including activities associated with Enhanced Vision Systems (EVS), Enhanced Flight Vision Systems (EFVS) and Synthetic Vision Systems (SVS).