SOW Ajo Helicopter Transport.doc

DOC document 63 KB Posted

Attached to
Request for Quote (RFQ) Helicopter Lift and Transportation Services - Ajo Mountain, AZ
Solicitation number
6973GH-19-Q-00027
Issued by

About this file

SOW Ajo Helicopter Transport (doc)

View the file

Other files

File Type Posted
WD 96-0458 (Rev.-36).Rev.-36 —
6973GH-19-Q-00027.pdf PDF
QUESTIONS AND ANSWERS.docx DOCX document
SOW Ajo Helicopter Transport.doc DOC document
WD 96-0458 (Rev.-36).Rev.-36 —
6973GH-19-Q-00027.pdf PDF
WD 96-0458 (Rev.-36).Rev.-36 —
6973GH-19-Q-00027.pdf PDF
SOW Ajo Helicopter Transport.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/11/2019

Statement of Work (SOW)

SERVICES

Ajo Mountain Helicopter Transport

1. Introduction and Overview

The purpose of this statement of work (SOW) is to outline the helicopter transportation requirements involved with the solar upgrade project for the existing power structure for Ajo Mountain Tactical Communications (TACCOM) site (BPSTU002).

2. Background The battery bank that supplies power to the Ajo Mountain TACCOM site is beginning to show signs of failure. To avoid a complete site failure and for an immediate fix, Ajo OIT along with other agencies within Customs & Border Protection are going to replace the battery bank. The Ajo Mountain site is at a remote location that requires helicopter transport for access. Replacement of the solar power system requires the transportation of batteries, equipment and personnel to the remote site location.

3. Scope of Work

The vendor shall supply aerial lift helicopter(s) and operator(s) to transport personnel and equipment up to and remove it from the remote site that is locate on Ajo Mountain, AZ (Latitude 32.027222, Longitude -112.690389). Multiple airlifts, of different payloads will be required throughout the duration of the project to transport personnel and equipment to the remote site and back to ground level.

The following information are estimates and the actual requirements may vary;

Passenger Trips: Utilization of a Light Twin Helicopter to provide transportation from a Forward Operating Base at Tigers Cage LZ NPS, (with GPS Coordinates 31.963767, -112.804282 for the concrete pad), to the remote tower site on the top of Ajo Mountain. Transportation must be

· Able to transport 4 people and luggage/equipment that can be stowed in cabin. Total payload will be approximately 1000-1500 lbs.

· Passenger transportation will be needed to the tower site in the morning and from the tower site in the evening for 8-12 hour work days

· Services are anticipated to be needed for up to 14 days from project start.

· Quote per day should include an itemization of any fees or charges to adjust schedule or extend schedule (Estimating the cost to include helo, pilot, standby time, and fuel)

Material Trips: We’re anticipating the utilization of a Twin Helicopter to provide transportation from the same location as the Passenger trips. Transportation must be

· Capable of providing transport of payloads between 500 to 1000 lbs. and 7000 to 8000 lbs. (The 7000 to 8000 lbs can be adjusted, according to the # of trips to suit the 4000 lb limit)

· There is estimated to be two trips with 500 to 1000 lbs. of payload to move materials to the tower site and two trips with 500 to 1000lbs of payload to remove old from the tower site

· There is anticipated to be one trip with 7000 to 8000 lbs. of payload to move new battery enclosure and batteries; one trip with 7000 to 8000 lbs. of payload to remove old battery enclosure and batteries (Pretty much a trip to move the new battery in and the old battery out). (The 7000 to 8000 lbs can be adjusted, according to the # of trips to suit the 4000 lb limit)

Material Transportation will be needed on an on-demand basis with the ability to be scheduled within a 2-3 day window from project start.

Below is a listing of the equipment to be transported to the remote site and the anticipated trips to be made.

Equipment

Qty
Description
Weight
Total
13
LG Electronics Solar Panels, model LG400N2W-A5
50
650
1
Outback Combiner, model FLEXware PV12
10
10
2
Outback Charger Controller, model FLEXmax 60
20
40
1
Outback Controller, model MATE3s
10
10
1
Outback HUB
10
10
1
Outback FLEXnet DC
10
10
3
Outback Shunt, model FW-SHUNT500
10
30
8
Absolyte Batteries, model 3-100G33
800
6400
1
Zomeworks Corporation Cool Cell Battery Enclosure, Model CCPSD-504494-NS
1000
1000
1
BTECH Battery Monitoring System, Model CQ2-1-L24-H00-T04-C01-48
10
10
2
Wilmore DC-DC Converter, model 1720-48-24-16
10
20
2
Wilmore DC-DC Converter, model 1720-48-13-30
10
20
1
Incidentals
500
500
4
FTE w/ Equip Carry-On & Luggage
350
1400

Anticipated Loads

Daily Transport Payload (2 Trips 1 HR RUN TIME EA and 10 HRS STANDBY)

Material Load One - Electronics & Light Materials

Material Load Two - Solar Panels

Material Load Three - New Battery Cabinet and Batteries

Material Load Four - Old Battery Cabinet and Batteries

Material Load Five - Light Removals

Material Load Six - Old Solar Panels

4. Schedule of Deliverables Vendor shall provide aerial lift helicopter(s) capable of reaching the remote site on top of Ajo Mountain (Approximate coordinates being Latitude 32.027222, Longitude -112.690389), and capable of taking on an approximate weight of up to 8000 pounds.

5. Period of Performance

It is expected to be needing these services early to mid-March 2019, but may be adjusted according to site and agency requirements

6. Place of Performance

Ajo Mountain, AZ (32.027222°, -112.690389°

File details come from the government source that posted it.