HQB Parking Lot Amendment 2 Attachment.pdf

PDF 514 KB Posted

Attached to
AMENDMENT 2: Headquarters Parking Lot at the Mike Monroney Aeronautical Center, Oklahoma City, Oklahoma.
Solicitation number
6973GH-18-R-00255
Issued by

About this file

HQB Parking Lot Amendment 2 Attachment (pdf)

View the file

Other files

File Type Posted
For Construction_Specifications_Revised.pdf PDF
AMP400 OC Construction contractors combined.pdf PDF
Questions and Answers for 6973GH-18-R-00255 Amendment 2..pdf PDF
6973GH-18-R-00255 Amendment 2.pdf PDF
Wage Determination.pdf PDF
For Construction_Drawings.pdf PDF
Contractor's Release.pdf PDF
6973GH-18-R-00255 Amendment 1.pdf PDF
Pre Bid Sign In 9-6-2018.pdf PDF
26 56 00 BSD-Exterior Lighting-DC15128-ADDM---2018-09-07.pdf PDF
SIR 6973GH-18-R-00255.pdf PDF
Chapter_33 Construction Safety.pdf PDF
SF25 Performance Bond.pdf PDF
SF25A Payment Bond.pdf PDF
Pre Bid Sign In 9-6-2018.pdf PDF
6973GH-18-R-00255 Amendment 1.pdf PDF
For Construction_Specifications_Revised.pdf PDF
SF25 Performance Bond.pdf PDF
For Construction_Drawings.pdf PDF
HQB Parking Lot Amendment 2 Attachment.pdf PDF
Chapter_33 Construction Safety.pdf PDF
AMP400 OC Construction contractors combined.pdf PDF
Questions and Answers for 6973GH-18-R-00255 Amendment 2..pdf PDF
6973GH-18-R-00255 Amendment 2.pdf PDF
SF25A Payment Bond.pdf PDF
SIR 6973GH-18-R-00255.pdf PDF
Contractor's Release.pdf PDF
Wage Determination.pdf PDF
Wage Determination.pdf PDF
SF25 Performance Bond.pdf PDF
AMP400 OC Construction contractors combined.pdf PDF
Contractor's Release.pdf PDF
SF25A Payment Bond.pdf PDF
Chapter_33 Construction Safety.pdf PDF
For Construction_Drawings.pdf PDF
SIR 6973GH-18-R-00255.pdf PDF
For Construction_Specifications_Revised.pdf PDF
6973GH-18-R-00255 Amendment 1.pdf PDF
SF25A Payment Bond.pdf PDF
AMP400 OC Construction contractors combined.pdf PDF
SF25 Performance Bond.pdf PDF
For Construction_Specifications_Revised.pdf PDF
For Construction_Drawings.pdf PDF
Chapter_33 Construction Safety.pdf PDF
SIR 6973GH-18-R-00255.pdf PDF
Contractor's Release.pdf PDF
Wage Determination.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers to Delta Electric Questions

Q1. Would FAA be able to confirm the source of the primary feeder to transformer # 72 Sheet E4

Specific Note #1?

A1. Transformer #72 is a loop feed transformer. One side is fed from switch #27430 (located west of hangar 9) and the other side is fed from transformer #13 (located north of Flight Inspection bldg.). See

Sketch 1.

Revise Specific Note #3 on Sheet E4 to read as follows:

After removing transformer #72, install a new manhole to create a path from duct banks coming from existing manhole #20 to duct banks going to existing manhole #24. Install new 15 KV feeders to connect existing 15KV switch #27430 to existing transformer #13.

(Sketch 1)

Q2. The light pole that is to be removed on Sheet E2 Specific Note #3. I order to maintain the circuit do we install a in ground traffic rated junction box or do we install new conduit and pull new conductors to the existing poles. I now that some of the street lighting has been in direct buried cable so I'm not sure what's existing so this could be an issue.

A2. Plans indicate new conduit and wire (specific note two).

Q3. The Light pole specification indicate a square pole.26 5600‐3 2.05. I think most of the poles at FAA are round taper. Also there is not a height indicated in the fixture schedule put on the point by point

Sheet E3 indicates MH 30 which I assume is 30 Ft. Another thing the pole finish is to match the luminaire but that not the standard FAA color. Please advise.

A3. Replace Exterior Lighting Specification 26 56 00 with revised specification (Attached).

Q4. On sheet C3 I don't see where there is underground primary conduit going to the electrical manhole

# 20. On sheet E 4 we are to extend new primary conductors thru manhole # 20 to switch # 27430 so can

FAA confirm that the duct bank is existing.

A4. Refer to answer to Question #1.

Q5. When install the new primary conductors in the existing duct bank conduit I assume that this work will be done after normal business hours so the existing conductors can be de‐energized please confirm.

A4. Yes, after hours/weekend. Coordination with OCAT shall be done to switch circuits to de‐energize the switch, transformers and the cables.

Amend the following:

1. Refer to Specification 32 13 13 Concrete Paving. Delete Paragraph 2.06 and insert the following:

“2.06 PAVEMENT MARKINGS

A. Pavement-Marking (Paint): Pavement striping shall be per Oklahoma City Standard Specifications for Construction of Public Improvements, Section 734 - Traffic Stripe (Paint).

1. Color: White or as indicated.

2. Glass beads shall be per Section 737 – Glass Beads Used in Traffic Pavement Marking

Material.”

2. Refer to Sheet C3. Add the demolition of an existing storm inlet and associated 8” storm drain lines near the northwest corner of the construction site. See sketch 2 below.

(Sketch 2) ↓North

File details come from the government source that posted it.