For Construction_Specifications_Revised.pdf
PDF 7 MB Posted
- Attached to
- AMENDMENT 2: Headquarters Parking Lot at the Mike Monroney Aeronautical Center, Oklahoma City, Oklahoma.
- Solicitation number
- 6973GH-18-R-00255
About this file
For Construction_Specifications_Revised (pdf)
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14.31.006 TABLE OF CONTENTS Page 2
FAA HQ Parking Lot
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING
REQUIREMENTS
00 01 07 SEAL AND SIGNATURE PAGE
01 01 10 TABLE OF CONTENTS
02 30 00 GEOTECHNICAL DATA
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY (ARCH)
01 30 00 ADMINISTRATIVE REQUIREMENTS (ARCH)
01 40 00 QUALITY REQUIREMENTS (ARCH)
01 45 33 CODE-REQUIRED SPECIAL INSPECTIONS (ARCH)
01 50 00 TEMPORARY FACILITIES AND CONTROLS (ARCH)
01 60 00 PRODUCT REQUIREMENTS (ARCH)
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS (ARCH)
01 74 19 CONSTRUCTION WASTE MANAGEMENT (ARCH)
01 78 00 CLOSEOUT SUBMITTALS (ARCH)
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION (ARCH)
DIVISION 22 – PLUMBING
22 11 13 FACILITY WATER DISTRIBUTION PIPING (CIVIL)
DIVISION 26 - ELECTRICAL
26 05 13 MEDIUM-VOLTAGE CABLES (ELECT)
26 05 19 CONDUCTORS AND CABLES (ELECT)
26 05 26 GROUNDING AND BONDING (ELECT)
26 05 34 CONDUIT (ELECT)
26 05 37 BOXES (ELECT)
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS (ELECT)
26.56.00 EXTERIOR LIGHTING (ELECT)
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING (CIVIL)
31 11 00 STORMWATER POLLUTION PREVENTION PLAN (CIVIL)
31 20 00 EARTH MOVING (CIVIL)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 13 13 CONCRETE PAVIING (CIVIL)
32 13 73 CONCRETE PAVING JOINT SEALANTS (CIVIL)
DIVISION 33 – EXTERIOR IMPROVEMENTS
33 41 00 STORM DRAINAGE UTILITY PIPING (CIVIL)
TABLE OF CONTENTS (CONTINUED)
APPENDIX A
STORMWATER POLLUTION PREVENTION PLAN (SWP3); To be submitted to OKC and ODEQ by the contractor awarded the project.
14.31.006/FAA HQ PARKING LOT 01 1000 - 1 SUMMARY
SECTION 01 1000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: MMAC HQ Parking Lot.
B. Owner's Name: FAA.
C. Architect's Name: Small Architects.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price which will be provided in
Section B of the contract.
1.03 WORK DESCRIPTION
A. Work Location: Federal Aviation Administration Mike Monrony Aeronautical Center.
1. Already Demolished Building K Site - 5700 SW 62nd Street
2. Already Demolished Building L Site - 5710 SW 62nd Street
B. Completion of Work: The Contractor shall be required to (a) commence Work under this contract within the designated calendar days after the date the Contractor recieves the notice to proceed, (b) execute the Work diligently, and (c) complete the entire Work ready for occupancy and use after notice to proceed within 240 calendar days.
C. Work includes: All labor, materials, and equipment neccessary to demolish existing items indicated and construct a new parking lot of approximately 134 spaces with add new sidewalks, lighting, and storm drainage.
D. Electrical Power and Lighting: Add new construction.
1.04 CONTRACTOR USE OF SITE AND PREMISES
A. Provide access to and from site as required by law and by Owner:
1. Do not obstruct roadways, sidewalks, or other public ways without permit.
B. Security Requirements: Contractor shall comply with all applicable Department of Transportation (DOT), FAA, and MMAC security directives while performing Work of this Contract.
C. Time Restrictions: Work shall be conducted between 7:00 a.m. and 4:30 p.m. on normal government work days. No Work shall occur at night, or on Saturday's, Sundays, or designated government holidays unless approved by the Contracting Officer seven (7) days in advance.
D. Utility Outages and Shutdown: Coordinate with the Contracting Office and Project Manager at 954-4574. Outages affecting FAA Operations are required to be accomplished at night, or on Saturday's, Sunday's, or designated government holidays. Prior to any outage or shutdown, fourteen (14) working days notification must be made to coordinate scheduling of any Work to be performed during any hours.
1. Prevent accidental disruption of utility services to other facilities.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
14.31.006/FAA HQ PARKING LOT 01 3000 - 1 ADMINISTRATIVE
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Progress meetings.
C. Construction progress schedule.
D. Submittals for review, information, and project closeout.
E. Number of copies of submittals.
F. Submittal procedures.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Owner/FAA will schedule a meeting after Notice of Award.
B. Attendance Required:
1. Owner/FAA.
2. Architect.
3. Contractor.
C. Agenda:
1. Distribution of Contract Documents.
2. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
3. Designation of personnel representing the parties to Contract, Owner/FAA and Architect.
4. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
5. Scheduling.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner/FAA, participants, and those affected by decisions made.
3.02 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner/FAA.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
xxx / FAA HQ Parking Lot TO #7 01 3000 - 2 ADMINISTRATIVE
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
E. Record minutes and distribute copies within two days after meeting to participants, with copies to Architect, Owner, participants, and those affected by decisions made.
3.03 CONSTRUCTION PROGRESS SCHEDULE
A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
B. Within 10 days after joint review, submit complete schedule.
C. Submit updated schedule with each Application for Payment.
3.04 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to AAQ to distribute to all parties for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.
3.05 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Monthly Waste Management Reports.
8. Other types indicated.
3.06 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in conformance to requirements of Section 01 7800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
3.07 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; two of which will be retained - one by the Owner/FAA and the Architect.
1. Retained samples will not be returned to Contractor unless specifically so stated.
xxx / FAA HQ Parking Lot TO #7 01 3000 - 3 ADMINISTRATIVE
3.08 SUBMITTAL PROCEDURES
A. General Requirements:
B. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting the Contract Documents and coordinating related Work.
2. Generic, non-project specific information submitted as shop drawings do not meet the requirements for shop drawings.
C. Transmit each submittal with approved form.
D. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
E. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.
F. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of
Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.
G. Schedule submittals to expedite the Project, and coordinate submission of related items.
H. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
I. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.
J. Provide space for Contractor, Owner/FAA and Architect review stamps.
K. When revised for resubmission, identify all changes made since previous submission.
L. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.
M. Submittals not requested will not be recognized or processed.
14.31.006/FAA HQ PARKING LOT 01 4000 - 1 QUALITY REQUIREMENTS
SECTION 01 4000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Tolerances.
C. Testing and inspection agencies and services.
D. Control of installation.
E. Tolerances.
F. Defect Assessment.
1.02 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Testing Agency Qualifications:
1. Prior to start of Work, submit agency name, address, and telephone number, and names of full time registered Engineer and responsible officer.
C. Design Data: Submit for Owner/FAA and Architect's knowledge for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information.
D. Test Reports: After each test/inspection, promptly submit Electronic copies of report to Owner/FAA, the Architect and to Contractor.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
j. Conformance with Contract Documents.
k. When requested by Owner/FAA or Architect, provide interpretation of results.
2. Test report submittals are for Owner/FAA and Architect's knowledge for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information.
1.03 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Contractor shall employ and pay for services of an independent testing agency to perform other specified testing.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
xxx / FAA HQ Parking Lot TO #7 01 4000 - 2 QUALITY REQUIREMENTS
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Owner/FAA before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have Work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with Manufacturer's tolerances. Should manufactures' tolerances conflict with Contract Documents, request clarification from the Owner/FAA before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with the Owner/FAA and Contractor in prerformance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Owner/FAA and Contractor of observed irregularities or non-conformance of Work for Products.
5. Perform additional tests and inspedtions required by the Owner/FAA.
6. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
C. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify Owner/FAA and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
D. Re-testing required because of non-conformance to specified requirements shall be performed by the same testing agency on instructions by the Owner/FAA.
xxx / FAA HQ Parking Lot TO #7 01 4000 - 3 QUALITY REQUIREMENTS
E. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor.
3.04 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not conforming to specified requirements.
B. If, in the opinion of the Owner/FAA, it is not practical to remove and replace the work, the
Contracting Officer will direct an appropriate remedy or adust payment.
14.31.006/FAA HQ PARKING LOT 01 4533 - 1 CODE-REQUIRED SPECIAL
INSPECTIONS
SECTION 01 4533
CODE-REQUIRED SPECIAL INSPECTIONS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Code-required special inspections.
1.02 DEFINITIONS
A. Code or Building Code: ICC (IBC), 2015 Edition of the International Building Code and specifically, Chapter 17 - Special Inspections and Tests.
B. Authority Having Jurisdiction (AHJ): Agency or individual officially empowered to enforce the building, fire and life safety code requirements of the permitting jurisdiction in which the Project is located.
C. Special Inspection:
1. Special inspections are inspections and testing of materials, installation, fabrication, erection or placement of components and connections mandated by the AHJ that also require special expertise to ensure compliance with the approved contract documents and the referenced standards.
2. Special inspections are separate from and independent of tests and inspections conducted by Owner or Contractor for the purposes of quality assurance and contract administration.
1.03 REFERENCE STANDARDS
A. ACI 318 - Building Code Requirements for Structural Concrete and Commentary; 2011.
B. ACI 530/530.1/ERTA - Building Code Requirements and Specification for Masonry Structures and Related Commentaries; 2011.
C. AISC 360 - Specification for Structural Steel Buildings; 2010.
D. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the
Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction;
2012a.
E. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2015.
F. AWS D1.3/D1.3M - Structural Welding Code - Sheet Steel; 2008.
G. AWS D1.4/D1.4M - Structural Welding Code - Reinforcing Steel; 2011.
H. ICC (IBC) - International Building Code; 2018.
1.04 SPECIAL INSPECTION AGENCY
A. The contractor will employ services of a Special Inspection Agency to perform inspections and associated testing and sampling required by the building code and the City of Oklahoma City.
These independent firms shall not be affiliated with or have had any business relation, nor any other relationship that would imply any conflict of interest with respect to the Contractor. The fees for such testing and inspections shall be included in the Base Bid Amount.
B. Employment of agency in no way relieves Contractor of obligation to perform work in accordance with requirements of Contract Documents.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 SPECIAL INSPECTIONS FOR CONCRETE CONSTRUCTION
A. Reinforcing Steel, Including Prestressing of Tendons and Placement: Verify compliance with approved contract documents and ACI 318, Sections 3.5 and 7.1 through 7.7; periodic.
B. Reinforcing Steel Welding: Verify compliance with AWS D1.4/D1.4M and ACI 318, Section 3.5.2; periodic.
xxx / FAA HQ Parking Lot TO #7 01 4533 - 2 CODE-REQUIRED SPECIAL
C. Bolts Installed in Concrete: Where allowable loads have been increased or where strength design is used, verify compliance with approved contract documents and ACI 318, Sections
8.1.3 and 21.2.8 prior to and during placement of concrete; continuous.
D. Design Mix: Verify plastic concrete complies with the design mix in approved contract documents and with ACI 318, Chapter 4 and 5.2; periodic.
E. Specified Curing Temperature and Techniques: Verify compliance with approved contract documents and ACI 318, Sections 5.11 through 5.13; periodic.
F. Concrete Strength in Situ: Verify concrete strength complies with approved contract documents and ACI 318, Section 6.2, for the following.
G. Formwork Shape, Location and Dimensions: Verify compliance with approved contract documents and ACI 318, Section 6.1.1; periodic.
3.02 SPECIAL INSPECTIONS FOR SOILS
A. Materials and Placement: Verify each item below complies with approved construction documents and approved geotechnical report.
1. Design bearing capacity of material below shallow foundations; periodic.
2. Design depth of excavations and suitability of material at bottom of excavations; periodic.
3. Materials, densities, lift thicknesses; placement and compaction of backfill: continuous.
4. Subgrade, prior to placement of compacted fill; periodic.
B. Testing: Classify and test excavated material; periodic.
3.03 A-1 SURVEY
A. The MMAC is on OCAT leased land and adjacent to runways. Airway clearance is required by registering objects over 27' high. The Contractor shall perform the survey for crane use and obtain approval from the Director of Airport Operations. A survey is required at the conclusion of the project to register a new building, light poles, and constructed objects over 27' high.
3.04 OTHER SPECIAL INSPECTIONS
A. Provide for special inspection of work that, in the opinion of the AHJ, is unusual in nature.
B. For the purposes of this section, work unusual in nature includes, but is not limited to:
1. Construction materials and systems that are alternatives to materials and systems prescribed by the building code.
2. Unusual design applications of materials described in the building code.
3. Materials and systems required to be installed in accordance with the manufacturer's instructions when said instructions prescribe requirements not included in the building code or in standards referenced by the building code.
3.05 SPECIAL INSPECTION AGENCY DUTIES AND RESPONSIBILITIES
A. Special Inspection Agency shall:
1. Provide qualified personnel at site. Cooperate with Owner/FAA and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified reference standards.
3. Ascertain compliance of materials and products with requirements of Contract Documents.
4. Promptly notify Owner/FAA and Contractor of observed irregularities or non-conformance of work or products.
5. Perform additional tests and inspections required by the Owner/FAA.
6. Submit reports of all tests or inspections specified.
B. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Owner/FAA.
C. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor.
xxx / FAA HQ Parking Lot TO #7 01 4533 - 3 CODE-REQUIRED SPECIAL
14.31.006/FAA HQ PARKING LOT 01 5000 - 1 TEMPORARY FACILITIES AND
CONTROLS
SECTION 01 5000
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary utilities.
B. Temporary telecommunications services.
C. Temporary sanitary facilities.
D. Temporary Controls: Barriers, enclosures, and fencing.
E. Security requirements.
F. Vehicular access and parking.
G. Waste removal facilities and services.
H. Field offices.
1.02 TEMPORARY UTILITIES
A. FAA shall provide and pay for all electrical power, lighting, water, heating and cooling, and ventilation required for construction purposes.
B. Use trigger-operated nozzles for water hoses, to avoid waste of water.
1.03 TELECOMMUNICATIONS SERVICES
A. Provide, maintain, and pay for telecommunications services to field office at time of project mobilization.
B. Telecommunications services shall include:
1. Windows-based personal computer dedicated to project telecommunications, with necessary software and laser printer.
2. Telephone Land Lines: One line, minimum; one handset per line.
3. Internet Connections: Minimum of one; DSL modem or faster.
4. Email: Account/address reserved for project use.
5. Facsimile Service: Minimum of one dedicated fax machine/printer, with dedicated phone line.
1.04 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
B. Maintain daily in clean and sanitary condition.
1.05 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.
B. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.06 FENCING
A. Provide 6 foot (1.8 m) high fence around construction site; equip with vehicular and pedestrian gates with locks.
1.07 SECURITY - SEE SECTION 01 3553
A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from unauthorized entry, vandalism, or theft.
1.08 VEHICULAR ACCESS AND PARKING
A. Comply with regulations relating to use of streets and sidewalks, access to emergency facilities, and access for emergency vehicles.
xxx / FAA HQ Parking Lot TO #7 01 5000 - 2 TEMPORARY FACILITIES AND
CONTROLS
B. Coordinate access and haul routes with governing authorities and Owner.
C. Provide and maintain access to fire hydrants, free of obstructions.
D. Provide means of removing mud from vehicle wheels before entering streets.
E. Provide temporary parking areas to accommodate construction personnel. When site space is not adequate, provide additional off-site parking.
1.09 WASTE REMOVAL
A. See Section 01 7419 - Construction Waste Management and Disposal, for additional requirements.
B. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
C. Provide containers with lids. Remove trash from site periodically.
1.10 FIELD OFFICES
A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.
B. Provide space for Project meetings, with table and chairs to accommodate 6 persons.
C. Locate offices a minimum distance of 30 feet (10 m) from existing and new structures.
1.11 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Date of Substantial
Completion inspection.
B. Remove underground installations to a minimum depth of 2 feet (600 mm). Grade site as indicated.
C. Clean and repair damage caused by installation or use of temporary work.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
14.31.006/FAA HQ PARKING LOT 01 6000 - 1 PRODUCT REQUIREMENTS
SECTION 01 6000
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Re-use of existing products.
B. Transportation, handling, storage and protection.
C. Product option requirements.
D. Substitution limitations.
E. Procedures for Owner-supplied products.
F. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
B. All chemicals, lubricants, paints, solvents, sealants, adhesives, patching materials, cements, foam insulation and gypsum wall board and other materials that my potentially contain ACM must have Material Safety Data Sheets (SDS) submitted prior to installation.
C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
PART 2 PRODUCTS
2.01 EXISTING PRODUCTS
A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by the Contract Documents.
B. Unforeseen historic items encountered remain the property of the Owner; notify Owner promptly upon discovery; protect, remove, handle, and store as directed by Owner.
C. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the Owner, or otherwise indicated as to remain the property of the Owner, become the property of the Contractor; remove from site.
2.02 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by the Contract Documents.
2.03 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:
Submit a request for substitution for any manufacturer not named.
2.04 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
xxx / FAA HQ Parking Lot TO #7 01 6000 - 2 PRODUCT REQUIREMENTS
PART 3 EXECUTION
3.01 SUBSTITUTION LIMITATIONS
A. Contracting Officer will consider requests for Substitutions only within ten (10) days after award of Contract.
B. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.
C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
D. A request constitutes a representation that the Contractor:
1. Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.
2. Will provide the same warranty for the Substitution as for the specified Product.
3. Will coordinate installation and make changes to other Work, which may be required for the Work to be completed with no additional cost to the FAA.
4. Waives claims for additional costs or time extension, which may subsequently become apparent.
5. Will reimburse Contracting Officer for review or redesign services associated with re-approval for authorities.
E. Substitutions will not be considered when they are indicated or implied on shop drawing or
Product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.
F. Substitution Submittal Procedure:
1. Submit three (3) copies of request for Substitution for consideration.
2. Submit shop drawings, Product data, and certified test results attesting to the proposed
Product equivalence.
3. The Contracting Officer will notify Contractor in writing of decision to accept or reject request.
G. If request for substitution is not accepted by the Contracting Officer, Contractor is responsible for supplying item as origionally specified or an acceptable substitution without additional cost to the FAA.
3.02 OWNER-SUPPLIED PRODUCTS
A. Owner's Responsibilities:
1. Arrange for and deliver Owner reviewed shop drawings, product data, and samples, to Contractor.
2. Arrange and pay for product delivery to site.
3. On delivery, inspect products jointly with Contractor.
4. Submit claims for transportation damage and replace damaged, defective, or deficient items.
5. Arrange for manufacturers' warranties, inspections, and service.
B. Contractor's Responsibilities:
1. Review Owner reviewed shop drawings, product data, and samples.
2. Receive and unload products at site; inspect for completeness or damage jointly with
Owner.
3. Handle, store, install and finish products.
4. Repair or replace items damaged after receipt.
3.03 TRANSPORTATION AND HANDLING
A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.
B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.
xxx / FAA HQ Parking Lot TO #7 01 6000 - 3 PRODUCT REQUIREMENTS
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.04 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Provide off-site storage and protection when site does not permit on-site storage or protection.
G. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.
H. Comply with manufacturer's warranty conditions, if any.
I. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
J. Prevent contact with material that may cause corrosion, discoloration, or staining.
K. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
L. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
14.31.006/FAA HQ PARKING LOT 01 7000 - 1 EXECUTION AND CLOSEOUT
SECTION 01 7000
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Pre-installation meetings.
C. Cutting and patching.
D. Surveying for laying out the work.
E. Cleaning and protection.
F. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.
G. General requirements for maintenance service.
1.02 RELATED REQUIREMENTS
A. Section 07 8400 - Firestopping.
1.03 QUALIFICATIONS
A. For surveying work, employ a land surveyor registered in the State in which the Project is located and acceptable to Owner/FAA. Submit evidence of surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate. Employ only individual(s) trained and experienced in collecting and recording accurate data relevant to ongoing construction activities, B. For design of temporary shoring and bracing, employ a Professional Engineer experienced in design of this type of work and licensed in the State in which the Project is located.
PART 2 PRODUCTS
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing products and work for patching and extending work.
B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.
C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01 6000 - Product Requirements.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.
Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.
xxx / FAA HQ Parking Lot TO #7 01 7000 - 2 EXECUTION AND CLOSEOUT
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.
3.03 PREINSTALLATION MEETINGS
A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify FAA Inspectors and Architect four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
1. Review conditions of examination, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.04 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
B. Promptly notify Owner/FAA of any discrepancies discovered.
C. Protect survey control points prior to starting site work; preserve permanent reference points during construction.
D. Promptly report to Owner/FAA the loss or destruction of any reference point or relocation required because of changes in grades or other reasons.
E. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Owner/FAA.
F. Utilize recognized engineering survey practices.
G. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means:
1. Site improvements including pavements; stakes for grading, fill and topsoil placement;
utility locations, slopes, and invert elevations.
2. Grid or axis for structures.
3. Building foundation, column locations, ground floor elevations.
H. Periodically verify layouts by same means.
I. Maintain a complete and accurate log of control and survey work as it progresses.
3.05 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.
D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
E. Make neat transitions between different surfaces, maintaining texture and appearance.
3.06 CUTTING AND PATCHING
A. Whenever possible, execute the work by methods that avoid cutting or patching.
B. Perform whatever cutting and patching is necessary to:
1. Complete the work.
2. Fit products together to integrate with other work.
xxx / FAA HQ Parking Lot TO #7 01 7000 - 3 EXECUTION AND CLOSEOUT
3. Provide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non-conforming work.
C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.
D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.
E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.
F. Restore work with new products in accordance with requirements of Contract Documents.
G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material in accordance with Section 07 8400, to full thickness of the penetrated element.
I. Patching:
1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.
2. Match color, texture, and appearance.
3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.
3.07 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
D. Collect and remove waste materials, debris, and trash/rubbish from site daily and dispose off-site; do not burn or bury.
3.08 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
B. Provide special protection where specified in individual specification sections.
C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
D. Remove protective coverings when no longer needed; reuse or recycle coverings if possible.
3.09 FINAL CLEANING
A. Storm drains must be protected from illicit discharges. Nothing but clean water is allowed in storm drains - NO CLEANERS.
B. Use cleaning materials that are nonhazardous.
C. Clean debris from area drains and drainage systems.
D. Clean site; sweep paved areas, rake clean landscaped surfaces.
xxx / FAA HQ Parking Lot TO #7 01 7000 - 4 EXECUTION AND CLOSEOUT
E. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site;
dispose of in legal manner; do not burn or bury.
3.10 CLOSEOUT PROCEDURES
A. Make submittals that are required by governing or other authorities.
1. Provide copies to Architect and Owner/FAA.
B. Accompany Owner/FAA and Architect on preliminary inspection to determine items to be listed for completion or correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial Completion.
C. Notify Owner/FAA when work is considered ready for Substantial Completion inspection.
D. Submit written certification containing Contractor's Correction Punch List, that Contract
Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for Architect's Substantial Completion inspection.
E. Conduct Substantial Completion inspection and create Final Correction Punch List containing Owner/FAA's, Architect's and Contractor's comprehensive list of items identified to be completed or corrected and submit to Owner/FAA.
F. Correct items of work listed in Final Correction Punch List and comply with requirements for access to Owner-occupied areas.
G. Notify Owner/FAA when work is considered finally complete and ready for Substantial Completion final inspection.
H. Complete items of work determined by Owner/FAA and Architect listed in executed Certificate of Substantial Completion.
3.11 MAINTENANCE
A. Provide service and maintenance of components indicated in specification sections.
B. Maintenance Period: As indicated in specification sections or, if not indicated, not less than one year from the Date of Substantial Completion or the length of the specified warranty, whichever is longer.
C. Maintenance service shall not be assigned or transferred to any agent or subcontractor without prior written consent of the Owner.
14.31.006/FAA HQ PARKING LOT 01 7419 - 1 CONSTRUCTION WASTE
MANAGEMENT AND DISPOSAL
SECTION 01 7419
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 GENERAL
1.01 WASTE MANAGEMENT REQUIREMENTS
A. Owner requires that this project generate the least amount of trash and waste possible.
B. Employ processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors.
C. Required Recycling, Salvage, and Reuse: The following may not be disposed of in landfills or by incineration:
1. Carpet, carpet tile, and carpet remnants, both new and removed: Contractor shall paletize and move to MMAC Building 50 for Recycling. Coordinate transfer with AMP-100
2. Mechanical and electrical equipment.
a. If during the demolition of the existing systems, mercury thermostats are removed for discard, these devices need to be collected in a bucket or other suitable container and provided to AMP-100 for proper recycling/disposal as hazardous waste.
3. Fluorescent lamps (light bulbs).
a. All lighting lamps and ballasts that are recovered during the demolition are treated as universal waste or potential universal waste. All UV lamps must be containerized in cartons for recycling and PCB ballasts collected in drums or other suitable container.
Coordinate activities with AMP-100.
4. Refrigerant.
a. AMP 300 will recover all refrigerant prior to demolition.
D. Methods of trash/waste disposal that are not acceptable are:
1. Burning on the project site.
2. Burying on the project site.
3. Dumping or burying on other property, public or private.
4. Other illegal dumping or burying.
E. Regulatory Requirements: Contractor is responsible for knowing and complying with regulatory requirements, including but not limited to Federal, state and local requirements, pertaining to legal disposal of all construction and demolition waste materials.
1.02 RELATED REQUIREMENTS
A. Section 01 3000 - Administrative Requirements: Additional requirements for project meetings, reports, submittal procedures, and project documentation.
B. Section 01 5000 - Temporary Facilities and Controls: Additional requirements related to trash/waste collection and removal facilities and services.
C. Section 01 6000 - Product Requirements: Waste prevention requirements related to delivery, storage, and handling.
D. Section 01 7000 - Execution and Closeout Requirements: Trash/waste prevention procedures related to demolition, cutting and patching, installation, protection, and cleaning.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Submit Waste Management Plan within 10 calendar days after receipt of Notice of Award of Bid, or prior to any trash or waste removal, whichever occurs sooner; submit projection of all trash and waste that will require disposal and alternatives to landfilling.
C. Submit Waste Management Reports monthly.
PART 3 EXECUTION
2.01 WASTE MANAGEMENT PROCEDURES
A. See Section 01 3000 for additional requirements for project meetings, reports, submittal procedures, and project documentation.
xxx / FAA HQ Parking Lot TO #7 01 7419 - 2 CONSTRUCTION WASTE
MANAGEMENT AND DISPOSAL
B. See Section 01 5000 for additional requirements related to trash/waste collection and removal facilities and services.
C. See Section 01 6000 for waste prevention requirements related to delivery, storage, and handling.
D. See Section 01 7000 for trash/waste prevention procedures related to demolition, cutting and patching, installation, protection, and cleaning.
2.02 WASTE MANAGEMENT PLAN IMPLEMENTATION
A. Manager: Designate an on-site person or persons responsible for instructing workers and overseeing and documenting results of the Waste Management Plan.
B. Communication: Distribute copies of the Waste Management Plan to job site foreman, each subcontractor, Owner, and Architect.
C. Instruction: Provide on-site instruction of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project.
D. Hazardous Wastes: Separate, store, and dispose of hazardous wastes according to applicable regulations.
E. Recycling: Separate, store, protect, and handle at the site identified recyclable waste products in order to prevent contamination of materials and to maximize recyclability of identified materials. Arrange for timely pickups from the site or deliveries to recycling facility in order to prevent contamination of recyclable materials.
14.31.006/FAA HQ PARKING LOT 01 7800 - 1 CLOSEOUT SUBMITTALS
SECTION 01 7800
CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Project Record Documents.
B. Operation and Maintenance Data.
C. Warranties and bonds.
D. Certification of Asbestos Free Materials
1.02 RELATED REQUIREMENTS
A. Section 01 3000 - Administrative Requirements: Submittals procedures, shop drawings, product data, and samples.
B. Individual Product Sections: Specific requirements for operation and maintenance data.
C. Individual Product Sections: Warranties required for specific products or Work.
1.03 SUBMITTALS
A. Project Record Documents: Submit documents to Owner/FAA and Architect with claim for final
Application for Payment.
B. Operation and Maintenance Data:
1. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Owner/FAA and Architect will review draft and return one copy with comments.
2. For equipment, or component parts of equipment put into service during construction and operated by Owner, submit completed documents within ten days after acceptance.
3. Submit one copy of completed documents 15 days prior to final inspection. This copy will be reviewed and returned after final inspection, with Owner/FAA and Architect comments.
Revise content of all document sets as required prior to final submission.
4. Submit two sets of revised final documents in final form within 10 days after final inspection.
C. Warranties and Bonds:
1. For equipment or component parts of equipment put into service during construction with
Owner's permission, submit documents within 10 days after acceptance.
2. Make other submittals within 10 days after Date of Substantial Completion, prior to final
Application for Payment.
3. For items of Work for which acceptance is…