SOW.pdf
PDF 1 MB Posted
- Solicitation number
- 6973GH-18-R-00153
About this file
SOW (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONTRACTOR'S RELEASE FORM.doc | DOC document | |
| GENERAL REPAIR REPORT-TW.pdf | ||
| TOWER REPAIR REPORT-WT.pdf | ||
| EXPERIENCE INFO FORM.pdf | ||
| TOWER REPAIR REPORT-BM.pdf | ||
| TOWER REPAIR REPORT-BP.pdf | ||
| WD-AZ180032.pdf | ||
| GENERAL REPAIR REPORT-BP.pdf | ||
| 6973GH-18-R-00153.pdf | ||
| GENERAL REPAIR REPORT-BM.pdf | ||
| TOWER REPAIR REPORT-WT.pdf | ||
| GENERAL REPAIR REPORT-TW.pdf | ||
| WD-AZ180032.pdf | ||
| GENERAL REPAIR REPORT-BM.pdf | ||
| CONTRACTOR'S RELEASE FORM.doc | DOC document | |
| EXPERIENCE INFO FORM.pdf | ||
| SOW.pdf | ||
| TOWER REPAIR REPORT-BP.pdf | ||
| GENERAL REPAIR REPORT-BP.pdf | ||
| TOWER REPAIR REPORT-BM.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.2 List of Deliverables by Task
The deliverables to be completed and submitted for each task under this SOW are described below. Acceptance of the work will be based on conformance with construction drawings and other government furnished information provided by FAALC/AML-2000.
1) Tower General Repairs
a) Reference Tower General Repair Report
2) Tower Structural Repairs
a) Reference Tower Structural Repair Report
4.0 Schedules/Milestones
Project scheduling and milestones for the site will be submitted within 5 days of award and include no less than the following milestones:
• Security Clearance,
• Prework Meeting,
• Mobilization,
• Site Work
• Final Inspection and Acceptance
• Demobilization
5.0 Other Considerations
All personnel shall be required to submit and clear a law enforcement clearance through the local CBP sector office.
6.0 Progress/Compliance
The following will be coordinated with FAA-AML-2070 in order to monitor progress and ensure compliance (identify action):
• Prework Meeting
• Final Inspection and Acceptance
• Submission Documents in Sections 3.1 & 4.1
7.0 Period of performance
After the work is awarded, the awarded contractor should be prepared to have a kickoff meeting with 14 calendar days prior to mobilization and submit site access form 21 calendar days prior to mobilization. From mobilization work should be completed within 60 calendar days
Working hours may be constricted due to allowable working hours for Government Escort.
Working hours are Monday through Friday 8 am to 5 pm unless otherwise approved. All weekend work must be approved with agency of Government Escort.
8.0 Place of performance
Site one is located at Black Peak (Latitude 34.124576, Longitude -114.212274) Site two is located at Black Mountain (Latitude 33.052319, Longitude - I 14.827463) Site three is located at White Tank (Latitude 33.575406, Longitude -112.578769)
File details come from the government source that posted it.