GENERAL REPAIR REPORT-BP.pdf
PDF 5 MB Posted
- Solicitation number
- 6973GH-18-R-00153
About this file
GENERAL REPAIR REPORT-BP (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONTRACTOR'S RELEASE FORM.doc | DOC document | |
| GENERAL REPAIR REPORT-TW.pdf | ||
| TOWER REPAIR REPORT-WT.pdf | ||
| SOW.pdf | ||
| EXPERIENCE INFO FORM.pdf | ||
| TOWER REPAIR REPORT-BM.pdf | ||
| TOWER REPAIR REPORT-BP.pdf | ||
| WD-AZ180032.pdf | ||
| 6973GH-18-R-00153.pdf | ||
| GENERAL REPAIR REPORT-BM.pdf | ||
| TOWER REPAIR REPORT-WT.pdf | ||
| GENERAL REPAIR REPORT-TW.pdf | ||
| WD-AZ180032.pdf | ||
| GENERAL REPAIR REPORT-BM.pdf | ||
| CONTRACTOR'S RELEASE FORM.doc | DOC document | |
| EXPERIENCE INFO FORM.pdf | ||
| SOW.pdf | ||
| TOWER REPAIR REPORT-BP.pdf | ||
| GENERAL REPAIR REPORT-BP.pdf | ||
| TOWER REPAIR REPORT-BM.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structural Analysis and Condition Assessment for LMR Sites
Black Peak, Arizona (AZ2118)
STRUCTURAL AND CONDITION ASSESSMENT
REPORT
September 14, 2016 Revision 01 – October 24, 2016
SENSITIVE BUT UNCLASSIFIED (SBU) GSA Order #: GS-P-00-16-LY-7055 PROPERTY OF THE UNITED STATES GOVERNMENT GSA Contract #: GS-07-P-15-UC-D-7000
COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS PDN: EP-GS-P-00-16-LY-7055
DOCUMENT TO UNAUTHORIZED RECIPIENTS HGA Commission Number 2111-064-00
IS PROHIBITED
Do not remove this notice Properly destroy or return documents when no longer needed
420 North 5th Street, Suite 100 Minneapolis, Minnesota 55401
Tower Engineering Professionals
326 Tryon Road
Raleigh, North Carolina 27603
STRUCTURAL AND CONDITION ASSESSMENT REPORT
FOR
[BLACK PEAK] AZ2118
51.5’ SELF SUPPORTING TOWER
PARKER, LA PAZ COUNTY, ARIZONA
TEP # 69882_85602
Revision 0
Respectfully Submitted By:
Prepared For:
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
Graham
Date: September 14, 2016
Stephen Fiskum, FAIA Tower Engineering Professionals
HGA Architects and Engineers 326 Tryon Road
420 5th Street North, Suite 100 Raleigh, NC 27603
Minneapolis, MN 55401 (919) 661-6351
(612) 758-4502 StructuresReview@tepgroup.net
Subject: Executive Summary
Tower Designation: Site Number: AZ2118
Site Name: Black Peak
Engineering Firm Designation: TEP Project Number: 69882_85602
Site Data: Shea Road, Parker, La Paz County, AZ 85344
Lat., Long.: 34.124576, -114.212274
(N 34° 07' 28.47'', W 114° 12' 44.19”)
51.5 Foot ± – Self Supporting Tower
Tower Engineering Professionals (TEP) is pleased to provide this executive summary for the Phase I Scope of Work, which included a Maintenance and Condition Assessment, Capital Expenditure Table, Steel and Appurtenance
Mapping, and Structural Analysis for the above referenced site.
Maintenance and Condition Assessment
Overall Tower Condition (Excellent/Good/Average/Fair/Poor): Average*
Tower Type: 51.5-ft self supporting tower
Tower Age: Approximately 20-30 years**
Number of Guy Wires: N/A
Tower Access Road Condition: Poor, several jagged protrusions in the access road where even high-clearance vehicles may scrape bottom or get stuck
A periodic inspection for the above referenced site was performed by Bryan Gilliam, C.W.I. and Cameron Torgent, E.I.
of TEP during the July 11, 2016 site visit. The inspection was in accordance with the ANSI/TIA-222-G-2005, Annex J:
Maintenance and Condition Assessment (Normative). TEP observed the following checklist items requiring some measure of possible or required corrective action: 1) Structure Condition, 2) Finish, 3) Grounding, 4) Antennas and
Lines, 5) Concrete Foundations, and 6) Non-TIA Related Items. Refer to the Maintenance and Condition Assessment
Report for specific details.
*TEP defines the tower conditions as follows:
Excellent - The tower has sufficient capacity to carry the existing loads. No modifications are required at this time. In addition, the tower has no maintenance issues of note and doesn’t require maintenance repairs at this time.
Good - The tower has sufficient capacity to carry the existing loads. No modifications are required at this time. However, the tower has some maintenance issues of note that require attention.
Average - The tower does not have sufficient capacity to carry the existing loads. Modifications will be required to bring the tower into compliance with the
ANSI/TIA-222-G standard for the existing loading. In addition, the tower may have minor maintenance issues of note that require attention.
Fair - The tower does not have sufficient capacity to carry the existing loads. Modifications will be required to bring the tower into compliance with the
ANSI/TIA-222-G standard for the existing loading. In addition, the tower has maintenance issues of note that require attention. Based on the itemized estimate in our Capital Expenditure Table, modifying the existing tower may be the most cost effective solution.
Poor - The tower does not have sufficient capacity to carry the existing loads. Modifications will be required to bring the tower into compliance with the
ANSI/TIA-222-G standard for the existing loading. In addition, the tower has maintenance issues of note that require attention. Based on the itemized estimate in our Capital Expenditure Table and/or the condition of the tower, a full tower replacement may be the best solution.
**Tower Age was estimated based on tower identification tags, tower manufacturer information, tower research, type and condition of tower components, and/or historical site images
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP Project Number 69882_85602 September 14, 2016
AZ2118 - Black Peak
326 Tryon Road, Raleigh, NC 27603 (o) 919-661-6351 (f) 919-661-6350 www.tepgroup.net
Condition Assessment of Non-Tower Assets
During the site visit, TEP conducted a visual inspection of all Non-Tower Owned Assets. TEP did not find any non-tower assets that require urgent corrective repairs. However, TEP recommends regular inspection and maintenance by licensed professionals based on manufacturer specifications. Refer to Section L of the Maintenance and Condition
Assessment Report for any applicable additional information.
Asset Type Coordinates Condition Notes
Estimated
Remaining
Life
Shelter CMU Brick 34.124578, -114.212203 Good No major issues observed 10+ years
Roof Wood 34.124578, -114.212203 Fair
Roofing felt is peeling, roof trim is showing signs of decay 1-5 years
Shelter
Access
(1)Single
Door,
(1) Double
Door
34.124578, -114.212203 Fair
Some surface corrosion on double door, single door has bottom gap, requires weatherproofing
1-5 years
A/C Units
(2)
Through
Wall
34.124578, -114.212203 Good
Frigidaire manufacturer tag, no major issues observed 10+ years
Power
Supply
Power
Meter
34.124578, -114.212203 Poor
Located outside shelter, LCD screen does not appear to be working properly 0-1 year
Power
Supply Generator
34.124586, -114.212129 Good
ReliOn Power Solution, no major issues observed 10+ years
Gas Source N/A - - None discovered on site. -
Cellular
Receivers
34.124578, -114.212203 Good
Shelter houses various units associated with communication equipment, no major issues of note
10+ years
Capital Expenditure Table
A cost estimate of $76,340 was provided to cover repairs and additional inspections as recommended in the
Maintenance and Condition Assessment Report and the Structural Analysis Report. The recommended repair schedule ranges from 6 months to 5 years. Also note that this estimate does not include any foundation reinforcements that may be required. TEP cannot say with certainty that modifying the existing tower would be more cost effective than a replacement without completing a Structural Modification Design Analysis. Refer to the
Capital Expenditure Table for details. For itemized repairs, refer to the Capital Expenditure Table for details. TEP estimated a ROM cost for full tower replacement would range from approximately $160,000 for a 100-ft self supporting tower to $250,000 for a 200-ft self supporting tower. These estimates do not include pricing for site specific costs related to zoning, permitting, environmental studies, etc.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
Steel and Appurtenance Mapping
The original design criteria were unavailable for review. A Steel and Appurtenance Mapping was performed in order to obtain the necessary tower and appurtenance loading information needed to conduct the Structural Analysis for this site. The antennas recorded during our Steel and Appurtenance Mapping are depicted in the table below. TEP denoted the owner of the equipment under the “Owner/Tenant” column based on information available on site.
Refer to the Steel and Appurtenance Mapping Report for additional detail.
Elevation
(ft) Qty Antenna Model
Mount
Type
Owner/
Tenant
53.0 1 RFI BA40-41-DIN Sidearm CBP
37.5 1 Telewave ANT150F2DIN Sidearm CBP
19.0 2 RFI BA40-41-DIN Sidearm CBP
10.0 1 Kathrein PRF-900 Paraflector Pipe CBP
Structural Analysis
The Structural Analysis report outlines overstresses in the tower legs from 0’ to 1.5’ elevations and diagonal bracing from 1.5’ to 21.5’ elevations. TEP believes that the majority of the overstresses can be attributed to the more stringent loading and analysis criteria as required by the latest ANSI/TIA-222-G-2-2009 Standard, as compared to previous versions of the TIA Standard for which the tower was originally designed. Based on our analysis we have determined the tower stress level for each controlling component, under the following load case, to be:
LC1: Existing Equipment Insufficient Capacity Note: See Table 1 for the existing loading
Thank you for the opportunity to provide this service for you. If you have any questions or comments, please contact our office.
Component % Capacity
Leg (T6) 178.8
Diagonal (T5) 162.5
Bolt Checks 162.5
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
MASTER TABLE OF CONTENTS
���� MAINTENANCE AND CONDITION ASSESSMENT
���� CAPITAL EXPENDITURE TABLE
���� ANNEX A: STEEL AND APPURTENANCE MAPPING
���� ANNEX B: STRUCTURAL ANALYSIS
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
MAINTENANCE AND CONDITION ASSESSMENT
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
Date: September 14, 2016
HGA Architects and Engineers 326 Tryon Road
420 5th Street North, Suite 100 Raleigh, NC 27603
Minneapolis, MN 55401 (919) 661-6351
(612) 758-4502 StructuresReview@tepgroup.net
Subject: Maintenance and Condition Assessment Report
Tower Designation: Site Number: AZ2118
Site Name: Black Peak
Engineering Firm Designation: TEP Project Number: 69882_85602
Site Data: Shea Road, Parker, La Paz County, AZ 85344
Lat., Long.: 34.124576, -114.212274
(N 34° 07' 28.47”, W 114° 12' 44.19”)
51.5 Foot ± – Self Supporting Tower
Dear Mr. Fiskum, Tower Engineering Professionals (TEP) completed a periodic inspection for the above referenced site. The onsite investigation was performed by Bryan Gilliam, C.W.I. and Cameron Torgent, E.I. of TEP during the July 11, 2016 site visit.
The inspection was in accordance with the ANSI/TIA-222-G-2005, Annex J: Maintenance and Condition Assessment
(Normative), including all addendums (addendums TIA-222-G-1 2007 and TIA 222-G-2 2009); the checklist can be found on pages 3 thru 8 of this report.
Observations and recommendations are listed herein. The inspection included observation of the tower components and CBP owned assets. For the purpose of this inspection, the tower legs were named by letter according to the magnetic azimuth defined by a line from the center of tower to the leg. “A” leg is the leg closest to magnetic north, followed clockwise by “B” and “C.”
Thank you for the opportunity to provide this service for you. If you have any questions or comments, please contact our office.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
Self Supporting Tower Maintenance and Condition Assessment Report September 14, 2016
TEP Project Number 69882_85602 AZ2118 - Black Peak
TABLE OF CONTENTS
1) ANSI/TIA-222-G-MAINTENANCE AND CONDITION ASSESSMENT
2) SUMMARY
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
ANSI/TIA-222-G MAINTENANCE AND CONDITION ASSESSMENT
A. STRUCTURE CONDITION
A.1. Damaged members (legs and bracing)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
A.2. Loose members
Okay Possible Improvement Needs Repair Not Applicable
Notes:
A.3. Missing members
Okay Possible Improvement Needs Repair Not Applicable
Notes:
A.4. Climbing facilities, platforms, catwalks – all secure
Okay Possible Improvement Needs Repair Not Applicable
Notes: Missing step peg observed at 14-ft on C-leg. Disengaged nut on step bolt observed at 41.5-ft on C-leg. Safety climb cable observed wrapped behind step bolt. Safety climb mount is the wrong type. See summary for details.
A.5. Loose and/or missing bolts and/or nut locking devices
Okay Possible Improvement Needs Repair Not Applicable
Notes: Missing nuts on diagonal bracing bolts on A-leg at 2.66-ft and B-leg at 8.5-ft. Loose leg bolt observed on C-leg at 21.5-ft. All leg flange bolts are missing nut locking devices throughout the tower. See summary for details
A.6. Visible cracks in welded connections
Notes:
B. FINISH
B.1. Paint and/or galvanizing condition
Notes:
B.2. Rust and/or corrosion condition including mounts and accessories
Okay Possible Improvement Needs Repair Not Applicable
Notes: Surface corrosion observed on nuts intermittently throughout the entire tower height. See summary for details.
B.3. FAA or ICAO color marking conditions
Okay Possible Improvement Needs Repair Not Applicable
Notes:
B.4. Water collection in members (to be remedied, e.g., unplug drain holes, etc.)
Okay Possible Improvement Needs Repair Not Applicable
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
C. LIGHTING
C.1. Conduit, junction boxes, and fasteners (weather tight and secure)
Notes:
C.2. Drains and vents openings (unobstructed)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
C.3. Wiring Condition
Okay Possible Improvement Needs Repair Not Applicable
Notes:
C.4. Light lenses
Okay Possible Improvement Needs Repair Not Applicable
Notes:
C.5. Bulb condition
Okay Possible Improvement Needs Repair Not Applicable
Notes:
C.6.a. Controllers functioning (Flasher)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
C.6.b. Controllers functioning (Photo control)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
C.6.c. Controllers functioning (Alarms)
D. GROUNDING
D.1. Connections
Notes:
D.2. Corrosion
Okay Possible Improvement Needs Repair Not Applicable
Notes:
D.3. Lightning protection (secured to structure)
Okay Possible Improvement Needs Repair Not Applicable
Notes: No lightning protection installed on tower. Addition of lightning rod and homerun ground wire are up to owner’s discretion.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
E. ANTENNAS AND LINES
E.1. Antenna condition
Notes:
E.2. Mount and/or ice shield condition (bent, loose, and/or missing members)
Okay Possible Improvement Needs Repair Not Applicable
Notes: Missing nut locking on mount hardware at 14.5-ft. See summary for details.
E.3. Feed line condition (flanges, seals, dents, jacket damage, grounding, etc.)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
E.4. Hanger condition (snap-ins, bolt on, kellum grips, etc.)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
E.5. Secured to structure
F. OTHER APPURTENANCES (WALKWAYS, PLATFORMS, SENSORS, FLOODLIGHTS, ETC.)
F.1. Condition
Notes:
F.2. Secured to structure
G. INSULATOR CONDITION
G.1. Cracking and chipping
Notes:
G.2. Cleanliness of insulators
Okay Possible Improvement Needs Repair Not Applicable
Notes:
G.3. Spark gaps set properly
Okay Possible Improvement Needs Repair Not Applicable
Notes:
G.4. Isolation transformer condition
Okay Possible Improvement Needs Repair Not Applicable
Notes:
G.5. Bolts and connection secure
Okay Possible Improvement Needs Repair Not Applicable
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
H. GUYS
H.1. Strand condition (corrosion, breaks, nicks, kinks, etc.)
Notes:
H.2.a. Guy Hardware Conditions (Turnbuckles or equivalent (secure and safety properly applied)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.b. Guy Hardware Conditions (Cable thimbles properly in place (if required))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.c. Guy Hardware Conditions (Service sleeves properly in place (if required))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.d.i. Guy Hardware Conditions (Cable connectors (end fittings) (Cable clamps applied properly and bolts tight))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.d.ii. Guy Hardware Conditions (Cable connectors (end fittings) (Wire serving properly applied))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.d.iii. Guy Hardware Conditions (Cable connectors (end fittings) (No signs of slippage or damaged strands))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.d.iv. Guy Hardware Conditions (Cable connectors (Preformed wraps – properly applied, fully wrapped, & sleeve in place))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.d.v. Guy Hardware Conditions (Cable connectors (end fittings) (Poured sockets secure and showing no separation))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.2.d.vi. Guy Hardware Conditions (Cable connectors (Shackles, bolts, pins, and cotter pins secure and in good condition))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.3. Guy tensions
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.4. Measure guy tensions
Okay Possible Improvement Needs Repair Not Applicable
Notes:
H.5. Record temperature, wind speed and wind direction
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
I. CONCRETE FOUNDATIONS
I.1.a. Ground condition (Settlement, movement or earth cracks)
Notes:
I.1.b. Ground condition (Erosion)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.1.c. Ground condition (Site condition (standing water, drainage, trees, etc.))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.2.a. Anchorage condition (Nuts and/or nut locking device (tightened))
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.2.b. Anchorage condition (Grout condition)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.2.c. Anchorage condition (Anchorages and/or anchor rod condition)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.3.a. Concrete condition (Cracking, spalling, or splitting)
Okay Possible Improvement Needs Repair Not Applicable
Notes: Hairline cracks observed on foundation propagating from all legs. See summary for details.
I.3.b. Concrete condition (Chipped or broken concrete)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.3.c. Concrete condition (Honeycombing)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
I.3.d. Concrete condition (Low spots to collect moisture)
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
J. GUYED MAST ANCHORS
J.1. Settlement, movement or earth cracks
Notes:
J.2. Backfill heaped over concrete for water shedding
Okay Possible Improvement Needs Repair Not Applicable
Notes:
J.3. Anchor rod condition below earth (Maintain required structural capacity of anchor during exploration.)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
J.4. Corrosion control measures (galvanizing, coating, concrete encasement, cathodic protection systems, etc.)
Okay Possible Improvement Needs Repair Not Applicable
Notes:
J.5. Anchor heads clear of earth
K. TOWER ALIGNMENT
K.1. Tower Plumb and Twist
Notes: Tower twist and plumb was not measured as a part of this scope of work.
L. NON-TIA RELATED ITEMS
L.1. Equipment Shelter
Notes: TEP noted shelter roofing felt was damaged. See summary for details.
L.2. Security
Okay Possible Improvement Needs Repair Not Applicable
Notes: Tower compound is unsecured. See summary for details.
L.3. Other Equipment
Okay Possible Improvement Needs Repair Not Applicable
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
SUMMARY
Photograph Observations and Recommendations
A.4. Climbing facilities, platforms, catwalks – all secure
Observation:
Missing step peg observed at 14-ft on C-leg.
Recommendation:
Replace with a new 5/8”dia. x 7” long step peg.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
Disengaged nut on step bolt observed at 41.5-ft on C-leg.
Replace with a longer 5/8”dia. step peg and tighten nut per the AISC “turn of the nut” method. Install nut locking device on new bolt.
Safety climb cable observed wrapped behind step bolt.
Untangle safety climb cable and tighten cable to remove slack. Installation of cable restrainers is up to tower owner’s discretion.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
Safety climb mount is the wrong type. Installed mount is intended for monopole type towers.
Consult with Trylon if mount is acceptable as-is. If not, replace with the appropriate safety climb mount for self-supporting towers.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
A.5. Loose and/or missing bolts and/or nut locking devices
Missing nuts on diagonal bracing bolts on A-leg at 2.66-ft and B-leg at 8.5-ft.
Replace with new A325 1/2”dia. bolts. Install nuts and nut locking devices on all new bolts. Tighten all nuts per the AISC
“turn of the nut” method.
Loose leg bolt observed on C-leg at 21.5-ft.
Replace with a new A325 1/2"dia. bolt. Tighten nut per the
AISC “turn of the nut” method.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
A.5. Loose and/or missing bolts and/or nut locking devices
All leg flange bolts are missing nut locking devices throughout the tower.
Install nut locking devices on all leg flange bolts. Tighten all nuts per the AISC “turn of the nut” method.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
B.2. Rust and/or corrosion condition including mounts and accessories
Surface corrosion observed on nuts intermittently throughout the entire tower height.
Replace all corroded nuts. Tighten all new nuts per the AISC
“turn of the nut” method.
E.2. Mount and/or ice shield condition (bent, loose, and/or missing members)
Missing nut locking on mount hardware at 14.5-ft.
Install nut locking device. Tighten all nuts per the AISC “turn of the nut” method.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
I.3.a. Concrete condition (Cracking, spalling, or splitting)
Hairline cracks observed on foundation propagating from all legs.
Periodically monitor foundation and contact TEP if condition worsens.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
L.1. Equipment Shelter
TEP noted shelter roofing felt was damaged.
Replace roofing felt to prevent weather damage to shelter.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
L.2. Security
Tower compound is unsecured.
Install an 8-ft, barbed wire fence around all CBP assets, including the tower and equipment shelters. Secure fence with chain and padlock.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
CAPITAL EXPENDITURE TABLE
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
ANSI/TIA-222-G: CAPITAL EXPENDITURE TABLE
Job Name: AZ2118 - Black Peak
TEP Number: 69882_85602
A. STRUCTURAL CONDITION
Issue: Repair/Modification: Repair Schedule:
A.1. Damaged members (legs and bracing)
a. The following members were overstressed in the structural analysis:
i. Order Structural Design Drawings for modifications to failing members.
0-6 months $57,000
● Tower Legs from 0'-1.5'
● Tower Diagonals from 1.5'-21.5'
Sub Total: $57,000
A.4. Climbing facilities, platforms, catwalks – all secure
a. Missing step peg observed at 14-ft on C-leg. i. Replace with a new 5/8"dia. x 7" long step peg. 0-1 year $50
b. Disengaged nut on step bolt observed at 41.5-ft on C-leg. ii. Replace with a longer 5/8"dia. step peg and tighten nut per the AISC "turn of the nut" method.
Install nut locking device on new bolt.
0-1 year $50
c. Safety climb cable observed wrapped behind step bolt. iii. Untangle safety climb cable and tighten cable to remove slack. Installation of cable retrainers is up to tower's owner discretion.
0-1 year $250
d. Safety climb mount is the wrong type. Installed mount is intended for monopole type towers.
iv. Consult with Trylon if mount is acceptable as-is. If not, replace with the appropriate safety climb mount for self-supporting towers.
0-1 year $1,750
Sub Total: $2,100
A.5. Loose and/or missing bolts and/or nut locking devices
a. Missing nuts on diagonal bracing bolts on A-leg at 2.66-ft and B-leg at 8.5-ft.
i. Replace with new A325 1/2"dia. bolts. Install nuts and nut locking devices on all new bolts. Tighten all nuts per the AISC "turn of the nut" method.
0-6 months $75
b. Loose leg bolt observed on C-leg at 21.5-ft. ii. Replace with a new A325 1/2"dia. bolt. Tighten nut per the AISC "turn of the nut" method.
0-6 months $65
c. All leg flange bolts are missing nut locking devices throughout the tower.
iii. Install nut locking devices on all leg flanges bolts.
Tighten all nuts per the AISC "turn of the nut" method.
0-6 months $250
Sub Total: $390
Total: $59,490
B. FINISH
Issue: Repair/Modification: Repair Schedule:
B.2. Rust and/or corrosion condition including mounts and accessories
a. Surface corrosion observed on nuts intermittently throughout the entire tower height.
i. Replace all corroded nuts. Tighten all new nuts per the AISC "turn of the nut" method.
0-6 months $700
Sub Total: $700
Total: $700
C. LIGHTING
NO DEFICIENCIES WERE IDENTIFIED
*Items that don't require attention were omitted from this list of itemized modification costs. For a full itemized list of everything that was assessed during our site visit please reference the Maintenance and Condition Assessment.
Fee:
Fee:
ii. Complete repairs as specified in Structural Design
Drawings.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
D. GROUNDING
Issue: Repair/Modification: Repair Schedule:
D.3. Lightning protection (secured to structure)
a. No lightning protection installed on tower. i. Addition of lightning rod and homerun ground wire are up to owner's discretion.
0-5 years $250
Sub Total: $250
Total: $250
E. ANTENNAS AND LINES
Issue: Repair/Modification: Repair Schedule:
E.2. Mount and/or ice shield condition (bent, loose, and/or missing members)
a. Missing nut locking device on mount hardware at 14.5-ft. i. Install nut locking device. Tighten all nuts per the
AISC "turn of the nut" method.
0-1 year $50
Sub Total: $50
Total: $50
F. OTHER APPURTENANCES (WALKWAYS, PLATFORMS, SENSORS, FLOODLIGHTS, ETC.)
NO DEFICIENCIES WERE IDENTIFIED
G. INSULATOR CONDITION
NO DEFICIENCIES WERE IDENTIFIED
H. GUYS
NO DEFICIENCIES WERE IDENTIFIED
I. CONCRETE FOUNDATIONS
Issue: Repair/Modification: Repair Schedule:
I.3.a. Concrete condition (Cracking, spalling, or splitting)
a. Hairline cracks observed on foundation propagating from all legs.
i. Periodically monitor foundation and contact TEP if condition worsens.
0-1 year $1,500
Sub Total: $1,500
Total: $1,500
J. GUYED MAST ANCHORS
NO DEFICIENCIES WERE IDENTIFIED
K. TOWER ALIGNMENT
NO DEFICIENCIES WERE IDENTIFIED
L. NON-TIA ISSUES
Issue: Repair/Modification: Repair Schedule:
L.1. Equipment Shelter
a. TEP noted shelter roofing felt was damaged. i. Replace roofing felt to prevent weather damage to shelter.
0-5 years $850
Sub Total: $850
L.2. Security
a. Tower compound is unsecured. i. Install an 8-ft, barbed wire fence around all CBP assets, including the tower and equipment shelters.
Secure fence with chain and padlock.
0-1 year $9,000
Sub Total: $9,000
Total: $9,850
Fee:
Fee:
Fee:
Modification Fee:
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
OTHER CONSTRUCTION COSTS
Item:
a. Permits / Application Fees $1,000
b. Post Modification Inspection Report $2,000
c. Mobilization Costs $1,500
Sub Total: $4,500
Total: $4,500
GRAND TOTAL: $76,340
Fee:
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
ANNEX A:
STEEL AND APPURTENANCE MAPPING
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Page Title Initials Page # (s) Notes Checklist & Notes
Tower Elevation Tower Section Elevation Transmission Cables
Anchor Head Details
Antenna and Mount Sketch Photos
CJT
6-11
13-17 18-21
CHECKLIST
Latitude: Longitude:
Ground Elevation:
Site Address:
Tower ID Plate:
Existing Carriers/Site #:
Gate Combo:
Telephone Company:
Pedestal # and Location:
Power Company:
Meter # and Owner:
34.124576° (N 34° 07' 28.47")
1622-FT (VIA GOOGLE EARTH)
SHEA ROAD, PARKER, AZ 85344 (LA PAZ COUNTY)
NONE OBSERVED
UNKNOWN
NONE OBSERVED
UNKNOWN
108 665 825 (CBP)
CBP / AZ2118
N/A
-114.212274° (W 114° 12' 44.19")
Crew Leader:
Crew Member: CAMERON TORGENT, E.I.
Abbreviations: AGL: Above Ground Level B.C.: Bolt Circle BP: Bent Plate C-C: Center to Center C: Channel CNR: Could Not Record EW: Elliptical Waveguide FH: Foam Heliax
HCL: Hard Copper Line HSS: Hollow Structural Section L: Angle 2L: Double Angle MC: Metal Conduit M.E.: Minimum Edge MOD: Modification PL: Plate
RC: Rigid Conduit S.B.: Stitch Bolts Schl: Schifflerized Angle SM: Smooth Heliax SP: Spacing SR: Solid Rod TH: Thickness Tri: Triangular
BRYAN GILLIAM, C.W.I.
NOTES
FCC#: N/A
Special Access Issues (Key Entry, Hidden/Unmarked Access, FM/TV on tower): CONTACT RICHARD KNIGGE
Compound Detail 2
(520) 909-7602
Ladder 3
CJT
CJT
CJT
CJT
CJT
CJT
CJT
CJT
RICHARD.L.KNIGGE@CBP.DHS.GOV
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
COMPOUND DETAIL
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Access Road Compound View CBP Equipment Shelter
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
LADDER
Climbing Ladder #1 Sketch
Description Ladder
# Height Width Step Rail (type & size) Rung (type & size) Safety (type & size)
4" 24" C-LEG 5
8"Ø S.R. 3 8"Ø0' - 51'-6"1
Climbing Ladder #1 Photo
Climbing Ladder #1 Photo
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Description # Height Width Step Rail (type & size) Rung (type & size) Holes (size & spacing)
Waveguide
WAVEGUIDE
12'-42' 21 2" 48" AB FACE 2"Tx21
2"Dx18"TH (3) 34"Ø1
Waveguide Ladder #1 Sketch Waveguide Ladder #1 Photo
Waveguide Ladder #1 Photo
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER ELEVATION
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER SECTION ELEVATION
BASE PHOTOSECTION _______________1 (0' - 1'-6") PHOTO
MEMBER SIZES
Member
LEG
BRACING
Size Bolts Gussets/Flange
SCH L4"x4"x5 16"
L13 4"x13
4"x316"
Face Width at Top ___________ Face Width at Bottom_________3'-81
2" 3'-81
16"
Min. Edge
1"(1) 12"Ø
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER SECTION ELEVATION
SECTION __________________2 (1'-6" - 11'-6")
MEMBER SIZES
Face Width at Top ___________ Face Width at Bottom_________3'-81
16" 3'-51
16"
Member
LEG
BRACING
Size Bolts Gussets/Flange
(6) 12"Ø (4) PL10"x3"x14"
Min. Edge
1"(1) 12"Ø
SCH L4"x4"x5 16"
L13 4"x13
4"x316"
PHOTO PHOTO
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER SECTION ELEVATION
SECTION __________________3 (11'-6" - 21'-6")
MEMBER SIZES
Face Width at Top ___________ Face Width at Bottom_________3'-51
16" 3'-2"
Member
LEG
BRACING
Size Bolts Gussets/Flange
(6) 12"Ø (4) PL10"x3"x14"
Min. Edge
1"(1) 12"Ø
SCH L4"x4"x5 16"
L11 2"x11
2"x 18"
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER SECTION ELEVATION
SECTION __________________4 (21'-6" - 31'-6")
MEMBER SIZES
Face Width at Top ___________ Face Width at Bottom_________3'-2"
2'-11"
Member
LEG
BRACING
Size Bolts Gussets/Flange
(6) 12"Ø (4) PL10"x3"x14"
Min. Edge
1"(1) 12"Ø
SCH L31
2"x31
2"x14" L11
2"x11 2"x18"
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER SECTION ELEVATION
SECTION __________________5 (31'-6" - 41'-6")
MEMBER SIZES
Face Width at Top ___________ Face Width at Bottom_________2'-11"
2'-8"
Member
LEG
BRACING
Size Bolts Gussets/Flange
(4) 12"Ø (4) PL8"x3"x14"
Min. Edge
1"(1) 12"Ø
SCH L31
2"x31
2"x 14" L11
2"x11 2"x18"
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TOWER SECTION ELEVATION
SECTION __________________6 (41'-6" - 51'-6")
MEMBER SIZES
Face Width at Top ___________ Face Width at Bottom_________2'-8"
2'-5"
Member
LEG
BRACING
Size Bolts Gussets/Flange
(4) 12"Ø (4) PL8"x3"x14"
Min. Edge
1"(1) 12"Ø
SCH L31
2"x31
2"x 14" L11
2"x11 2"x18"
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
0°
240° 120°
TOWER MAPPING
Site Name
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
TRANSMISSION CABLES
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Coax # Type/Style Start Height End Height Antenna Carrier Notes
CBP2 14'-6"
CBP
14'-6" 3 CBP3
FH 12 9'-6" 10'-0" 1 CBP
FH 12 9'-6"
FH 12 9'-6"
CBP4 48'-6" 5
35'-0" 4 CBP5
FH 12 9'-6"
FH 12 9'-6" DISCONNECTED
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
ANTENNA AND MOUNT SKETCH
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Side Elevation Plan View
Photo
Mount Elevation LegAntenna # 1 10'-0" A
Mount Type Azimuth
PIPE 300°
Antenna Manufacturer Antenna Model #
KATHREIN PRF-900 PARAFLECTOR
TMA (#) / Model # (Coax Quantity) Size
N/A (1) FH 12
Antenna Elevation 10'-0"
Carrier______________CBP
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
ANTENNA AND MOUNT SKETCH
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Side Elevation Plan View
Photo
Mount Elevation LegAntenna # 2 14'-6" A
Mount Type Azimuth
SIDEARM N/A
Antenna Manufacturer Antenna Model #
RFI BA40-41-DIN
TMA (#) / Model # (Coax Quantity) Size
N/A (1) FH 12
Antenna Elevation 19'-0"
Carrier______________CBP
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
ANTENNA AND MOUNT SKETCH
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Side Elevation Plan View
Mount Elevation LegAntenna # 3 14'-5" B
Mount Type Azimuth
SIDEARM N/A
Antenna Manufacturer Antenna Model #
RFI BA40-41-DIN
TMA (#) / Model # (Coax Quantity) Size
N/A (1) FH 12
Antenna Elevation 19'-0"
Carrier______________CBP
Photo
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
ANTENNA AND MOUNT SKETCH
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Side Elevation Plan View
Mount Elevation LegAntenna # 4 35'-0" B
Mount Type Azimuth
SIDEARM N/A
Antenna Manufacturer Antenna Model #
TELEWAVE ANT150F2DIN
TMA (#) / Model # (Coax Quantity) Size
N/A (1) FH 12
Antenna Elevation 37'-6"
Carrier______________CBP
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
ANTENNA AND MOUNT SKETCH
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
Side Elevation Plan View
Mount Elevation LegAntenna # 5 48'-6" A
Mount Type Azimuth
SIDEARM N/A
Antenna Manufacturer Antenna Model #
RFI BA40-41-DIN
TMA (#) / Model # (Coax Quantity) Size
N/A (1) FH 12
Antenna Elevation 53'-0"
Carrier______________CBP
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
PHOTOS
Partial Tower Elevation
Partial Tower Elevation
Partial Tower Elevation
Base of Tower
Tower Elevation
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
PHOTOS
CA Face
BC Face
AB Face
C Leg
B Leg
A Leg
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
PHOTOS
Typical Members
ReliOn Generator
Power Meter
Typical Leg Connection
CBP Equipment Shelter
Top of Tower
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP #
Client # Date Page of
BLACK PEAK
69882_85602
AZ2118
SEPTEMBER 14, 2016
326 Tryon Road, Raleigh, NC 27603 o) 919.661.6351 f) 919.661.6350 www.tepgroup.net
PHOTOS
Shelter Equipment
Shelter Equipment
Inside CBP Shelter
Shelter Equipment
A/C Unit
Inside CBP Shelter
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
ANNEX B:
STRUCTURAL ANALYSIS
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
HGA Architects and Engineers 326 Tryon Road 420 5th Street North, Suite 100 Raleigh, NC 27603 Minneapolis, MN 55401 (919) 661-6351
(612) 758-4502 StructuresReview@tepgroup.net
Subject: Structural Analysis Report
Carrier Designation: U.S. Department of Homeland Security Site Number: AZ2118 Site Name: Black Peak
Engineering Firm Designation: TEP Project Number: 69882_85602
Site Data: Shea Road, Parker, La Paz County, AZ 85344 Lat., Long.: 34.124576, -114.212274 (N 34° 07' 28.47'', W 114° 12' 44.19'')
51.5 Foot ± - Self Supporting Tower
Dear Mr. Fiskum, Tower Engineering Professionals is pleased to submit this “Structural Analysis Report” to determine the structural integrity of the above mentioned tower.
The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be:
LC1: Existing + Proposed + Reserved Loading Insufficient Capacity Note: See Table 1 for the existing, proposed, and reserved loading
The analysis has been performed in accordance with the ANSI/TIA-222-G-2-2009 Structural Standard for Antenna Supporting Structures and Antennas – Addendum 2 and the 2006 International Building Code.
All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances listed in Table 1 for the determined available structural capacity to be effective.
We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional services to you and HGA Architects and Engineers. If you have any questions or need further assistance on this or any other projects please give us a call.
Structural analysis prepared by: Nick Smith, E.I.
Structure Capacity Foundation Capacity
178.8% -
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
51.5-ft± Self Supporting Tower Structural Analysis AZ2118 - Black Peak TEP Project Number 69882_85602, Revision 0 Page 2 tnxTower Report - version 7.0.5.1
TABLE OF CONTENTS
1) INTRODUCTION
2) ANALYSIS CRITERIA
Table 1 - Existing, Proposed, and Reserved Antenna and Cable Information
3) ANALYSIS PROCEDURE
Table 2 - Documents Provided 3.1) Analysis Method 3.2) Assumptions
4) ANALYSIS RESULTS
Table 3 - Section Capacity (Summary) Table 4 - Tower Component Stresses vs. Capacity
Table 5 - Dish Twist/Sway Results for 60 mph Service Wind Speed 4.1) Recommendations
5) APPENDIX A
tnxTower Output
6) APPENDIX B
Conceptual Modification Plan
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP Project Number 69882_85602, Revision 0 Page 3
1) INTRODUCTION
This tower is a 51.5-ft self supporting tower located in La Paz County, Arizona. The original design criteria were unavailable for review. TEP visited the site in July of 2016 to gather existing tower steel and appurtenance information. All other information provided to TEP was assumed to be accurate and complete.
2) ANALYSIS CRITERIA
The analysis has been performed in accordance with the ANSI/TIA-222-G-2-2009 Structural Standard for Antenna Supporting Structures and Antennas – Addendum 2 using an ultimate 3-second gust wind speed of 120 mph converted to a nominal 3-second gust wind speed of 93 mph with no ice per section 1609.3.1 as required for use in the TIA-222-G Standard per Exception #5 of Section 1609.1.1 and 60 mph under service loads. Risk Category III was used in this analysis with the following design criteria:
Type of Analysis: Feasibility Classification of Structure: Class III Exposure Category: Exposure C Topographic Category: Category 5 Crest Height = 1020-ft, Slope Distance = 3206-ft, Feature Type = Hill.
Earthquake Category: Not Considered Commentary: Earthquake effects may be ignored per this standard for site locations where Ss does not exceed 1.0. (La Paz County Max Ss = 0.60).
Table 1 - Existing, Proposed, and Reserved Antenna and Cable Information
Existing Proposed Reserved
Mount Level
(ft)
Ant
CL
(ft)
Qty Antenna Model Mount Type
Qty Coax
Coax Size
Coax Location
Owner/ Tenant
Existing 48.5 53.0 1 RFI BA40-41-DIN Sidearm 1 1/2 AB Face CBP
Existing 35.0 37.5 1 Telewave ANT150F2DIN Sidearm 1 1/2 AB Face CBP
Existing 14.5 19.0 2 RFI BA40-41-DIN Sidearm 2 1/2 AB Face CBP
Existing 10.0 10.0 1 Kathrein PRF-900 Paraflector Pipe 1 1/2 AB Face CBP
3) ANALYSIS PROCEDURE
Table 2 - Documents Provided
Document Remarks Source
Correspondence Correspondence from HGA Architects and Engineers in reference to the existing, proposed, and reserved loading.
CBP
3.1) Analysis Method tnxTower (version 7.0.5.1), a commercially available analysis software package, was used to create a three-dimensional model of the tower and calculate member stresses for various loading cases.
Selected output from the analysis is included in Appendix A.
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP Project Number 69882_85602, Revision 0 Page 4
3.2) Assumptions
1) The tower and foundation were built in accordance with the manufacturer’s specifications.
2) The tower and foundation have been maintained in accordance with the manufacturer’s specification.
3) The configuration of existing antennas, transmission cables, mounts and other appurtenances are as specified in the tower mapping report by TEP.
4) All tower components are in sufficient condition to carry their full design capacity.
5) Serviceability with respect to antenna twist, tilt, roll, or lateral translation, is not checked and is left to the carrier or tower owner to ensure conformance. See Table 5.
6) All antenna mounts and mounting hardware are structurally sufficient to carry the full design capacity requirements of appurtenance wind area and weight as provided by the original manufacturer specifications. It is the carrier’s responsibility to ensure compliance to the structural limitations of the existing and/or proposed antenna mounts. TEP did not analyze antennas supporting mounts as part of this structural analysis report.
7) The following material grades were assumed:
a) Connection bolts: ASTM A325N
b) Leg grade: ASTM A572-50
c) Diagonals grade: ASTM A36
8) This analysis report is not a construction document.
This analysis may be affected if any assumptions are not valid or have been made in error. Tower Engineering Professionals should be notified to determine the effect on the structural integrity of the tower.
4) ANALYSIS RESULTS
Table 3 - Section Capacity (Summary)
Section No. Elevation (ft) Component Type Size Critical
Element P (lb) øPallow (lb) % Capacity
Pass / Fail
T1 51.5 - 41.5 Leg V3 1/2x3 1/2x1/4 1 -4075.680 67272.203 6.1
7.3 (b) Pass
T2 41.5 - 31.5 Leg V3 1/2x3 1/2x1/4 23 -12169.400 66397.500 18.3
21.7 (b) Pass
T3 31.5 - 21.5 Leg V3 1/2x3 1/2x1/4 40 -23863.000 66398.000 35.9
42.6 (b) Pass
T4 21.5 - 11.5 Leg V4x4x5/16 59 -39652.699 97257.398 40.8
41.6 (b) Pass
T5 11.5 - 1.5 Leg V4x4x5/16 76 -62325.301 97257.398 64.1
65.3 (b) Pass
T6 1.5 - 0 Leg V4x4x5/16 95 -64846.801 105247.000 178.8 Fail
T1 51.5 - 41.5 Diagonal L1 1/2x1 1/2x1/8 8 -1844.840 5330.170 34.6
48.8 (b) Pass
T2 41.5 - 31.5 Diagonal L1 1/2x1 1/2x1/8 26 -2480.580 4639.470 53.5
68.7 (b) Pass
T3 31.5 - 21.5 Diagonal L1 1/2x1 1/2x1/8 44 -3247.490 4176.870 77.7
83.7 (b) Pass
T4 21.5 - 11.5 Diagonal L1 1/2x1 1/2x1/8 62 -4582.770 3717.250 123.3 Fail
T5 11.5 - 1.5 Diagonal L1 3/4x1 3/4x3/16 83 -9082.450 7886.350 115.2
162.5 (b) Fail
Summary
Leg (T6) 178.8 Fail
Diagonal (T5) 162.5 Fail
Bolt Checks 162.5 Fail
RATING = 178.8 Fail
PROPERTY OF THE UNITED STATES GOVERNMENT- FOR OFFICIAL USE ONLY- DO NOT REMOVE THIS NOTICE- PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED
TEP Project Number 69882_85602, Revision 0 Page 5
Structure Rating (max from all components) = 178.8%
Table 4 - Tower Component Stresses vs. Capacity
Notes Component Elevation
(ft) % Capacity Pass / Fail
- Anchor Rods - - N/A
Table 5 - Dish Twist/Sway Results for 60 mph Service Wind Speed
(ft)
Dish Model Beam Deflection
Deflection (in) Tilt (deg) Twist (deg)
10.0 Kathrein PRF-900 Paraflector 0.180 0.049 0.129
4.1) Recommendations
1) If the load differs from that described in Table 1 of this report or the provisions of this analysis are found to be invalid, another structural analysis should be performed.
2) The tower does not have sufficient capacity to carry the existing, proposed, and reserved loads.
Modifications will be required to bring the tower into compliance with the ANSI/TIA-222-G standard for the existing, proposed, and reserved loading. The following components require modifications:
a) Tower legs from 0’ to 1.5’
b) Tower diagonals from 1.5’ to 21.5’ Further engineering and detailing is required to design the necessary modifications.
3) A Professional Engineer licensed in the state of Arizona shall issue design drawings for the above modifications. This analysis report is not a construction document.
4) TEP did not have sufficient information to perform a foundation analysis. Provide TEP with foundation drawings and/or a geotechnical report for this site in order to determine the substructure capacity. If this information is not available, TEP recommends a foundation mapping and/or geotechnical investigation.
5) Prior to acceptance of changed configuration a rigorous structural analysis shall be performed in order to determine the overall stability and the adequacy of the structural members, foundations and connections.
PROPERTY OF THE UNITED STATES…