6973GH-24-R-00056.pdf
PDF 429 KB Posted
- Attached to
- Screening Information Request (SIR)/Request for Proposal (RFP): Beechcraft King Air 300/360 Maintenance Support Federal contract opportunity
- Solicitation number
- 6973GH-24-R-00056
About this file
This document is a Screening Information Request (SIR)/Request for Proposal (RFP) for Beechcraft King Air 300/360 Maintenance Support issued by the Federal Aviation Administration (FAA). The FAA is seeking a single award of an indefinite delivery/indefinite quantity contract for a base year and four one-year option periods. The required services include program management, scheduled and unscheduled aircraft maintenance, engine maintenance, and other related support for the FAA's Beechcraft aircraft fleet. Proposals are due by 3:00 p.m. Central Time on October 9, 2024, and will be evaluated using a Best Value Approach. The North American Industry Classification System (NAICS) code for this effort is 488190 "Other Support Activities for Air Transportation" with a $40 million size standard. All questions must be submitted in writing to the Contracting Officer by September 23, 2024.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD
3. SOLICITATION TYPE1. CONTRACT NO. 2. SOLICITATION NUMBER
6. ISSUED BY CODE 7. ADDRESS OFFER TO (If other than Item 6)
5. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"
NEGOTIATED BID (RFP)
SEALED BID (IFB)
4. DATE ISSUED
PAGE OF PAGES
1 86
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
9. FOR
INFORMATION
CALL
CAUTION: LATE Submissions, Modifications and Withdrawals. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or if hand carried, in the
SOLICITATION
8. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTR., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICE/COST
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
10. TABLE OF CONTENTS
17. OFFER DATE16. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
14C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
14B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
15. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER14A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
13. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)12. DISCOUNT FOR PROMPT PAYMENT the designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above , to furnish any or all items upon which prices are offered at the price set opposite each item , delivered at
11. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted
NOTE: Item 11 does not apply if the solicitation includes Minimum Bid Acceptance Period .
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or by other authorized official written notice.
27. AWARD DATE
(Signature of Contracting Officer)
26. CONTRACT AUTHORITY
24. PAYMENT WILL BE MADE BY
25. NAME OF CONTRACTING OFFICER (Type or print)
CODE 23. ADMINISTERED BY (If other than Item 6)
ITEM
(4 copies unless otherwise specified)
22. SUBMIT INVOICES TO ADDRESS SHOWN IN21. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
20. ACCOUNTING AND APPROPRIATION19. AMOUNT18. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by CONTRACT AUTHORITY)
CODE
AC-24-0166009/09/2024
X
AAQ720-AFN
AAQ-720 DIVERSIFIED FRANCHISE ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
OKLAHOMA CITY OK 73125
stephanie.r.riddle@faa.gov
1500 CT 10/09/2024
Stephanie R. Riddle 405 Stephanie.R.Riddle@faa
.gov 954-4166
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Stephanie R. Riddle
6973GH-24-R-00056
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
NOTE TO VENDORS: Line items listed on this SF30 are for Government use only. Please continue to
"Section B - Supplies or Services/Prices" of this instrument for applicable contract line items.
Delivery Location Code: A697363F
A697363F
697363 DOT FAA AJW 3422 HNGR 9E
LOGISTIC SUPPORT SECTION RM 128
6500 S MACARTHUR BLVD
OKLAHOMA CITY OK 731696901 US
Period of Performance: 02/03/2025 to 02/02/2030
00001 CLIN 00001: Program Management Support (PWS 3.1)
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00002 CLIN 00002: Scheduled Maintenance- Beech 300
Checks to include Time Limited Work (PWS 6.0)
Phases 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00003 CLIN 00003: Scheduled Maintenance- Beech 360ER
Checks to include Time Limited Work (PWS 6.0)
Phase 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00004 CLIN 00004: Pratt & Whitney PT6A-60A Engine
Maintenance: (PWS 7.0)
Sub-CLINS
00004AA Pratt & Whitney PT6A-60A Engine Overhaul
Continued ...
3 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
00004AB Pratt & Whitney PT6A-60A Engine Trend
Monitoring
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00005 CLIN 00005: Unscheduled Maintenance (PWS 4.2)
Sub-CLINS
00005AA Beechcraft 300
00005AB Beechcraft 360 ER
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00006 CLIN 00006: Travel Reimbursement of allowable travel costs (PWS 3.1)
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00007 CLIN 00007: AOG Maintenance Support (PWS 4.3)
00007AA: 300 Series Airframe (AOG)
00007AB: Pratt & Whitney PT6A-60A Engine (AOG)
00007AC: Series Avionics (AOG)
00007AD: Travel (AOG)
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00008 CLIN 00008: Over and Above (O&A) Maintenance
Support (PWS 4.4)
Electronic & IT: 03
Delivery: 02/02/2026
Period of Performance: 02/03/2025 to 02/02/2026
00009 CLIN 00009: Program Management Support (PWS 3.1)
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
4 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00010 CLIN 00010:Scheduled Maintenance- Beech 300
Checks to include Time Limited Work (PWS 6.0)
Phases 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00011 CLIN 00011: Scheduled Maintenance- Beech 360ER
Checks to include Time Limited Work (PWS 6.0)
Phase 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00012 CLIN 00012: Pratt & Whitney PT6A-60A Engine
Maintenance: (PWS 7.0)
Sub-CLINS
00012AA Pratt & Whitney PT6A-60A Engine Overhaul
00012AB Pratt & Whitney PT6A-60A Engine Trend
Monitoring
Option Year I
Electronic & IT: 03
(Option Line Item)
5 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00013 CLIN 00013: Unscheduled Maintenance (PWS 4.2)
Sub-CLINS
00013AA Beechcraft 300
00013AB Beechcraft 360 ER
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00014 CLIN 00014: Travel Reimbursement of allowable travel costs (PWS 3.0)
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00015 CLIN 00015: AOG Maintenance Support (PWS 4.3)
Sub-CLINs
00015AA - 300 Series Airframe (AOG)
00015AB - Pratt & Whitney PT6A-60A Engine (AOG)
00015AC - Series Avionics (AOG)
00015AD - Travel (AOG)
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
6 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
00016 CLIN 00016: Over and Above (O&A) Maintenance
Support (PWS 4.4)
Option Year I
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2026
Delivery: 02/02/2027
Period of Performance: 02/03/2026 to 02/02/2027
00017 CLIN 00017: Program Management Support
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00018 CLIN 00018:Scheduled Maintenance- Beech 300
Checks to include Time Limited Work (PWS 6.0)
Phases 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00019 CLIN 00019: Scheduled Maintenance- Beech 360ER
Checks to include Time Limited Work (PWS 6.0)
Phase 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
7 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00020 CLIN 00020: Pratt & Whitney PT6A-60A Engine
Maintenance: (PWS 7.0)
Sub-CLINS
00020AA Pratt & Whitney PT6A-60A Engine Overhaul
00020AB Pratt & Whitney PT6A-60A Engine Trend
Monitoring
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00021 CLIN 00021: Unscheduled Maintenance (PWS 4.2)
Sub-CLINS
00021AA Beechcraft 300
00021AB Beechcraft 360 ER
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00022 CLIN 00022: Travel Reimbursement of allowable travel costs (PWS 3.1)
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
8 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00023 CLIN 00023: AOG Maintenance Support (PWS 4.3)
Sub-CLINs
00023AA - 300 Series Airframe (AOG)
00023AB - Pratt & Whitney PT6A-60A Engine (AOG)
00023AC - Series Avionics (AOG)
00023AD - Travel (AOG)
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00024 CLIN 00024: Over and Above (O&A) Maintenance
Support (PWS 4.4)
Option Year II
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2027
Delivery: 02/02/2028
Period of Performance: 02/03/2027 to 02/02/2028
00025 CLIN 00025: Program Management Support
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00026 CLIN 00026:Scheduled Maintenance- Beech 300
Checks to include Time Limited Work (PWS 6.0)
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
9 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00027 CLIN 00027: Scheduled Maintenance- Beech 360ER
Checks to include Time Limited Work (PWS 6.0)
Phase 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00028 CLIN 00028: Pratt & Whitney PT6A-60A Engine
Maintenance: (PWS 7.0)
Sub-CLINS
00028AA Pratt & Whitney PT6A-60A Engine Overhaul
00028AB Pratt & Whitney PT6A-60A Engine Trend
Monitoring
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00029 CLIN 00029: Unscheduled Maintenance (PWS 4.2)
Sub-CLINS
00029AA Beechcraft 300
00029AB Beechcraft 360 ER
10 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00030 CLIN 00030: Travel Reimbursement of allowable travel costs (PWS 3.1)
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00031 CLIN 00031: AOG Maintenance Support (PWS 4.3)
Sub-CLINs
00031AA - 300 Series Airframe (AOG)
00031AB - Pratt & Whitney PT6A-60A Engine (AOG)
00031AC - Series Avionics (AOG)
00031AD - Travel (AOG)
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
00032 CLIN 00032: Over and Above (O&A) Maintenance
Support (PWS 4.4)
Option Year III
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2028
Delivery: 02/02/2029
Period of Performance: 02/03/2028 to 02/02/2029
11 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
00033 CLIN 00033: Program Management Support
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00034 CLIN 00034:Scheduled Maintenance- Beech 300
Checks to include Time Limited Work (PWS 6.0)
Phases 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00035 CLIN 00035: Scheduled Maintenance- Beech 360ER
Checks to include Time Limited Work (PWS 6.0)
Phase 1-4
Phase 1 Checks @ 200 hours
Phase 2 Checks @ 400 hours
Phase 3 Checks @ 600 hours
Phase 4 Checks @ 800 hours
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00036 CLIN 00036: Pratt & Whitney PT6A-60A Engine
Maintenance: (PWS 7.0)
12 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
00036AA Pratt & Whitney PT6A-60A Engine Overhaul
00036AB Pratt & Whitney PT6A-60A Engine Trend
Monitoring
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00037 CLIN 00037: Unscheduled Maintenance (PWS 4.2)
00037AA Beechcraft 300
00037AB Beechcraft 360 ER
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00038 CLIN 00038: Travel Reimbursement of allowable travel costs (PWS 3.1)
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00039 CLIN 00039: AOG Maintenance Support (PWS 4.3)
Sub-CLINs
00039AA - 300 Series Airframe (AOG)
00039AB - Pratt & Whitney PT6A-60A Engine (AOG)
00039AC - Series Avionics (AOG)
00039AD - Travel (AOG)
Option Year IV
Electronic & IT: 03
(Option Line Item)
13 86
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-24-R-00056
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
00040 CLIN 00040: Over and Above (O&A) Maintenance
Support (PWS 4.4)
Option Year IV
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
02/02/2029
Delivery: 02/02/2030
Period of Performance: 02/03/2029 to 02/02/2030
Section B - Supplies or Services/Prices Section B - Schedule
B.1 TYPE AND TERM OF CONTRACT
This contract is an Indefinite Delivery/Indefinite Quantity (ID/IQ) Firm Fixed Price and Time and Materials task order contract. The base period of performance is from the date of contract award through twelve (12) months, with four (4) one-year option periods. If the options are exercised, the total period of performance is expected to be five
(5) years. The minimum guarantee required by the use of an ID/IQ will be award of one (1) task order. The minimum requirement will be considered fulfilled after award of the first task order.
B.2 SCHEDULE B
Offerors must complete Attachment 01 Schedule B and submit it with Volume II Cost/Price Proposal.
B.3 EXERCISE OF OPTIONS
The FAA may unilaterally exercise Option I any time prior to the end of the base period of performance. Options 2, 3, and 4 may similarly be exercised at any time during the preceding period's period of performance.
Clause List
The remainder of this page has been intentionally left blank.
Section C - Description/Specifications Scope of Work
C.1 SCOPE OF WORK
(a) Services required by the FAA include obtaining aircraft maintenance and aircraft technical services. The response time for services is critical to return FAA owned aircraft to airworthy and mission capable condition in a timely manner. Availability of aircraft is critical to meet the mission requirements.
The Contractor or any subcontractor performing work under this contract must hold a 14 CFR Part 145 Repair Station Certificate, associated Operations Specifications listing the appropriate ratings and limitations and have access to the original equipment manufacturer (OEM) engineering support.
The Contractor may be authorized to subcontract for services when an authorized service facility is not available at a site where services are required. The Contractor must ensure that subcontractors comply with applicable regulations and the terms within this document.
(b) The complete Performance Work Statement (PWS) is attached to this Screening Information Request (SIR) and is identified in Section J, List of Attachments, Attachment 02 - Performance Work Statement.
Clause List
AC1220 AIRWORTHINESS REQUIREMENTS (JUL 2015)
Units furnished shall conform to the definitions and requirements evidencing approval as airworthy for service as set forth below. Evidence of approval for return to service shall be considered acceptable only when the applicable condition is met and documents are made a part of each unit or markings are on each specified package or unit:
(a) New - A unit defined as unused, of current production, factory fresh, undamaged, and in good state of preservation.
(1) Shipping ticket, invoice, or other documents providing evidence that the part was received from a manufacturer holding a Federal Aviation Administration (FAA) Production Certificate (PC), an Approved Production Inspection System (APIS), Parts Manufacturing Approval (FAA-PMA), or Technical Standard Order Authorization (TSOA) issued under FAR Part 21.
(2) A supplier (vendor/distributor) must furnish the FAA a copy of the original manufacturer's shipping invoice as evidence that the part is new and was produced by one of the manufacturers outlined in paragraph (a)(1).
(b) Used - continued time in service; a unit defined as overhauled, unused since overhaul, in a good state of preservation, and approved for return to service.
(c) Overhauled - a unit with zero (0) time in service since overhaul. Shelf life requirement shall be in accordance with TI4100.24. NOTE: Units with only a functional check in lieu of overhaul may be acceptable with prior approval of the FAA Contracting Officer and/or Contracting Officers Representative (COR).
(d) Evidence of approval for return to service of units under paragraphs (b) and (c) indicating overhaul, functional tests and any service bulletin or airworthiness directive compliance, shall be considered acceptable only when one of the following is attached to each unit.
(1) An approved FAA Form 337 in duplicate, if a major alteration is accomplished by a certificated repair station in accordance with FAR 43, Appendix B(a). NOTE: Form 337 is not required for major repairs if accomplished by a certificated repair station in accordance with FAR 43, Appendix B(b); or
(2) Maintenance Release and Work Order completed in accordance with Federal Aviation Regulations, Part 43, Appendix B; or
(3) A maintenance record completed in accordance with paragraph (f) shall be attached by manufacturers who do not possess an FAA Repair Station Certificate, but perform maintenance rebuilding or alterations pursuant to provision of Part 43 Section 43.3(i) of the FARs; or
(4) A Serviceable Tag with a work order completed in accordance with paragraph (f) for units not under the rules and regulations of the FARs (nonaircraft systems).
(e) If the contractor is an air carrier, a maintenance release showing the air carrier certificate number will be acceptable along with a copy of the inventory tag.
(f) The contractor shall furnish a copy of the work order (suitable for microfilming) on which work last accomplished on the unit was recorded and it shall include at a minimum the following information:
(1) Part number, serial number, and nomenclature of the unit;
(2) A description of the work performed (or reference to acceptable data) in such detail that the type and extent of such work can be readily ascertained;
(3) A listing by part number and nomenclature of all significant parts replaced during maintenance;
(4) Work order must include the signature of a person authorized and the certificate number of the person performing the work;
(5) Identification of all airworthiness directives (AD), service bulletins (SB), and alterations that have been complied with on the unit. The record must include the AD revision number and method of compliance.
AC1221 CURE DATE FOR RUBBER COMPONENTS (JAN 1997)
If any item is to be furnished which contains natural or synthetic rubber, the contractor shall include a certification, with each shipment, that each rubber component has not exceeded the manufacturer's recommended cure date. The specific expiration date(s) shall be furnished in the certification.
AC1222 SPECIFICATIONS - OVERHAUL (JAN 1997)
(a) The contractor shall, when performing overhaul, replace all materials which are subject to deterioration while in storage (rubber, leather, plastic, seals, gaskets, lubricants, etc.). Said replacement shall be made using new, factory-fresh materials. Natural or synthetic rubber materials used shall not exceed 18 months age from cure date.
(b) The contractor shall assure that all items on which work was performed bear approval for return to service as set forth in the clause titled ‘Return to Service and Reporting of Failure Data.’
(c) The contractor shall inspect all units received from the FAA for agreement with the unit identification listed on the delivery order. The contractor shall verify that the part number identified on the name plate of each unit agrees with the configuration of the unit. The contractor shall advise the Contracting Officer of any discrepancy and request disposition instructions.
(d) The contractor shall accomplish all Airworthiness Directives (AD) not previously accomplished in effect on the date of solicitation issuance for items to be overhauled. The contractor shall document all AD's complied with, listing the AD number and, if the AD contains more than one section, indicate the section complied with. Following inspection of an item the contractor shall also document all other AD's previously complied with which do not require repetitive compliance. AD compliance shall be indicated on the work order required by the clause titled ‘Return to Service and Reporting of Failure Data.’
(e) The data plate on each item shall be corrected to show the component configuration/model number after service bulletin compliance and/or modification. In the event an item is received by the contractor and inspection reveals that service bulletin compliance and/or modification(s) requested has previously been accomplished, the contractor shall, without additional cost to the Government, correct the item data plate accordingly.
(f) All work performed under this contract shall conform to: (1) the terms, provisions, and conditions of this contract, (2) Federal Aviation Regulations, (3) Federal Aviation Administration Airworthiness Directives, (4) the latest revisions of the technical manuals listed herein (where applicable), and (5) service bulletins, service letters or other instructions issued by the item manufacturer or by the Federal Aviation Administration, when specifically authorized for accomplishment by the Contracting Officer.
(g) Any FAA supplemental overhaul modification specification (Airborne Electronic Equipment Modification, Technical Issuance Engineering Order, etc.), identified and specified herein for the items listed in Section B apply only to Federal Aviation Administration aircraft, engines, components, avionic and aircraft accessories, systems or equipment in accordance with the terms and conditions of this contract.
(h) Provide the FAA with a Teardown Analysis Report for the purpose of Escalating Time Intervals on all overall products.
AC1223 RETURN TO SERVICE AND REPORTING OF FAILURE DATA (JAN 1997)
(a) Evidence of approval for return to service shall be furnished by the contractor for each unit serviced or furnished under this contract. Such evidence must utilize the following forms, as applicable:
(1) For units undergoing major repair, as defined by Federal Aviation Regulations (FAR), work must be performed in accordance with appropriate procedures, manual, or specifications that have been determined acceptable to the FAA Administrator, and a FAA Form 337, or Maintenance Release and Work Order as applicable by certified repair station shall be executed.
(2) For units undergoing major alteration, as defined by Federal Aviation Regulations (FAR), work must be performed in accordance with data approved by the FAA Administrator, and a FAA Form 337 shall be executed.
(3) For all other units serviced, the contractor shall complete one of the following and attach to each unit:
(i) A properly executed maintenance release in accordance with FAR 43, Appendix B,
(ii) A maintenance record or a signed copy of the manufacturer's work order, if contractor does not possess a FAA Repair Station Certificate under FAR Part 145, but performs maintenance, including rebuilding or alterations, pursuant to provisions of FAR Part 43,
(iii) A work order or summary of work performed for units and regulations of the FAR (non-aircraft systems or uncertified units),
(iv) A maintenance release, if contractor is an appropriately certificated air carrier, which must include the following:
(a) brief description of work accomplished
(b) air carrier certificate number
(c) signature of authorized person approving unit for return to service.
(v) If the contractor is an appropriately certificated air carrier, a maintenance release must be issued. The air carrier certificate number, shown on the maintenance release, along with a copy of the work order completed in accordance with paragraph (b), will be acceptable.
(b) The work order furnished shall include at least the following information: [Caution: This information must be furnished to preclude nonacceptance of the overhauled unit(s).]
(1) Part number, serial number, and nomenclature of the unit;
(2) The number of the FAA delivery order authorizing the work;
(3) A description of the work performed in such detail that the type and extent of such work can be readily ascertained;
(4) A listing by part number and nomenclature of all significant parts replaced;
(5) Reference to applicable technical data providing approved instructions and procedures for the work performed;
(6) Verification of the reparable parts tag statement of unserviceability;
(7) Contractor evaluation of the general condition of the unit as found during disassembly and inspection;
(8) Date of completion of the work performed;
(9) Name of the person performing work, if other than the person specified in 10 below; and
(10) Signature, certificate number, and kind of certificate held if work accomplished by an individual.
(c) In addition, the contractor shall furnish appropriate work orders and available serviceable parts tags for all engine and propeller parts serviced under the terms of the contract.
(1) The contractor shall provide Maintenance Release and Work Order for all cycle limited components replaced.
These tags may be either the originals or copies, but must contain information that will document the current status and number of cycles of the components, including Time Since New (TSN), Time Since Overhaul (TSO), Cycles Since New (CSN) and Cycles Since Overhaul (CSO); and
(2) The contractor shall provide Maintenance Release and Work Order for hard-time components. These parts tags indicating repair, replacement Time Since Overhaul (TSO), Time Since New (TSN), Total Landings, and Landings Since Overhaul of components should be included in all engine record documentation packages.
(3) The contractor shall provide Maintenance Release and Work Order for all parts overhauled on an ‘on condition’ basis, and any other items worked.
(d) The serviceable tag and maintenance release shall be signed by a person having authority pursuant to the FAR to return the unit to service, and the number of the person's certificate (or the certificate number of the repair facility) and date of completion shall be shown,
(e) Submission of Forms: For units serviced, the applicable forms shall be placed in a plastic envelope and secured to the outside of the item container. An envelope conforming to PPP-E-540 or commercial equivalent may be used.
Failure to furnish required documentation with the serviced unit will be cause for its rejection.
AC1225 IRREPARABLE CONTRACT ITEMS (JAN 1997)
(a) Within 15 calendar days after receipt of the unit(s), the contractor shall complete a teardown and inspection. If the contractor determines any contract item(s) to be irreparable (beyond feasible or economical repair), the contracting officer shall be furnished written notification, including cost and condition details.
(b) The Contracting Officer shall make a determination in writing to the contractor that such contract item is either
(1) irreparable, or (2) reparable. If determined irreparable, the Contracting Officer will provide the contractor with appropriate disposition instructions.
(c) Irreparable contract items which are directed to be returned to FAA shall be shipped at the expense of the Government.
(d) The contractor will be reimbursed for labor expended in the teardown and inspection of the irreparable contract item at the hourly composite rate shown in the price schedule, or, if there is no hourly composite rate, the amount of reimbursement will be negotiable.
(e) If the irreparable contract item is to be returned to FAA, the contractor shall furnish a Summary of Teardown Inspection Report, which will accompany the irreparable contract item.
AC1232 QUALITY CONTROL SYSTEM (JUL 2015)
The contractor must have a Quality Control System which meets the requirements of Federal Aviation Regulation Part 135 and/or Part 145, Subpart B, Section 145.45 and 145.59.
AC1233 SPECIFICATIONS FOR AIRCRAFT ENGINE, QEC ASSEMBLY, AND ACCESSORIES
OVERHAUL AND REPAIR (JAN 1997)
(a) All items furnished or work accomplished by the contractor under the provisions of this contract shall be in accordance with (1) the terms, conditions, specifications, and attachments contained herein; (2) applicable Federal Aviation Regulations; (3) applicable portions of manufacturer's publications; (4) applicable FAA airworthiness directives; and (5) those service bulletins, overhaul and repair manuals, service letters or other instructions or modifications issued by either the item manufacturer, the contractor or the FAA and specifically authorized for accomplishment by the Contracting Officer. Each of the foregoing instructions shall apply to the extent they are current and in effect at the time work is accomplished.
(b) Where airworthiness directives, service bulletins, or other instructions authorize alternate compliance methods, the method that results in the most permanent fix at the least cost to the Government will be used, unless otherwise directed by the Contracting Officer.
(c) The contractor is authorized to use any smoke reducing fuel additive approved by the engine manufacturer for engine run tests. However, when such additives are used, the contractor must enter on the engine records the number and length of times used.
(d) A delivery order will be issued for each basic engine and/or QEC assembly input to the contractor for work to be performed under the contract. The delivery order will indicate the appropriate line item of the schedule and its flat rate labor or job price, the estimated number of man-hours, or estimated monetary amounts to accomplish the anticipated work. The estimates set forth on the delivery order shall not be exceeded without prior written authority of the Contracting Officer.
(e) Based upon information contained in the Teardown Analysis Report for the purpose of Escalation of Time Intervals. the Contracting Officer will determine which of the line items of the schedule are applicable for further work. When work has been completed for any applicable flat rate labor or flat rate job price item of the schedule prior to the Government's receipt of the aforementioned reports, these rates shall apply to that portion of the work.
The delivery order may be amended as necessary to provide for specific work found necessary by the Contracting Officer after receipt of reports.
(f) Additional Labor:
(1) The contractor shall furnish, when so directed by the Contracting Officer, direct labor for additional maintenance which is not provided for in any other item of the schedule. Such labor may include inspection, repair, overhaul, rework, or modification of separate assemblies, subassemblies, and parts in support of maintenance accomplished by the FAA.
(2) A delivery order will be issued authorizing the maintenance to be accomplished for each item(s) input to the contractor for work in support of maintenance accomplished by the FAA. The delivery order will indicate thereon a monetary amount based on the estimated number of contractor-furnished employee-hours required, and where required, an estimated monetary amount for contractor-furnished parts and an estimated monetary amount for out-of-plant processing. All parts and services furnished for these types of services shall be provided for as set forth in the contract for the specific item(s) affected.
(3) The contractor must provide a list of all vendors used for out-of-plant processing to the contracting officer within 15 days after receipt of written notice of award. The list must contain company name, address, certificate number, and identify function performed.
(g) Out-of-Plant Processing:
(1) An attachment to the contract lists all items that may be sent out by the contractor for out-of-plant processing.
(2) The contractor shall not contract out any work other than that listed in the above attachment without prior approval of the Contracting Officer.
(3) The contractor shall invoice for all out-of-plant processing and the parts necessarily acquired through out-of-plant processing under this item, except for the items of the contract which provide for flat rate job prices and/or requires the contractor to furnish 100 percent replacement parts in the flat rate labor or job price.
AC1236 SERVICE POLICY PROGRAM (JUN 2015)
(a) Certain parts, assemblies and/or engines which may be repaired, overhauled, or exchanged under this contract may be under some type of service policy program with the original manufacturer. Under this type of program the original manufacturer, upon his customer's request, will assume the cost or a portion of the cost, for parts and/or labor to replace defective parts or to accomplish certain product improvement changes.
(b) It is the responsibility of the contractor to advise the Contracting Officer by furnishing him with a copy of any such known service policy program(s) that may be available for any item to be repaired, overhauled, or exchanged.
The contractor, if so directed by the Contracting Officer during the repair, overhaul, or exchange of any item so covered by such a program, shall take necessary action to accomplish the work and bill the Government for the total of all labor and parts involved. The contractor shall be paid for all labor in accordance with the applicable hourly composite labor rate established in Section B. The parts shall be furnished by the contractor in accordance with the replacement parts items in Section B as appropriate.
(c) At the time the contractor accomplishes any work so covered by this service policy program, he shall immediately request any applicable allowance from the original manufacturer. One copy of that request shall be furnished to the Contracting Officer. The contractor shall also request that the original manufacturer submit one copy of his response/or credit allowance to the Contracting Officer.
(d) Upon the contractor's receipt of each allowance from the original manufacturer, a credit memorandum or any other method of payment acceptable to the Contracting Officer shall be submitted with the contractor's next regular billing cycle to the FAA paying office with one copy furnished to the Contracting Officer.
AC1240 COMPLIANCE WITH FEDERAL AVIATION REGULATIONS AND AIRWORTHINESS
DIRECTIVES (JAN 1997)
Each item delivered hereunder must have been manufactured, rebuilt, altered, overhauled, or repaired (as the case may be) to comply with applicable Federal Aviation Regulations including applicable Airworthiness Directives effective prior to executing the approval to return to service.
AC1316 OVERHAUL MANUALS (JUN 2015)
The contractor shall possess, or obtain at its own expense, all applicable manufacturer's manuals and other technical data, except for FAA-published technical data which will be furnished by the Government at no cost.
AC1510 DEFINITION OF CONTRACT TERMS (JUN 2015)
(a) ‘Contractor's Cost’ means the net cost to the contractor (after deducting cash or trade discounts, rebates, commissions and any other allowances and credits available to the contractor, regardless of date purchased, plus properly identified and supported freight or transportation costs) for parts acquired by the contractor for performance under this contract.
(b) ‘Direct Labor Hours’ means those hours of labor which are identifiable as being performed directly on an item of the contract and which serve as the basis for payment of the Hourly Composite Rate set forth in Section B. The method of charging direct labor hours to this contract must conform to the contractor's accepted normal accounting practices and procedures, and allow for verification to the sources of the costs incurred. The term Direct Labor Hours does NOT include time for the indirect work of overhead and supervisory employees such as officers, engineers, supervisors, foremen, quality control inspectors, material handlers, clerks, typists, timekeepers, watchmen and truck drivers.
(c) ‘Direct Material’ means those materials which are not encompassed by the definition of ‘Indirect Materials.’
(d) ‘Flat Rate Labor Price’ is the price for overhaul, not subject to upward or downward revision, of the reparable Government-owned units listed in Section B. The Flat Rate Labor Price includes direct and indirect labor, indirect material, overhead, profit, preservation and packaging, test, out-of-plant services, and all other elements of cost, except the cost of new, unused parts.
(e) ‘Hourly Composite Rate’ includes direct and indirect labor, indirect material, overhead and profit. Payment under the applicable item will be computed by multiplying the Direct Labor Hours expended by the Hourly Composite Rate. The amounts payable for fractional parts of an hour may be prorated by fractions or increments not less than one-tenth (1/10) of one hour.
(f) ‘Indirect Material’ means all supplies and materials which do not become an integrated part of the assembly, accessory, or component. Typical items are lubricants, solvents, wiping rags, emery cloth, plating material, safety wire and abrasives. Price of indirect material shall be included in the Hourly Composite Rate.
(g) ‘Irreparable’ means a condition where an item cannot be returned to service in accordance with the applicable manufacturer's overhaul limits and instructions and/or pertinent regulations of the Federal Aviation Administration.
(h) ‘New, Unused Parts’ means serviceable parts that have never been used, which conform to current production standards and which are intended for replacement for like irreparable parts.
(i) ‘Out-of-Plant Services’ means those services performed for the contractor by its vendor, processor or subcontractor, such as special grinding, plating or similar rework processes, on components or parts removed from the Government-owned reparable items.
(j) ‘Overhaul’ means (1) the complete disassembly of the contract items listed in Section B including every assembly, subassembly and part; (2) the cleaning of each part and its inspection for serviceability; (3) the repair or rework of each reparable part and the replacement of each irreparable part; (4) the reassembly, calibration, as necessary, testing and inspection; (5) the marking and finishing of the exterior, where required; and (6) the preservation, packing and packaging, as required.
(k) ‘Reparable’ means the condition of an item which can be returned to service after repair or rework in accordance with procedures, tolerances and limits established by the overhaul and repair instructions issued by the item manufacturer, or as otherwise authorized under the provisions of the Federal Aviation Regulations.
(l) ‘Serviceable’ means the condition of an item in a good state of preservation that can be placed in service in accordance with applicable manufacturer's overhaul limits and instructions and/or pertinent regulations of the Federal Aviation Administration without repair.
(m) ‘Test’ means a test or check of equipment in its operational (or functional) environment, using equipment, procedures, and limits specified in applicable authorized manufacturer publications, manuals, and specifications and technical orders or FAA authorized changes in procedures and limits.
Section D - Packaging and Marking Clause List
N/A
Section E - Inspection and Acceptance Clause List
3.10.4-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1996)
3.10.4-4 INSPECTION OF SERVICES - BOTH FIXED-PRICE & COST REIMBURSEMENT (APR
1996)
3.10.4-5 INSPECTION - TIME-AND-MATERIAL AND LABOR-HOUR (APR 1996)
AC1908 INSPECTION AND ACCEPTANCE AT DESTINATION (JUN 2015)
(a) Final inspection and acceptance shall be at destination.
(b) Although source inspection by the Government is not anticipated under this contract, the provisions of this clause shall in no way be construed to limit the rights of the Government under the clause entitled 3.10.4-4 Inspection of Services - Both Fixed-Price & Cost Reimbursement (APR 1996) and 3.10.4-5 Inspection - Time-and- Material and Labor-Hour (APR 1996).
Section F - Deliveries or Performance Clause List
AC0168 AUTHORIZED PERFORMANCE (JUL 2015)
The execution of a contract shall not constitute authority for the contractor to commence performance. Performance shall be ordered by the issuance of a formal delivery order by an authorized Contracting Officer of the Mike Monroney Aeronautical Center. Orders issued orally or by written telecommunications shall reference a formal delivery order number and shall be confirmed by issuance of the formal delivery order.
AC1604 CONTRACT PERIOD (JUN 2015)
The effective period of this contract is 1 year from the effective period of this contract is 1 year from date of contract award plus four 12-month option year periods, if exercised.
AC1814 PERFORMANCE TIMES (JUL 2015)
(a) The term ‘performance time’ as used herein is deemed to commence:
(1) As to furnishing an ‘Engine Condition Report’ and ‘Teardown Analysis Report for the Purpose of Escalation of Time Interval’: at the close of the first day on which the contractor has received both the engine or QEC and a delivery order authorizing the contractor to initiate work or in those cases where the Government representative participates in teardown, at the close of the first day on which teardown is complete.
(2) As to any overhaul, heavy maintenance, or ‘disassembly, cleaning, inspection, reassembly and test’: at the close of the first day on which the contractor has received both the item requiring such work and a delivery order containing the appropriate authorization to proceed or in those cases where the Government representative participates in teardown, at the close of the first day on which teardown is complete.
(3) As to any maintenance operation, repair, modification or Service Bulletin accomplishment: at the close of the first day when the contractor has both the item to be serviced and the Contracting Officer's direction to proceed with each individual task, repair or modification or in those cases where the Government representative participates in teardown, at the close of the first day on which teardown is complete.
(4) As to unit exchange or purchase of parts in support of FAA maintenance: upon the receipt of verbal notice given by the Contracting Officer (accompanied by a delivery order number), or a written delivery order.
(5) As to rental service: upon the receipt of verbal instructions given by the Contracting Officer or his/her authorized representative to initiate such service.
(6) As to furnishing field services: at the close of the first day of contractor's receipt of verbal instructions given by the Contracting Officer requesting the services.
(b) Performance Time Periods: Calendar Days
(1) For the furnishing of an ‘Engine Condition Report.’ 10
(2) For the furnishing of a ‘Teardown Analysis Report for the Purpose of Escalation of Time Interval.’ 20
(3) For the completion of overhaul or heavy maintenance of an engine or QEC. N/A
(4) For the completion of overhaul accessories. N/A
(5) For the completion of maintenance operations, repair, modification work, or Service Bulletin accomplishment on any engine, QEC, accessory, or component. 45 days (6) For the furnishing of parts to support FAA emergency maintenance. 24 hours
(7) For the shipment of unit exchange items. 24 hours
(8) For the initiation of rental service. 24 hours
(9) For the initiation of field services. 24 hours
(c) Performance time, as to any item or group of items set forth above, is deemed completed only when the item or items are suitably packaged for the intended transportation and placed at a shipping point designated by the Contracting Officer.
Section G - Contract Administration Data Clause List
3.10.1-22 CONTRACTING OFFICER'S REPRESENTATIVE (APR 2012)
AC0116 OPTION TO EXTEND SERVICES (JUN 2015)
The Government may unilaterally exercise its option to extend the term of the contract for performance of specified services pursuant to Section I, AMS Clause 3.2.4-34, Option to Extend Services , by written notice to the contractor not later than the expiration date of the current contract period.
AC1810 REPORTS AND RECORDS (JUL 2015)
(a) The FAA shall forward up-to-date engine historical records to the contractor at the time of shipment of each engine or QEC assembly. Engine historical records will include a listing of life-limited parts indicating the part number, nomenclature, location, serial number, total operating hours, and total cycles accumulated. Separate assemblies, subassemblies, or parts input to the contractor will be tagged to show item identification and condition where applicable, the operating hours since new or last overhaul, and accumulated cycles.
(b) The contractor shall enter on the historical records all FAA airworthiness directives, manufacturer's service bulletins or other modifications, and all other significant maintenance actions he accomplishes. In addition, he shall record as previously complied with all such modifications found to be previously accomplished but not recorded. He shall record accomplishment of such modifications whether the intent of the modifications were performed under the contractor's specifications, FAA specifications or engineering orders, or by replacement of parts due to normal attrition. The contractor shall indicate on the historical records the nomenclature, part number, location, total time, and total cycles, accumulated for all replacement life-limited parts, he installs. Entries on historical records pertaining to compliance with FAA airworthiness directives, manufacturers' service bulletins, or other modifications will be in such detail that the method and extent of compliance can be readily ascertained.
(c) The contractor shall furnish an Engine Condition Report not later than 20 calendar days after receipt of the item and a Teardown Analysis Report not later than 10 calendar days…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .