About this file
This notice provides details for a federal contract solicitation to demolish Building 45 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The solicitation seeks a contractor to demolish the existing building via controlled disassembly and top-down dismantling using enclosed equipment. The contractor will reclaim 1,500 cleaned historic bricks for use in repairing other historic buildings and cap the ground underneath to convert it into a surface parking lot and greenspace. The new contract will also modify an existing access point to a steam tunnel. The solicitation is scheduled to be posted on July 8, 2021 with a bid opening on August 11, 2021 and a pre-bid conference. The project magnitude is estimated between $2,000,000 to $5,000,000 and the contract period of performance is 365 calendar days. The solicitation will be issued as a 100% service-disabled veteran-owned small business set-aside under NAICS code 236220 for commercial and institutional building construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25221B0019 0003.docx | DOCX document | |
| 36C25221B0019 0002.docx | DOCX document | |
| Map of Bid Opening.png | PNG image | |
| 4 - 695-18-111 SOW - revised 051321.pdf | ||
| 31 20 00 Earthwork.pdf | ||
| Utility Plan.pdf | ||
| Amendment 03 drawings.pdf | ||
| S04 - Pre-Bid Sign-in Sheet.pdf | ||
| 36C25221B0019 0001.docx | DOCX document | |
| 36C25221B0019.docx | DOCX document | |
| J_A Fire Alarm.pdf | ||
| 695-18-111 Specifications.pdf | ||
| Wage Decision 20210319.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
695-18-111
DEMOLISH BUILDING 45
MILWAUKEE VAMC
MILWAUKEE, WI
BID DOCUMENTS
100% CONSTRUCTION
DOCUMENTS
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
CIVIL
GI001 GENERAL NOTES
GI002 PHASING PLAN
CD101 DEMOLITION PLAN
CS101 CONSTRUCTION SITE PLAN
CS102 SITE PLAN
CS501 SITE DETAILS
CS502 SITE DETAILS
CG101 GRADING PLAN
CJ101 EROSION AND SEDIMENTATION CONTROL AND LANDSCAPE PLAN
CJ501 EROSION CONTROL DETAILS
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD101 BASEMENT AND FIRST FLOOR DEMOLITION PLAN
AD102 SECOND THRU PENTHOUSE DEMOLITION PLAN
AD301 BUILDING SECTIONS DEMO
AD302 BUILDING SECTIONS DEMO
AE301 TUNNEL ENTRANCE ENCLOSURE PLAN AND SECTIONS
PLUMBING
PS000 SYMBOLS, ABBREVIATIONS, AND SHEET INDEX
PL101 TUNNEL DEMO PLAN - PLUMBING
PL102 TUNNEL PLAN - PLUMBING
PL400 PLUMBING SCHEDULES AND DETAILS
ELECTRICAL
ES000 SYMBOLS, ABBREVIATIONS, SCHEDULES & DETAILS
ES101 DEMOLITION SITE PLAN - ELECTRICAL
ES102 NEW SITE PLAN - ELECTRICAL
ES103 NEW SITE PLAN - PHOTOMETRICS
ES301 TUNNEL ENTRANCE ENCLOSURE PLAN - ELECTRICAL
ES400 ONE LINE DIAGRAM & DETAILS
HAZARD MATERIAL REMOVAL
HA101 FIRST FLOOR HAZARDOUS MATERIAL REMOVAL PLAN
HA102 SECOND THRU PENTHOUSE HAZARDOUS MATERIAL REMOVAL PLAN
DOCUMENT SET FOR REFERENCE ONLY
A-100 EXISTING CONDITIONS - IMAGE LOCATIONS
A-101 EXISTING CONDITIONS - EXTERIOR IMAGES
A-102 EXISTING CONDITIONS - INTERIOR IMAGES
A-103 EXISTING CONDITIONS - INTERIOR IMAGES
Contact:Contact:Contact:Contact:
RING & DUCHATEAU
Engineer
MECHANICAL,
ELECTRICAL &
PLUMBING
GUIDON DESIGN INC.
Mark VanderWoude
Sr. Project Manager
STRUCTURAL
ENGINEER
GUIDON DESIGN INC.
Stacey Paul
Sr. Civil Engineer
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 104 e: spaul@guidondesign.com
CIVIL
ENGINEER
CLEMENT J. ZABLOCKI
VA MEDICAL CENTER
5000 W. National Avenue Milwaukee, WI 53295 p: 414.384.2000
OWNER
GUIDON DESIGN INC.
James Gooden
Project Architect
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 145 e: jgooden@guidondesign.com
ARCHITECT
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com
17400 West Capital Dr.
Brookfield, WI 53045 p: 414.778.1700 e: mmcgann@ringdu.com
AREA MAP
VICINITY MAP
CAMPUS MAP
Mike McGann
N
SITE
N
N
PROJECT LOCATION:
BUILDING 45
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
GENERAL NOTES
GI001
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45PHASING PLAN
GI002
N
0 10050 0 2010 0 10050
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
N
0 4020
DEMOLITION PLAN
CD101
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
N
0 6030
CONSTRUCTION SITE PLAN
CS101
DETOUR
DETOUR
END
DETOUR
WORKERS
STOP
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
N
0 4020
SITE PLAN
CS102
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45SITE DETAILS
CS501
STOP
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
CS502
SITE DETAILS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
N
0 4020
GRADING PLAN
CG101
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45EROSION AND SEDIMENTATION
CONTROL AND LANDSCAPE PLAN
CJ101
0 4020
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
MILWAUKEE, WI
695-18-111
05/28/2021Revisions: Date:
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317-800-6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045 Approved:
SLP TJS
DEMOLISH BUILDING 45
2"
EROSION CONTROL DETAILS
CJ501
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
EXTENT OF REVISION
REVISION SET
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND COR.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH COR AND
VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY SHUT DOWN, INFECTION
CONTROLS, OCCUPANT/EMPLOYEE SAFETY, ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
16. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
17. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
18. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
19. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
20. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
22. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
WALL TO BE
REMOVED
DEMOLISHED DOOR
REVISION TO PLAN CALLOUT
WALLS DOORS
1 DEMOLITION NOTE
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLSARCHITECTURAL ABBREVIATIONS
A/E ARCHITECT/ENGINEER
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AR AS REQUIRED
ARCH ARCHITECT
BLDG BUILDING
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CL CENTER LINE
CLR CLEAR
COORD COORDINATE
CPT CARPET
CTR CENTER
DEMO DEMOLITION
DIA DIAMETER
DIM DIMENSION
DN DOWN
E EAST
ELEC ELECTRIC
EPA ENVIRONMENTAL PROTECTION AGENCY
EQ EQUAL
EQUIP EQUIPMENT
ETC AND SO FORTH OR ET CETERA
EXIST EXISTING
F FAHRENHEIT OR FEMALE
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FT FEET OR FOOT
GAL GALLON
GYP GYPSUM
HAZ MAT HAZARDOUS MATERIALS
HW HARDWARE
HM HECTOMETER OR HOLLOW METAL
HSKPG HOUSEKEEPING
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
INFO INFORMATION
INTL INTERNATIONAL
JAN JANITOR
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
MECH MECHANICAL
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MISC MISCELLANEOUS
mm MILLIMETER
N NORTH
OC ON CENTER
OZ OUNCE
PCF POUNDS PER CUBIC FOOT
PREFAB PREFABRICATE
PREFIN PREFINISH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
RB RESILIENT BASE OR RUBBER BASE
RCP REFLECTED CEILING PLAN
REQ REQUIRE
REQD REQUIRED
REV REVISION
RO ROUGH OPENING
SF SQUARE FOOT (FEET)
SIM SIMILAR
S SOUTH
SPEC SPECIFICATION
STL STEEL
SURF SURFACE
SUSP SUSPEND
TA TOILET ACCESSORY
T&G TONGUE AND GROOVE
TEMP TEMPERATURE OR TEMPORARY
THRU THROUGH
TO TOP OF ___
TV TELEVISION
TYP TYPICAL
VAR VARIES
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
COAL BUNKERS ABOVE
ABANDONED STEAM TUNNEL
TO REMAIN
BOILER HOUSE
FUEL BUNKER ROOM
(FLOOR ELEVATION 651.0)
ASH CHUTE ROOM
(FLOOR ELEVATION
652.360)
STORAGE ROOM
(FLOOR ELEVATION
652.333)
ENGINE HOUSE
EXISTING VAULT B
TO REMAIN
333 3
AD301
AD302
AD302
142' - 5 3/4"
/8
/2
46' - 5 1/4"
7'
/8
7 7 7 7
76' - 3"
/8
/8
/2
20' - 5 7/8"
/8
T Y
P
TYP.
15' - 4 7/8"
T Y
P
6'
TYP.
8' - 0"
13 13 13
20' - 2"
20' - 2"
TYP.
15' - 11 5/8"
T Y
P
7'
1/ 2"
8'
/8
3' - 3 1/4"
9' - 4 1/8" 9' - 1 1/2"
5'
/8
9' - 3 7/8"
9'
/4
1' - 9 1/2"
3'
7' - 9 5/8"
9'
5/ 8"
/8
9' - 8 3/4"
ASH BUNKER ABOVE
AE301
NEW VAULT ACCESS
6' -0
± 16'-0"
AE301
A. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS WHETHER OR NOT
SPECIFICALLY INDICATED ON THE DRAWINGS TO FACILITATE THE
COMPLETION OF ALL REQUIRED WORK. CONTRACTOR SHALL VISIT THE SITE
AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
D. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL FLOOR PLAN AD101 AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE.
F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.
G. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
H. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS
OTHERWISE INDICATED.
I. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE INDICATED.
J. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.
K. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO
PLUMBING PLAN FOR ADDITIONAL INFORMATION.
L. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
M. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
NOTE:
DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4' - 0" BELOW
GRADE WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR
COMPONENTS. IDENTIFIED COMPONENTS ARE FOR REFERENCE ONLY AND
CONTRACTOR IS RESPONSIBLE FOR A PRE-DEMOLITION SURVEY OF
EXISTING CONDITIONS IN CONJUNCTION WITH THE SPECIFICATIONS FOR
SCOPE.
1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED
BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN
THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.
2. TURBINE GENERATOR.
3. BOILER EQUIPMENT PADS AND FOUNDATIONS.
4. COAL GRAVITY DISCHARGE ELEVATOR.
5. COAL PIT FOUNDATION AND FOOTING (BOTTOM APPROX. 8'-0" BELOW
FLOOR LINE). INFILL PIT WITH PRE-ENGINEERED FILL.
6. STACK FOOTING.
7. EQUIPMENT ISOLATION PADS 5' - 6" DEEP. INFILL PIT WITH PRE-ENGINEERED
FILL.
8. 5' x 7' x 5' WATER PIT. COORDINATE WITH ENGINEERING DRAWINGS.
9. ABANDONED ASH PIT FOUNDATION AND FOOTING (BOTTOM APPROX. 10'-0"
BELOW FLOOR LINE).
10. STAIR AND LANDING.
11. RAISED CONCRETE PAD AND STAIR.
12. MECHANICAL EQUIPMENT. FOUNDATION WALLS AROUND MECHANICAL PIT
TO REMAIN. INFILL PIT WITH PRE-ENGINEERED FILL.
13. STRUCTURAL COLUMNS AND FOUNDATIONS.
14. EXISTING FLOOR TO REMAIN. SAW CUT INTO 2' X 2' SQUARES AND BREAK UP
FLOOR TO ALLOW DRAINAGE.
15. INFILL BASEMENT WITH PRE-ENGINEERED FILL.
16. EXISTING CONTROL SWITCH.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
INTERIOR FACE OF
CONCRETE WALLS
ENGINE HOUSE BASEMENT
(FLOOR ELEVATION 645.833)
AD301
46' - 6 7/8"
1. EXISTING GRATING IN VAULT 'B' TO BE REPLACED. NEW GRATING TO BE
GALVANIZED STEEL, 19-W-4 WITH 1 1/2" X 1/8" BARS. CONTRACTOR TO
COORDINATE OPENINGS AND PIPE SUPPORTS.
#PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
AD101
BASEMENT AND FIRST FLOOR DEMOLITION
PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"AD101
1 FIRST FLOOR DEMO PLAN
N
SCALE: 6" = 1'-0"
KEYPLAN
N
SCALE: 1/8" = 1'-0"AD101
2 BASEMENT DEMO PLAN
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW CONSTRUCTION SHALL BE
PROVIDED. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS
WHETHER OR NOT SPECIFICALLY INDICATED ON THE DRAWINGS TO
FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR
SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED
TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
D. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE
ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
G. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
I. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS
OTHERWISE INDICATED.
J. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE INDICATED.
K. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.
L. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO
PLUMBING PLAN FOR ADDITIONAL INFORMATION.
M. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
N. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
NOTE:
DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4' - 0" BELOW
GRADE WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR
COMPONENTS. IDENTIFIED COMPONENTS ARE FOR REFERENCE ONLY AND
CONTRACTOR IS RESPONSIBLE FOR A PRE-DEMOLITION SURVEY OF
EXISTING CONDITIONS IN CONJUNCTION WITH THE SPECIFICATIONS FOR
SCOPE.
1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED
BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN
THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.
2. COAL GRAVITY DISCHARGE ELEVATOR.
3. STAIR AND LANDING.
4. COAL BUNKER.
5. STRUCTURAL COLUMNS AND FOUNDATIONS.
6. ASH BUNKER AND VENT.
7. CATWALK.
8. WALKWAY PLATFORM.
9. LADDER.
10. PIPE RAILING.
DEMOLITION GENERAL NOTES
DEMOLITION PLAN NOTES
CHECKERED PLATE
WALKWAY (FLOOR
ELEVATION 689.67)
COAL BUNKER
- STEEL LINER ON STEEL STRUTS
1 1
/8
38' - 5 7/8"
2' - 3 1/4"
8'
/4
6'
/8
3' - 6 1/2"
5'
/8
12' - 7 3/4"
8'
/8
6'
/4
19' - 9 1/4"11' - 8 3/4"
ASH
BUNKER
FLOOR ELEVATION
666.33
BOILER
HOUSE
/8
/2
39' - 10 1/4"
/8
3' - 3 3/4"
4'
3/ 8"
8' - 1 7/8"
6'
/4
R O
O F
B E
Y O
N D
R O
O F
B E
Y O
N D
(FLOOR ELEVATION 703.83)
/8
40' - 10 3/4"
2' - 11 5/8"
4'
/8
WALKWAY
(FLOOR ELEVATION 678.33)
/2
3/ 8"
40' - 3 5/8"
/2
21' - 9 1/8"
4'
/8
4' - 6 7/8"5' - 0"12' - 2 1/4"
6'
/4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
AD102
SECOND THRU PENTHOUSE DEMOLITION
PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
NN
N N
SCALE: 6" = 1'-0"
KEYPLAN
N
SCALE: 3/16" = 1'-0"AD102
1 ABOVE WALKWAY DEMO PLAN
SCALE: 3/16" = 1'-0"AD102
2 SECOND FLOOR DEMO PLAN
SCALE: 3/16" = 1'-0"AD102
4 PENTHOUSE DEMO PLAN
SCALE: 3/16" = 1'-0"AD102
3 THIRD FLOOR WALKWAY DEMO PLAN
PENT
HOUSE
COAL
BUNKER
FUEL BUNKER
ROOM
STORAGE
ROOM / STAIRS
F
IE
LD
V
E R
IF
Y
3/ 4"
1' - 7 1/8" 28' - 1 3/4" 20' - 4 3/8" 1' - 4 3/4"
15' - 10"
50' - 11"
F
IE
LD
V
E R
IF
Y
8'
EXISTING GRADE
EL. 653.10 EXISTING GRADE
EL. 652.10
M
IN
. D E
M O
D E
P T
H 4'
M
IN
. D E
M O
D E
P T
H 4'
V
IF
3/ 8"
8'
/8
3/ 8"
FINISHED GRADE
VARIES
FINISH GRADE
VARIES
ENGINE
HOUSE
ENGINE HOUSE
BASEMENT
4 5
2' - 7 1/2" 41' - 2 1/4" 2' - 7 1/2"
EXISTING GRADE
EL. 649.61
FINISHED GRADE
VARIES
EXISTING GRADE
EL. 647.74
V
IF
1'
M
IN
. D E
M O
D E
P T
H
4'
V
IF
2'
/8
M
IN
. D E
M O
D E
P T
H 4'
FINISH GRADE
VARIES
NOTE:
DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4' - 0" BELOW
GRADE WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR
COMPONENTS. IDENTIFIED COMPONENTS ARE FOR REFERENCE ONLY AND
CONTRACTOR IS RESPONSIBLE FOR A PRE-DEMOLITION SURVEY OF
EXISTING CONDITIONS IN CONJUNCTION WITH THE SPECIFICATIONS FOR
SCOPE.
1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED
BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN
THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.
2. ROOF TRUSS.
3. FLOOR FRAMING.
4. STAIR.
5. INFILL BASEMENT WITH PRE-ENGINEERED FILL.
6. FLOOR SLAB.
7. FOUNDATION WALL AND CONCRETE FOOTING.
8. COAL BUNKER.
9. FOUNDATION TO REMAIN.
10. ABANDONED PIT FOUNDATION AND FOOTING TO REMAIN. INFILL
ABANDONED PIT WITH PRE-ENGINEERED FILL.
11. INTERIOR WALL PARTITION.
12. STRUCTURAL STEEL ELEMENTS.
13. EXISTING FLOOR TO REMAIN. BREAK UP FLOOR INTO 2' X 2' SQUARES
MAXIMUM AND BREAK UP FLOOR TO ALLOW DRAINAGE.
DEMOLITION GENERAL NOTES
DEMOLITION SECTION NOTES
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW CONSTRUCTION SHALL BE
PROVIDED. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS
WHETHER OR NOT SPECIFICALLY INDICATED ON THE DRAWINGS TO
FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR
SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED
TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
D. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE
ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
G. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
I. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS
OTHERWISE INDICATED.
J. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE INDICATED.
K. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.
L. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO
PLUMBING PLAN FOR ADDITIONAL INFORMATION.
M. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
N. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
AD301
BUILDING SECTIONS DEMO
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"AD301
1 ASH CHUTE / BUNKER HOUSE SECTION
SCALE: 1/4" = 1'-0"AD301
2 ENGINE HOUSE SECTION
ENGINE
HOUSE
8 8
10 10 10 10
/8
26' - 8 5/8"
2' - 6 1/4" 2' - 4 5/8"2' - 0 7/8" 8' - 10 3/8" 11" 8' - 11" 2' - 0 1/2"
2' - 6"2' - 7 1/4"
/8
ENGINE HOUSE
BASEMENT
BOILER
HOUSE
20' - 9 3/4" 10' - 6 1/2" 20' - 9 3/4"
1/ 2"
3/ 8"
/8
4'
/2
3'
/4
1' - 0" 71' - 7 3/8" 31' - 8 7/8" 1' - 3 1/2"
1' - 11 3/8" 15' - 2 5/8" 2' - 7 1/2"
FINISHED GRADE
VARIES
EXISTING GRADE
EL. 649.00
EXISTING GRADE
EL. 650.36V
.I.
F
1'
/8
M
IN
. D E
M O
D E
P T
H 4'
V
IF
2'
/8
M
IN
. D E
M O
D E
P T
H 4'
FINISH GRADE
VARIES
NOTE:
DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4' - 0" BELOW
GRADE WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR
COMPONENTS. IDENTIFIED COMPONENTS ARE FOR REFERENCE ONLY AND
CONTRACTOR IS RESPONSIBLE FOR A PRE-DEMOLITION SURVEY OF
EXISTING CONDITIONS IN CONJUNCTION WITH THE SPECIFICATIONS FOR
SCOPE.
1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED
BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN
THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.
2. ROOF TRUSS.
3. EXISTING FOUNDATION WALL TO REMAIN.
4. LADDER.
5. INFILL BASEMENT WITH PRE-ENGINEERED FILL.
6. FLOOR SLAB.
7. FOUNDATION WALL AND CONCRETE FOOTING.
8. EQUIPMENT ISOLATION PADS. INFILL EQUIPMENT PIT.
9. INFILL PIT WITH PRE-ENGINEERED FILL.
10. STRUCTURAL STEEL FRAMING.
DEMOLITION GENERAL NOTES
DEMOLITION SECTION NOTES
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW CONSTRUCTION SHALL BE
PROVIDED. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS
WHETHER OR NOT SPECIFICALLY INDICATED ON THE DRAWINGS TO
FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR
SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED
TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
D. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE
ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
G. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
I. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS
OTHERWISE INDICATED.
J. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE INDICATED.
K. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.
L. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO
PLUMBING PLAN FOR ADDITIONAL INFORMATION.
M. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
N. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
AD302
BUILDING SECTIONS DEMO
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/4" = 1'-0"AD302
1 PARTIAL ENGINE HOUSE SECTION
SCALE: 1/4" = 1'-0"AD302
2 BOILER HOUSE SECTION
AE301
AE301
FIXED STEEL LADDER,
COORDINATE WITH
FLOOR DOOR OPENING
PORTION OF TUNNEL
TO BE INFILLED
WITH BACKFILL
INFILL TUNNEL OPENING
WITH PRE-ENGINEERED FILL
ABANDONED STEAM
TUNNEL TO REMAIN
NEW REINFORCED
CONCRETE WALL
AREA OF EXCAVATION,
COORDINATE WITH CIVIL
7" MIN.
1'
C
LE
A R
E Q
E Q
WATERPROOF BOTH
NEW & EXISTING
INFILL EXISTING
MECHANICAL PIT WITH
PRE-ENGINEERED FILL
INFILL TUNNEL OPENING
WITH PRE-ENGINEERED FILL
WATERPROOF BOTH
NEW & EXISTING
SAWCUT THROUGH WALL AND
FLOOR TO ISOLATE TUNNEL FROM
BUILDING TO AVOID COLLATERAL
DAMAGE
BREAK UP FLOOR
FOR DRAINAGE
TUNNEL FLOOR
88' - 0"
TOP OF CONC. SLAB
101' - 0"
AE301
MAINTENANCE
TUNNEL
3'-0" x 3'-0" ACCESS DOOR, COORDINATE CONCRETE
EMBEDS & ANCHORAGE
WITH SUPPLIER
PORTION OF EXISTING
FOUNDATION WALL TO
REMAIN
INFILL EXISTING
MECHANICAL PIT WITH
PRE-ENGINEERED FILL NEW 14" REINFORCED
CONCRETE WALL
INFILL PORTION
OF EXISTING TUNNEL
WITH PRE-ENGINEERED FILL
LIGHT FIXTURE, REFER
TO ELECTRICAL
DRAWINGS
HEIGHT OF TUNNEL
95' - 1"
EXISTING GRADE TO BE
EXCAVATED AND
BACKFILLED, COORDINATE
WITH CIVIL
VERIFY IN FIELD
11' - 2 3/8" 10' - 0" 1' - 0"
1/4" PROTECTION
BOARD ON BITUMINOUS
SHEET MEMBRANE
WATERPROOFING ON
NEW 14" REINFORCED
CONCRETE WALL
1/4" PROTECTION BOARD ON
BITUMINOUS SHEET MEMBRANE
WATERPROOFING ON
NEW 14" CONCRETE WALL
EXISTING GRADE TO BE
EXCAVATED AND BACKFILLED,
COORDINATE WITH CIVIL
PORTION OF EXISTING
SIDEWALK TO BE REMOVED
AND REPLACED DURING
CONSTRUCTION, COORDINATE
WITH CIVIL
DEMOLISH EXISTING
BUILDING
REFER TO CIVIL DRAWINGS
22' - 2 3/8"
#6 VERTICAL BARS @ 12" O.C.
(EPOXY EMBED 4")
#5 HORIZONTAL BARS @ 12" O.C.
(PROVIDE CORNER BARS AT ENDS)
#6 DOWEL x 3'-0" @ 12" O.C.
(EPOXY EMBED 6")
#6 VERTICAL BARS
@ 12" O.C.
#5 HORIZONTAL BARS
@ 12" O.C. (EPOXY
EMBED 4" AT ENDS)
(+/- FIELD VERIFY)
REMOVE PORTION
OF TUNNEL CEILING
PORTION OF TUNNEL
CEILING TO REMAIN
NEW SIDEWALK,
COORDINATE
WITH CIVIL
FIXED STEEL LADDER,
COORDINATE WITH
ACCESS DOOR
OPENING
WATERPROOFING
MEMBRANE
12" CAST IN PLACE
CONCRETE SLAB W/
#5 BARS @ 12" O.C.
EACH WAY, TOP AND
BOTTOM
(COORD. W/ ACCESS DOOR SUPPLIER)
NEW PLUMBING
LINE, REFER TO PLUMBING
DRAWINGS
PROVIDE TEMPORARY
SUPPORT DURING
CONSTRUCTION
7" MIN.
4" M
IN
WATER STOP BETWEEN ALL
NEW AND EXISTING WALLS
WATER STOP BETWEEN ALL
NEW AND EXISTING WALLS
HIGH WATER ALARM
LIGHT & POLE, MATCH
EXISTING, COORDINATE
WITH ELECTRICAL
EXISTING PLUMBING
LINE, REFER TO PLUMBING
DRAWINGS
SAWCUT THROUGH WALL AND
FLOOR TO ISOLATE TUNNEL FROM
BUILDING TO AVOID COLLATERAL
DAMAGE
FOUNDATION WALL
BEYOND
FLOOR SLAB SLOPES (V.I.F)
FIRST FLOOR
100' - 0"
TUNNEL FLOOR
88' - 0"
AE301
TOP OF CONC. SLAB
101' - 0"
3'-0"x 3'-0" ACCESS DOOR, COORDINATE CONCRETE
EMBEDS & ANCHORAGE
WITH SUPPLIER
FIXED STEEL
LADDER,
COORDINATE
WITH FLOOR
DOOR OPENING
12" CAST IN PLACE
CONCRETE SLAB W/
#5 BARS @ 12" O.C.
EACH WAY, TOP AND BOTTOM
HEIGHT OF TUNNEL
95' - 1"
EXISTING TUNNEL
WALL TO REMAIN
1/4" PROTECTION BOARD
ON BITUMINOUS SHEET
MEMBRANE WATERPROOFING
ON NEW 14" REINFORCED
CONCRETE WALL
F
IE
LD
V
E R
IF
Y
/8
REMOVE PORTION OF
TUNNEL CEILING
EXISTING TUNNEL
SLAB
#6 VERTICAL BARS @ 12" O.C.
(EPOXY EMBED 4")
#5 HORIZONTAL BARS @
12" O.C. (PROVIDE CORNER
BARS AT ENDS)
#5 HORIZONTAL BARS @
12" O.C. (PROVIDE
CORNER BARS AT ENDS)
#6 VERTICAL BARS
@ 12" O.C. (EPOXY
EMBED 4")
(+/- FIELD VERIFY)
EXISTING GRADE TO BE
EXCAVATED AND
BACKFILLED, COORDINATE
WITH CIVIL
EXISTING GRADE TO BE
EXCAVATED AND BACKFILLED,
COORDINATE WITH CIVIL
(COORD. W/ ACCESS DOOR SUPPLIER)
1' - 6" CLEAR
1'
1'
1'
1'
1'
1'
1'
1'
1'
1'
1'
1'
4" M
IN
EQ EQ
WATER STOP BETWEEN ALL
NEW AND EXISTING WALLS
WATER STOP BETWEEN ALL
NEW AND EXISTING WALLS
NEW PLUMBING LINE, REFER TO
PLUMBING DRAWINGS
AE301
AE301
3'-0" x 3'-0"
STAINLESS STEEL
ACCESS DOOR
10' - 0"
7'
1/ 2"
12" CAST IN PLACE
CONCRETE SLAB
LINE OF EXISTING
TUNNEL
ABANDONED STEAM
TUNNEL TO REMAIN
AREA OF EXCAVATION,
COORDINATE WITH CIVIL
INFILL TUNNEL OPENING
WITH PRE-ENGINEERED FILL
HIGH WATER ALARM
LIGHT & POLE, MATCH
EXISTING, COORDINATE
WITH ELECTRICAL
PORTION OF EXISTING
SIDEWALK TO BE REMOVED
AND REPLACED DURING
CONSTRUCTION, COORDINATE
WITH CIVIL
INFILL EXISTING
MECHANICAL PIT WITH
PRE-ENGINEERED FILL
SAWCUT THROUGH WALL AND
FLOOR TO ISOLATE TUNNEL FROM
BUILDING TO AVOID COLLATERAL
DAMAGE
EXISTING TUNNEL
ROOF TO REMAIN
EXISTING TUNNEL
WALL TO REMAIN
EXISTING TUNNEL
FLOOR TO REMAIN
NEW CONCRETE TUNNEL WALL
NEW CONCRETE TUNNEL ROOF
NEW ACCESS DOOR AND
FIXED STEEL LADDER
NEW WATER STOP
BETWEEN ALL NEW
& EXISTING WALLS
EXISTING PORTION OF TUNNEL
ROOF TO BE DEMOLISHED
NOTE:
ISOMETRIC VIEW IS FOR REFERENCE ONLY. REFER
TO PLANS & SECTIONS FOR MORE INFORMATION.
EXISTING VAULT B
TO REMAIN
6' -0
± 16'-0"
EXISTING GRATING IN VAULT 'B' TO BE
REPLACED. NEW GRATING TO BE
GALVANIZED STEEL, 19-W-4 WITH 1 1/2"
X 1/8" BARS. CONTRACTOR TO
COORDINATE OPENINGS AND PIPE
SUPPORTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
AE301
TUNNEL ENTRANCE ENCLOSURE PLAN AND
SECTIONS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
SCALE: 3/8" = 1'-0"AE301
3 TUNNEL ACCESS ENCLOSURE PLAN
SCALE: 3/8" = 1'-0"AE301
2 TUNNEL ENCLOSURE SECTION SCALE: 3/8" = 1'-0"AE301
1 TUNNEL ENCLOSURE SECTION
SCALE: 3/8" = 1'-0"AE301
4 TUNNEL ACCESS ENCLOSURE ROOF PLAN
NN
NOT TO SCALEAE301
5 TUNNEL ACCESS ENCLOSURE ISOMETRIC
Revisions: Date:
SCALE: 1/4" = 1'-0"AE301
6 VAULT B ENLARGED PLAN
COAL BUNKERS ABOVE
ABANDONED STEAM TUNNEL
TO REMAIN
BOILER HOUSE
ENGINE HOUSE
EXISTING VAULT
TO REMAIN
ASH BUNKER ABOVE
111111
1 1
1 1
1 1
1111111111
LINE OF BASEMENT
BELOW
NEW VAULT ACCESS
AREA FOR REMOVAL OF FLUORESCENT TUBE AND BALLAST
REMOVAL
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 13.41.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. REMOVAL OF COUNTED AND UNFORESEEN MUD FITTINGS ON FIBERGLASS
INSULATED DOMESTIC WATER LINES. ASSUME 1,660 LF PIPE INSULATION ON
PIPING (4"-24" OD INSULATION) FROM GROUND FLOOR TO 20 FEET ABOVE
GROUND LEVEL. PIPE INSULATION FOR ABATEMENT LOCATED AT
BASEMENT AND FIRST FLOOR OF BOILER HOUSE AND ENGINE HOUSE;
RISERS OUTSIDE OF ENGINE HOUSE TO TUNNEL PIT.
E. REMOVAL OF ASBESTOS CONTAINING BLACK MASTIC FROM WATER
DAMAGED PIPE INSULATION. ASSUME 600 LF OF DEBRIS CLEANUP LOCATED
AT EAST SIDE OF BOILER HOUSE, FIRST FLOOR AND TUNNEL ENTRY PIT.
F. REMOVAL OF ASBESTOS CONTAINING TANK INSULATION. ASSUME 130SF OF
INSULATION LOCATED AT THE NORTH END OF ENGINE HOUSE.
G. REMOVAL OF WINDOW GLAZING / CAULK ON WOOD WINDOWS. ASSUME 86
WINDOWS LOCATED AT THE BOILER HOUSE AND ENGINE HOUSE.
H. REMOVAL OF FLUORESCENT LIGHT TUBES AND BALLASTS, ASSUME 6
FIXTURES LOCATED IN THE OFFICE AREA BETWEEN BOILER AND POWER
BUILDINGS.
I. REMOVAL OF Hg/SODIUM LIGHT BULB. ASSUME 8 FIXTURES LOCATED AT
THE UPPER WALLS OF BOILER & POWER BUILDINGS.
J. REMOVAL OF WOOD DOOR FRAME CAULKING. ASSUME 4 DOOR FRAMES
LOCATED AT THE ENTRY DOORS OF BOILER HOUSE AND ENGINE HOUSE.
K. REMOVAL OF ASBESTOS CONTAINING ROPE GASKET IN BOX / GROUND.
ASSUME 1 BOX LOCATED ON THE SECOND LEVEL OF COAL BUNKER.
L. REMOVAL OF ASBESTOS CONTAINING EBONY CEMENT BOARD. ASSUME 135
SF LOCATED AT THE BASEMENT AND FIRST FLOOR OF ENGINE HOUSE.
M. REMOVAL OF ASBESTOS CONTAINING ASPHALT BUILT-UP ROOFING.
ASSUME 432 SF LOCATED AT THE WEST ADDITION TO ENGINE HOUSE.
N. REMOVAL OF PCB OILS IN STORED TRANSFORMER. ASSUME 1
TRANSFORMER LOCATED IN THE BOILERHOUSE.
O. REMOVAL OF LEAD BASED PAINT. ASSUME 10,622 SF LOCATED IN THE
BOILER AND POWER / ENGINE HOUSES.
P. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
Q. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED
LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE
EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED
PLASTER WALLS AND PAINTED SURFACES. REFER TO SPECIFICATION
SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL, DISPOSAL AND FOR
ADDITIONAL INFORMATION.
R. CONTRACTOR TO SUBMIT LEAD SURFACES STABILIZATION PLAN AND
PROCEDURES PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS.
1. REMOVE WINDOWS, FRAME AND CAULKING PER ASBESTOS ABATEMENT
SPECIFICATION SECTION 02 82 13.41.
2. REMOVE PCB OILS IN STORED TRANSFORMER PER ASBESTOS ABATEMENT
SPECIFICATION SECTION 02 82 13.41.
3. REMOVE ENTRY DOOR FRAME CAULKING PER ASBESTOS ABATEMENT
SPECIFICATION SECTION 02 82 13.41.
4. REMOVE EXISTING FLOORING AND SUBFLOOR PER ASBESTOS ABATEMENT
SPECIFICATION SECTION 02 82 13.41.
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
AREA FOR REMOVAL OF ASBESTOS CONTAINING ASPHALT
BUILT-UP ROOFING 4
4 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/3
/2
:1
:2
P M
HA101
FIRST FLOOR HAZARDOUS MATERIAL
REMOVAL PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JP
100% CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"HA101
1 FIRST FLOOR HAZMAT PLAN
N
SCALE: 6" = 1'-0"
KEYPLAN
N
SCALE: 1/8" = 1'-0"HA101
2 BASEMENT HAZMAT PLAN
CHECKERED PLATE
WALKWAY (FLOOR
ELEVATION 689.67)
COAL BUNKER
- STEEL LINER ON STEEL STRUTS
111111
ASH
BUNKER
FLOOR ELEVATION
666.33
BOILER
HOUSE
1 1 1 1 1 1
R O
O F
B E
Y O
N D
R O
O F
B E
Y O
N D
(FLOOR ELEVATION 703.83)
1 1
1 1
WALKWAY
(FLOOR ELEVATION 678.33)
AREA FOR REMOVAL OF FLUORESCENT TUBE AND BALLAST
REMOVAL
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 13.41.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. REMOVAL OF COUNTED AND UNFORESEEN MUD FITTINGS ON FIBERGLASS
INSULATED DOMESTIC WATER LINES. ASSUME 1,660 LF PIPE INSULATION ON
PIPING (4"-24" OD INSULATION) FROM GROUND FLOOR TO 20 FEET ABOVE
GROUND LEVEL. PIPE INSULATION FOR ABATEMENT LOCATED AT
BASEMENT AND FIRST FLOOR OF BOILER HOUSE AND ENGINE HOUSE;
RISERS OUTSIDE OF ENGINE HOUSE TO TUNNEL PIT.
E. REMOVAL OF ASBESTOS CONTAINING BLACK MASTIC FROM WATER
DAMAGED PIPE INSULATION. ASSUME 600 LF OF DEBRIS CLEANUP LOCATED
AT EAST SIDE OF BOILER HOUSE, FIRST FLOOR AND TUNNEL ENTRY PIT.
F. REMOVAL OF ASBESTOS CONTAINING TANK INSULATION. ASSUME 130SF OF
INSULATION LOCATED AT THE NORTH END OF ENGINE HOUSE.
G. REMOVAL OF WINDOW GLAZING / CAULK ON WOOD WINDOWS. ASSUME 86
WINDOWS LOCATED AT THE BOILER HOUSE AND ENGINE HOUSE.
H. REMOVAL OF FLUORESCENT LIGHT TUBES AND BALLASTS, ASSUME 6
FIXTURES LOCATED IN THE OFFICE AREA BETWEEN BOILER AND POWER
BUILDINGS.
I. REMOVAL OF Hg/SODIUM LIGHT BULB. ASSUME 8 FIXTURES LOCATED AT
THE UPPER WALLS OF BOILER & POWER BUILDINGS.
J. REMOVAL OF WOOD DOOR FRAME CAULKING. ASSUME 4 DOOR FRAMES
LOCATED AT THE ENTRY DOORS OF BOILER HOUSE AND ENGINE HOUSE.
K. REMOVAL OF ASBESTOS CONTAINING ROPE GASKET IN BOX / GROUND.
ASSUME 1 BOX LOCATED ON THE SECOND LEVEL OF COAL BUNKER.
L. REMOVAL OF ASBESTOS CONTAINING EBONY CEMENT BOARD. ASSUME 135
SF LOCATED AT THE BASEMENT AND FIRST FLOOR OF ENGINE HOUSE.
M. REMOVAL OF ASBESTOS CONTAINING ASPHALT BUILT-UP ROOFING.
ASSUME 432 SF LOCATED AT THE WEST ADDITION TO ENGINE HOUSE.
N. REMOVAL OF PCB OILS IN STORED TRANSFORMER. ASSUME 1
TRANSFORMER LOCATED IN THE BOILERHOUSE.
O. REMOVAL OF LEAD BASED PAINT. ASSUME 10,622 SF LOCATED IN THE
BOILER AND POWER / ENGINE HOUSES.
P. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
Q. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED
LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE
EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED
PLASTER WALLS AND PAINTED SURFACES. REFER TO SPECIFICATION
SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL, DISPOSAL AND FOR
ADDITIONAL INFORMATION.
R. CONTRACTOR TO SUBMIT LEAD SURFACES STABILIZATION PLAN AND
PROCEDURES PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS.
1. REMOVE WINDOWS, FRAME AND CAULKING PER ASBESTOS ABATEMENT
SPECIFICATION SECTION 02 82 13.41.
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
AREA FOR REMOVAL OF ASBESTOS CONTAINING ASPHALT
BUILT-UP ROOFING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\j jo n e s \D o c u m e n ts
\1
.1
.1
D e m o B ld g jjo n e s
J S
C .r v t
/2
/2
:0
:5
A
M
HA102
SECOND THRU PENTHOUSE HAZARDOUS
MATERIAL REMOVAL PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU
17400 W. CAPITOL DR.
BROOKFIELD, WI 53045
DEMOLISH BUILDING 45
MILWAUKEE, WI
695-18-111
5/28/2021 JLG JDJ
100% CONSTRUCTION
DOCUMENTS
SCALE: 6" = 1'-0"
KEYPLAN
NNN
N N
SCALE: 3/16" = 1'-0"HA102
1 ABOVE WALKWAY HAZMAT PLAN
SCALE: 3/16" = 1'-0"HA102
2 SECOND FLOOR HAZMAT PLAN
SCALE: 3/16" = 1'-0"HA102
4 PENTHOUSE HAZMAT PLAN
SCALE: 3/16" = 1'-0"HA102
3 THIRD FLOOR WALKWAY HAZMAT PLAN
SHEET PROVIDED BY THE VA - FOR REFERENCE ONLY
THIS SHEET IS FOR REFERENCE ONLY
| Sheets |
| GI000 - COVER SHEET |
| AE001 - ARCHITECTURAL SYMBOLS AND ABBREVIATIONS |
| AD101 - BASEMENT AND FIRST FLOOR DEMOLITION PLAN |
| AD102 - SECOND THRU PENTHOUSE DEMOLITION PLAN |
| AD301 - BUILDING SECTIONS DEMO |
| AD302 - BUILDING SECTIONS DEMO |
| AE301 - TUNNEL ENTRANCE ENCLOSURE PLAN AND SECTIONS |
| HA101 - FIRST FLOOR HAZARDOUS MATERIAL REMOVAL PLAN |
| HA102 - SECOND THRU PENTHOUSE HAZARDOUS MATERIAL REMOVAL PLAN |