About this file

This solicitation package includes demolition drawings and specifications for Project 695-18-111 to demolish Building 45 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contractor shall disassemble the existing building in a controlled manner to minimize loss of 1,500 cleaned historic bricks, which will be reclaimed for use in repair of historic buildings within the landmark district. Additionally, the contractor will cap the ground underneath the building and convert the area to a surface parking lot and greenspace, modifying an existing steam tunnel access point. The pre-solicitation notice establishes a project price range between $2-5 million under NAICS Code 236220 with a 365-day period of performance. The solicitation will post on July 8, 2021 with a bid opening tentatively scheduled for August 11, 2021. A pre-bid conference will be held to review the 100% SDVOSB set-aside requirements for verified status in VIP and representation of SDVOSB/VOSB small business size standards.

View the file

Other files

File Type Posted
36C25221B0019 0003.docx DOCX document
36C25221B0019 0002.docx DOCX document
Map of Bid Opening.png PNG image
4 - 695-18-111 SOW - revised 051321.pdf PDF
31 20 00 Earthwork.pdf PDF
Utility Plan.pdf PDF
S04 - Pre-Bid Sign-in Sheet.pdf PDF
36C25221B0019 0001.docx DOCX document
695-18-111 Drawings.pdf PDF
36C25221B0019.docx DOCX document
J_A Fire Alarm.pdf PDF
695-18-111 Specifications.pdf PDF
Wage Decision 20210319.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COAL BUNKERS ABOVE

ABANDONED STEAM TUNNEL

TO REMAIN

BOILER HOUSE

FUEL BUNKER ROOM

(FLOOR ELEVATION 651.0)

ASH CHUTE ROOM

(FLOOR ELEVATION

652.360)

STORAGE ROOM

(FLOOR ELEVATION

652.333)

ENGINE HOUSE

EXISTING VAULT B

TO REMAIN

333 3

AD301

AD302

AD302

142' - 5 3/4"

/8

/2

46' - 5 1/4"

7'

/8

7 7 7 7

76' - 3"

/8

/8

/2

20' - 5 7/8"

/8

T Y

P

TYP.

15' - 4 7/8"

T Y

P

6'

TYP.

8' - 0"

13 13 13

20' - 2"

20' - 2"

TYP.

15' - 11 5/8"

T Y

P

7'

1/ 2"

8'

/8

3' - 3 1/4"

9' - 4 1/8" 9' - 1 1/2"

5'

/8

9' - 3 7/8"

9'

/4

1' - 9 1/2"

3'

7' - 9 5/8"

9'

5/ 8"

/8

9' - 8 3/4"

ASH BUNKER ABOVE

AE301

NEW VAULT ACCESS

6' -0

± 16'-0"

AE301

A. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS WHETHER OR NOT

SPECIFICALLY INDICATED ON THE DRAWINGS TO FACILITATE THE

COMPLETION OF ALL REQUIRED WORK. CONTRACTOR SHALL VISIT THE SITE

AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

D. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLAN AD101 AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE.

F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

G. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

H. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

I. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE INDICATED.

J. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

K. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO

PLUMBING PLAN FOR ADDITIONAL INFORMATION.

L. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

M. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

NOTE:

DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4'-0" BELOW GRADE

WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR

COMPONENTS. IDENTIFIED COMPONENTS ARE THE KNOWN MAJOR

COMPONENTS FROM THE DRAWINGS PROVIDED BY THE VA.

1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED

BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN

THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.

2. TURBINE GENERATOR.

3. BOILER EQUIPMENT PADS AND FOUNDATIONS.

4. COAL GRAVITY DISCHARGE ELEVATOR.

5. COAL PIT FOUNDATION AND FOOTING (BOTTOM APPROX. 8'-0" BELOW

FLOOR LINE). INFILL PIT WITH PRE-ENGINEERED FILL.

6. STACK FOOTING.

7. EQUIPMENT ISOLATION PADS 5' - 6" DEEP. INFILL PIT WITH PRE-ENGINEERED

FILL.

8. 5' x 7' x 5' WATER PIT. COORDINATE WITH ENGINEERING DRAWINGS.

9. ABANDONED ASH PIT FOUNDATION AND FOOTING (BOTTOM APPROX. 10'-0"

BELOW FLOOR LINE).

10. STAIR AND LANDING.

11. RAISED CONCRETE PAD AND STAIR.

12. MECHANICAL EQUIPMENT. FOUNDATION WALLS AROUND MECHANICAL PIT

TO REMAIN. INFILL PIT WITH PRE-ENGINEERED FILL.

13. STRUCTURAL COLUMNS AND FOUNDATIONS.

14. EXISTING FLOOR TO REMAIN. SAW CUT INTO 2' X 2' SQUARES AND BREAK UP

FLOOR TO ALLOW DRAINAGE.

15. INFILL BASEMENT WITH PRE-ENGINEERED FILL.

16. EXISTING CONTROL SWITCH.

DEMOLITION GENERAL NOTES

DEMOLITION PLAN NOTES

INTERIOR FACE OF

CONCRETE WALLS

ENGINE HOUSE BASEMENT

(FLOOR ELEVATION 645.833)

AD301

46' - 6 7/8"

1. EXISTING GRATING IN VAULT 'B' TO BE REPLACED. NEW GRATING TO BE

GALVANIZED STEEL, 19-W-4 WITH 1 1/2" X 1/8" BARS. CONTRACTOR TO

COORDINATE OPENINGS AND PIPE SUPPORTS.

#PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\j jo n e s \D o c u m e n ts

\1

.1

.1

D e m o B ld g jjo n e s

J S

C .r v t

/2

/2

:1

:1

P

M

AD101

BASEMENT AND FIRST FLOOR DEMOLITION

PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045

DEMOLISH BUILDING 45

MILWAUKEE, WI

695-18-111

5/28/2021 JLG JDJ

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/8" = 1'-0"AD101

1 FIRST FLOOR DEMO PLAN

N

SCALE: 6" = 1'-0"

KEYPLAN

N

SCALE: 1/8" = 1'-0"AD101

2 BASEMENT DEMO PLAN

N

Revisions: Date:

ADDENDUM #1 2021/08/04

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW CONSTRUCTION SHALL BE

PROVIDED. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS

WHETHER OR NOT SPECIFICALLY INDICATED ON THE DRAWINGS TO

FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR

SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED

TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

D. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE

ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

G. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

I. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

J. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE INDICATED.

K. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

L. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO

PLUMBING PLAN FOR ADDITIONAL INFORMATION.

M. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

N. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

NOTE:

DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4'-0" BELOW GRADE

WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR

COMPONENTS. IDENTIFIED COMPONENTS ARE THE KNOWN MAJOR

COMPONENTS FROM THE DRAWINGS PROVIDED BY THE VA.

1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED

BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN

THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.

2. COAL GRAVITY DISCHARGE ELEVATOR.

3. STAIR AND LANDING.

4. COAL BUNKER.

5. STRUCTURAL COLUMNS AND FOUNDATIONS.

6. ASH BUNKER AND VENT.

7. CATWALK.

8. WALKWAY PLATFORM.

9. LADDER.

10. PIPE RAILING.

DEMOLITION GENERAL NOTES

DEMOLITION PLAN NOTES

CHECKERED PLATE

WALKWAY (FLOOR

ELEVATION 689.67)

COAL BUNKER

- STEEL LINER ON STEEL STRUTS

1 1

/8

38' - 5 7/8"

2' - 3 1/4"

8'

/4

6'

/8

3' - 6 1/2"

5'

/8

12' - 7 3/4"

8'

/8

6'

/4

19' - 9 1/4"11' - 8 3/4"

ASH

BUNKER

FLOOR ELEVATION

666.33

BOILER

HOUSE

/8

/2

39' - 10 1/4"

/8

3' - 3 3/4"

4'

3/ 8"

8' - 1 7/8"

6'

/4

R O

O F

B E

Y O

N D

R O

O F

B E

Y O

N D

(FLOOR ELEVATION 703.83)

/8

40' - 10 3/4"

2' - 11 5/8"

4'

/8

WALKWAY

(FLOOR ELEVATION 678.33)

/2

3/ 8"

40' - 3 5/8"

/2

21' - 9 1/8"

4'

/8

4' - 6 7/8"5' - 0"12' - 2 1/4"

6'

/4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\j jo n e s \D o c u m e n ts

\1

.1

.1

D e m o B ld g jjo n e s

J S

C .r v t

/2

/2

:1

:1

P

M

AD102

SECOND THRU PENTHOUSE DEMOLITION

PLAN

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045

DEMOLISH BUILDING 45

MILWAUKEE, WI

695-18-111

5/28/2021 JLG JDJ

100% CONSTRUCTION

DOCUMENTS

NN

N N

SCALE: 6" = 1'-0"

KEYPLAN

N

SCALE: 3/16" = 1'-0"AD102

1 ABOVE WALKWAY DEMO PLAN

SCALE: 3/16" = 1'-0"AD102

2 SECOND FLOOR DEMO PLAN

SCALE: 3/16" = 1'-0"AD102

4 PENTHOUSE DEMO PLAN

SCALE: 3/16" = 1'-0"AD102

3 THIRD FLOOR WALKWAY DEMO PLAN

Revisions: Date:

PENT

HOUSE

COAL

BUNKER

FUEL BUNKER

ROOM

STORAGE

ROOM / STAIRS

F

IE

LD

V

E R

IF

Y

3/ 4"

1' - 7 1/8" 28' - 1 3/4" 20' - 4 3/8" 1' - 4 3/4"

15' - 10"

50' - 11"

F

IE

LD

V

E R

IF

Y

8'

EXISTING GRADE

EL. 653.10 EXISTING GRADE

EL. 652.10

M

IN

. D E

M O

D E

P T

H 4'

M

IN

. D E

M O

D E

P T

H 4'

V

IF

3/ 8"

8'

/8

3/ 8"

FINISHED GRADE

VARIES

FINISH GRADE

VARIES

ENGINE

HOUSE

ENGINE HOUSE

BASEMENT

4 5

2' - 7 1/2" 41' - 2 1/4" 2' - 7 1/2"

EXISTING GRADE

EL. 649.61

FINISHED GRADE

VARIES

EXISTING GRADE

EL. 647.74

V

IF

1'

M

IN

. D E

M O

D E

P T

H

4'

V

IF

2'

/8

M

IN

. D E

M O

D E

P T

H 4'

FINISH GRADE

VARIES

NOTE:

DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4'-0" BELOW GRADE

WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR

COMPONENTS. IDENTIFIED COMPONENTS ARE THE KNOWN MAJOR

COMPONENTS FROM THE DRAWINGS PROVIDED BY THE VA.

1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED

BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN

THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.

2. ROOF TRUSS.

3. FLOOR FRAMING.

4. STAIR.

5. INFILL BASEMENT WITH PRE-ENGINEERED FILL.

6. FLOOR SLAB.

7. FOUNDATION WALL AND CONCRETE FOOTING.

8. COAL BUNKER.

9. FOUNDATION TO REMAIN.

10. ABANDONED PIT FOUNDATION AND FOOTING TO REMAIN. INFILL

ABANDONED PIT WITH PRE-ENGINEERED FILL.

11. INTERIOR WALL PARTITION.

12. STRUCTURAL STEEL ELEMENTS.

13. EXISTING FLOOR TO REMAIN. BREAK UP FLOOR INTO 2' X 2' SQUARES

MAXIMUM AND BREAK UP FLOOR TO ALLOW DRAINAGE.

DEMOLITION GENERAL NOTES

DEMOLITION SECTION NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW CONSTRUCTION SHALL BE

PROVIDED. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS

WHETHER OR NOT SPECIFICALLY INDICATED ON THE DRAWINGS TO

FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR

SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED

TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

D. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE

ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

G. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

I. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

J. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE INDICATED.

K. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

L. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO

PLUMBING PLAN FOR ADDITIONAL INFORMATION.

M. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

N. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\j jo n e s \D o c u m e n ts

\1

.1

.1

D e m o B ld g jjo n e s

J S

C .r v t

/2

/2

:1

:1

P

M

AD301

BUILDING SECTIONS DEMO

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045

DEMOLISH BUILDING 45

MILWAUKEE, WI

695-18-111

5/28/2021 JLG JDJ

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"AD301

1 ASH CHUTE / BUNKER HOUSE SECTION

SCALE: 1/4" = 1'-0"AD301

2 ENGINE HOUSE SECTION

Revisions: Date:

ENGINE

HOUSE

8 8

10 10 10 10

/8

26' - 8 5/8"

2' - 6 1/4" 2' - 4 5/8"2' - 0 7/8" 8' - 10 3/8" 11" 8' - 11" 2' - 0 1/2"

2' - 6"2' - 7 1/4"

/8

ENGINE HOUSE

BASEMENT

BOILER

HOUSE

20' - 9 3/4" 10' - 6 1/2" 20' - 9 3/4"

1/ 2"

3/ 8"

/8

4'

/2

3'

/4

1' - 0" 71' - 7 3/8" 31' - 8 7/8" 1' - 3 1/2"

1' - 11 3/8" 15' - 2 5/8" 2' - 7 1/2"

FINISHED GRADE

VARIES

EXISTING GRADE

EL. 649.00

EXISTING GRADE

EL. 650.36V

.I.

F

1'

/8

M

IN

. D E

M O

D E

P T

H 4'

V

IF

2'

/8

M

IN

. D E

M O

D E

P T

H 4'

FINISH GRADE

VARIES

NOTE:

DEMOLISH ALL BUILDING COMPONENTS TO A MINIMUM 4'-0" BELOW GRADE

WHICH INCLUDES BUT NOT LIMITED TO THE FOLLOWING MAJOR

COMPONENTS. IDENTIFIED COMPONENTS ARE THE KNOWN MAJOR

COMPONENTS FROM THE DRAWINGS PROVIDED BY THE VA.

1. WALLS. SALVAGE AND CLEAN AT LEAST 1500 USABLE BRICKS. SALVAGED

BRICKS TO BE PLACED ON A PALLET AND DELIVERED TO A LOCATION WITHIN

THE VA CAMPUS. COORDINATE DELIVERY LOCATION WITH COR.

2. ROOF TRUSS.

3. EXISTING FOUNDATION WALL TO REMAIN.

4. LADDER.

5. INFILL BASEMENT WITH PRE-ENGINEERED FILL.

6. FLOOR SLAB.

7. FOUNDATION WALL AND CONCRETE FOOTING.

8. EQUIPMENT ISOLATION PADS. INFILL EQUIPMENT PIT.

9. INFILL PIT WITH PRE-ENGINEERED FILL.

10. STRUCTURAL STEEL FRAMING.

DEMOLITION GENERAL NOTES

DEMOLITION SECTION NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW CONSTRUCTION SHALL BE

PROVIDED. CONTRACTOR SHALL REMOVE EXISTING IMPROVEMENTS

WHETHER OR NOT SPECIFICALLY INDICATED ON THE DRAWINGS TO

FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR

SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED

TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

D. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE

ARCHITECTURAL FLOOR PLAN AE101 AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

E. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

F. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

G. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

H. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

I. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

J. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE INDICATED.

K. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

L. REMOVE ALL PLUMBING FIXTURES AND ASSOCIATED ACCESSORIES

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED. REFER TO

PLUMBING PLAN FOR ADDITIONAL INFORMATION.

M. REMOVE DOOR LEAVES, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

N. REMOVE ALL STRUCTURAL FRAMING AND COLUMNS THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\j jo n e s \D o c u m e n ts

\1

.1

.1

D e m o B ld g jjo n e s

J S

C .r v t

/2

/2

:1

:1

P

M

AD302

BUILDING SECTIONS DEMO

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045

DEMOLISH BUILDING 45

MILWAUKEE, WI

695-18-111

5/28/2021 JLG JDJ

100% CONSTRUCTION

DOCUMENTS

SCALE: 1/4" = 1'-0"AD302

1 PARTIAL ENGINE HOUSE SECTION

SCALE: 1/4" = 1'-0"AD302

2 BOILER HOUSE SECTION

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

MILWAUKEE, WI

695-18-111

07/22/2021Revisions: Date:

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317-800-6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045 Approved:

SLP TJS

DEMOLISH BUILDING 45

N

0 4020

DEMOLITION PLAN

CD101

ADDENDUM #1 08/04/2021

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

MILWAUKEE, WI

695-18-111

07/22/2021Revisions: Date:

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317-800-6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045 Approved:

SLP TJS

DEMOLISH BUILDING 45

N

0 6030

CONSTRUCTION SITE PLAN

CS101

DETOUR

DETOUR

END

DETOUR

WORKERS STOP

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

MILWAUKEE, WI

695-18-111

07/22/2021Revisions: Date:

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317-800-6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045 Approved:

SLP TJS

DEMOLISH BUILDING 45

N

0 4020

SITE PLAN

CS102

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

MILWAUKEE, WI

695-18-111

07/22/2021Revisions: Date:

GUIDON DESIGN, INC.

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317-800-6388

RING & DUCHATEAU

17400 W. CAPITOL DR.

BROOKFIELD, WI 53045 Approved:

SLP TJS

DEMOLISH BUILDING 45EROSION AND SEDIMENTATION

CONTROL AND LANDSCAPE PLAN

CJ101

N

0 4020

Sheets
AD101 - BASEMENT AND FIRST FLOOR DEMOLITION PLAN
AD102 - SECOND THRU PENTHOUSE DEMOLITION PLAN
AD301 - BUILDING SECTIONS DEMO
AD302 - BUILDING SECTIONS DEMO