Attachment J.11 - Traffic Data Sheet 18-24.pdf
PDF 147 KB Posted
- Solicitation number
- 693JJ320R000020
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 18 STATE CODE [ _ _ ]
LTPP MONITORED TRAFFIC DATA SPS PROJECT ID [ _ _ _ _ ]
WIM SITE COORDINATION DATE: (mm/dd/yyyy) __ __ / __ __ / __ __ __ __
1. DATA PROCESSING –
a. Down load –
State only LTPP read only LTPP download LTPP download and copy to state
b. Data Review – State per LTPP guidelines State – Weekly Twice a Month Monthly Quarterly
LTPP
c. Data submission – State – Weekly Twice a month Monthly Quarterly
LTPP
2. EQUIPMENT –
a. Purchase –
LTPP
State
b. Installation – Included with purchase Separate contract by State State personnel LTPP contract
c. Maintenance – Contract with purchase Separate contract LTPP Separate contract State State personnel
d. Calibration – Vendor State
LTPP
e. Manuals and software control – State
LTPP
f. Power –
i. Type –
Overhead Underground Solar
ii. Payment –
State
LTPP
N/A
g. Communication –
i. Type –
Landline Cellular Other
ii. Payment – State
LTPP
N/A
3. PAVEMENT –
a. Type –
Portland Concrete Cement Asphalt Concrete
b. Condition – Always new Replacement as needed Grinding and maintenance as needed Maintenance only No remediation
c. Profiling Site Markings –
i. Short wave –
Permanent Temporary
ii. Long wave – Permanent Temporary
4. ON SITE ACTIVITIES –
a. WIM Validation Check - advance notice required _____ days / weeks
b. Notice for straightedge and grinding check - ______ days / weeks
i. On site lead –
LTPP
ii. Accept grinding –
LTPP
c. Calibration Routine – LTPP – Semi-annually Annually State per LTPP protocol – Semi-annually Annually State other – _________________________
d. Test Vehicles
i. Trucks –
1st – Air suspension 3S2 State LTPP 2nd – _______________ State LTPP 3rd – _______________ State LTPP 4th – _______________ State LTPP
ii. Loads – State LTPP
iii. Drivers – State LTPP
e. Contractor(s) with prior successful experience in WIM calibration in state:
f. Access to cabinet
i. Personnel Access –
State only Joint
LTPP
ii. Physical Access – Key Combination
g. State personnel required on site – Yes No
h. Traffic Control Required – Yes No
i. Enforcement Coordination Required – Yes No
j. Authorization to calibrate site – State only
LTPP
5. SITE SPECIFIC CONDITIONS –
a. Funds and accountability – _________________________________________
b. Reports – ___________________________________________________________
c. Other – ___________________________________________________________
6. CONTACTS –
a. Equipment (operational status, access, etc.) –
Name: _______________________ Phone: _________________
Agency: _________________________________________
b. Data Processing and Pre-Visit Data –
Name: _______________________ Phone: _________________
Agency: _________________________________________
c. Construction schedule and verification –
Name: _______________________ Phone: _________________
Agency: _________________________________________
d. Test Vehicles (trucks, loads, drivers) –
Name: _______________________ Phone: _________________
Agency: _________________________________________
e. Traffic Control –
Name: _______________________ Phone: _________________
Agency: _________________________________________
f. Enforcement Coordination –
Name: _______________________ Phone: _________________
Agency: _________________________________________
File details come from the government source that posted it. Updated .