QandA_TFHRC Laboratory Renovation_07.10.2020.pdf

PDF 117 KB Posted

Attached to
Design-Build Turner-Fairbank Laboratory Renovations
Solicitation number
693JJ320R000018
Issued by

About this file

This document contains questions and answers regarding a two-phase qualifications-based procurement for design-build renovation services at the Turner Fairbank Highway Research Center. The Federal Highway Administration seeks to shortlist three highly qualified offerors to compete in Phase II for the design and construction of laboratory renovations between $1-5 million. Phase I submissions are due by July 20, 2020 and should include an SF330 and evidence of relevant experience. Qualified small businesses are eligible for this set-aside. Renovation services will include architectural, engineering, construction management and general contracting. The contract type will be firm-fixed-price.

View the file

Other files

File Type Posted
693JJ320R000018_0001.pdf PDF
QandA_TFHRC Laboratory Renovation_6.6.2020.pdf PDF
SOW_(RFQ_Draft).docx DOCX document
SF330.pdf PDF
Request for Qualifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 693JJ320R000018

Project Name: Design‐Build Turner‐Fairbank Laboratory Renovations

# Question Answer Date

When is the estimated RFP and site walk release date and can you please provide a list of the interested vendors for this opportunity?

Phase II of the solicitation is expected to be released after selecting the most highly qualified vendors from Phase I. The RFP will contain information regarding site visits. Interested vendor list is available on the Government Point of

Entry www.beta.sam.gov if you "Follow" the contract opportunity.

6/22/20

Paragraph 3.2.1 Specialized Experience states offeror shall submit no more than five (5) projects. If proposing on this effort with a teaming arrangement with a teaming agreement in place between a prime contractor and A/E firm, please confirm past performance of the A/E firm can be submitted to meet this requirement.

Yes. A contractor teaming arrangement, which two or more companies form a partnership or joint venture to act as a potential prime; or a potential prime agrees with one or more companies to have them act as its subcontractor specific to this acquisition "shall provide information demonstrating experience relevant to their role on the submitted project."

6/30/20

The Solicitation documents state that there will be a Base Contract for Design and that the Construction will be performed as options and phases. What is the anticipated term of (1) the Base Contract, and (2) the entire contract including all options for construction?

The design schedule and anticipated completion date of construction will be established during

Phase II of the Design‐Build project solicitation.

6/29/20

In Paragraph 2, Submittal Requirements for

Phase I RFQ, the instructions state: “Phase I proposals shall consist of four (4) Sections, detailed below.” The instructions that follow discuss Factors 1, 2 and 3. Please clarify what the four sections are that are mentioned in this paragraph.

Phase I proposals shall consist of three (3)

Sections. Amendment to follow.

6/29/20

Should we assume that Factor 1 information is to be presented in Section H of the SF330, and that the Organization Chart will NOT count in the 20‐page limit, since it is to be included in Section D of the SF330? Please clarify.

Yes. 6/30/20

Should we include the Past Performance information (one‐page limit) in Section H of the SF330?

Submittal requirements for Past Performance may be submitted under Section H.

6/30/20

Regarding the credentials of the Safety

Representative – Can we assume that OSHA

30 will meet the requirement?

Yes. Credential levels for key personnel will be evalated as appropiate for the task.

6/30/20

Regarding relevant experience – Will a project for the New Construction of several buildings be considered relevant?

Relevant is defined as projects similar to the project in this RFQ in scope, magnitude, and complexity and that have a logical connection with the requirements of this Project.

6/30/20

In order to be considered relevant, do all projects need to have been performed under

Design‐Build contracts, or would a Design‐Bid‐

Build contract performed by the Prime be considered relevant, as well?

No. Per Section 3.2.2, the Offeror submittals will be evaluated "to the extent of recent, relevant experience of the Offeror in design, construction or design build...".

6/30/20

We would like to confirm the meaning of “All

Offerors shall submit the following information for the last 3 consecutive projects which they were prime.” Does this mean the last 3 projects we closed?

Yes. Provide the information requested for the last

3 projects completed.

7/9/20

Does the USDOT require firms to submit

SF330 Parts I and II?

Part II is not required unless a branch office will be utilized in the performance of this requirement.

7/9/20

Does the USDOT want a full and complete

SF330? Per the instructions of the RFP, the

Department did not discuss how/where sections SF330 G‐I should be submitted.

Yes. Provide a completed Part I SF330. 7/9/20

Because this project requires a specialized discipline, can firms submit a project from specialized sub‐consultants in Factor 2 to assist in establishing the team’s capabilities?

Outside consultants may supplement a Prime's capabilities, but shall not be used to meet the minimum qualifications for Factor 2.

7/9/20

Regarding Factor 2 Specialized Experience, how does the design team convey expertise if the projects/experience all comes from the

Prime?

See question/answer #2. 7/9/20

Is it a requirement for the Principal to be

Design‐Build Institute of America (DBIA) certified prior to the submission?

No. 7/9/20