This document is a Results of Bid Opening for a Federal Highway Administration Eastern Federal Lands Highway Division project. The solicitation number is 693C73-26-B-000006 for project WV ERFO FS MNGAH921 2018-1(1) at Monongahela National Forest. The bid opening occurred on April 28, 2026, at 2:00 p.m. local time in Ashburn, VA.

Five bids were received for this construction project, which is divided into three schedules (A, B, and C). The performance period for all schedules combined is 740 calendar days, or if awarded separately: 145 calendar days for Schedule A, 462 calendar days for Schedule B, and 363 calendar days for Schedule C. The bidders and their total combined prices are as follows: Structural Engineering Group, Inc. ($12,375,959.10); ERon Road Construction, LLC ($16,688,337.00); Engineer's Estimate ($16,710,000.00); Kovilic Construction Company, Inc. ($18,394,175.00); and Central Southern Construction Corp. ($21,683,838.10). The low bidder is Structural Engineering Group, Inc. The document notes that the Eastern Federal Lands Highway Division is currently reviewing and verifying all bid information, and the low bidder will be contacted once the thorough review process is completed.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration

Eastern Federal Lands Highway Division

Results of Bid Opening

Monongahela National Forest

PROJECT: WV ERFO FS MNGAH921 2018-1(1)

SOLICITATION NO. 693C73-26-B-000006

April 28, 2026, at 2:00 p.m.

Ashburn, VA

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.

The low bidder will be contacted once a thorough review has been completed.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-26-B-000006

Project: WV ERFO FS MNGAH921 2018-1(1)

April 28, 2026, 2:00 p.m. local time

The performance period for the completion of Schedule A + B + C + 740 calendar days.

The performance period if schedules are awarded separately: 145 calendar days for Schedule A, 462 calendar days for Schedule B, and 363 calendar days for Schedule C.

BIDDER SCHEDULE TOTAL TOTAL PRICE

Central Southern Construction

Corp.

SCHEDULE A

$4,553,496.50

SCHEDULE B

$8,061,789.90

SCHEDULE C

$9,068,551.70

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$21,683,838.10

ERon Road Construction, LLC SCHEDULE A

$946,991.00

SCHEDULE B

$7,803,912.00

SCHEDULE C

$7,937,434.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$16,688,337.00

Kovilic Construction Company, Inc.

SCHEDULE A

$1,180,500.00

SCHEDULE B

$8,174,100.00

SCHEDULE C

$9,039,575.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$18,394,175.00

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-26-B-000006

Project: WV ERFO FS MNGAH921 2018-1(1)

April 28, 2026, 2:00 p.m. local time

The performance period for the completion of Schedule A + B + C + 740 calendar days.

The performance period if schedules are awarded separately: 145 calendar days for Schedule A, 462 calendar days for Schedule B, and 363 calendar days for Schedule C.

BIDDER SCHEDULE TOTAL TOTAL PRICE

Structural Engineering Group, Inc.

SCHEDULE A

$764,406.70

SCHEDULE B

$5,652,024.90

SCHEDULE C

$5,959,527.50

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$12,375,959.10

Engineer’s Estimate SCHEDULE A

$645,000.00

SCHEDULE B

$9,960,000.00

SCHEDULE C

$6,105,000.00

SCHEDULE A + SCHEDULE B + SCHEDULE C =

$16,710,000.00

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.

Slide 1
Slide 2: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-26-B-000006 Project: WV ERFO FS MNGAH921 2018-1(1) April 28, 2026, 2:00 p.m. local time The performance period for the completion of Sch
Slide 3: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-26-B-000006 Project: WV ERFO FS MNGAH921 2018-1(1) April 28, 2026, 2:00 p.m. local time The performance period for the completion of Sch

File details come from the government source that posted it. Updated .