Amendment 0001 - WV ERFO FS MNGAH921 2018-1(1).pdf
PDF 7 MB Posted
- Attached to
- Monongahela National Forest Federal contract opportunity
- Solicitation number
- 693C73-26-B-000006
About this file
This is Amendment No. 0001 to Solicitation 693C73-26-B-000006 for repair and reconstruction work on multiple roads and trails in the Monongahela National Forest in West Virginia. The amendment is issued by the Federal Highway Administration's Eastern Federal Lands Highway Division and was effective March 10, 2026, with a revised bid opening date of April 21, 2026, at 2:00 p.m. EDT.
The amendment accomplishes six primary objectives: (1) provides responses to bidder questions regarding RECP Type 5.F specifications, alternative bypass methods for culverts, coordination with ongoing construction, temporary access road removal, and bid schedule adjustments; (2) includes scoping site visit photographs from December 2021 showing soil nail walls, embankment repairs, revet mattresses, soldier pile walls, MSE walls, and culvert work locations; (3) revises Special Contract Requirements Sections 629 and 713 to add engineered anchor specifications for RECP Type 5.F, including detailed installation procedures for securing pins and earth anchors, material specifications, and performance requirements; (4) updates the Bid Schedule (B-Pages B-1 through B-9) revising pay item 62901-0000 for RECP requirements; (5) revises project plan sheets C02, C03, F08, and K10 with updated callouts and descriptions; and (6) reschedules the bid opening from the original date to April 21, 2026. The contract includes three schedules (A Base, B Option 1, and C Option 2) with performance periods of 145, 462, and 363 calendar days respectively, totaling 740 days if all schedules are awarded simultaneously.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7326B000006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1404/01/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/10/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project WV ERFO FS MNGAH921 2018-1(1)
The purpose of this Amendment is to:
1. Provide a summary of responses to questions and clarifications asked by interested bidders.
2. Provide photos from a Scoping Site Visit held in December 2021.
3. Update the Special Contract Requirements (J Pages) as follows:
a. Revised Sections 629 and 713 of the Special Contract Requirements (J Pages) for the RECP
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 29
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7326B000006/0001 requirement.
4. Update the Solicitation Bid Schedule (B-Pages) pages B-1 through B-9 as follows:
a. Revised the pay item 62901-0000 description in
Schedules B and C for the RECP requirement.
5. Update the project Plans as follows:
a. Revised sheets C02, C03, F08, and K10 for the
RECP requirement.
6. Reschedule the Bid Opening date to April 21, 2026, at 2:00 p.m. EDT.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project WV ERFO FS MNGAH921-2018(1)
Monongahela National Forest
Solicitation: 693C73-26-B-000006
The purpose of this Amendment is to:
1. Provide a summary of responses to questions and clarifications asked by interested bidders.
2. Provide photos from a Scoping Site Visit held in December 2021.
3. Update the Special Contract Requirements (J Pages) as follows:
a. Revised Sections 629 and 713 of the Special Contract Requirements (J Pages) for the
RECP requirement.
4. Update the Solicitation Bid Schedule (B-Pages) pages B-1 through B-9 as follows:
a. Revised the pay item 62901-0000 description in Schedules B and C for the RECP requirement.
5. Update the project Plans as follows:
a. Revised sheets C02, C03, F08, and K10 for the RECP requirement.
6. Reschedule the Bid Opening date to April 21, 2026, at 2:00 p.m. EDT.
Bidders Questions Page 1 of 2
Questions / Clarifications
The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The
Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. We cannot find any specifications referencing RECP type 5.F and engineered anchors in either the FHWA FP-14 or the project specifications. Can you please provide more information on this?
Response: Yes. See the updated plans and SCRs for more information on RECP Type 5.F with and without engineered anchors.
2. The project plans indicate that the proposed culvert at TR312 MP1.0 is to use E-157-09 to bypass stream flow using a pump. The detail requires the pump to be able to accommodate the
2-year flow. The hydraulic report for this site indicates the 2-year event is 60 cfs. There is no reasonable way to pump 60 cfs. This would require multiple 12” pumps. Will FHWA consider alternative bypass methods for this location?
Response: Yes, an alternative bypass method could be considered. Any proposed method will require prior approval and justification, along with documentation demonstrating compliance with E&SC, flow maintenance and required capacity.
3. During our site visit, several locations were not accessible due to ongoing construction and road closure signage at the Canaan Loop Trail. Could FHWA provide photos of these areas, along with additional information on the current construction activities, anticipated completion timeline, and whether coordination with other contractors will be required during our work?
Response: The current contractor on Canaan Loop Road (FSR 13) has an anticipated completion date of 04/18/2026. There are other upcoming contracts across the Forest that will require coordination between the Forest, its contractors, FHWA, and its contractors.
Photos from the Scoping Site Visit in 12/2021 have been provided.
4. Additionally, some locations include soil nails and soldier pile walls, which would require mobilizing drill shaft equipment uphill. If temporary stone access roads are needed to reach these areas, should they be removed upon completion of the project?
Response: Yes, any temporary road needs to be removed, and the location restored to previous conditions.
mailto:eflhd.contracts@dot.gov
Bidders Questions Page 2 of 2
5. The bid date for this project is during spring break activities for a lot of suppliers and sub-contractors in the area. We are not getting a lot of interest in this project due people being out of town at that time. Is it possible to get a bid extension for the above referenced project?
Response: Yes. The bid opening is being rescheduled to April 21, 2026, at 2:00 PM EDT with this Amendment.
6. This is from Sheet 3 of 3 TABULATION OF QUANTITIES. I assume that this is the drilled shafts to set the soldier beams for the Wall in Schedule C. That wall has 54 h-piles that are 25’ long each. If the drilled shaft bid quantity is 355 LF, that is about 6’ per shaft. I think it should be more like 1,355…
Response: The quantity for the drilled shafts in Schedule C has been verified and is correct.
The bidder’s calculation was off because they assumed 54 piles. For site 2019-1.8 (Sheets
F06, G06, and R16), the estimated total for the structural steel pile is 495 LNFT, which equates to roughly 20 piles (at 25 feet each). Furthermore, 7 feet of the 25-foot H-pile is exposed. The drilled shaft pay item only accounts for the embedded portion and does not include the 7 feet exposed. Therefore, 355 LNFT is sufficient.
DSR 2019-1.5 – FSR 13:
DSR 2019-1.5 – FSR 13:
Soil Nail Wall
Soil Nail Wall
Amendment 0001 Scoping Site Visit Photos
DSR 2019-1.6 – FSR 13 Embankment repairs with riprap and geotextile lining
Amendment 0001
DSR 2019-1.7 – FSR 13:
DSR 2019-1.7 – FSR 13:
Revet Mattress
Revet Mattress
DSR 2019-1.8 – FSR 13:
DSR 2019-1.8 – FSR 13:
Soldier Pile Wall
Soldier Pile Wall
DSR 2019-1.8 – FSR 13: Soldier Pile Wall
DSR 2019-1.10 – FSR 13: Embankment repairs with riprap and geotextile lining MSE Wall with Gabion Facing
DSR 2019-1.11 – FSR 13 Remove stacked culverts, install box culvert, repair roadway
DSR 2019-1.11 – FSR 13 Remove stacked culverts, install box culvert, repair roadway
Special Contract Requirements Page 1 of 3
Changes to the Special Contract Requirements
1. Revise Special Contract Requirements Section 629 on page J-20 as follows:
629.05. Delete the title of the Subsection and substitute the following:
629.05 Erosion Control Blanket and Turf Reinforcement Mat Type (RECP, Types 1.B, 1.C, 1.D, 2.B, 2.C, 2.D, 3.B, 4, 5.A, 5.B,5.C, and 5.F)
629.05. Add the following after the fourth paragraph:
Support RECP with engineered anchors in accordance with an approved design developed according to Section 257.
629.05(a). Add the following:
(4) Engineered Anchors. Secure RECP Type 5.F to the slope with securing pins and engineered earth anchors.
The securing pins are devices designed to temporarily hold the RECP Type 5.F in place during installation until the engineered earth anchors are installed, or the establishment of vegetation occurs. The engineered anchors are devices designed to permanently stabilize soil via a metal anchor, flexible or rigid tendon, and a load bearing plate. The anchor and tendon are driven through the RECP to the specified depth and then tensioned appropriately to load-lock the anchor for desired pull-out resistance.
Install the RECP Type 5.F mat 36 inches beyond the edge of the slope shoulder and the edges of the treated area onto flat final grade. Secure with a single row of securing pins on 12-inch intervals in between the engineered earth anchors at 48-inch intervals. Unroll the RECP down the slope. Secure the RECP initially with the securing pins driven flush with the RECP at the designated frequency based on the engineered earth armoring surficial slope stability or erosion control requirements. Install the engineered earth anchors at depth, spacing and loading shown in the submittal approved by the CO. Cut a
2 to 4-inch-long slot on the mat to pass the anchor at each location, push the anchor to full depth, retrieve the push rod, and pull back the anchor tendon to fully deploy and engage the anchor bearing plate. Tightly secure each anchor on the mat with washers and the bearing plate.
Position adjacent up gradient rolls in same manner, overlapping down gradient rolls a minimum of 3 inches. until the project limits are completed. Secure the overlaps with securing pins at 12-inch intervals in between the engineered earth anchors placed at intervals based on the engineered earth armoring surficial slope stability or erosion control requirements. Secure the RECP Type 5.F at the toe of slope and longitudinal limits trenches with securing pins and engineered earth anchors.
Special Contract Requirements Page 2 of 3
Predrill or pre-bore holes for anchor installation in hard cemented sands or cobbles as approved by the CO. Casing shall be used for anchors in unstable cohesionless soils.
Casing shall be sufficiently rigid to keep the borehole from collapsing and allow casing retrieval upon anchor installation. Ensure casing is stopped short of full anchor depth.
Ensure that the difference between the casing length and the required anchor length is equal to anchor total length minus twice the length of the anchor bearing plate to allow for bearing plate rotation and anchor deployment.
Use drilled or bored holes to install anchors in gravelly soils, cobbles, boulders, or other buried obstacles. Do not install engineered anchors in boulders or rock. Replace engineered anchors that occur in boulders or rock with drilled anchors as approved by the
CO. It is the Contractor's responsibility to provide equipment capable of penetrating to the required depth. If engineered anchors are used in combination with drilled holes, ensure drilled hole diameter is greater than the engineered anchor bearing plate width.
Progress holes without noticeable subsiding of the surrounding ground surface. If noticeable subsidence occurs, stop work and consult with the CO. Before continuing to progress the hole, propose a scheme for progressing the work without subsidence as approved by the CO.
Retrieve the casing after each anchor has been installed and deployed at the required depth. Backfill void between the anchor rod and the casing with sand as the casing is retrieved. Ensure backfilling is done simultaneously with casing extraction. All extracted casings remain the property of the Contractor.
Backfill and compact trenches for installation with specified soil or as directed by the earthwork technical specifications or as directed by the CO.
Establish permanent vegetation, where feasible, to assist in the long-term performance of the RECP Type 5.F solution and the control of erosion. Vegetation establishment should be included in the Contractor submittal and approved by the CO.
2. Revise Special Contract Requirements Section 713 on page J-31 as follows:
713.18. Delete Table 713-4 and substitute the following:
Table 713-4
Turf Reinforcement Mats
Properties (1) Test Method Rolled Erosion Control Product Type
5.A 5.B 5.C 5.F
Minimum tensile strength (2) (3)
ASTM D4595 125 lb/ft
(1.82 kN.m)
150 lb/ft
(2.19 kN/m)
175 lb/ft
(2.55 kN/m)
3,000 lb/ft
(43.8 kN/m)
UV stability
(minimum % tensile retention)
ASTM D4355
(500-hour exposure)
80 80 80 90
Special Contract Requirements Page 3 of 3
Table 713-4
Turf Reinforcement Mats
Properties (1) Test Method Rolled Erosion Control Product Type
5.A 5.B 5.C 5.F
Minimum thickness (2) ASTM D6525 ¼ in
(6.35 mm)
¼ in
(6.35 mm)
¼ in
(6.35 mm)
0.45 in
(11.43 mm)
Maximum gradient for slope applications
- 2V:1H 2V:1H 2V:1H 1V:1.5H
Minimum shear stress for channel applications (4)
ASTM D6460
or other qualified independent test (5)
60 lb/ft2
(288 Pa)
8.0 lb/ft2
(384 Pa)
10.0 lb/ft2
(480 Pa)
15.0 lb/ft2
(575 Pa)
(1) For turf reinforcement mats containing degradable components, obtain property values on the non-degradable portion of the matting alone.
(2) Minimum average roll values, machine direction only.
(3) Field conditions with high loading and high survivability requirements may warrant the use of turf reinforcement mats with tensile strengths of 3,000 pounds per foot (44 kilonewtons per meter) or greater.
(4) Minimum shear stress the turf reinforcement mat (fully vegetated) can sustain without physical damage or excess erosion (> 1⁄2-inch (> 12.7-millimeter) soil loss) during a 30-minute flow event in large-scale testing.
These performance test values should be supported by periodic bench scale testing under similar test conditions and failure criteria using Erosion Control Technology Council, Test Method #3.
(5) Other large-scale test methods determined acceptable by the CO.
BID SCHEDULE
Project No : WV ERFO FS MNGAH921 2018-1 (1)
Schedule : A
Project Name : Repair storm & flood damage on multiple roads & trails, including bridge replacement and slides
Schedule Type : Base
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION ALL LPSM
A1010 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
A1020 15401-0000 CONTRACTOR
TESTING ALL LPSM
A1030 15702-6000
SOIL EROSION
CONTROL,
TEMPORARY STREAM
DIVERSION
ALL LPSM
A1040 15706-0200
SOIL EROSION
CONTROL, CHECK
DAM
6.000 EACH
A1050 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL LPSM
A1060 20103-0000 CLEARING AND
GRUBBING 2,750.000 SQYD
A1070 20301-1900 REMOVAL OF PIPE
CULVERT 6.000 EACH
A1080 20401-0000 ROADWAY
EXCAVATION 180.000 CUYD
A1090 20820-0000 DEWATERING ALL LPSM
A1100 25102-0200 PLACED RIPRAP,
METHOD A, CLASS 2 265.000 TON
A1110 25102-0300 PLACED RIPRAP,
METHOD A, CLASS 3 30.000 TON
A1120 30110-0000 AGGREGATE
SURFACE COURSE 680.000 TON
A1130 30302-1000 DITCH
RECONDITIONING 1,610.000 LNFT
A1140 30303-2000
AGGREGATE
SURFACE
RECONDITIONING
2,045.000 SQYD
A1150 60103-1920
CONCRETE,
HEADWALL FOR 24-
INCH EQUIVALENT
DIAMETER PIPE
CULVERT
3.000 EACH
A1160 60103-1940
CONCRETE,
HEADWALL FOR 30-
INCH EQUIVALENT
DIAMETER PIPE
CULVERT
1.000 EACH
A1170 60103-1960
CONCRETE,
HEADWALL FOR 36-
INCH EQUIVALENT
DIAMETER PIPE
CULVERT
(33-INCH
EQUIVALENT)
2.000 EACH
A1180 60202-0400
24-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
70.000 LNFT
B-1Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge replacement and slides
A1190 60202-0500
30-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
33.000 LNFT
A1200 60202-0600
36-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
(33-INCH
EQUIVALENT) 57.000 LNFT
A1210 62502-0000 TURF
ESTABLISHMENT 2,565.000 SQYD
A1220 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
A1230 63701-0000 FIELD OFFICE 1.000 EACH
Submitted By: Schedule Total:
B-2Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge
(1)
Schedule : B
Project Name : Repair storm & flood damage on multiple roads & trails, including bridge replacement and slides
Schedule Type : Option
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
B1000 15101-0000 MOBILIZATION ALL LPSM
B1010 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
B1020 15401-0000 CONTRACTOR
TESTING ALL LPSM
B1030 15702-4000
SOIL EROSION
CONTROL, FILTER
BAG
ALL LPSM
B1040 15702-5000
SOIL EROSION
CONTROL,
TEMPORARY
DIVERSION BERM
ALL LPSM
B1050 15702-6000
SOIL EROSION
CONTROL,
TEMPORARY STREAM
DIVERSION
ALL LPSM
B1060 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
1,915.000 LNFT
B1070 15706-0200
SOIL EROSION
CONTROL, CHECK
DAM
6.000 EACH
B1080 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL LPSM
B1090 20103-0000 CLEARING AND
GRUBBING 13,130.000 SQYD
B1100 20301-0300 REMOVAL OF BOX
CULVERT 1.000 EACH
B1110 20301-0400 REMOVAL OF BRIDGE (TIMBER TRAIL
BRIDGE) 2.000 EACH
B1120 20301-1900 REMOVAL OF PIPE
CULVERT 4.000 EACH
B1130 20303-1600 REMOVAL OF
PAVEMENT, ASPHALT 1,315.000 SQYD
B1140 20401-0000 ROADWAY
EXCAVATION 10,940.000 CUYD
B1150 20410-0000 SELECT BORROW 4,460.000 CUYD
B1160 20420-0000 EMBANKMENT
CONSTRUCTION 100.000 CUYD
B1170 20703-2000 GEOGRID,
STABILIZATION 24,500.000 SQYD
B1180 20801-0000 STRUCTURE
EXCAVATION 165.000 CUYD
B1190 20820-0000 DEWATERING ALL LPSM
B1200 25102-0200 PLACED RIPRAP,
METHOD A, CLASS 2 130.000 TON
B1210 25102-0300 PLACED RIPRAP,
METHOD A, CLASS 3 35.000 TON
B-3Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge
B1220 25102-0400 PLACED RIPRAP,
METHOD A, CLASS 4 585.000 TON
B1230 25102-0500 PLACED RIPRAP,
METHOD A, CLASS 5 65.000 TON
B1240 25701-0600
CONTRACTOR
FURNISHED
REINFORCED SOIL
SLOPE DESIGN
ALL LPSM
B1250 26303-0000 CONCRETE LAGGING 5,955.000 SQFT
B1260 30101-4000 AGGREGATE BASE
GRADING C OR D 700.000 TON
B1270 30110-0000 AGGREGATE
SURFACE COURSE 270.000 TON
B1280 30302-1000 DITCH
RECONDITIONING 1,535.000 LNFT
B1290 30303-2000
AGGREGATE
SURFACE
RECONDITIONING
475.000 SQYD
B1300 40301-0100 ASPHALT CONCRETE
PAVEMENT, TYPE 1 230.000 TON
B1310 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
20.000 CUYD
B1320 55401-2000 REINFORCING STEEL,
EPOXY COATED 1,600.000 LB
B1330 55505-0000 STRUCTURAL STEEL
SOLDIER PILE 2,970.000 LNFT
B1340 55601-1300 BRIDGE RAILING,
TIMBER 170.000 LNFT
B1350 55701-2000
STRUCTURAL TIMBER
AND LUMBER,
TREATED
6.000 MFBM
B1360 56401-0000 BEARING DEVICE 10.000 EACH
B1370 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER 2,150.000 LNFT
B1380 60103-0140
CONCRETE,
HEADWALL FOR 24-
INCH PIPE CULVERT
2.000 EACH
B1390 60103-0260
CONCRETE,
HEADWALL FOR 60-
INCH PIPE CULVERT
2.000 EACH
B1400 60201-0400 12-INCH PIPE
CULVERT 11.000 LNFT
B1410 60201-0800 24-INCH PIPE
CULVERT 48.000 LNFT
B1420 60201-1400 60-INCH PIPE
CULVERT 97.000 LNFT
B1430 60202-0600
36-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
35.000 LNFT
B1440 60502-0000
GEOCOMPOSITE
UNDERDRAIN
SYSTEM
545.000 LNFT
B1450 60704-0000 CLEANING CULVERT
IN PLACE 1.000 EACH
B1460 61010-0000 DRAINAGE WEEP
HOLE 11.000 EACH
B1470 62502-0000 TURF
ESTABLISHMENT 11,580.000 SQYD
B1480 62901-0000 ROLLED EROSION
CONTROL PRODUCT 2,750.000 SQYD
B1490 62903-0000
CELLULAR
CONFINEMENT
SYSTEM
20.000 SQYD
B1500 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
B-4Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge replacement and slides
A001
Submitted By: Schedule Total:
B-5Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge
(1)
Schedule : C
Project Name : Repair storm & flood damage on multiple roads & trails, including bridge replacement and slides
Schedule Type : Option
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
C1000 15101-0000 MOBILIZATION ALL LPSM
C1010 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
C1020 15401-0000 CONTRACTOR
TESTING ALL LPSM
C1030 15702-4000
SOIL EROSION
CONTROL, FILTER
BAG
ALL LPSM
C1040 15702-5000
SOIL EROSION
CONTROL,
TEMPORARY
DIVERSION BERM
ALL LPSM
C1050 15702-6000
SOIL EROSION
CONTROL,
TEMPORARY STREAM
DIVERSION
ALL LPSM
C1060 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
1,190.000 LNFT
C1070 15706-0200
SOIL EROSION
CONTROL, CHECK
DAM
14.000 EACH
C1080 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL LPSM
C1090 20103-0000 CLEARING AND
GRUBBING 14,720.000 SQYD
C1100 20301-0400 REMOVAL OF BRIDGE (STEEL TRAIL
BRIDGE) 2.000 EACH
C1110 20301-0400 REMOVAL OF BRIDGE (TIMBER TRAIL
BRIDGE) 1.000 EACH
C1120 20301-1900 REMOVAL OF PIPE
CULVERT 10.000 EACH
C1130 20304-8000
REMOVAL OF
WINGWALL
CONCRETE
ALL LPSM
C1140 20401-0000 ROADWAY
EXCAVATION 3,665.000 CUYD
C1150 20402-0000 SUBEXCAVATION 720.000 CUYD
C1160 20410-0000 SELECT BORROW 1,090.000 CUYD
C1170 20420-0000 EMBANKMENT
CONSTRUCTION 665.000 CUYD
C1180 20421-0000 ROCK EXCAVATION 17.000 CUYD
C1190 20703-2000 GEOGRID,
STABILIZATION 425.000 SQYD
C1200 20801-0000 STRUCTURE
EXCAVATION 550.000 CUYD
C1210 20802-0000 FOUNDATION FILL 100.000 CUYD
B-6Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge
C1220 20803-0000 STRUCTURAL
BACKFILL 220.000 CUYD
C1230 20820-0000 DEWATERING ALL LPSM
C1240 25102-0200 PLACED RIPRAP,
METHOD A, CLASS 2 1,295.000 TON
C1250 25102-0300 PLACED RIPRAP,
METHOD A, CLASS 3 122.000 TON
C1260 25102-0400 PLACED RIPRAP,
METHOD A, CLASS 4 970.000 TON
C1270 25102-0500 PLACED RIPRAP,
METHOD A, CLASS 5 210.000 TON
C1280 25102-0600 PLACED RIPRAP,
METHOD A, CLASS 6 300.000 TON
C1290 25302-1000
GABIONS,
GALVANIZED OR
ALUMINIZED COATED
30.000 CUYD
C1300 25302-2000 GABIONS, POLYVINYL
CHLORIDE COATED 172.000 CUYD
C1310 25305-1000
REVET MATTRESS,
GALVANIZED OR
ALUMINIZED COATED
380.000 SQYD
C1320 25501-2000
MECHANICALLY
STABILIZED EARTH
WALL, GABION FACE
2,125.000 SQFT
C1330 25801-0000
REINFORCED
CONCRETE
RETAINING WALL
580.000 SQFT
C1340 25902-0000 SOIL NAIL RETAINING
WALL 745.000 SQFT
C1350 25903-0000 VERIFICATION TEST
NAIL 8.000 EACH
C1360 26303-0000 CONCRETE LAGGING 1,250.000 SQFT
C1370 30101-4000 AGGREGATE BASE
GRADING C OR D 685.000 TON
C1380 30110-0000 AGGREGATE
SURFACE COURSE 835.000 TON
C1390 30302-1000 DITCH
RECONDITIONING 2,135.000 LNFT
C1400 30303-2000
AGGREGATE
SURFACE
RECONDITIONING
1,510.000 SQYD
C1410 55115-1000 PREBORING 42.000 LNFT
C1420 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
100.000 CUYD
C1430 55401-2000 REINFORCING STEEL,
EPOXY COATED 17,900.000 LB
C1440 55504-0000 PRE-FABRICATED
STEEL BRIDGE ALL LPSM
C1450 55505-0000 STRUCTURAL STEEL
SOLDIER PILE 495.000 LNFT
C1460 55601-1300 BRIDGE RAILING,
TIMBER 160.000 LNFT
C1470 55701-2000
STRUCTURAL TIMBER
AND LUMBER,
TREATED
5.000 MFBM
C1480 56401-0000 BEARING DEVICE 6.000 EACH
C1490 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER 355.000 LNFT
C1500 60103-0100
CONCRETE,
HEADWALL FOR 18-
INCH PIPE CULVERT
1.000 EACH
C1510 60103-0140
CONCRETE,
HEADWALL FOR 24-
INCH PIPE CULVERT
2.000 EACH
B-7Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge
C1520 60103-0160
CONCRETE,
HEADWALL FOR 30-
INCH PIPE CULVERT
3.000 EACH
C1530 60103-1940
CONCRETE,
HEADWALL FOR 30-
INCH EQUIVALENT
DIAMETER PIPE
CULVERT
(27-INCH
EQUIVALENT)
2.000 EACH
C1540 60103-1960
CONCRETE,
HEADWALL FOR 36-
INCH EQUIVALENT
DIAMETER PIPE
CULVERT
2.000 EACH
C1550 60201-0800 24-INCH PIPE
CULVERT 58.000 LNFT
C1560 60201-0900 30-INCH PIPE
CULVERT 65.000 LNFT
C1570 60202-0500
30-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
(27-INCH
EQUIVALENT) 60.000 LNFT
C1580 60202-0600
36-INCH EQUIVALENT
DIAMETER ARCH OR
ELLIPTICAL PIPE
CULVERT
30.000 LNFT
C1590 60502-0000
GEOCOMPOSITE
UNDERDRAIN
SYSTEM
120.000 LNFT
C1600 60704-0000 CLEANING CULVERT
IN PLACE 5.000 EACH
C1610 61010-0000 DRAINAGE WEEP
HOLE 4.000 EACH
C1620 62502-0000 TURF
ESTABLISHMENT 10,350.000 SQYD
C1630 62901-0000 ROLLED EROSION
CONTROL PRODUCT 65.000 SQYD
C1640 62903-0000
CELLULAR
CONFINEMENT
SYSTEM
11.000 SQYD
C1650 63501-0000 TEMPORARY TRAFFIC
CONTROL ALL LPSM
Submitted By: Schedule Total:
B-8Bid Schedule Project: WV ERFO FS MNGAH921 2018-1(1), Repair storm & flood damage on multiple roads & trails, including bridge replacement and slides
A001
B - 9
BID SUMMARY
Project WV ERFO FS MNGAH921 2018-1(1)
(1) Schedule A (Base Contract) Bid Total (from Page B-2) = (1) $
(2) Schedule B (Government Option 1) Bid Total (from Page B-5) = (2) $
(3) Schedule C (Government Option 2) Bid Total (from Page B-8) = (3) $
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $
Maximum Time Allowed for the Contract if Schedules A, B, and C are Awarded at the Same
Time:
If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 740 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all
Schedule A work will be 145 calendar days and will start on the effective date of Schedule A’s Notice to
Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 462 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 363 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
Yes No Does the Bidder claim the Price Evaluation Preference for HUBZone
Small Business Concerns as defined in FAR Provision 52.219-4? ☐ ☐
Title Sheet
Symbols And Abbreviations
Location Maps
Horizontal Alignment Information
Typical Sections
Erosion and Sediment Control Narrative
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED FOR
US DEPARTMENT OF AGRICULTURE
WEST VIRGINIA
GRANT, POCAHONTAS, RANDOLPH, TUCKER, AND WEBSTER COUNTIES
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH:
SPECIFICATIONS:
DESIGN DESIGNATION:
PROJECT WV ERFO FS MNGAH921 2018-1(1)
MONONGAHELA NATIONAL FOREST
U.S. FOREST SERVICE
other miscellaneous work trail repairs including bridge replacement, and and ditch reconditioning, culvert replacement, Work includes repair of slope failures, shoulder
1.26 Miles
Know what'sbelow.
before you dig.Call
R
U.S. Department of Transportation
Administration
Federal Highway
SHEET
NO
A01
A02-A03
A04-A05
A06-A08
B01-B04
D01-D03
LANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
Project Manager Highway Design Manager
DECEMBER 2025
Tabulation of Quantities
PLANS PREPARED BY
C04-C12
M01
N
AND RECONSTRUCTION
AND TRAIL SECTIONS, BRIDGE REPLACEMENT
RECONSTRUCTION OF DAMAGED ROADWAY
1.26 Miles
R01-R16 Bridge Plans
A09-A14
Survey Information
S01-S23 Standards and Details
C01-C03
Summaries and Schedules
N01-N03 Temporary Traffic Control Narrative
M02-M14 Erosion and Sediment Control Plans
811 or 800-245-4848
Culvert Cross SectionsK01-K20
WV ERFO FS MNGAH921 2018-1(1)
SCALE IN MILES
40200
Match existinge(max)
NoneC/A
<5% %Trucks
30 vphDHV:
25 mphV(MPH)
<100ADT(2043)
<100ADT(2023)
Plan-Profiles, Schedule A
T01-T106 Cross Sections
Plan-Profiles, Schedule B
Plan-Profiles, Schedule C
E01-E07
F01-F15
N
KEY MAP
STATE OF WEST VIRGINIA
Charleston
Parkersburg
Elkins
Logan
Hinton
0 6060
SCALE IN MILES
WV ERFO FS MNGAH921 2018-1(1)
PROJECT
Wall Profiles G01-G09
Lead Designers
Anne Toma (WSP USA) Brian Johnson (WSP USA)Rachel Wright (FHWA)Ramesh Kotadia (FHWA/EFLHD)
Aggregate Surface9' ±1.0TR 312
Aggregate Surface9' ±0.2FSR 90
Aggregate Surface5' ±0.1TR 111
Asphalt Surface14' ±16.0
Asphalt Surface14' ±15.9
FSR 86
Aggregate Surface5' ±1.2TR487
Asphalt Surface14' ±7.1FSR 86
Aggregate Surface10' ±4.144
Aggregate Surface10' ±2.645
Aggregate Surface10' ±2.618
Aggregate Surface10' ±4.026
FSR 102
TYPE
SURFACE LAYER
WIDTH
POST
MILE
NAME
ROUTE
DISASTER NO. WV2018-1-FS, WV2018-2-FS, WV2019-1-FS
on Forest Service Projects, 2014"
"Standard Specification for Construction of Trails
C02 REVISED DESCRIPTION 3/26/26 BPJ
1 C03 REVISED DESCRIPTION 3/26/26 BPJ
1 F08 REVISED CALLOUT 3/26/26 BPJ
1 K10 REVISED CALLOUT 3/26/26 BPJ
D
I m p e r i a l S h e e t c b m s \w s p u s p w
\d
\A
W
V E
R F
O F
S M
N G
A H tt l.
d g n :1
A
M
M a r c h
A01
NUMBER
SHEET
PROJECT
2018-1(1)
WV ERFO FS MNGAH921
WV
STATE
DATE INITIALREVISIONSHEETMARK
AGRICULTURE
ECREMMOC
E E
S S
E
NNET F
O
E
T A
T S
R E
E
NI
GNE DERE
TSI
G E
R
732801 .ON
N O
S
NHOJ .P
N
AI
R
B
H
CI
W
O
NAMOR .P S
A
M O
H T
E E
S S
E
NNET F
O
E
T A
T S
AGRICULTURE
ECREMMOC
R E
E
NI
GNE DERE
TSI
G E
R
275421 .ON
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITIES
MONONGAHELA NATIONAL FOREST
(SHEET 2 OF 3)
SCHEDULE B
REVISED DESCRIPTION
NO. DATE BY REVISIONS
3/26/26
BPJ
:1
M a r c h
P la n
S h e b m s \w s p u s p w
\d
\C
W
V E
R F
O F
S M
N G
A H q ty
.d g n
STATE PROJECT
NUMBER
SHEET
WV
2018-1(1)
WV ERFO FS MNGAH921
C02
AGRICULTURE
ECREMMOC
E E
S S
E
NNET F
O
E
T A
T S
R E
E
NI
GNE DERE
TSI
G E
R
732801 .ON
N O
S
NHOJ .P
N
AI
R
B
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITIES
MONONGAHELA NATIONAL FOREST
(SHEET 3 OF 3)
SCHEDULE C
REVISED DESCRIPTION
2,600SQYD
INCH DEPTH
AGGREGATE BASE GRADING C OR D, 6-
30102-2000C1350
4,750SQFTCONCRETE LAGGING 26303-0000C1340
2,000SQFTSOIL NAIL RETAINING WALL 25902-0000C1330
525SQFT
WALL
REINFORCED CONCRETE RETAINING
25801-0000C1320
1,750SQFT
GABION FACE
MECHANICALLY STABILIZED EARTH WALL,
25501-2000C1310
40CUYDGABIONS, POLYVINYL CHLORIDE COATED 25302-2000C1300
16.8TONPLACED RIPRAP, METHOD B, CLASS 9 25102-2900C1290
7TONPLACED RIPRAP, METHOD A, CLASS 6 25102-0600C1280
1,260TONPLACED RIPRAP, METHOD A, CLASS 5 25102-0500C1270
37.8TONPLACED RIPRAP, METHOD A, CLASS 4 25102-0400C1260
25.2TONPLACED RIPRAP, METHOD A, CLASS 3 25102-0300C1250
46.2TONPLACED RIPRAP, METHOD A, CLASS 2 25102-0200C1240
1,260TONPLACED RIPRAP, METHOD A, CLASS 1 25102-0100C1230
ALLLPSMDEWATERING 20820-0000C1220
105CUYDSTRUCTURE EXCAVATION 20801-0000C1210
35SQYDGEOCELL 20707-0000C1200
500SQYDGEOGRID, STABILIZATION 20703-2000C1190
2,850SQYD
CLASS 2, TYPE C
SEPARATION-STABILIZATION GEOTEXTILE,
20701-0800C1180
1,300CUYDBACKFILL, SELECT GRANULAR 20435-1000C1170
18CUYDROCK EXCAVATION 20421-0000C1160
290CUYDEMBANKMENT CONSTRUCTION 20420-0000C1150
4,100CUYDROADWAY EXCAVATION 20401-0000C1140
ALLLPSMREMOVAL OF WINGWALL CONCRETE 20304-8000C1130
80SQYDREMOVAL OF WALL 20303-3600C1120
22EACHREMOVAL OF PIPE CULVERT 20301-1900C1110
2EACHREMOVAL OF BRIDGE 20301-0400C1100
1EACHREMOVAL OF BOX CULVERT 20301-0300C1090
7,250SQYDCLEARING AND GRUBBING 20103-0000C1080
17EACHSOIL EROSION CONTROL, FILTER BAG 15706-2200C1070
2,400EACHSOIL EROSION CONTROL, SANDBAG 15706-0300C1060
15EACHSOIL EROSION CONTROL, CHECK DAM 15706-0200C1050
1,100LNFTSOIL EROSION CONTROL, SILT FENCE 15705-0100C1040
ALLLPSM
STREAM DIVERSION
SOIL EROSION CONTROL, TEMPORARY
15702-6000C1030
ALLLPSMCONTRACTOR TESTING 15401-0000C1020
ALLLPSMCONSTRUCTION SURVEY AND STAKING 15201-0000C1010
ALLLPSMMOBILIZATION 15101-0000C1000
Bid Schedule
Quantities Estimated
UnitPay Item Description Number Pay Item
No.
Item Line
950CUYD
RECONSTRUCTION
MITIGATION, STREAMBED CHANNEL
64704-1600C1660
3EACHREMOVE AND REPLACE (BRIDGE)64620-0000C1650
ALLLPSMTEMPORARY TRAFFIC CONTROL 63501-0000C1640
4,300SQYDTURF ESTABLISHMENT 62502-0000C1630
8EACHTERMINAL SECTION TYPE TANGENT 61702-0800C1620
430LNFT
STEEL OR WOOD POSTS
GUARDRAIL SYSTEM G4, TYPE 4, CLASS B
61701-2050C1610
2EACHCLEANING CULVERT IN PLACE 60704-0000C1600
38LNFT
REINFORCED CONCRETE BOX CULVERT
8 FEET SPAN, 4 FEET RISE PRECAST
60220-1800C1590
38LNFT
REINFORCED CONCRETE BOX CULVERT
4 FEET SPAN, 4 FEET RISE PRECAST
60220-0350C1580
90LNFT48-INCH PIPE CULVERT 60201-1200C1570
30LNFT30-INCH PIPE CULVERT 60201-0900C1560
310LNFT24-INCH PIPE CULVERT 60201-0800C1550
45LNFT18-INCH PIPE CULVERT 60201-0600C1540
1EACH
CULVERT
CONCRETE, HEADWALL FOR 72-INCH PIPE
60103-0300C1530
1EACH
CULVERT
CONCRETE, HEADWALL FOR 30-INCH PIPE
60103-0160C1520
18EACH
CULVERT
CONCRETE, HEADWALL FOR 24-INCH PIPE
60103-0140C1510
12EACHBEARING DEVICE 56401-0000C1500
9MFBM
TREATED
STRUCTURAL TIMBER AND LUMBER,
55701-2000C1490
175LNFTBRIDGE RAILING, TIMBER 55601-1300C1480
2,900LNFTSTRUCTURAL STEEL SOLDIER PILE 55505-0000C1470
4,000LBREINFORCING STEEL, EPOXY COATED 55401-2000C1460
25CUYDPRECAST STRUCTURAL CONCRETE 55210-0000C1450
32CUYDSTRUCTURAL CONCRETE, CLASS A (AE) 55201-0200C1440
1,500SQYD
DEPTH
AGGREGATE-TOPSOIL COURSE, 6-INCH
31302-0600C1430
200SQYD
DEPTH
AGGREGATE-TOPSOIL COURSE, 4-INCH
31302-0400C1420
1,750SQYDAGGREGATE SURFACE RECONDITIONING 30303-2000C1410
625SQYDROADBED RECONDITIONING 30303-1000C1400
2,400LNFTDITCH RECONDITIONING 30302-1000C1390
55CUYDBEDDING AND BACKFILL AGGREGATE 30210-0000C1380
175SQYD
DEPTH
AGGREGATE SURFACE COURSE, 6-INCH
30111-2000C1370
2,000SQYD
DEPTH
AGGREGATE SURFACE COURSE, 4-INCH
30111-1000C1360
Bid Schedule
Quantities Estimated
UnitPay Item Description Number Pay Item
No.
Item Line
:5
M a r c h
P la n
S h e b m s \w s p u s p w
\d
\C
W
V E
R F
O F
S M
N G
A H q ty
.d g n
STATE PROJECT
NUMBER
SHEET
WV
2018-1(1)
WV ERFO FS MNGAH921
C03
AGRICULTURE
ECREMMOC
E E
S S
E
NNET F
O
E
T A
T S
R E
E
NI
GNE DERE
TSI
G E
R
732801 .ON
N O
S
NHOJ .P
N
AI
R
8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00
3,228 3,228
3,230 3,230
3,232 3,232
3,234 3,234
3,236 3,236
3,238 3,238
3,240 3,240
3,242 3,242
3,244 3,244
3,246 3,246
3,248 3,248
3,250 3,250
3,252 3,252
3,254 3,254
3,256 3,256
3,258 3,258
3,260 3,260
13+50 14+00 14+50
-1.58% -1.20%
-1.20% +0.78%
.8
E
L
.6
V
P I
.7
L
.8
V
P I
' VC50
133K =
' VC74
37K =
,2
.5
ELEV. 3246.56
10+30.00
LOCATION FSR 13 MP 10.5
BEGIN PROJECT
Existing Ground
Proposed Profile Grade
Gravel Road Reconstruction
8' Span x 5' Rise RCBC
FSR 13 (LOOP RD.)
11+41.00 @ 30°00'00" SKEW RT.
Culverts
Remove Ex. Stacked ELEV. 3244.02
12+90.00
LOCATION FSR 13 MP 10.5
END PROJECT
5 - 21 1/2" D.I. PIPE
E=1947383.3113
N=209597.0525
10+30.00
LOCATION FSR 13 MP 10.5
BEGIN PROJECT
E=1947381.5953
N=209853.4261
12+90.00
LOCATION FSR 13 MP 10.5
END PROJECT
Laur el R un
Curve = FSR 13_MP 10.5_1
10+30 to 12+90
Gravel Road Reconstruction
NAIL 1.11A
CP 1.11C
CP 1.11B
Construction Centerline
Gravel Roadway
Proposed Edge of
11+41.00, 30°00'00" Skew, 46 lnft
8' Span x 5' Rise RCBC Install
See Sheet K17 for Details
Remove Existing Cross Pipes
. See Box Culvert and Wingwall Special Details, Sheets E602 - E602B.2
Property owner: U.S. Forest Service.1.
NOTES:
R o a d W id th
S h o u ld e r s
Stake Limits
Approximate Slope
FSR 13 (Loop Road)
Curve = FSR 13_MP 10.5_2
Rolled Erosion Control Product Type 5.F (Without Engineered Anchors)
Length=24', Average Width= 16.5', Depth= 2.5'
Place Riprap, Method A, Class 4
Wingwall 1
Wingwall 2
Wingwall 3
Wingwall 4
Surface Area = 6 sqyd, Min. Depth = 2.6'
Place Riprap, Method A, Class 4
Surface Area = 4 sqyd, Min. Depth = 2.6'
Place Riprap, Method A, Class 4
REVISED CALLOUT
03/26/26
U.S. DEPARTMENT OF TRANSPORTATION MONONGAHELA NATIONAL FOREST
PLAN-PROFILE
FSR 13 - MP 10.5
SCHEDULE C (DSR 2019-1.11)
N
Scale in feet
40302010 100
:5
M a r c h
D
S R
P la n
S h e t] b m s \w s p u s p w
\d
\D
S R
P la n .d g n
STATE PROJECT
NUMBER
SHEET
WV
2018-1(1)
WV ERFO FS MNGAH921
F08
AGRICULTURE
ECREMMOC
E E
S S
E
NNET F
O
E
T A
T S
R E
E
NI
GNE DERE
TSI
G E
R
732801 .ON
N O
S
NHOJ .P
N
AI
R
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,910
2,900
2,920 2,920
2,930 2,930
2,940
2,950
2,910
2,900
2,940
2,950
2,9602,960
2,9702,970
Offset = 49.37'
Invert = 2914.01'
81+92.11
Gravel Trail Reconstruction
Offset = 40.17'
Invert = 2919.85'
81+96.39
6.64% Slope.
60" Culvert Size, 88' Length, Install RCP:
See Standard 601-5
Install Concrete Wingwall
TR 312
81+94.56
Skew = 02°42'48"
Des.Grade = 2947.18
Subgrade = 2946.35
Original Grade = 2952.81
2,9802,980
Existing Ground
1V:
1.
6H
CL
TR 312
See Standard 601-5
Install Concrete Wingwall
-3.0%-3.0%
1V:1.6H
E X
R
O W
O F
F S
E T
.2
Length= 20.5', Width= 30.0', Depth = 2.5'
Place Riprap, Method A, Class 4
Elev. 2922.51
Water Mark
Ordinary High
1V:3 H 1V:3H
2,900
2,920
2,910
E X
R
O W
O F
F S
E T
.1
S
E A
B O
V E
M A
T C
H L
IN
E
.0
S E
E B
E L
O W
M A
T C
H L
IN
E
.0
See Detail E629-01
RECP, Type 5.B with Turf Establishment
4-ft above that.
Then Separated Every
Up to Elevation 2923'.
Separated by 2-ft Height
Soil Stabilization Geogrid (Typ.)
at a Location Directed by the CO.
4'x3' Stacked Stone Culvert and Headwalls
Remove and Stockpile Stone from Existing
Geogrid-Reinforced Select Borrow
Stone Culvert and Replace with
Full Excavation to Remove Existing
REVISED CALLOUT
U.S. DEPARTMENT OF TRANSPORTATION
TR 312 - MP 1.0
MONONGAHELA NATIONAL FOREST
CULVERT CROSS SECTION
SCHEDULE B (DSR 2018-2.8)100
Scale in feet
6. Extend geogrid from end to end of the proposed embankment.
in FP-14, Section 714.
5. Provide Type II geogrid reinforcement meeting Stabilization Geogrid requirements appropriate soil classification.
4. Complete compaction in accordance with Section 204.11 of FP-14 for the
3. Limit maximum lift thickness for each compacted embankment layer to 12 inches.
2. Use backfill material in accordance with FP-14 Select Borrow requirements.
30 days before starting reinforced soil slope construction.
1. Submit documents required in the Reinforced Soil Slopes Section of FP-14 at least
NOTES:
:3
M a r c h
D
S R
B o x c u lv e r t x s e c ti o n
.5
S h e t] b m s \w s p u s p w
\d
\D
S R
P la n
.d g n
2018-1(1)
WV ERFO FS MNGAH921
K10
STATE PROJECT
NUMBER
SHEET
WV
AGRICULTURE
ECREMMOC
E E
S S
E
NNET F