About this file

This is Amendment No. 0002 to Federal Highway Administration solicitation 693C73-26-B-000006 for the Monongahela National Forest project WV ERFO FS MNGAH921-2018(1), issued by the Eastern Federal Lands Highway Division on March 10, 2026, effective April 20, 2026. The amendment serves two purposes: providing clarification responses to bidder questions and rescheduling the bid opening date to April 28, 2026 at 2:00 p.m. EDT. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

The amendment addresses seven technical clarifications regarding project specifications and pay items. Key responses include: riprap specifications are found in the plans and Section 251 of the FP-14 standard specifications; Contractor-furnished Reinforced Soil Slope Design applies specifically to engineered anchor system design at two sites (DSR 2018-2.4 and DSR 2018-2.7); the 8' x 5' reinforced concrete box culvert is paid under pay items 55201-0200 and 55401-2000 using steel and concrete quantities since it is cast-in-place rather than precast; prefabricated steel truss pedestrian bridges require weathering steel with natural coating and no specified coatings; subsurface conditions are described in the Geotechnical Report and Addendum with boring log data, though localized variability may occur during construction; stacked stone culvert removal uses pay item 20301-0300; and the RCBC box culvert and wingwalls are also paid under items 55201-0200 and 55401-2000. Offers must acknowledge receipt of this amendment prior to the April 28, 2026 bid opening date by completing blocks 8 and 15 of the form, referencing the solicitation and amendment number.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7326B000006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: Construction

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: Acquisitions

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1404/20/20260002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/10/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project WV ERFO FS MNGAH921 2018-1(1)

The purpose of this Amendment is to:

1. Provide a summary of responses to questions and clarifications asked by interested bidders.

2. Reschedule the Bid Opening date to April 28, 2026 at 2:00 p.m. EDT.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0002

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project WV ERFO FS MNGAH921-2018(1)

Monongahela National Forest

Solicitation: 693C73-26-B-000006

The purpose of this Amendment is to:

1. Provide a summary of responses to questions and clarifications asked by interested bidders.

2. Reschedule the Bid Opening date to April 28, 2026 at 2:00 p.m. EDT.

Questions / Clarifications

The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The

Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. We are unable to locate riprap sizes and specifications in the contract documents. Please provide the required riprap classification, gradation, thickness, and any applicable specifications.

Response: Riprap classes and methods of installation are specified in the plans. Section 251 of the FP-14 provides specifications for materials and construction requirements for riprap.

2. What are the expectations and scope related to Contractor furnished Reinforced Soil Slope design? Is this related to the Concrete Lagging design work or soil slope design involving geogrids, and stone backfill designs?

Response: The item Contractor furnished Reinforced Soil Slope Design was included in the

Quantities by Site for two locations: DSR 2018-2.4 and DSR 2018-2.7. At both sites, the slide mitigation design includes the item Rolled Erosion Control Product Type 5.F, With

Engineered Anchors. The Contractor furnished Reinforced Soil Slope Design pay item covers the Contractor’s responsibility for designing the engineered anchor system. This design is to be completed based on the actual conditions encountered during construction and in accordance with the specifications and minimum requirements for this system included in the drawings, Geotechnical Addendum, and SCRs from the project.

mailto:eflhd.contracts@dot.gov

3. Please clarify how the 8' x 5' RCBC listed in Schedule C is to be paid. Specifically, which pay item should be used for this work?

Response: Payment for the box culvert and wingwalls are under the 55201-0200 and 55401-

2000 pay items. Steel and concrete quantities were used because this box culvert is cast in place rather than precast.

4. We are finding some ambiguity regarding the finish of the pedestrian bridges. Would you mind clarifying please if they are to get coated or just sandblasted for a natural finish?

Response: The prefabricated steel truss pedestrian bridges have no specified coatings and should be weathering steel with a natural coating.

5. Can the Government provide guidance on the expected subsurface conditions for the drilled shaft locations, including an estimated breakdown of drilling through soil versus rock?

Response: The Geotechnical Report and Geotechnical Addendum for this project provide boring log data describing the anticipated subsurface conditions for the pile walls, including the depth to the top of bedrock at each boring location. This information is intended to serve as a reference for design and construction planning. However, localized subsurface variability may occur and can only be definitively identified during construction.

6. On sheet C02, line item B1100 states removal of box culvert, but when referencing sheet

E07, drawing refers to removal of stacked stone culvert. Is this just an error in verbiage of pay item description?

Response: No. Pay item 20301-0300 is to be used for the removal of the stacked stone culvert. This pay item was determined to be the best fit, as there is no FP-14 pay item specifically for removal of a stacked stone culvert.

7. On sheet number F08, the drawings refer to installation of 8' x 5' x 46' RCBC (reinforced concrete Box Culvert), but we cannot find a line item/pay item number on any schedule for this feature of work. Can the Government please provide clarification?

Response: Payment for the box culvert and wingwalls are under the 55201-0200 and 55401-

2000 pay items. Steel and concrete quantities were used because this box culvert is cast in place rather than precast.