Results of Bid Opening - PR ER DOT PRMNT RPR(27).pdf

PDF 421 KB Posted

Attached to
Sign and Safety Repairs - Metro, North, and South Regions
Solicitation number
693C73-26-B-000002
Issued by

About this file

This is a Bid Opening Abstract for a Federal Highway Administration (FHWA) Eastern Federal Lands Highway Division solicitation for signing and guardrail repairs on project AC-817578 (PR ER DOT PRMNT RPR(27)). The bid opening occurred on January 29, 2026, at 2:00 p.m. local time in Ashburn, VA, under Solicitation No. 693C73-26-B-000002. The project is structured with five separate schedules (A through E) that can be awarded together or independently. Combined performance is 1,145 calendar days, with individual schedule durations of 260 days (Schedule A), 475 days (Schedule B), 345 days (Schedule C), 315 days (Schedule D), and 435 days (Schedule E).

Seven bids were received with the following total prices for all combined schedules: Caribbean Sign Supplies Manufacturers, Inc. ($14,969,047.00) - the apparent low bidder; H&E and OEG JV, LLC ($15,979,086.51); Master Pavement Line Corp ($15,629,510.00); JC & Associates Property Management Group Inc ($15,784,000.00); Desarrolladora J.A., Inc. ($21,616,611.00); J.M. Caribbean Builders Corp ($18,194,440.00); and Engineer's Estimate ($21,410,000.00). EFL is conducting a thorough review and verification of all submitted information, and the apparent low bidder will be contacted upon completion of this evaluation. Award has not been finalized pending this review process.

View the file

Other files

File Type Posted
Amendment 0003 - PR ER DOT PRMNT RPR(27).pdf PDF
Amendment 0002 - PR ER DOT PRMNT RPR(27).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(27).pdf PDF
Lead Based Paint Report - 817578 PR-722.pdf PDF
Asbestos Containing Materials Report - 817578 PR-715.pdf PDF
Asbestos Containing Materials Report - 817578 PR-171.pdf PDF
Asbestos Containing Materials Certification - 831578 PR-510.pdf PDF
Asbestos Containing Materials and Lead Based Paint Certification - 817578 PR-743.pdf PDF
Asbestos Containing Materials Report - 832578 PR-887.pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 831578 - Part 1 of 7.pdf PDF
Lead Based Paint Report - 817578 PR-725.pdf PDF
Lead Based Paint Report - 831578 PR-505.pdf PDF
Lead Based Paint Report - 831578 PR-139.pdf PDF
Asbestos Containing Materials and Lead Based Paint Certification - 831578 PR-501.pdf PDF
Categorical Exclusion Form (NEPA) Appendices - Part 1 of 8.pdf PDF
Asbestos Containing Materials Report - 817578 PR-720.pdf PDF
Lead Based Paint Report - 833578 PR-143.pdf PDF
Asbestos Containing Materials Report - 831578 PR-14.pdf PDF
Lead Based Paint Report - 817578 PR-7718.pdf PDF
Asbestos Containing Materials and Lead Based Paint Certification - 831578 PR-545.pdf PDF
Asbestos Containing Materials and Lead Based Paint Certification - 817578 PR-720.pdf PDF
Lead Based Paint Report - 817578 PR-743.pdf PDF
Section 106 Report - 832578 833578 - Part 3 of 11.pdf PDF
Asbestos Containing Materials Report - 817578 PR-7718.pdf PDF
Section 106 Report - 831578 - Part 3 of 6.pdf PDF
Lead Based Paint Report - 832578 PR-8860.pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 834578 - Part 3 of 5.pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 833578 - Part 6 of 8.pdf PDF
Lead Based Paint Report - 833578 PR-523.pdf PDF
Categorical Exclusion Form (NEPA) - 817578 831578 832578 833578 834578.pdf PDF
Lead Based Paint Report - 831578 PR-545.pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 817578.pdf PDF
Lead Based Paint Report - 817578 PR-738.pdf PDF
Lead Based Paint Report - 831578 PR-510.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Asbestos Containing Materials and Lead Based Paint Certification - 817578 PR-723.pdf PDF
Section 106 Report - 832578 833578 - Part 8 of 11.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Asbestos Containing Materials and Lead Based Paint Certification - 831578 PR-500.pdf PDF
Asbestos Containing Materials Certification - 817578 PR-725.pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 831578 - Part 2 of 7.pdf PDF
Lead Based Paint Report - 833578 PR-526.pdf PDF
Lead Based Paint Report - 832578 PR-874.pdf PDF
Lead Based Paint Report - 831578 PR-501.pdf PDF
Asbestos Containing Materials Certification - 817578 PR-569.pdf PDF
Asbestos Containing Materials Report - 832578 Ave Sanchez Osorio (PR-72).pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 833578 - Part 1 of 8.pdf PDF
Asbestos Containing Materials Report - 832578 PR-187.pdf PDF
Lead Based Paint Report - 833578 Street C.pdf PDF
Plans - PR ER DOT PRMNT RPR(27) - 833578 - Part 3 of 8.pdf PDF
Show 40 more

Latest 50 of 192 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration

Eastern Federal Lands Highway Division

Bid Opening for

Signing and Guardrail Repairs on AC-817578

PROJECT: PR ER DOT PRMNT RPR(27)

SOLICITATION NO. 693C73-26-B-000002

January 29, 2026, at 2:00 p.m.

Ashburn, VA

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award, the low bidder will be contacted once a thorough review has been completed.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-26-B-000002

Project: PR ER DOT PRMNT RPR(27)

January 29, 2026, 2:00 p.m. local time

The performance period for the completion of Schedule A+B+C+D+E is 1145 calendar days.

The performance period if schedules are awarded separately: 260 calendar days for Schedule A, 475 calendar days for Schedule B, 345 calendar days for Schedule C, 315 calendar days for Schedule D, and 435 calendar days for Schedule E.

BIDDER SCHEDULE TOTAL TOTAL PRICE

Caribbean Sign Supplies

Manufacturers, Inc.

SCHEDULE A

$4,310,870.00

SCHEDULE B

$3,546,239.00

SCHEDULE C

$2,449,292.00

SCHEDULE D

$2,540,571.00

SCHEDULE E

$2,109,775.00

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$14,969,047.00

Desarrolladora J.A., Inc. SCHEDULE A

$5,416,735.00

SCHEDULE B

$5,291,520.00

SCHEDULE C

$4,102,300.00

SCHEDULE D

$3,557,826.00

SCHEDULE E

$3,248,230.00

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$21,616,611.00

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award, the low bidder will be contacted once a thorough review has been completed.

BID OPENING for SOLICITATION NO. 693C73-26-B-000002

Project: PR ER DOT PRMNT RPR(27)

January 29, 2026, 2:00 p.m. local time

The performance period for the completion of Schedule A+B+C+D+E is 1145 calendar days.

The performance period if schedules are awarded separately: 260 calendar days for Schedule A, 475 calendar days for Schedule B, 345 calendar days for Schedule C, 315 calendar days for Schedule D, and 435 calendar days for Schedule E.

BIDDER SCHEDULE TOTAL TOTAL PRICE

H&E and OEG JV, LLC SCHEDULE A

$4,200,260.08

SCHEDULE B

$4,182,906.23

SCHEDULE C

$3,128,649.37

SCHEDULE D

$2,266,176.05

SCHEDULE E

$2,201,094.78

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$15,979,086.51

J.M. Caribbean Builders Corp SCHEDULE A

$5,472,200.00

SCHEDULE B

$4,251,900.00

SCHEDULE C

$3,123,195.00

SCHEDULE D

$2,894,545.00

SCHEDULE E

$2,452,600.00

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$18,194,440.00

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award, the low bidder will be contacted once a thorough review has been completed.

BID OPENING for SOLICITATION NO. 693C73-26-B-000002

Project: PR ER DOT PRMNT RPR(27)

January 29, 2026, 2:00 p.m. local time

The performance period for the completion of Schedule A+B+C+D+E is 1145 calendar days.

The performance period if schedules are awarded separately: 260 calendar days for Schedule A, 475 calendar days for Schedule B, 345 calendar days for Schedule C, 315 calendar days for Schedule D, and 435 calendar days for Schedule E.

BIDDER SCHEDULE TOTAL TOTAL PRICE

JC & Associates Property

Management Group Inc

SCHEDULE A

$4,924,668.00

SCHEDULE B

$3,785,250.00

SCHEDULE C

$2,622,014.00

SCHEDULE D

$2,409,014.00

SCHEDULE E

$2,043,054.00

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$15,784,000.00

Master Pavement Line Corp SCHEDULE A

$4,751,854.24

SCHEDULE B

$3,484,823.04

SCHEDULE C

$2,681,322.84

SCHEDULE D

$2,485,880.94

SCHEDULE E

$2,225,628.94

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$15,629,510.00

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award, the low bidder will be contacted once a thorough review has been completed.

BIDDER SCHEDULE TOTAL TOTAL PRICE

Engineer’s Estimate SCHEDULE A

$6,395,000.00

SCHEDULE B

$5,055,000.00

SCHEDULE C

$3,855,000.00

SCHEDULE D

$3,065,000.00

SCHEDULE E

$3,040,000.00

SCHEDULE A + SCHEDULE B + SCHEDULE C +

SCHEDULE D + SCHEDULE E =

$21,410,000.00

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-26-B-000002

Project: PR ER DOT PRMNT RPR(27)

January 29, 2026, 2:00 p.m. local time

The performance period for the completion of Schedule A+B+C+D+E is 1145 calendar days.

The performance period if schedules are awarded separately: 260 calendar days for Schedule A, 475 calendar days for Schedule B, 345 calendar days for Schedule C, 315 calendar days for Schedule D, and 435 calendar days for Schedule E.

*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award, the low bidder will be contacted once a thorough review has been completed.

Slide 1
Slide 2: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-26-B-000002 Project: PR ER DOT PRMNT RPR(27) January 29, 2026, 2:00 p.m. local time The performance period for the completion of Schedul
Slide 3: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-26-B-000002 Project: PR ER DOT PRMNT RPR(27) January 29, 2026, 2:00 p.m. local time The performance period for the completion of Schedul
Slide 4: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-26-B-000002 Project: PR ER DOT PRMNT RPR(27) January 29, 2026, 2:00 p.m. local time The performance period for the completion of Schedul
Slide 5: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-26-B-000002 Project: PR ER DOT PRMNT RPR(27) January 29, 2026, 2:00 p.m. local time The performance period for the completion of Schedul

File details come from the government source that posted it. Updated .